0% found this document useful (0 votes)
7 views9 pages

Original CNC Format

Uploaded by

Kunal Thengdi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views9 pages

Original CNC Format

Uploaded by

Kunal Thengdi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

Welding work per hour

Date:
Time Dia Length Qty. Pipe No. Remarks

4:30 to 5:30pm

5:30 to 6:30pm

6:30 to 7:30pm

7:30 to 8:30pm

9 to 10pm

10 to 11pm

11 to 12am

12 to 1am

Total Repair Total Pipes

WIRE CONSUMPTION

Welding work per hour


Date:
Time Dia Length Qty. Pipe No. Remarks
4:30 to 5:30pm
5:30 to 6:30pm

6:30 to 7:30pm

7:30 to 8:30pm

9 to 10pm

10 to 11pm

11 to 12am

12 to 1am

1 to 2 am

2 to 3 am

3 to 4.30 am

Total Repair Total Pipes

WIRE CONSUMPTION
Welding Report
Date:
Time Dia Length Qty. Pipe No. Remarks

8 to 9am

9 to 10am

10 to 11am

11 to 12pm

12.30 to 1.30pm

1.30 to 2.30pm

2.30 to 3.30pm

3.30 to 4.30pm

Total Repair Total Pipes


Wire Consumption
A) CNC Pipe Machining Report
Date:

Time Dia Length Nos Insert / Tool Remarks


Consumption

8 to 9am

9 to 10am

10 to 11am

11 to 12pm

12.30 to 1.30pm

1.30 to 2.30pm

2.30 to 3.30pm

3.30 to 4.30pm

Total Pipes
REMARKS.:

B) CNC Flange Machining Report


Date:

Time SIZE Rework Nos Insert / Tool Remarks


Consumption

8 to 9am

9 to 10am

10 to 11am

11 to 12pm

12.30 to 1.30pm

1.30 to 2.30pm

2.30 to 3.30pm

3.30 to 4.30pm

Total Flanges

REMARKS.:

B) CNC Flange Machining Report


Date:

Time SIZE Rework Nos Insert / Tool Remarks


Consumption

4:30 to 5:30pm

5:30 to 6:30pm

6:30 to 7:30pm

7:30 to 8:30pm

9 to 10pm

10 to 11pm

11 to 12am

12 to 1am

REMARKS.:
A) CNC Pipe Machining Report
DAY SHIFT
Operator Name .:- Date:

Insert / Tool
Time Dia Length Nos Consumption Party Name

8 to 9am

9 to 10am

10 to 11am

11 to 12pm

12.30 to 1.30pm

1.30 to 2.30pm

2.30 to 3.30pm

3.30 to 4.30pm

Total Pipes
REMARKS.:

B) CNC Flange Machining Report


Operator Name .:- Date:

Insert / Tool
Time SIZE Rework Nos Consumption Remarks

8 to 9am

9 to 10am

10 to 11am

11 to 12pm

12.30 to 1.30pm

1.30 to 2.30pm

2.30 to 3.30pm

3.30 to 4.30pm

Total Flanges

REMARKS.:

TOTAL PIPES M/C(NOS) TOTAL LENGTH (Mtr) TOTALWEIGHT (Mt)

A) CNC Pipe Machining Report


NIGHT SHIFT
Operator Name .:- Date:
Insert / Tool
Time Dia Length Nos Consumption Party Name

4.30 to 5.30pm

5.30 to 6.30pm
6.30 to 7.30pm

7.30 to 8.00pm

8.30 to 9.30pm

9.30 to 10.30pm

10.30 to 11.30pm

11.30 to 12.30am

12.30 to 1.30am

1.30 to 2.30am

2.30 to 3.30am

3.30 to 4.30 am

Total Pipes
REMARKS.:

B) CNC Flange Machining Report


Operator Name .:- Date:
Insert / Tool
Time SIZE Rework Nos Consumption Remarks

4.30 to 5.30pm

5.30 to 6.30pm

6.30 to 7.30pm

7.30 to 8.00pm

8.30 to 9.30pm

9.30 to 10.30pm

10.30 to 11.30pm

11.30 to 12.30am

12.30 to 1.30am

1.30 to 2.30am

2.30 to 3.30am

3.30 to 4.30 am

Total Flanges
REMARKS.:

TOTAL PIPES M/C(NOS) TOTAL LENGTH (Mtr) TOTALWEIGHT (Mt)


A) CNC Pipe Machining Report
NIGHT SHIFT
Operator Name .:- Date:
Insert / Tool
Time Dia Length Nos Party Name
Consumption
4.30 to 5.30pm

5.30 to 6.30pm

6.30 to 7.30pm

7.30 to 8.00pm

8.30 to 9.30pm

9.30 to 10.30pm

10.30 to 11.30pm

11.30 to 12.30am

12.30 to 1.30am

1.30 to 2.30am

2.30 to 3.30am

3.30 to 4.30am

Total Pipes
REMARKS.:

B) CNC Flange Machining Report


NIGHT SHIFT
Operator Name .:- Date:
Insert / Tool
Time SIZE Rework Nos Remarks
Consumption
4.30 to 5.30pm

5.30 to 6.30pm

6.30 to 7.30pm

7.30 to 8.00pm

8.30 to 9.30pm

9.30 to 10.30pm

10.30 to 11.30pm

11.30 to 12.30am

12.30 to 1.30am

1.30 to 2.30am

2.30 to 3.30am

3.30 to 4.30am

Total Flanges
REMARKS.:

TOTAL PIPES M/C(NOS) TOTAL LENGTH (Mtr) TOTALWEIGHT (Mt)

You might also like