CE CHECKLIST Rev 01 03-04-2024

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Red = NO Go

Yellow = Action to Complete


Green = GO / Release

Status:
• Customer Enquiry Checklist Date: 03/ 04 / 2024
Project Name:
C60 - SECONDARY GEAR HOUSING & GEAR Project No: CE24-00014
COVER
Originator: Fanus
Purchase order &
Drawing title: QT46202 / SC5315 Checker: Christina
Reviewer: Marco

Originator / Checker Originator / Checker


No Aspect Reviewed No Aspect Reviewed
Initials or N/A Initials or N/A

Can all goods be produced in line with


Enquiry been registerd on the CE
1 register & PC System ? 14 customer data pack supplied with
RFQ ?
Have all deviations been documented
Has a drawing data pack been
2 supplied with parts list ? 15 & approved concesion been returned
by customer ?

Can all reference numbers be Have goods been produced /


3 identified ? 16 manufactured before ?

Are all support documents & Have special consideration been


4 drawings avialable ? 17 given to paclaging & storage ?

Has a technical study / review, Has a prelimanry B.O.M been


5 report been compiled. 18 generated ?

Will technical assistance be required Where applicable has a SQ number


6 for obtaining quotes i.e. RFQ
drawings.\
19 been allocated & has a assesment
been done with a technical report ? N/A
Will technical assistance be required
Have all long lead time items been
7 for obtaining quotes i.e. RFQ 20 identified & given priority ?
drawings ?

For all stock items has economical


Will prelimanry drawing be compiled
8 for estimation / budget quotations ? 21 adjustment been given
consideration ?

Has a prelimanry suppliers list been


9 Prelimanry QCP been compiled ? 22 compiled and avialable ?

Has prelimanry flow charts been Is a complete RFQ data pack avialble
10 compiled & shared ? 23 for Estmating / Quoting ?

Have all pricing / quotes - data pack Have team feasability study been
11 been supplied to estimation (Budget 24 compiled and approved by
quotes)? Management ?

Has historic data / lessons learned Has a prelimanry time / project plan
12 been concederd ? 25 been compiled ?

Has a prelimanry drawings / spec's


Has time plan been supplied with
13 been defined for all sub contracting 26 quotation / offer made to customer ?
activaties ?

• Review results: • Signature:


Singed by:
We have checked the RFQ & Drawing(s) are acceptable, and of the standard required also
that previous comments have been acted upon.
Singed by:
We have reviewed the drawings and all of the above points have been acted upon.
Singed by:
I have include all descriptions, Part numbers, Revision information, Materials are correct and
indicated on drawings. (That no un-authorised changes was made)

Date: Comments: (If required)


Status = Yellow, See action plan CE24-00014

RFQ Packagae Complete:


File: SJvV C:/ My Doc / FEDATECH Project Hand Over checklist Rev 00 29 August 2023 Yes No