0% found this document useful (0 votes)
4 views5 pages

Dbmsproject Info

Uploaded by

developerram911
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views5 pages

Dbmsproject Info

Uploaded by

developerram911
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

project models a comprehensive database for managing various aspects of an airline's operations, including airplane

information, airport data, employee details, flight schedules, and customer bookings. Here's a detailed explanation of
each part of the project:

### 1. **Airplane Information Management**

#### Tables:
* **AIRPLANESINFO**: This table stores information about different types of airplanes.

- `P_TYPE`: The type of the airplane (Primary Key).

- `P_WEIGHT`: The weight of the airplane.

- `FUEL`: The fuel capacity of the airplane.

- `PASSENGERS`: The passenger capacity of the airplane.

* **AIRPLANES**: This table stores individual airplane records.

- `P_ID`: The unique ID of the airplane (Primary Key).

- `P_TYPE`: The type of the airplane (Foreign Key referencing `AIRPLANESINFO`).

- `MAINTAINANCE`: The maintenance status of the airplane.

### 2. **Airport Information Management**

#### Tables:

* **AIRPORTSINFO_LOC**: This table stores location-based information about airports.

- `A_LOC`: The location of the airport (Primary Key).

- `A_RANK`: The rank of the airport.

- `PLANES_CAPACITY`: The plane capacity of the airport.

* **AIRPORTSINFO_NAME**: This table stores name-based information about airports.

- `A_NAME`: The name of the airport (Primary Key).

- `A_LOC`: The location of the airport (Foreign Key referencing `AIRPORTSINFO_LOC`).

* **AIRPORTSINFO_ID**: This table maps airport IDs to their names.

- `A_ID`: The unique ID of the airport (Primary Key).

- `A_NAME`: The name of the airport (Foreign Key referencing `AIRPORTSINFO_NAME`).

### 3. **Employee and Salary Management**

#### Tables:

* **SALARY**: This table stores salary information based on job titles and locations.

- `JOB`: The job title (Primary Key).


- `A_LOC`: The location of the job (Foreign Key referencing `AIRPORTSINFO_LOC`).

- `SALARY`: The salary for the job.

* **EMP**: This table stores information about employees.

- `E_ID`: The unique ID of the employee (Primary Key).

- `E_NAME`: The name of the employee.

- `E_EMAIL`: The email of the employee.

- `JOB`: The job title of the employee (Foreign Key referencing `SALARY`).

- `A_LOC`: The location of the job (Foreign Key referencing `AIRPORTSINFO_LOC`).

- `JOINDATE`: The join date of the employee.

### 4. **Customer Management**

#### Table:

* **CUSTOMER**: This table stores information about customers.

- `C_ID`: The unique ID of the customer (Primary Key).

- `C_NAME`: The name of the customer.

- `C_EMAIL`: The email of the customer.

- `NO_OF_FLIGHTS`: The number of flights the customer has taken.

### 5. **Flight and Booking Management**

#### Tables:

* **FLIGHT**: This table stores basic information about flights.

- `F_ID`: The unique ID of the flight (Primary Key).

- `P_ID`: The ID of the airplane used for the flight.

- `FROMA_ID`: The ID of the departure airport.

- `TOA_ID`: The ID of the destination airport.

- `DEPARTURE`: The departure time of the flight.

* **FLIGHTINFO**: This table stores detailed information about flights, including arrival time and fare.

- `F_ID`: The unique ID of the flight (Primary Key).


- `P_ID`: The ID of the airplane used for the flight.

- `FROMA_ID`: The ID of the departure airport.

- `TOA_ID`: The ID of the destination airport.

- `DEPARTURE`: The departure time of the flight.

- `ARRIVAL`: The arrival time of the flight.

- `FARE`: The fare of the flight.

* **FLIGHTINFO_EMP**: This table stores the relationship between flights and employees.

- `F_ID`: The ID of the flight (Foreign Key referencing `FLIGHT`).

- `E_ID`: The ID of the employee (Foreign Key referencing `EMP`).

* **FLIGHTINFO_CUSTOMER**: This table stores the relationship between flights and customers.

- `SEQ`: A sequence number for the entry.

- `C_ID`: The ID of the customer (Foreign Key referencing `CUSTOMER`).

- `F_ID`: The ID of the flight (Foreign Key referencing `FLIGHT`).

- `PRIMARY KEY(C_ID, F_ID)`: Composite primary key.

### 6. **Triggers and Sequences**

* **Trigger `FLIGHT_INFO_TRIGGER`**: This trigger automatically inserts records into the `FLIGHTINFO` table after a new
flight is inserted into the `FLIGHT` table, setting the arrival time and fare based on specific conditions.

* **Sequence `CUSTOMER_IN_FLIGHT`**: This sequence generates unique values for entries in the
`FLIGHTINFO_CUSTOMER` table, with a maximum value of 100 and no cycling.

### **Sample Data Insertion**

The project includes sample data insertion for testing and demonstrating the database functionality. This involves
inserting records into all the tables to represent a realistic scenario of an airline's operations.

### **Overall Functionality**

The designed database allows the management of:

* Different types of airplanes and their specifications.


* Airports and their capacities and rankings.

* Employees, their jobs, salaries, and locations.

* Customers and their flight histories.

* Flights, including departure, arrival, airplane details, and associated fares.

* The relationship between flights and both employees and customers, ensuring efficient tracking and management of
flight operations and bookings.

The trigger ensures that certain business rules are enforced automatically, and the sequence helps in maintaining unique
booking entries.

This model provides a comprehensive framework for managing an airline's database, ensuring efficient and organized
storage and retrieval of information.

You might also like