HS 2 Group 2
HS 2 Group 2
ENGINEERING
HYDRAULIC STRUCTURE 2 GROUP ASSIGNMENT
Group member
Name Id
Yasin Mohammed Ru 1551/14
Ibrahim Aly Ru 0305/14
Latera Galana Ru 0832/14
¿=L−2 ( Nkp+ ka ) He
L=15∗6=90 m
3
3 /2
Q=Cd∗L∗H =12000=2.2∗90∗He 2
( )
2
12000 3
He=
2.2∗90
He=15.43 m
Hd+d 115.4
= =7.48 ,7.48>1.7
He 15.4
There is no effect
¿=L−2 ( Nkp+ ka ) He
Where N =number of span -1
6-1=5
N=5
He at effective length
3
Q=Cd∗¿∗He3 / 2 , 12000=2.2∗80.74∗He 2
He=16.6 m
Step 3
2 2
V 0.98
Head due to velocity He= = =0.5 m
2 g 2∗9.81
At u/s vertical condition
K=2 n=1.85
n n−1 1.85 1.85−1 1.85
X ¿ KH d y,X ¿ KH d yX =2∗¿
1.85 0.85
x dy 1.85∗x
y= differentiate theequation =
21.895 dx 21.895
Down stream slope ,0.8H:1V
0.85 0.85
dy 1.85∗x 1 1.85∗x
= = = =1.25
dx 21.895 0.8 21.895
0.85
1.85∗x =27.368
0.85 27.368
x = =14.8
1.85
1 /0.85
x=14.8 =23.8 m
X(m) 1 3 6 9 11 13 16 18 21 22 23.8
Step 4
the curve should go up to the point given by: 0.27Hd = 0.27*16.6 = 4.5 , substitute the
x(m) 0 -1 -2 -3 -4 -4.5
y(m) 0 0.06 0.263 0.641 0.1309 2.1