PR8511_FLUID_POWER_LAB
PR8511_FLUID_POWER_LAB
INDEX
23
6 STUDY AND USE OF PNEUMATIC ELEMENTS
CYCLE II
7
SIMULATION OF LOGIC PNEUMATIC CIRCUITS 24-27
EX NO: 1 A DATE :
APPARATUS REQUIRED :
AIR SUPPLY :
RESULT:
EX NO: 1 B DATE :
AIM :
To actuate a single acting cylinder using pilot operated 3/2 dcv and
manually actuated 3/2 dcv
APPARATUS REQUIRED :
AIR SUPPLY :
EX NO: 1 C DATE :
To actuate a single acting cylinder using pilot operated 3/2 dcv and
manually actuated 3/2 dcv
APPARATUS REQUIRED :
AIR SUPPLY :
RESULT:
EX NO: 2A DATE :
APPARATUS REQUIRED :
PROCEDURE :
RESULT:
EX NO: 2 B DATE :
APPARATUS REQUIRED :
PROCEDURE :
RESULT:
EX NO: 2 C DATE :
APPARATUS REQUIRED :
PROCEDURE :
RESULT:
EX NO: 3A DATE :
AIM :
APPARATUS REQUIRED:
DOUBLE ACTING
CYLINDER
4/3DCV
PRESSURE GAUGE
PUMP
FILTER
TANK
16
EX NO: 3B DATE :
Hydraulic motor
4/3 leaver operated with detent control dcv
Pressure Gauge
Pressure relief valve
Filter
Connecting tubes
PROCEDURE :
RESULT:
EX NO:4A DATE :
LADDER DIAGRAM
20
EX NO: 4B DATE :
Hydraulic motor
4/3 double side solenoid operated dcv
Pressure Gauge
Pressure relief valve
Filter
Connecting tubes
PROCEDURE :
LADDER DIAGRAM
22
EX NO: 5 DATE :
AIM :
APPARATUS REQUIRED:
PROCEDURE :
RESULT:
23
EX NO: 6 DATE :
APPARATUS REQUIRED:
PROCEDURE :
RESULT:
24
EX NO: 7A DATE :
AND Gate,
Double acting cylinder,
5/2 pilot operated spring return dcv
3/2 push button
PROCEDURE :
RESULT:
Thus the above simulation was made for the “AND” logic gate
using basic pneumatic trainer kit.
25
DIAGRAM:
5/2 DCV
AND GATE
EX NO: 7B DATE :
OR Gate,
Double acting cylinder,
5/2 pilot operated spring return dcv
3/2 push button
PROCEDURE :
RESULT:
Thus the above simulation was made for the “AND” logic gate
using basic pneumatic trainer kit.
27
DIAGRAM:
28
EX NO: 8A DATE :
Thus the above simulation was made for the “Flow control valves
using meter in circuit pneumatic trainer kit.
29
DIAGRAM:
30
EX NO: 8B DATE :
Thus the above simulation was made for the “Flow control valves
using meter out circuit pneumatic trainer kit.
31
DIAGRAM:
32
EX NO: 9 DATE :
APPARATUS REQUIRED:
DIAGRAM:
34
EX NO: 10 DATE:
APPARATUS REQUIRED:
AIR SUPPLY:
PROCEDURE:
RESULT:
LADDER DIAGRAM
36
EX NO: 11 DATE:
APPARATUS REQUIRED:
Automation Studio
Hardware key
PROCEDURE:
sequence.
RESULT:
Thus the above sequencing simulation was made in the Automation Studio.
37
EX NO: 12 DATE:
APPARATUS REQUIRED:
PROCEDURE:
RESULT:
LADDER DIAGRAM:
41
EX NO: 13 DATE:
APPARATUS REQUIRED:
AIR SUPPLY:
PROCEDURE:
RESULT:
-
43
LADDER DIAGRAM: