1 INSTALLATION TANKS
Install Liner and fit upper Nozzle Circular Steel Tank Construction Manual Approved Tank GA Drawing #
1.5 As Per Section10 303771-2 This Document H R
penetrations V 1.2
Approved GA
Circular Steel Tank Construction Manual
1.6 Assemble remainder of Tank wall rings As Per Section 6 & 8 Drawing/Circular Steel Tank This Document R R
V 1.2
Construction Manual
Circular Steel Tank Construction Manual Circular Steel Tank
1.7 Hold Down Bolts fitted As per Section 17 This Document R R
V 1.2 Construction Manual V 1.2
Install Ladders / Cages and Security Circular Steel Tank Construction Manual Circular Steel Tank
1.8 As per Secrtion 14 This Document R R
Doors V 1.2 Construction Manual V 1.2
Check all fixings on ladder cages and Circular Steel Tank Construction Manual Circular Steel Tank
1.9 Visual Checks/Confirmation This Document R R
guardrailing correctly tightened V 1.2 Construction Manual V 1.2
Install Lower Nozzle Fittings, SWAH and Circular Steel Tank Construction Manual Circular Steel Tank
1.10 As per Section 15 and 16 This Document R R
Cover (Side Wall Access Hatch) V 1.2 Construction Manual V 1.2
Tank
Installation Supervisor to check off entire ITP
1.13 Practical Completion Visual Checks/Confirmation Commissioning R W&H