SEP 2023 WORK SCHEDULE - PRASAD KAPURE FIRST TIME RIGHT STATUS

SR NO PROJECT- WALL TYPE DATE VERIFICATION REPORT


01/08/2023
02/08/2023
joing shrjah 03/08/2023
joing procedure & formalities 04/08/2023
05/08/2023
06/08/2023
joing Dubai office 07/08/2023
GLASS DESIGN FORMAT STUDY 08/08/2023
MATHCAD FORMAT STUDY 09/08/2023
MATHCAD FORMAT STUDY 10/08/2023
DESIGN CODE & STANDARD REFERENCE 11/08/2023
WWEKLY OFF 12/08/2023
SUNDAY 13/08/2023
PROJECT STUDIES 14/08/2023
1 S VTOWER LEVELO 04 SCW CORNER CASE REPORT COMPILATION 15/08/2023 1 NOT SUBMITTE
S VTOWER LEVELO 04 SCW CORNER CASE REPORT 16/08/2023
SYSTEM STUDY FOR PROJECTS 17/08/2023
SYSTEM STUDY FOR PROJECTS 18/08/2023
2 CG FEATURED BAND REPORT 19/08/2023 1 NOT SUBMITTE
20/08/2023
CG FEATURED BAND REPORT 21/08/2023
CG FEATURED BAND REPORT 22/08/2023
3 CG BALUSTRADE MOCK UP REPORT 23/08/2023 1 NOT SUBMITTE
CG BALUSTRADE MOCK UP REPORT 24/08/2023
CVG SWIMMING POOL BALUSTRADE REPORT 25/08/2023
WEEKLY OFF 26/08/2023
SUNDAY 27/08/2023
4 CVG SWIMMING POOL BALUSTRADE REPORT 28/08/2023 1 NOT SUBMITTE
CREST ROOF FEATURED BAND CALC STUDY 29/08/2023
5 CREST ROOF FEATURED BAND REPORT COMPILATION 30/08/2023 1 NOT SUBMITTE
SAT TOTAL VERIFICATION TOTAL APPROVAL
0 5

VERIFICATION V 0
REPORTS 5
NOT SUBMITTED 5
APPROVED 0
APPROVED R1 0
FIRST TIME RIGHT(V+R0 5
TOTAL ITEM 5
PERCENTAGE (FTR/T) 100.00%
ACHIEVED
TOTAL TARGET

TOTAL % 100 81.81


ED

ED

ED

ED

ED