AEE Syllabus
AEE Syllabus
7. Rules and procedure relating to Tenders and contracts for execution of works and
Procurement of Stores, M&P Programme and RSP.
8. Procedure for Possessing and finalizing Audit Objections and Draft Paras.
9. Delegation of Powers.
A. Professional Subjects:
7. Power System and Protection: Basic concepts of electrical power generation and
various equipment. Concepts of transmission lines, cables, Series and shunt
compensation, Electric field distribution and insulators, Distribution systems,
Per unit quantities, Circuit breakers, Concept of protection.
g. Lift & Escalator: Working of Lift & Escalator, Installation of Lift and Escalator.
Maintenance, various safety devices, control panels & Safety aspects.
2. Traction distribution:
a. OHE: Basic design concepts of TRD system of conventional and 2x25kV system.
Types of overhead equipment. Sectioning principles of OHE. Various parts of
OHE. Foot Patrolling, current collection, Tower wagons, seasonal & cyclic
checks, maintenance Schedule, Preventive maintenance Tools, failure
investigation of OHE, earthing and bonding. Railway Electrification and process
of construction. Power Blocks & Procedure to obtain it.
d. NDT techniques, Open Access, safety precautions for electrified sections, Latest
development in TRD, MSG meetings. Instructions issued by Railway Board,
Systems of Train Lighting and Air conditioning on coaches, Self Generating Coaches,
ICF TL/AC Coach Generation system. Equipment, circuits and protection in ICF TL/AC
coaches. Emergency feed extension in coaches. EOG and HOG systems in coaches -
Hotel Load converter and Interlocking panel. Equipment, power circuits and protection
systems in LHB TL/AC coaches, Power car and Pantry car. Air Conditioning in ICF/LHB
coaches, Heat Load Calculation, Precooling, Pulldown and Dynodrive tests.
Maintenance schedules of ICF and LHB coaches. Duties of ACCM/ACCA. Pre-cooling
of AC Coaches. Fire causes and prevention measures in coaches. SMIs, Modification
Sheets and Technical circulars issued by RDSO and instructions by Railway Board and
RDSO.
4. Electric Locos:
Organizational structure and duties of officers & staff. Conventional AC & 3 phase
locomotives on IR. Equipment in locomotives, their functioning / operations,
maintenance / overhauling and testing parameters & maintenance schedules. Reliability
& safety action plans. Traction Power Circuit, Auxiliary Circuit, Control Circuits and
Pneumatic Circuits. Different types of braking arrangements. Locomotive maintenance
schedules & various tests to be carried out. Working of Electric Loco Shed & Electric
Loco Workshop. Safety items and safety checks involved in safe locomotive operation.
Relevant paras of ACTM, Accident Manual, G&SR, IR SOD and Instructions issued by
Railway Board, RDSO and CLW. Latest developments in the field of electric
locomotives.
7. Store Matters:
Procedure related to procurement of stock items and non-stock items, distribution and
accountal of stores. Receipt and custody of stores. Sale of surplus stores. Inventory
management, ABC Analysis. Procurement through GeM, IREPS. Schedule of powers
under stores matters.
Work proposals, Types of estimates & estimation stages. Type of tenders, earnest
money, Performance guarantee, security deposit, technical & financial eligibility criteria,
Merits and demerits of EPC tender. IRPMS. Procedure and stages of e-tendering
through IREPS, General Condition of Contract (GCC) for works and service contracts,
various provisions in Schedule of Power (SOP) under works matters, Basic principles of
Project management, quality control in electrical works.
Syllabus for 30% LDCE for promotion to Group 'B' post of AEE in Electrical
Department.
A. Professional Subjects :
Laws, DC & AC circuit analysis, Magnetic circuits and analysis, Poly phase circuit
analysis.
2. Electronic Devices & Analog Electronics: Energy Band Theory of Solids, Intrinsic and
Extrinsic Semiconductors Doping, Doping Materials, Carrier Mobility, Conductivity,
Semiconductor Diodes, Diode Rectifiers, Bipolar Junction Transistor, JFET, MOSFET,
Transistor Biasing Circuits. CE, CB and CC modes of transistor. Using transistors as
amplifiers and switches. Characteristics of an Operational Amplifier Applications of
Op-Amp as an Inverting and Non-Inverting Amplifier, Integrator, Differentiator, Summing
and Subtracting Amplifier and Logarithmic Amplifier. Differential Amplifier - Calculation
of common mode rejection ratio, Active & Passive Filters.
3. Digital Electronics: Number Systems, Basic Logic Gates & Boolean Algebra, Digital
Logic Gate Characteristics, Minimization Techniques, Combinational Logic Circuits, Flip
flops and Sequential Circuits.
8. Power System and Protection: Basic concepts of electrical power generation and
various equipment. Concepts of transmission lines, Models and performance of
transmission lines and cables, Series and shunt compensation, Electric field distribution
and insulators, Distribution systems, Per unit quantities, Bus admittance matrix, Load
flow methods, Power factor correction, Symmetrical components, Symmetrical and
Asymmetrical fault analysis, Principles of various protection system,
Circuit breakers, Latest research in the field of power system.
1. General Services:
e. Lift & Escalator: Working of Lift & Escalator, Installation of Lift and Escalator.
Maintenance, various safety devices, control panels & Safety aspects.
2. Traction distribution:
a. OHE: Basic design concepts of TRD system of conventional and 2x25kV system.
Types of overhead equipment. Sectioning principles of OHE. Various parts of
OHE. Foot Patrolling, current collection, Tower wagons, seasonal & cyclic
checks, maintenance Schedule, Preventive maintenance Tools, failure
investigation of OHE, earthing and bonding. Railway Electrification and process
of construction. Power Blocks & Procedure to obtain it.
d. NDT techniques, Open Access, safety precautions for electrified sections, Latest
development in TRD, MSG meetings. Instructions issued by Railway Board,
3. Train Lighting and AC Coaches: Systems of Train Lighting and Air conditioning on
coaches, Self Generating Coaches, ICF TL/AC Coach Generation system. Circuits and
protection in ICF TL/AC coaches, Emergency feed extension in coaches. Air
Conditioning in coaches, Heat Load Calculation, Precooling and Pulldown Tests.
Dynodrive test. 25 kVA coach inverter, Water raising apparatus. EOG and HOG
systems in coaches- Hotel Load converter and Interlocking panel. Power and control
circuits and protection systems in LHB TL/AC coaches, Power car, Pantry car, AC
Double Decker, AC 3Tier Economy and LSLRD coach. HVAC Microcontroller and
Electronic equipment in LHB coaches. LHB pantry car and its equipment. Push pull
train operation. Maintenance schedules of ICF and LHB coaches, Pantry cars and
Power cars. Manufacturing, POH and IOH activities of coaches. Commissioning tests
and Special Repair. Circuits, working and maintenance of Passenger amenities items in
ICF/LHB coaches. Coaching depot working, Primary & Secondary maintenance, Sick
line attention, Pit occupation chart, Rake links and Coach requirement, Staff yardsticks
and benchmarking. Duties of ACCM/ACCA. Pre-cooling of AC Coaches. Features of
ICMS. Unit exchange spares. Fire causes and prevention measures in coaches. SMIs,
Modification Sheets and Technical circulars issued by RDSO and instructions by
Railway Board and RDSO. Reliability Action plan, recent developments in coaches.
4. Electric Locos: Organizational structure and duties of officers & staff. Conventional
AC & 3 phase locomotives on IR. Equipment in locomotives, their functioning /
operations, maintenance / overhauling and testing parameters & maintenance
schedules. Reliability & safety action plans. Traction Power Circuit, Auxiliary Circuit,
Control Circuits and Pneumatic Circuits. Different types of braking arrangements.
Locomotive maintenance schedules & various tests to be carried out. Working of
Electric Loco Shed & Electric Loco Workshop. Safety items and safety checks involved
in safe locomotive operation. Relevant paras of ACTM, Accident Manual, G&SR, IR
SOD and Instructions issued by Railway Board, RDSO and CLW. Latest developments
in the field of electric locomotives.
6. Electric Loco and EMU Operation: Organizational structure and duties of officers &
staff. Crew management Training, Monitoring & Counseling. Crew & loco links.
HOER Rules. Loco utilization. SPAD (Signal Passing At Danger). Management of Crew
lobby, running room, trips shed & TLC / Power controller office. Working of CMS &
FOIS. Safe, punctual & efficient loco / EMU operation with online troubleshooting of
locomotive / EMU failures. Relevant paras of ACTM, Accident Manual, G&SR and
Instructions issued by Railway Board & RDSO. Latest developments in the field of
electric locomotives / EMU operations.
7. Store Matters: Procedure related to procurement of stock items and non-stock items,
distribution and accountal of stores. Receipt and custody of stores. Sale of surplus
stores. Inventory management, ABC Analysis. Procurement through GeM, IREPS.
Schedule of powers under stores matters.
8. Tenders and Contracts: Work proposals, Types of estimates & estimation stages,
procedure of survey, Type of tenders, earnest money, Performance guarantee, security
deposit, technical & financial eligibility criteria, Merits and demerits of
EPC tender. IRPMS. Procedure and stages of e-tendering through IREPS, General
Condition of Contract (GCC) for works and service contracts, various provisions in
Schedule of Power (SOP) under works matters, Basic principles of Project
management, quality control in electrical works.