0% found this document useful (0 votes)
24 views12 pages

Module 5

upda test exam support
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views12 pages

Module 5

upda test exam support
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 12

MODULE-5

1. An alternator is said to be over excited when it is operating at:

Unity power factor

Leading power factor

Lagging power factor

Lagging to leading power factor


Correct Answer : c

Explanation : "An alternator is considered overexcited when the back emf voltage
has a greater magnitude than the terminal voltage. Over excitation is characterized
by positive reactive power flow out of the generator terminals. The excitation is
controlled by the current flowing in the field winding. As the excitation is increased,
the armature current will have a phase angle that increases in the lagging direction.

2. A synchronous motor is said to be over excited when it is operating at:

Unity power factor

Leading power factor

Lagging power factor

Lagging to leading power factor


Correct Answer : b

Explanation : If DC field excitation of a synchronous motor is such that back EMF Eb


is greater than applied voltage V, then the motor is said to be over-excited. An over-
excited synchronous motor draws leading current. Therefore, if the field of the
synchronous motor is overexcited then its power factor will be leading.

3. A micro antenna is:

Integrated antenna

Long Antenna

Short Antenna
Medium Antenna
Correct Answer : a Explanation : An micro antenna is an
antennas for a variety of services to be integrated into one single module. Hence it
is an integrated antenna

4. What is primary use for fast track scheduling:

To decrease the cost of construction

To decrease the cost of professional services

To avoid future cost increase

To guarantee project cost prior to the start of building


Correct Answer : d

Explanation : Fast-tracking is a technique where activities that would have been


performed sequentially using the original schedule are performed in parallel. In
other words, fast tracking a project means the activities are worked on
simultaneously instead of waiting for each piece to be completed separately. Hence
it guarantee project cost prior to the start of building

5. The direction of the force acting on a moving charge place in a magnetic


field is:

Perpendicular to the magnetic field

Opposite to the direction of motion of the charge

Along the direction of the magnetic field

Along the direction of motion of the charge


Correct Answer : a
Explanation

6. The unit of conductance is:

ohm

ohm/m

mho/m

mho
Correct Answer : d

Explanation : Conductance is the inverse of resistance (Ohm) so the inverse unit is


mho

7. For the circuit shown phase shift of the transfer function V/Vo at very high
frequencies is:

90°


80°

180°
Correct Answer : a

Explanation : At high frequency, the value of Capacitance reactance Xc is very low


and has very low impact and the inductive reactance is very high (Directly
proportional to Frequency) it produces a phase shift of only 90°

8. The wire placed on the top of a transmission line is a:

Phase wire

Neutral wire

Transmission wire

Ground wire
Correct Answer : d

Explanation : "Top of the cable is ground wire rest and other (1 or 3 lines) are phase
cables. It is just for the protection from lighting strikes. They serve to shield the line
and intercept lighting stroke before it hits the current carrying conductors below.
That's why they are often made of steel. "

9.Consider the three-stages RF amplifier shown below AR1 refers to the input
amplifier stage. AR2 to the second stage, AR2 to the second stage and AR3
to the output stage. For this amplifier configuration the total noise figure
(DB) is most nearly:

6.6

8.6

10.5

12.3
Correct Answer : b

Explanation :

10. Of the following engineering disciplines, who would be BEST suited to


design and operate an automobile factory?

Petroleum Engineer

Mechanical Engineer

Civil Engineer

Chemical Engineer
Correct Answer : b

Explanation : A mechanical engineer might work in the automotive industry,


aerospace and transport industries, power generation, refineries, insurance
industries, building services, railway systems design, consumer goods design and
production and management consultancies.

Question 11

Which of the following describes the leakage flux?

A flux outside the core

Flux linking the primary

Flux linking the secondary


Flux other than the mutual flux
Correct Answer : a

Explanation : Leakage flux is the flux outside the core. Other fluxes given in choice
are useful fluxes.

12. Fast Tracking in Project means?

Start the project before the design complete

Fixed cost-plus fee

Planning of Project

None
Correct Answer : a

Explanation : "Fast-tracking is a technique where activities that would have been


performed sequentially using the original schedule are performed in parallel. In
other words, fast tracking a project means the activities are worked on
simultaneously instead of waiting for each piece to be completed separately. "

13. We have three resistance of values 2Ω, 3Ω, 6Ω. Which of the following
combination will give an effective resistance of 4Ω?

All the three resistance in parallel

2 resistance in series with parallel combination of 3 and 6 resistance

3 resistance in series with parallel combination of 2 and 6 resistance

None
Correct Answer : b

Explanation : [(3x6)/(3+6)] + 2 = 4Ω

14. The condition for successful parallel operation of transformer is:

Correct polarity

Per unit impedance based on their rating should be equal

Identical voltage and frequency rating


All of these
Correct Answer : d

Explanation : The convenient are same voltage ratio and turns ratio, same
percentage impedance, same KVA rating, and same position of tap changer. The
mandatory conditions are same phase angle shift, same polarity, same phase
sequence and same frequency.

15. The output of a NOR gate is HIGH if ____________.

all inputs are HIGH

any input is HIGH

any input is LOW

all inputs are LOW


Correct Answer : d

Explanation :

16. Digital telecommunication equipment provides connection oriented


AND/OR connection less service, connection-oriented service is provided by:

ATM

ETHERNET

FDDI

SMDS
Correct Answer : a

Explanation : ATM has made possible the efficient transmission of multimedia


information like voice and video. ATM, however, is connection oriented in nature.
Transmission occurs on virtual channels established prior to transmission. In order
to accommodate the internetworking of more traditional connectionless LANs and
MANs across public wide area networks like B-ISDN, a means by which
connectionless service can be provided on top of connection oriented technologies
must be devised

17. Commercial AM Modulation technique is:

DSB-SC

DSB-LC

QAM

SVAM
Correct Answer : a

Explanation : "Double-sideband suppressed-carrier transmission (DSB-SC) is


transmission in which frequencies produced by amplitude modulation (AM) are
symmetrically spaced above and below the carrier frequency and the carrier level is
reduced to the lowest practical level, ideally being completely suppressed. "

18. For last switching of an NMOS R-pull up inverter (W/L) should be:

Large

Small

Equal to the drain current

Equal to the power dissipated during switching


Correct Answer : c

Explanation : Pull up means getting close VDD. So PMOS has VDD as source,
naturally when input is zero drain (Equal to drain current) would be pulled up. When
output at zero PMOS turns on, it will be pulled high.

19. A real time kernel is considered a “bare bones” real-time operating


system. At a minimum a kernel should provide:

Task management, file management, memory management

Task scheduling, task dispatching, file management


Inter-task communication, task dispatching, memory allocation

Task scheduling, task dispatching, inter-task communication.


Correct Answer : a

Explanation : kernel is responsible for memory management, process and task


management, and disk management.

20. A certain communication signal uses a bandwidth BW of 2kHz. What is


the classification of this signal?

Voice grade VHF

Narrowband VLF

Voice grade HF

Wide band UHF


Correct Answer : b

Explanation : Very low frequency or VLF is the ITU designation for radio frequencies
(RF) in the range of 2–30 kHz, corresponding to wavelengths from 100 to 10 km,
respectively.

21. In medium sized induction motors, the slip is generally around

0.04%

0.40%

4%

14%
Correct Answer : c
Explanation

22. What is the minimum gauge size of the earthing cable?

20 SWG

16 SWG

10 SWG

8 SWG
Correct Answer : b

Explanation : 16 SWG = 0.064” / 1.626mm

23. For forward biasing:

Anode 3V cathode 7V

Anode 5V cathode 3V

Anode 7V cathode 10V

Anode 4V cathode 7V
Correct Answer : b

Explanation : For Forward Biasing Anode potential should be greater than Cathode
Potential

24. Amplifier working with good gain in:


Reverse region

Cutoff region

Active region

Saturated region
Correct Answer : c

Explanation : Transistors operate in active region, they act as amplifiers i.e. they
can be used to increase the strength of the input signal without altering it
significantly

25. What is MOSFET?

Transistor

Thyristor

Amplifier

Oscillator
Correct Answer : a

Explanation : Metal Oxide Semiconductor Field-Effect Transistor

26. In open loop system

the control action depends on the size of the system

the control action depends on system variables

the control action depends on the input signal

the control action is independent of the input signal


Correct Answer : d

Explanation : Then an Open-loop system, also referred to as non-feedback system,


is a type of continuous control system in which the output has no influence or effect
on the control action of the input signal. In other words, in an open-loop control
system the output is neither measured nor “fed back” for comparison with the
input.
27. A circuit breaker is a

Fuse

Switch

Resettable Protective Device

Resistor
Correct Answer : c

Explanation : A circuit breaker is a safety device to prevent damage to motors and


wiring when the current flowing through the electrical circuit supersedes its design
limits. Simply put, a switch is designed to switch power on and off, a circuit breaker
“breaks” the circuit in an overload or fault condition

You might also like