Proposed Warehouse Storage Dormitory
Proposed Warehouse Storage Dormitory
ELEVATIONS, SECTIONS
District/City/Municipality
4
LOT 3496, CAD
, 96
1.00
5
BUILDING LINE
10.70
9.70
OFFICE WORKSHOP
13.18
FUTURE EXPANSION
4
27.75
6
3
5.00
12.00
ARCHITECTURAL
STRUCTURAL
1 PERSPECTIVE
17.05
2
6
A-1 SCALE NTS 16.7
S-1 STRUCTURAL DETAILS
1
SECOND FLOOR FRAMING PLAN
7.38
ROOF FRAMING PLAN
2.10
4.23
2
47.0
2.13
TTER
(EX
GU
SID
EW
ALK
STRUCTURAL
IST
2
ING
LO
4
30.2
T 5 NGA
BA
RA
-P
CS ROA
-07
Y
-00
8.0
42
0
D1
78
0.0
ELECTRICAL
1
0M
WI
GENERAL NOTES, LEGEND, LOCATION MAP,
DE
E-1 LIGHTING LAYOUTS, POWER RISER DIAGRAM,
SCHEDULE OF LOADS
)
E-2 LIGHTING LAYOUT
SANITARY
SECOND FLOOR LIGHTING LAYOUT
WAREHOUSE
3 SITE DEVELOPMENT PLAN
N
A-1 SCALE 1:200 M ELECTRICAL
PLUMBING
SITE
- PERSPECTIVE
- SITE DEVELOPMENT PLAN
PROPOSED WAREHOUSE STORAGE & DORMITORY - VICINITY MAP 1 A
BARANGAY CAMANJAC, DUMAGUETE CITY
04
THE COPYRIGHT OF THIS DRAWING REMAINS THE PROPERTY OF PALAD DESIGN CONSULTANTS DRAWN BY: BMP DATE: RES. CERT.: DATE:
WHOSE PERMISSION MUST BE OBTAINED BEFORE ANY USE OF IT CAN BE MADE. CHECKED BY: DATE: TIN.: TCT NO.: PROJ. NO 2013-03
A B C
A B C A B C 11.00 C B A
11.00 11.00 1.50 4.45 3.55 1.50
11.00
1.50 4.45 3.55 1.50 1.50 4.45 3.55 1.50 0.85 3.15 3.15 0.85
5.50 5.50 1.50 3.55 4.45 1.50
1.55 2.90
0.62
0.62
APEX APEX
0.60
0.6
2.32
4
1.70
1.70
4 4
2.98
2.98
T&B
2.32
FIREWALL
2.50
STORAGE TOOLS
WASH AREA
7.62
7.62
6.70
6.70
3 3
5.00
5.00
2.80
5.00
5.00
5.00
FINISH FLOOR LINE ( EL 0.30 M) FINISH FLOOR LINE ( EL 0.30 M)
0.30
0.30
NATURAL GRADE LINE ( EL 0.00 M) NATURAL GRADE LINE ( EL 0.00 M)
13.98
13.98
13.32
WORKSHOP WORKSHOP
3 FRONT ELEVATION 4 REAR ELEVATION
10.00
10.00
10.00
2 2 A-2 SCALE 1:100 M A-2 SCALE 1:100 M
WORKSHOP 1 2 3 4
5.00
5.00
5.00
AREA
0.62
1 1 APEX
1.00
1.00
1.00
RAMP UP
1.70
1.70
ROOF LINE
A-2
8
1.50
10.99 11.00
7.62
7.00
WORKSHOP WORKSHOP
N
1 2
5.00
WORKSHOP
A-2 SCALE 1:100 M A-2 SCALE 1:100 M AREA
3.50
FINISH FLOOR LINE ( EL 0.30 M)
0.30
0.30
NATURAL GRADE LINE ( EL 0.00 M)
WORKSHOP
5 RIGHT SITE ELEVATION
A-2 SCALE 1:100 M
4 3 2 1 A B C 4 3 2 1
13.98 13.98
2.98 5.00 5.00 1.00 11.00 2.98 5.00 5.00 1.00
0.82 2.16 10.00 1.50 4.45 3.55 1.50 0.82 2.16 10.00
1.55 2.90
0.62
0.62
0.62
APEX APEX APEX
1.55
1.70
1.70
1.70
1.70
1.10 0.40
1.10 0.40
2.65
7.62
7.62
7.62
7.62
6.70
6.70
7.00
4.70
5.00
5.00
WORKSHOP WORKSHOP
AREA AREA
3.50
3.50
T&B WASH AREA STORAGE TOOLS
2.80
T&B STORAGE ROOM
( EL 0.30 M) FINISH FLOOR LINE FINISH FLOOR LINE ( EL 0.30 M) FINISH FLOOR LINE ( EL 0.30 M)
0.30
0.30
0.30
0.30
0.30
( EL 0.00 M) NATURAL GRADE LINE NATURAL GRADE LINE ( EL 0.00 M) NATURAL GRADE LINE ( EL 0.00 M)
- FLOOR PLANS
1.00
RIBTYPE ROOFING
APEX ( EL 4.20 M)
1.10
1.20
3.70
1.50
TOP OF CONTAINER VAN ( EL 3.10 M)
4.20
FEMALE MALE
T&B
1.00
2.60
2X6X2.0MM
3 TUBULAR POST
DOUBLE-DECK
DOUBLE-DECK
LOCKER
0.90
BED
BED
FINISH FLOOR LINE ( EL 0.50 M)
9.70
0.50
7
2.50
2.50
CONFERENCE ( EL 0.00 M) OPEN
NATURAL GRADE LINE
FEMALE STAFF ROOM ROOM A-2
8.50
20 FT CONTAINER VAN 20 FT CONTAINER VAN 2O FT CONTAINER VAN
ARCADE
5.00
5.00
OFFICE
2 2X6X2.0MM
TUBULAR POST SITTING AREA
4 REAR ELEVATION
MALE STAFF ROOM RECEPTION A-3 SCALE 1:100 M
2.50
2.50
20 FT CONTAINER VAN CLERICAL POOL
AREA
DOUBLE-DECK
DOUBLE-DECK
20 FT CONTAINER VAN
BED
BED
2X6X2.0MM LOCKER 1 2 3
1 TUBULAR POST
3 2 1
0.60
0.60
9.70
1.00
1.00
1.00 2.50 2.50 3.70 9.70
0.40
0.40
1.50 1.00 1.20 3.70 2.50 2.50 1.00
APEX ( EL 4.20 M)
A-2
8
APEX ( EL 4.20 M)
1.10
1.10
1.00 1.20
1.10
1.10
2.20 6.10 5.00 6.10 1.00 TOP OF CONTAINER VAN ( EL 3.10 M)
20.40 TOP OF CONTAINER VAN ( EL 3.10 M)
1.70
OFFICE
4.20
4.20
GROUND FLOOR PLAN
2.60
1
4.20
4.20
2.60
2.60
A-3 SCALE 1:100 M
1.40
0.90
FINISH FLOOR LINE ( EL 0.50 M)
A B C D
0.50
OPEN OPEN FINISH FLOOR LINE ( EL 0.50 M)
NATURAL GRADE LINE ( EL 0.00 M)
0.50
0.50
20.40 NATURAL GRADE LINE ( EL 0.00 M)
2.20 6.10 5.00 6.10 1.00 COLUMN PEDESTAL
BUILDING LINE
3.70
1.50
A B C D
2.70
20.40
2.20 6.10 5.00 6.10 1.00
1.00
1.00 1.20
3
APEX ( EL 4.20 M)
9.70
7
2.50
2.50
1.10
A-2
8.50
TOP OF CONTAINER VAN ( EL 3.10 M)
4.20
4.20
0.5 MM THK LONGSPAN
2.60
2.60
RIBTYPE ROOFING CONFERENCE
SITTING AREA
FEMALE STAFF ROOM ROOM
2.50
2.50
0.90
FINISH FLOOR LINE ( EL 0.50 M)
0.50
0.50
NATURAL GRADE LINE ( EL 0.00 M)
1
1.00
1.00 OFFICE
7 CROSS SECTION
1.00 1.20 A-3 SCALE 1:100 M
A-2
20.40
OFFICE
2 ROOF PLAN
A-3 SCALE 1:100 M
3 2 1
8.50
A B C D 2.50 2.50 2.50 1.00
20.40 1.30 1.20
2.20 6.10 5.00 6.10 1.00
1.00 1.20
APEX ( EL 4.20 M)
1.10
1.10
APEX ( EL 4.20 M)
TOP OF CONTAINER VAN ( EL 3.10 M)
1.00
1.00
4.20
4.20
2.60
2.60
SITTING AREA
4.20
4.10
2.60
2.60
0.50
0.50
0.90
0.50
OPEN OPEN
NATURAL GRADE LINE ( EL 0.00 M)
OFFICE
OFFICE
2O FT CONTAINER VAN
8 LONGITUDINAL SECTION
3 FRONT ELEVATION A-3 SCALE 1:100 M
- FLOOR PLANS
LOCATION
GROUND FLOOR:
+ 1.00
-FEMALE STAFF ROOM
-MALE STAFF ROOM
-CONFERENCE ROOM 2X3X1.5MM STAINLESS
-RECEPTION AREA TUBULAR AS HANDRAIL
-TOOL STORAGE
2.10
HARDWARES
0.90
BUILT-IN DOOR HINGES
LEVER TYPE
2X2X1.5MM TUBULAR
FLOOR FINISH LINE AS POST
QUANTITY
1X2X1.5MM TUBULAR
FIVE (5) SETS
MARK DESCRIPTION
0.60
LOCATION
GROUND FLOOR:
- MALE STAFF T&B
- FEMALE STAFF T&B
- CONFERENCE T&B
- WORKSHOP T&B
2.10
MARK DESCRIPTION
1.20
0.60 0.60 6MM THK CLEAR GLASS
LOCATION
GROUND FLOOR
1.10
-CONFERENCE ROOM
-CLERICAL POOL
-MALE STAFF ROOM
2.10
MARK DESCRIPTION
LOCATION
GROUND FLOOR:
- MALE STAFF T&B
0.60
QUANTITY
0.80
A.2 GROUND FLOOR SLAB ON FILL
400mm
f'c = 17 MPa (2,500 psi) @ 28th day.
0.15
A.3 OTHERS NOT SPECIFIED
f'c = 21 MPa (3,000 psi) @ 28th day.
B. REINFORCEMENT : 7 TRUSS -1 DETAIL
B.1 ALL MILD REINFORCING BARS SHALL BE ROUND DEFORMED" S-1 SCALE 1:50 MTS 2 1 1/2 x 1 1/2 x 1/4" ANGLE BAR
CONFORMING TO ASTM A-615
0.80
WRITTEN APPROVAL OF THE STRUCTURAL ENGINEER.
B.3 WHERE SPLICING IS REQUIRED; SLAB, BEAM AND 400mm
0.15
GIRDER REINFORCING BARS SHALL BE SPLICED AT
QUARTER POINT AND A MINIMUM LENGTH OF 40 TIMES THE
400mm
DIAMETER OF THE BAR.
B.4 COLUMN VERTICAL BARS SHALL BE SPLICED @ MID-FLR.
HEIGHT, AND A MINIMUM LENGTH OF 40 D ALSO . NOT
6 TRUSS -2 DETAIL
MORE THAN 50% OF THE TOTAL NUMBER OF BARS SHALL S-1 SCALE 1:50 MTS 2 1 1/2 x 1 1/2 x 1/4" ANGLE BAR
C. STRUCTURAL STEEL :
C.1 ALL STRUCTURAL STEEL, BOTH ANGLES AND STEEL PLATES
SHALL CONFORM TO ASTM A36
0.80
BUILDINGS" SHOULD BE STRICTLY FOLLOWED IN THE EXE-
CUTION OF THE PROJECT.
0.15
1 COLUMN SCHEDULE
5 TRUSS -3 DETAIL 2 1 1/2 x 1 1/2 x 1/4" ANGLE BAR
S-1 SCALE 1:50 MTS
S-1 SCALE NTS
0.40
0.25
F-1 F-2
SCHEDULE OF FOOTINGS
THICKNESS (mm) SIZE (mm) BOTTOM REINFORCEMENTS D (mm) 5.50
0.40
MARK BAR "L" (PARALLEL
REMARKS
BAR "S" (PARALLEL
T1 T2 WIDTH LENGTH TO SHORT SPAN ) TO LONG SPAN )
(VERIFY)
1.50 4.00
CENTER
F-1 300 300 1300 1300 7 -16MMØ 7 -16MMØ 1200 FOOTING
1.58
CENTER
F-4 300 300 1200 1200 6 -16MMØ 6 -16MMØ 1200
FOOTING
2 TYPICAL FOOTING DETAILS
S-1 SCALE NTS
3 FOOTINGS SCHEDULE
S-1 SCALE NTS
0.25
1.00
0.60
0.30
7 WALL FOOTING DETAILS 4 TRUSS COLUMN AND BEAM DETAIL
S-1 SCALE NTS
S-1 SCALE 1:50 MTS
- STRUCTURAL DETAILS
1.00
C-2 WF C-2 RB-1
F-2 F-2
RB-1
1.20
3.70
FTB-1
1.50
WF C-2 WF-1
2X4X1.5MM
C-2 C-2
TUBULAR
F-2 F-2 FTB-1 F-2 RB-1
2.70
RB-1
RB-1
RB-1
RB-1
RB-1
1.50
1.50
C-2 C-2
F-2 F-2
1.00
C-1 C-1 C-2 C-1 RB-1
2X6X2.0MM
TUBULAR BOLTED
F-1 F-1 F-2 F-1 2X6X2.0MM
3 ON SLAB
3 TUBULAR POST
RB-1
FTB-1
C-1
FTB-1
9.70
7.70
2.50
2.50
2.50
2.50
F-1
WF-1
WF
8.50
7.10
C-1 C-1 C-1 C-1
2X6X2.0MM F-1 LINE OF CONTAINER VAN F-1 F-1 LINE OF CONTAINER VAN
F-1 LINE OF CONTAINER VAN LINE OF CONTAINER VAN
2 TUBULAR BOLTED
ON SLAB
2 2X6X2.0MM
TUBULAR POST
T-1
T-1
T-1
T-2
T-2
T-2
T-3
FTB-1
FTB-1
WF-1
2.50
2.50
2.50
2.50
2X4X1.5MM
TUBULAR
C-1 C-1 C-1 C-1
2X6X2.0MM F-1 F-1 WF-1 F-1 F-1 2X6X2.0MM
TUBULAR BOLTED
1 ON SLAB
1 TUBULAR POST
0.48
1.00
1.00
STAIR FOOTING STAIR FOOTING
OFFICE
N
OFFICE 2 ROOF FRAMING PLAN
N
A B C
A B C
A B C
0.50
11.00
11.00 1.50 4.45 3.55 1.50
1.50 4.45 3.55 1.50 11.00
1.55 2.90 1.50 4.45 3.55 1.50
1.76 2.69 2 2 x 2 x1/4'' THK. ANGLE BAR
4
FTB-1 C-2 RB-1
4 C-2
4
FTB-1 B-1
4 B-1
TRUSS - 5
TRUSS - 5
C-4
2.98
F-4 C-4 50x100x1.5mm
C-4
2.32
F-4
2.98
TRUSS - 5
FTB-1
WF-1
2.36
2.98
TRUSS - 5
RB - 1
SPACED @0.60 M.O.C
2.45
SLAB
C-3 C-3
F-3 F-3
3
3 C-4 TRUSS COLUMN AND BEAM
(SEE DETAIL IN S-1)
F-4
WF-1 3 RB - 1
TRUSS - 5
TRUSS - 5
FTB-1
FTB-1
5.00
5.00
5.00
5.00
TRUSS - 5
TRUSS - 5
5.00
5.00
12.98
13.98
12.36
12.98
13.32
12.45
C-3 C-3
F-3 F-3
2
FTB-1
TRUSS - 5
TRUSS - 5
5.00
5.00
FTB-1
TRUSS - 5
5.00
5.00
5.00
ON 50mm THK. WELL COMPACTED
GRAVEL AND SAND BEDDING
(WORKSHOP AREA)
C-3 C-3
F-3 F-3 C-1 C-1
1 TRUSS COLUMN AND BEAM
1
1.00
1.00
1
8.00
WORKSHOP WORKSHOP
N
N
5 ROOF FRAMING PLAN
S-2 SCALE 1:100 M
- FOUNDATION PLAN
L E G E N D
Pinlight
Center Light
Wall Lamp
Modern chandelier
Exhaust Fan
1 SCHEDULE OF LOAD
E-1 SCALE NTS
One Gang Switch
Refrigerator Outlet 5 6 5 6
30AT,2P 30AT,2P 30AT,2P 30AT,2P
Washing Machune Outlet
7 8 7 8
Counter Top Outlet
30AT,2P 30AT,2P 30AT,2P 30AT,2P
SN
T.V. Antenna Outlet 9
30AT,2P PB-2
Water Heater SN
1
LP Circuit Homerun PB-1
Panelboard
Circuit Breaker
2 PANEL BOARD DETAILS
E-1 SCALE NTS
Telephone Outlet
Service Entrance
WORKSHOP OFFICE
Auxiliary Entrance 4 POWER RISER DIAGRAM 3 POWER RISER DIAGRAM
Door Bell E-1 SCALE NTS E-1 SCALE NTS
C Chime
LED Lights
4
LOT 3496, CAD,
96
1
ROOF LINE
PB-1
5
LOT 3500, CAD, 96
2
1 PB-2
PB-2
LOT 3497, CAD, 96
6
3
2
PB
2 -1
1
1
PB-2
GUARD
HOUSE
WAREHOUSE
N
TTE
R
3 LIGHTING LAYOUT
(EX
1
M
WI
DE
)
- LIGHTING LAYOUT
4
LOT 3496, CAD,
96
ROOF LINE
5
T&B
3
PB-1
7
PB-2 FEMALE MALE 4 9
T&B
PB-1 1
5 PB-
PB-2
2X6X2.0MM
TUBULAR POST
DOUBLE-DECK
DOUBLE-DECK
LOCKER
BED
BED
CONFERENCE
FEMALE STAFF ROOM ROOM
ARCADE
PB-1 PB-1
2X6X2.0MM
TUBULAR POST SITTING AREA
DOUBLE-DECK
DOUBLE-DECK
PB-2
BED
BED
2X6X2.0MM LOCKER
-2
TUBULAR POST
LOT 3497, CAD, 96
6 7
4 PB-1 PB-1
RAMP UP
6
3
2
1
8
PB-2
GUARD
HOUSE
WAREHOUSE
N
R
3 POWER LAYOUT
TTE
(EX
1
M
WI
DE
)
- LIGHTING LAYOUT
0.15
RULES AND REGULATION OF LOCAL GOVERNMENT AUTHORITIES CONCERNED.
2 COORDINATE THE DRAWING WITH OTHER RELATED DRAWINGS AND SPECIFICATIONS, C.O.
INLET
FOUND THEREIN.
1.60
MH
3 ALL PIPES SHALL BE INSTALLED AS INDICATED ON PLANS, ANY RELOCATIONS
ESCUTCHEON
REQUIRED FOR PROPER EXECUTIONS OF OTHER TRADES SHALL BE WITH PRIOR MH
PLATES
C.O. MH C.O.
APPROVAL OF THE ARCHITECT OR ENGINEER.
0.15
4 PROPOSED SANITARY UTILITIES SHALL CONFORM TO THE ACTUAL LOCATION,
OUTLET
DEPTH AND INVERT ELEVATION OF ALL EXISTING PIPES AND STRUCTURES AS
PLAN ISOLATING
VALVE
VERIFIED BY THE CONTRACTOR.
5 ALL SLOPES FOR HORIZONTAL DRAINAGES SHALL MAINTAIN 1% UNLESS 100mmØ PVC
INLET 0.60 0.60 0.60
3
C.O. C.O. C.O. P-1
OTHERWISE SPECIFIED.
300
6 SIZES OF WATER SUPPLY PIPES TO FIXTURES SHALL BE IN ACCORDANCE FREE BOARD
0.15
COORDINATES THE WORKS WITH THE SEWER LINE EFFLUENT DISPOSSAL POINT AND LEACHING LEACHING
CHAMBER CHAMBER
DIGESTIVE CHAMBER 1 2
WATER LINE SERVICE CONNECTING POINT. SAND SAND
3-LAYERS & VERT. BARS @ 0.80m. 150mmØ PVC TAP TO
8 ALL PIPES SIZES ARE IN MILLIMETERS AND ALL DIMENSIONS ARE IN METERS 150mm THK. R.C. SLAB w/ 10mmØ
1.20
2.00
P-1 SCALE NTS
MATERIAL SPECIFICATIONS
4-12mmØ CONT. BARS
w/ 10mmØ TIES @300mm OC.
0.45 0.45 0.45 0.45
DRAINAGE LINES SHALL BE (PVC ORANGE) PIPE, SERIES 1000 C- 35 NELTEX BRAND ADJUSTABLE
STRAINER
9 WATER CLOSET DETAIL
0.25
SEWER & VENT SHALL BE (PVC ORANGE) PIPE, SERIES 1000 C- 35 NELTEX BRAND P-1 SCALE NTS
508-101.60
HOT WATER LINE SHALL BE PPR (FUSION TYPE) 228.6 FIN. FLOOR FINISH
D
VALVES "KITZ", "CRANE" BRAND OR APPROVED EQUAL
4 SEPTIC TANK DETAILS D
(BY OTHERS)
P-1 SCALE NTS
C
FLOOR DRAIN
FLOOR DRAINS MANUFACTURED BY "METMA" BRAND OR APPROVED EQUAL. 15mm Ø WATER PIPE SQUARE STRAINER W/
D
SLOT OPENING
LINE R.C. SLAB "METMA" M-120-G
ISOLATING
6 FLOOR DRAIN DETAIL
HWL / HWLAC HOT WATER LINE / ABOVE CEILING
VALVE
GROUND FLOOR P-1 SCALE NTS
GV GATE VALVE
7 FLOOR DRAIN DETAIL
CV CHECK VALVE P-1 SCALE NTS 5 DETAIL OF AIR CHAMBER
P-1 SCALE 1:5 M.
D
SLOT OPENING
DD DECK DRAIN "METMA" M-120-G
DS DOWNSPOUT
SS SOIL STACK
PLAN
WATER PROOFING MEMBRANE
LAVATORY DETAIL
508-101.60
VS VENT STACK 8 228.6 FIN. FLOOR FINISH
C
WH WATER HEATER
FLOOR DRAIN
A BODY
SECTION SECTION
SECTION CB-1 CB-2
4 HOSEBIBB DETAIL 4 FLOOR DRAIN DETAIL
P-1 NOT TO SCALE P-1 NOT TO SCALE
7 CATCHBASIN DETAILS
P-1 SCALE NTS
- PLUMBING DETAILS
4
LOT 3496, CAD,
96
HB
SHO LAV LAV
ROOF LINE
5
T&B
WC SLOP SINK
25mm CW LOOPED
LAV
GV
GV
GV GV
LAV WC SHO LAV WC SHO
FEMALE MALE 25mm CW LOOPED
LAV WC SHO T&B
2X6X2.0MM
TUBULAR POST
GV
DOUBLE-DECK
DOUBLE-DECK
LOCKER
BED
BED
CONFERENCE
25mm CW LOOPED
FEMALE STAFF ROOM ROOM
RECEPTION
MALE STAFF ROOM CLERICAL POOL
AREA
25mm CW LOOPED
DOUBLE-DECK
DOUBLE-DECK
25mm CW LOOPED
BED
BED
2X6X2.0MM LOCKER
TUBULAR POST
HB
LOT 3497, CAD, 96
25mm CW LOOPED
HB HB
4
RAMP UP
6
3
25mm CW LOOPED
HB
1
GV
GUARD LAV
HOUSE
WC
WAREHOUSE
N
1 COLD WATER LAYOUT
WA
R
TTE
RS
(EX
GU
ALK
ER
WMV
G
EW
VIC
SID
2
IST
EC
ON
NE
ING
CT
LIOO
N
T 5 NG
BA
RA
- P AY R
CS
-07 OAD
-00
42 0.00
78
1
1
M
W IDE
)
4
LOT 3496, CAD,
96
FD LAV
TRENCH
ROOF LINE
5
T&B
SLOP SINK
WC
TRENCH
FCO VS
150 mmØ SP
LAV
VS VS CB-1
LAV WC FD LAV FD
WC
FEMALE MALE
T&B
2X6X2.0MM WC FD
TUBULAR POST
VS
DOUBLE-DECK
DOUBLE-DECK
LOCKER
BED
BED
CONFERENCE
FEMALE STAFF ROOM ROOM
ARCADE
2X6X2.0MM
TUBULAR POST SITTING AREA
TRENCH
TRENCH
RECEPTION
MALE STAFF ROOM CLERICAL POOL
AREA
DOUBLE-DECK
DOUBLE-DECK
BED
BED
2X6X2.0MM LOCKER
TUBULAR POST
LOT 3497, CAD, 96
CB-1
200mmØ DP
RAMP UP
CB-1 CB-1
6
200 mmØ DP
3
DP
CB-1
mmØ
200
-1
CB
2
200mmØ DP
200 mmØ DP
-1
CB
CB-1
1
CB-1
BUILDING LINE
LAV
GUARD
HOUSE
WC
20
FD CB-1
0
mm
Ø DP
R
TTE
(EX
GU
WALK
IDE
2
S
IST
-1
CB
ING
LO
CB-1
T 5 NG
30
BA
0m
m
RA
Ø
- P AY R
RC
PD
IPE
IN P
CS
DRA
RA
RCP
IN
Ø
mm
PIP
-07 OAD
300
E
-00
B-1
8
C
1
1
M
WI
DE
)