Take off's C-30
Take off's C-30
Take off's C-30
50 A1
A2 ++0.51
0.30
L
0.00
2.40 98.79 99.50
A3
Ethio Telecom Takeoff Sheet
Project Jemmo call center renovation work
tz LXWXH Squ. Description First Floor
Ground floor 1 1.20
shatter 1.95
1 1.18 2.34 m2
2.90 1 1.28
3.42 m2 1.95
1 1.16 2.50 m2
2.90 1 1.23
3.36 m2 1.95
1 1.15 2.40 m2
2.90 1 1.26
3.34 m2 1.95
1 1.00 2.46 m2
2.90 1 1.22
2.90 m2 1.28
1 2.00 1.56 m2
2.90 3 0.95
5.80 m2 1.95
1 2.05 5.56 m2
2.90 1 1.24
5.95 m2 1.95
1 1.80 2.42 m2
2.90 2 1.20
5.22 m2 1.95
1 1.25 4.68 m2
2.90 1 1.27
3.63 m2 1.95
33.62 m2 2.48 m2
Mezzanine Floor 2 0.96
2 1.20 1.98
2.07 3.80 m2
4.97 m2 1 1.00
1 1.12 2.65
2.07 2.65 m2
2.32 m2 1 0.95
1 1.08 2.65
2.07 2.52 m2
2.24 m2 2 0.95
2 1.11 1.97
2.07 3.74 m2
4.60 m2 2 0.96
6 0.97 1.95
2.07 3.74 m2
12.05 m2 2 1.10
4 1.10 1.95
1.50 4.29 m2
6.60 m2 3 1.12
3 0.95 1.95
2.07 6.55 m2
5.90 m2 1 1.15
3 1.28 1.95
1.27 2.24 m2
4.88 m2 1 0.97
3 1.25 1.95
1.27 1.89 m2
4.76 m2 2 1.1
2 1.18 1.95
2.07 4.29 m2
4.89 m2 1 1.17
2 1.13 1.95
2.07 2.28 m2
4.68 m2 2 1.16
2 1.68 1.95
2.07 4.52 m2
6.96 m2 2 1.16
4 1.85 1.95
2.07 4.52 m2
15.32 m2 1 0.8
1 1.96 2.62
2.07 2.10 m2
4.06 m2 1 1.57
2 2.00 1.6
2.07 2.51 m2
8.28 m2 3 1.17
1 1.85 1.95
2.07 6.84 m2
3.83 m2 1 1.08
96.34 1.95
2.11 m2
1 0.95
1.95
1.85 m2
Ethio Telecom Takeoff Sheet
Project Jemmo call center renovation work
tz LXWXH Squ. Description tz LXWXH Squ. Description
2 0.97 1 1.46
1.96 1.55
3.80 m2 2.26 m2
1 0.84 1 1.75
2.65 1.59
2.23 m2 2.78 m2
1 0.84 1 0.88
1.55 1.59
1.30 m2 1.40 m2
1 0.82 1 0.93
1.55 1.59
1.27 m2 1.48 m2
1 1.72 1 1.93
1.55 1.95
2.65 m2 3.76 m2
1 1.42 1 1.93
1.55 1.95
2.20 m2 3.76 m2
102.29 1 1.2
Second Floor 1.8
1 1.14 2.16 m2
1.95 1 1.14
2.22 m2 1.8
1 1.17 2.05 m2
1.95 1 1.15
2.28 m2 1.8
1 1.20 2.07 m2
1.95 80.60
2.34 m2 3rd Floor
1 0.93 1 1.15
2.65 1.80
2.46 m2 2.07 m2
1 2.00 1 1.16
1.95 1.80
3.90 m2 2.09 m2
1 2.05 1 1.15
2.65 1.93
5.43 m2 2.22 m2
1 1.25 1 1.17
1.94 1.93
2.43 m2 2.26 m2
1 1.20 1 1.24
1.95 1.93
2.34 m2 2.39 m2
1 1.20 1 1.20
1.94 1.93
2.33 m2 2.32 m2
1 1.28 1 1.28
1.94 1.93
2.48 m2 2.47 m2
1 1.93 2 1.20
1.95 1.93
3.76 m2 4.63 m2
1 1.90 1 1.22
1.95 1.93
3.71 m2 2.35 m2
1 1.93 1 1.30
1.98 1.93
3.82 m2 2.51 m2
1 1.62 4 1.93
1.63 1.93
2.64 m2 14.90 m2
1 1.80 1 1.63
1.63 1.62
2.93 m2 2.64 m2
1 1.08 1 0.83
1.64 1.63
1.77 m2 1.35 m2
1 0.83 1 0.98
1.56 1.63
1.29 m2 1.60 m2
1 1.58 1 1.42
1.63 1.59
2.58 m2 2.26 m2
1 0.86 1 1.63
1.64 1.59
1.41 m2 2.59 m2
3 0.54 2 1.76
1.64 1.5
2.66 m2 5.28 m2
1 0.54 1 1.57
2.61 1.5
1.41 m2 2.36 m2
1 1.65
1.63
2.69 m2
Ethio Telecom Takeoff Sheet
Project Jemmo call center renovation work
tz LXWXH Squ. Description tz LXWXH Squ. Description
1 1.06 1 1.28
1.63 1.95
1.73 m2 2.50 m2
1 0.83 1 1.27
1.63 1.95
1.35 m2 2.48 m2
1 1.58 1 1.20
1.63 1.95
2.58 m2 2.34 m2
1 0.86 1 1.28
1.61 1.95
1.38 m2 2.50 m2
3 0.54 4 1.65
1.60 1.95
2.59 m2 12.87 m2
1 1.74 1 1.65
1.61 1.62
2.80 m2 2.67 m2
1 1.43 1 1.80
1.61 1.62
2.30 m2 2.92 m2
1 1.64 1 1.89
1.62 1.58
2.66 m2 2.99 m2
1 1.75 1 1.58
1.62 1.58
2.84 m2 2.50 m2
1 1.58 4 0.54
1.62 1.65
2.56 m2 3.56 m2
1 1.47 2 0.87
1.62 1.65
2.38 m2 2.87 m2
1 1.76 3 1.95
1.62 1.93
2.85 m2 11.29 m2
1 0.88 31.75
1.62 5th Floor
1.43 m2 1 1.13
1 0.93 1.93
1.63 2.18 m2
1.52 m2 1 1.15
2 1.93 1.93
1.93 2.22 m2
7.45 m2 1 1.20
1 1.2 1.93
1.93 2.32 m2
2.32 m2 2 1.28
1 1.18 1.95
1.93 4.99 m2
2.28 m2 1 1.25
1 1.12 1.93
1.93 2.41 m2
2.16 m2 1 1.23
83.24 m2 1.93
4th Floor 2.37 m2
1 1.14 1 1.32
1.95 1.93
2.22 m2 2.55 m2
1 1.17 1 1.20
1.95 1.93
2.28 m2 2.32 m2
1 1.15 1 1.22
1.95 1.95
2.24 m2 2.38 m2
1 1.33 4 1.93
1.95 1.95
2.59 m2 15.05 m2
1 1.18 2 1.68
1.95 1.66
2.30 m2 5.58 m2
1 1.23 1 1.92
1.95 1.66
2.40 m2 3.19 m2
Ethio Telecom Takeoff Sheet
Project Jemmo call center renovation work
tz LXWXH Squ. Description tz LXWXH Squ. Description
1 1.56 6th Floor
1.66 1 2.00
2.59 m2 2.14
1 1.83 4.28 m2
1.63 1 1.93
2.98 m2 2.16
1 1.75 4.17 m2
1.63 1 1.98
2.85 m2 2.16
1 1.46 4.28 m2
1.63 4 1.93
2.38 m2 2.14
1 1.61 16.52 m2
1.62 1 1.93
2.61 m2 1.8
1 1.75 3.47 m2
1.66 7 1.93
2.91 m2 2.13
1 1.61 28.78 m2
1.63 1 2.13
2.62 m2 2.13
1 1.44 4.54 m2
1.63 3 0.56
2.35 m2 1.1
1 1.75 1.85 m2
1.66 67.89 m2
2.91 m2
1 1.83
1.65
3.02 m2
1 1.66
1.65
2.74 m2
1 1.44
1.65
2.38 m2
1 1.60
1.65
2.64 m2
1 1.75
1.62
2.84 m2
1 1.62
1.62
2.62 m2
1 1.44
1.59
2.29 m2
1 1.75
1.59
2.78 m2
3 0.55
1.65
2.72 m2
1 0.87
1.65
1.44 m2
2 1.93
1.95
7.53 m2
1 1.28
1.95
2.50 m2
1 1.16
1.95
2.26 m2
1 1.19
1.95
2.32 m2
111.84
100.50 A1
A2 ++0.51
0.30
L
0.00
2.40 98.79 99.50
A3
Ethio Telecom Takeoff Sheet
Project Jemmo call center rebranding work
tz LXWXH Squ. Description tz LXWXH Squ. Description
6th Floor painting and chucking 1 1.6
Ceiling 6
1 17.20 9.60 m2
4.10 586.34
70.52 m2 Deduction area forOpen down
1 5.60 1 2.22
14.00 6.6
78.40 m2 14.65 m2
1 17.20 571.69 m2 total area
4.20
72.24 m2 1 5.73
1 22.20 2.95
7.10 16.90 m2
157.62 m2 1 5.46
378.78 m2 2.95
Deducted area for open down 16.11 m2
1 2.20 1 2.7
6.60 2.95
14.52 m2 7.97 m2
364.26 1 2.65
Wall Painting and chucking 2.95
1 17.20 7.82 m2
2.95 1 28.6
50.74 m2 2.95
1 4.10 84.37 m2
2.95 1 9.7
12.10 m2 2.95
1 5.60 28.62 m2
2.95 1 9.4
16.52 m2 2.95
2 5.60 27.73 m2
2.95 1 15.25
33.04 m2 2.95
1 6.30 44.99 m2
2.95 1 16.85
18.59 m2 2.95
1 13.50 49.71 m2
2.95 1 9.34
39.83 m2 2.95
1 3.00 27.55 m2
2.95 311.77 m2
8.85 m2 Deduction area for windows and door
1 9.50 1 1.3
2.95 2
28.03 m2 2.60 m2
1 24.30 11 1.75
2.95 2.16
71.69 m2 41.58 m2
279.39 1 1.83
Deduction area for door and windows 2.14
1 15.00 3.92 m2
1.30 2 1.75
19.50 m2 2.16
1 0.90 7.56 m2
2.95 2 0.95
2.66 m2 2.56
6 4.80 4.86 m2
1.30 60.52
37.44 m2 251.25
1 2.50 Painting of column
2.95 15 1.85
7.38 m2 2.95
66.98 m2 81.86
212.41 333.11 Total chucking and painting of wall
Column Painting Offices, Training room and meeting room 2nd to 6th floor
50 0.55 10 5.6
2.95 2.95
81.13 m2 165.20 m2
293.54 Total Chucking and painting of wall anc column 10 5.8
3rd Floor 2.95
Ceiling 171.10 C
1 6.7 10 5.6
22.53 2.95
150.95 m2 165.20 m2
1 6.8 10 4.6
15.73 2.95
106.96 m2 135.70 m2
1 19.56
16.3
318.83 m2
Ethio Telecom Takeoff Sheet
Project Jemmo call center renovation work
tz LXWXH Squ. Description tz LXWXH Squ. Description
Deduction area for windows and door
10 1.6
1.5
24.00 m2
10 0.95
2.65
25.18 m2
49.18
588.02 m2
Ceiling
5 5.6
5.8
162.40 m2
5 4.6
5.6
128.80 m2
291.20 m2
First Floor Metting Room
2 10.2
2.95
60.18 m2
2 5.6
2.95
33.04 m2
93.22
Opening
Door And Window
2 0.95
2.95
5.61 m2
4 1.60
1.50
9.60 m2
78.01 m2 total area of wall at trainning room
Ceiling
2 10.20
5.60
114.24 m2
Summery Of Work
m2 Total Ceiling Painting of 2nd and 3rd call center,1st
1341.39 to 6th floor meeting room,office and training room
m2 Total wall Painting of 2nd and 3rd call center,1st to
1385.58 6th floor meeting room,office and training room
m2 Total wall Chucking of 2nd and 3rd call center,1st to
333.11 6th floor meeting room,office and training room
m2 Total ceiling Chucking of 2nd and 3rd call center,1st
571.69 to 6th floor meeting room,office and training room
100.50 A1
A2 ++0.51
0.30
L
0.00
2.40 98.79 A3
99.50
Ethio Telecom Takeoff Sheet
ProjectLegehar New Fence
tz LXWXH Squ. Description tz LXWXH Squ. Description
Basement Floor
1 12.00
2.50
30.00 m2
52 2.00
2.50
260.00 m2
52 0.40
2.50
52.00
342.00
1 109.00
0.30
0.5
16.35
26 2.00
0.50 concrete work for grade beam
0.15
3.9
26 0.40
0.50 concrete work for grade beam
0.15
0.78
21.03
6 0.95
Wooden door dmolishing at first floor
2.65
15.11 m2
15.11
Demolishing of Aluminum Partition and
door
Aluminum partition demolishing at
1 2.20 mezannen floor
5.45
11.99 m2
1 0.95 Aluminum Door demolishing at mezannen
2.20 floor
2.09 m2
1 1.80 Aluminum Door demolishing at mezannen
2.20 floor
3.96 m2
6.05
Partition work
1 2.20
MDF partition at janitor room
6.34
13.95 m2
1 3.36 MDF partition for new store
2.20
7.39 m2
1 4.45
MDF partition for new store
2.20
9.79 m2
31.13 m2
Aluminum partition and door work
1 2.20 new aluminum partition
6.34
13.95 m2
1 0.95
door at janitor room
2.20
2.09 m2
1 1.80
door at lunch room
2.20
3.96 m2
6.05
EthioA1
A2 ++0.51
100.50 0.30
L
0.00
2.40 98.79 A3
99.50
Telecom Takeoff Sheet
Project Epoxy Floor finishing work at Kikos core site
tz LXWXH Squ. Description tz LXWXH Squ. Description
Epoxy floor finishing work at Kirkos
Core Site 4 2.14
Ground Floor at Battry Room 1.60
13.70 m2
Total Room area
1 5.78 20.31 m2 total diducted area for equipment
25.00 2 0.53
144.50 m2 0.53
Diducted area for equipment 0.56 m2
4 1.10 2 0.37
1.10 0.53
4.84 m2 0.39 m2
2 0.80 3 0.28
3.20 0.38
5.12 m2 0.32 m2
1 0.86 1 0.43
8.80 0.53
7.57 m2 0.23 m2
1 0.86 1.50 m2 total diducted area for Column
9.88 21.81 m2 Total area of diducted area
8.50 m2 110.09 m2 Total area of epoxy work at Bole
m2 Total area of epoxy work at Bole and
26.03 m2 Total deducted area for equipment 228.56 Kirkos
118.47 m2 Total
Epoxy area
floor of epoxywork
finishing workatatBole
BoleCore
Site
Ground Floor at Battery Room
Total Room area
1 10.68
12.35
131.90 m2
Deducted area for equipment and
column
2 0.40
1.32
1.06 m2
2 0.65
2.60
3.38 m2
1 0.65
0.70
0.46 m2
1 0.65
1.40
0.91 m2
1 0.80
1.00
0.80 m2
100.50 A1
Ethio Telecom98.79
A2 ++0.51
0.30
L
0.00
2.40 99.50
A3
3 1.80
2.10
11.34 m2
1 0.90
2.10
1.89 m2
1 1.50
2.10
3.15 m2
First Floor
1 1.00
2.10
2.10 m2
1 0.90
2.10
1.89 m2
Second Floor
1 1.00
2.10
2.10 m2
1 0.90
2.10
1.89 m2
24.36 m2
100.50 A1
A2 ++0.51
L
0.00 98.79 99.50
A3
Ethio Telecom
Project:-
Supply and Lay Crushed aggregate base course material
Owner:- Ethio Telecom
Contractor:- Ayalneh Fekadu Senbetu Excavation Product Supply
Work Order 123256
Payment No. 1
tz LXWXH Squ. Description
1 32.00
193.00 Crushed aggregate Base course on Pavement Section-5
0.07
432.32 m3
Crushed Aggregate Base course Section-4
1 32.00
130.00 Crushed aggregate Base course on Pavement Section-4
0.05
208.00 m3
Crushed Aggregate Base course Section-3
1 32.00
101.23 Crushed aggregate Base course on Pavement Section-3
0.05
161.97 m3
Crushed Aggregate Base course Section-2
1 32.00
Crushed aggregate Base course on Pavement Section-2
85.00
0.05
136.00 m3
938.3
Sign. Sign.
Supervisor:-
Sign.
100.50 A1
A2 ++0.51
L
0.00 98.79 99.50
A3
Ethio Telecom
Project:-
Akaki 20,000m2 Concrete Pavement C-30 concrete work
Owner:- Ethio Telecom
Contractor:- Mumicha General Contruction work
Work Order UNC/CIV/X220/SAAZ-000001
Payment No. 2
tz LXWXH Squ. Description
1 32.00
108.50 C-30 concrete Work on Pavement Section-5
0.20
694.40 m3
Concrete Work On Pavement Section-3
1 32.00
47.75 C-30 concrete Work on Pavement Section-4
0.20
305.60 m3
1000.00 m3 Total Excuted Volume
Sign. Sign.
Supervisor:-
Sign.
100.50 A1
A2 ++0.51
0.30
L
0.00
2.40 98.79 99.50
A3
Ethio Telecom
Payment No- 3
Project :- Akaki 20,000m2 rigid Pavement Ditch construction Concrete and Backfill work
tz LXWXH Squ. Description
Lean Concrete
1 60.00
under Dich-1
1.00
60.00 m2
1 100.00
Under Dich-2
1.00
100.00 m2
1 140.00 Under Dich-3
1.00
140.00 m2
1 180.26
Under Dich-4
1.00
180.26 m2
1 213.00
Under Dich-5
1.00
213.00 m2
693.26 m2
Concrete Slab Work
1 60.00 for Dich-1
1.00
60.00 m2
1 100.00
for Dich-2
1.00
100.00 m2
1 140.00
for Dich-3
1.00
140.00 m2
1 180.26
for Dich-4
1.00
180.26 m2
1 213.00
for Dich-5
1.00
213.00 m2
693.26 m2
Amanuel w/medhin
Ethio Telecom
Payment No- 3
Project :- Akaki 20,000m2 rigid Pavement Ditch construction Concrete and Backfill work
Concrete For Vertical Sides of dich
2 60.00
0.60 For two vertical sides Dich-1
0.15
10.80 m3
2 100.00
0.60 For two vertical sides Dich-2
0.15
18.00 m3
2 140.00
0.60 For two vertical sides Dich-3
0.15
25.20 m3
2 180.26
0.60 For two vertical sides Dich-4
0.15
32.45 m3
2 213.00
0.60 For two vertical sides Dich-5
0.15
38.34 m3
124.79 m3
Back fill work around ditchs
2 60.00
0.60 Around two sides of Dich-1
0.65
46.80 m3
2 100.00
0.60 Around two sides of Dich-2
0.65
78.00 m3
2 140.00
0.60 Around two sides of Dich-3
0.65
109.20 m3
2 180.26
0.60 Around two sides of Dich-4
0.65
140.60 m3
2 213.00
0.60 Around two sides of Dich-5
0.65
166.14 m3
540.74 m3
Amanuel w/medhin
100.50 A1
A2 ++0.51
0.30
L
0.00
2.40 98.79 A3
99.50
Payment No- 2
2 213.00
Internal Sides of Dich-5
0.60
255.60 m2
2 213.00
External Sides of Dich-5
0.80
340.80 m2
596.40 m2
2 180.26
Internal Sides of Dich-4
0.60
216.31 m2
2 180.26
External Sides of Dich-4
0.80
288.42 m2
504.73
1101.13 m2
Formwork Demolishing
2 213.00
Internal Sides of Dich-5
0.60
255.60 m2
2 213.00
External Sides of Dich-5
0.80
340.80 m2
596.40 m2
2 180.26
Internal Sides of Dich-4
0.60
216.31 m2
2 180.26
External Sides of Dich-4
0.80
288.42 m2
504.73
1101.13 m2
100.50 A1
A2 ++0.51
0.30
L
0.00
2.40 98.79 A3
99.50
Payment No- 1
2 60.00
Internal Sides of Dich-1
0.60
72.00 m2
2 60.00
External Sides of Dich-1
0.80
96.00 m2
168.00 m2
2 100.00
Internal Sides of Dich-2
0.60
120.00 m2
2 100.00
External Sides of Dich-2
0.80
160.00 m2
280.00
2 140.00
Internal Sides of Dich-3
0.60
168.00 m2
2 140.00
External Sides of Dich-3
0.80
224.00 m2
392.00 m2
840.00 m2
Formwork Demolishing
2 60.00
Internal Sides of Dich-1
0.60
72.00 m2
2 60.00
External Sides of Dich-1
0.80
96.00 m2
168.00 m2
2 100.00 Internal Sides of Dich-2
0.60
120.00 m2
2 100.00
External Sides of Dich-2
0.80
160.00 m2
280.00
2 140.00
Internal Sides of Dich-3
0.60
168.00 m2
2 140.00
External Sides of Dich-3
0.80
224.00 m2
392.00 m2
840.00
100.50 A1
A2 ++0.51
0.30
L
0.00
2.40 98.79 A3
99.50
Ethio Telecom
Project Jemmo Rebranding Work
tz LXWXH Squ. Description tz LXWXH Squ.
1st floor
12 2.20
Column rebranding
2.50
66.00 m2
1 112.50
walls rebranding
2.50
281.25 m2
2nd to 5th
48 2.20
Column rebranding
2.50
264.00 m2
4 115.00
walls rebranding
2.50
1150.00 m2
6th floor
12 2.20
Column rebranding
2.50
66.00 m2
1 95.80
walls rebranding
2.50
239.50 m2
Mezzanen floor
1 62.40
walls rebranding
2.50
156.00 m2
2222.75 m2
A1
A2 ++0.51
100.50 0.30
L
0.00
2.40
98.79 A3
99.50
Ethio Telecom Takeoff Sheet
Project Legehar Rebranding Work
tz LXWXH Squ. Description tz LXWXH Squ. Description
4th Floor Basment floor
36 0.80
Column rebranding
2.50 9 0.80
Column rebranding
72.00 m2 2.50
15 1.60 18.00 m2
Column rebranding
2.50 6 1.60
Column rebranding
60.00 m2 2.50
1 152.17 24.00 m2
Wall rebranding
2.50 1 53.30
Wall rebranding
380.43 2.50
512.43 133.25
3rd floor 175.25
2393.01
15 0.80 Column rebranding On G+2 Building Ground floor
2.50 1 86.00
wall rebranding
30.00 m2 2.50
6 1.60 215.00
Column rebranding
2.50
24.00 m2 On G+2 Building1st floor
1 63.86 1 69.50
Wall rebranding wall rebranding
2.50 2.50
159.65 173.75
213.65 388.75
2nd floor 2781.76
36 0.80
Column rebranding
2.50 Guard house rebranding
72.00 m2
15 1.60 2 14.80
Column rebranding Column rebranding
2.50 0.40
60.00 m2 11.84 m2
1 163.70 2 3.80
Wall rebranding walls rebranding
2.50 0.40
409.25 3.04 m2
541.25 4 3.80
Column rebranding
1st floor 0.40
6.08
36 0.80 12 2.00
Column rebranding
2.50 0.40
72.00 m2 9.60
15 1.60 30.56
Column rebranding
2.50 Posts
60.00 m2 28 2.30
1 160.80 0.40
Wall rebranding
2.50 25.76
402.00 56.32
534.00
Ground floor
20 0.80
Column rebranding
2.50
40.00 m2
15 1.60
Column rebranding
2.50
60.00 m2
1 55.57
Wall rebranding
2.50
138.93
20 0.80
Column rebranding
2.50
40.00 m2
1 55.00
walls rebranding
2.50
137.50 m2
416.43
100.50 A1
A2 ++0.51
0.30
L
0.00
2.40 98.79 A3
99.50
Ethio Telecom Takeoff Sheet
Project Legehar Monitoring room
tz LXWXH Squ. Description tz LXWXH Squ. Description
Scafflolding work
1 1.80
ሴራሚክስ ታይል ወለል ማንጠፍ ስራ
2.50
4.50 m2
1 1.80 የወለል /ግድግዳ/ ሴራሚክስ ቴራዞ እምነበረድ
ሲማንቶ ታይልስ ማንሳት ስራ እና አርቆ
2.50 የማስቀመጥ ስራ
4.50 m2
SPC Floor Finishing work
1 5.68
PVC የታይል ንጣፍ መለጠፍ ስራ (SPC)
3.92
22.27 m2
1 5.74
PVC የታይል ንጣፍ መለጠፍ ስራ (SPC)
0.30
1.72 m2
23.99
Scafflolding demolishing work
Amanuel W/medhin
Prepared by Approved by Contructor
100.50 A1
A2 ++0.51
0.30
L
0.00
2.40 98.79 99.50
A3
Ethio Telecom Takeoff Sheet
Project Legehar Compound Concrete Pavement Work
tz LXWXHSqu. Description tz LXWX Squ. Description
Earth Work
Bulk Excavation
1 15.20
7.75
0.30
35.34
bulk excavation work at the back side of cafeteria
1 21.00
3.80
0.30
6.3
41.64 m3 Total volume of excavation
Hard core Work
1 15.20
7.75
117.8
1 21.00
3.80
79.8
197.6 m2 Total chuck area of hardcore work
Concrete work
1 15.20
7.75
117.8
1 21.00
3.80
79.8
197.6
2 3.65
2.80
20.44
Work shope manager office below power
2 3.40
monitoring
2.80
19.04
Deduction
1 0.95
2.65
2.5175
36.96 m2 Total chuck and painting area of wall
Ceiling
1 3.65
3.40
12.41
12.41 m2 Total chuck and painting area of ceiling
Amanuel W/medhin
Prepared by Approved by Contructor
100.50 A1
A2 ++0.51
0.30
L
0.00
2.40 98.79 99.50
A3
Ethio Telecom Takeoff Sheet
Amanuel W/medhin
Prepared by Approved by Contructor
BILL OF QUANTITY
PROJECT LEGEHAR POWER MONITORING ALIMINIUM WORK
LOCATION LEGEHAR
CLIENT ETHIO TELECOM
CONSULTANT ETHIO TELECOM CIVIL WORK OPRATION
CONTRUCTOR YABISHO ALUMINIUM METAL WORK & G.C
PROJECT NO. UNC/CIV/X223/CAAZ-000018
ITEM DESCRIBTION UNIT UNIT PRICE EX. QTY CON. QTY EX. AMOUNT CON AMOUNT