MD-512-0G00-CN-CV-ITP-KB64-0002_C01_C
MD-512-0G00-CN-CV-ITP-KB64-0002_C01_C
MD-512-0G00-CN-CV-ITP-KB64-0002_C01_C
INSPECTION RESPONSIBILITY
Verifying ASSIGNMENTS
ITEM PROJECT PHASE & ACCEPTANCE
Quality Related Activity Reference Document & REMARKS
NO. ACTIVITY CODE CRITERIA
Form #
SEG JACOBS Ma'den/ FLOUR
MD-101-SMEM-EG-ST-SPC-
1.1 Approved Concrete Design Mix
0004
As per ASTM C1202 QCL-Q-001 RH R R
Type I or V Cement
unless otherwise
Ready Mix Concrete receiving MD-101-SMEM-EG-ST-SPC-
2.2
Inspection 0004
specified - ASTM C150, QCL-Q-002 H R R
Aggregates - ASTM C33,
ASTM C586, ASTM C494
3.0 INSTALLATION
MD-101-SMEM-EG-ST-SPC-
3.1 Formworks Inspection
0005
Page 1 of 4
ITP No. DATE DISCIPLINE:
INSPECTION AND TEST PLAN
MD-512-0G00-CN-CV-
ITP FOR CONCRETE WORKS CIVIL
ITP-KB64-0002_C01
PROJECT TITLE: CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
Verifying ASSIGNMENTS
ITEM PROJECT PHASE & ACCEPTANCE
Quality Related Activity Reference Document & REMARKS
NO. ACTIVITY CODE CRITERIA
Form #
SEG JACOBS Ma'den/ FLOUR
MD-101-SMEM-EG-ST-SPC-
3.2 Installation of Reinforcing Bars and Embedded Items
0005
Reinforcement Cut, Bend, As per Bending Schedule, Method Statement for Bar Bending
Formed Dimensions Checking ACI 117, 315
QCL-Q-005 H W S and Fabrications.
Reinforcement Placement
Checking
As per Drawing QCL-Q-005 H W S
Page 2 of 4
ITP No. DATE DISCIPLINE:
INSPECTION AND TEST PLAN
MD-512-0G00-CN-CV-
ITP FOR CONCRETE WORKS CIVIL
ITP-KB64-0002_C01
PROJECT TITLE: CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
Verifying ASSIGNMENTS
ITEM PROJECT PHASE & ACCEPTANCE
Quality Related Activity Reference Document & REMARKS
NO. ACTIVITY CODE CRITERIA
Form #
SEG JACOBS Ma'den/ FLOUR
MD-101-SMEM-EG-ST-SPC-
3.3 Concrete sampling, Testing and Placement
0005
MD-101-SMEM-EG-ST-SPC-
3.4 Formwork Stripping, Concrete Finishing and Curing
0005
Page 3 of 4
ITP No. DATE DISCIPLINE:
INSPECTION AND TEST PLAN
MD-512-0G00-CN-CV-
ITP FOR CONCRETE WORKS CIVIL
ITP-KB64-0002_C01
PROJECT TITLE: CONTRACTOR/SUBCONTRACTOR
INSPECTION RESPONSIBILITY
Verifying ASSIGNMENTS
ITEM PROJECT PHASE & ACCEPTANCE
Quality Related Activity Reference Document & REMARKS
NO. ACTIVITY CODE CRITERIA
Form #
SEG JACOBS Ma'den/ FLOUR
MD-101-SMEM-EG-ST- MD-512-0G00-
4.0 INSPECTION RECORD FOR LEAK TEST ACI 350.1-01 CN-CV-CHK- H H S
SPC-0005, Sec. 6.3 KB64-0024_A01
MD-101-SMEM-EG-ST-SPC-
5.0 Final Acceptance
0005
Repaired(If required) QCL-Q-008 H H R Review and Approval of Documents
LEGEND
W Witness Inspection/Test Hold Point for QC Inspection or Test RH Review and Approval of Documents
R Review of Documents
GENERAL NOTES
1 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
2 Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative is not present.
3 Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.
Page 4 of 4
CHECKLIST NUMBER DATE QR NUMBER
INSPECTION CHECKLIST APPROVED
MD-512-0G00-CN-CV-
INSPECTION RECORD FOR LEAK TEST CHK-KB64-0024_A01
REV.: 01 Civil
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A Preparation work
Prior to the leakage test, the concrete repair work should be done after curing
ACI 350.1-01
A1 work be finished and it should be approved after inspection by JACOBS. Any
Chapter 2
surface defects are not allowed
The cleaning work should be done inside the pit and the exterior side coating work ACI 350.1-01
A2
is not allowed before the leakage test is finished Chapter 2
Standing water in or outside of the tank that would interfere with the observation of ACI 350.1-01
A3
the exposed concrete surfaces of the tank shall be removed. Chapter 2
ACI 350.1-01
A4 All openings should be sealed if have before leak test.
Chapter 2
ACI 350.1-01
A5 The designed level should be issued by JACOBS and marked before leakage test.
Chapter 2
The potable water supplier should be confirmed and the water test report also be
A6 ACI 350.1-01
applied.
The water shall be kept at the test level of unlined concrete tanks for at least three
ACI 350.1-01
A7 days prior to the actual test.If any flow of water is observed from the pit exterior
2.3
surfaces, including joints or cracks, the defect causing the leakage shall be
B Leak test
ACI 350.1-01
B1 The initial filling should not exceed a rate of 1.2m/h
Chapter 2
Filling water to maintain the water level reaching the design level for 7days and no ACI 350.1-01
B2
damp spots, seepage, and leakage was found Chapter 2
REMARKS:
Page 1 of 1