1.0 INTRODUCTION.........................................................................................................1
1.1. General Overview.....................................................................................................1
2 Objective of the Terms of reference.............................................................................1
3. Project Description.........................................................................................................2
4. Project location................................................................................................................2
5 Time Schedule..................................................................................................................3
6. Sources of Data................................................................................................................3
List of table
Table 1: work schedules......................................................................................................3
Table 2: checklist for screening of impacts.........................................................................4
ii
1.0 INTRODUCTION
consultancy plc. to identify potential impacts, both positive and negative and then to
propose possible enhancement/mitigation measures for the proposed project,
Construction material Manufacturing located in Oromia National regional state, Gelan
sub city Gelan woreda.
1
2 Objective of the Terms of reference
This ToR was prepared to: define the scope of work for the proposed Construction
material Manufacturing project to be established at Shegar City,Gelan Sub City; identify
the possible chances and constraints; indicate time table and finally produce
Environmental and Social Impact Statement to be evaluated by the regulatory body.
3. Project Description
Total investment cost is 5,000,000 million birr. The project will create 74 job
opportunities in permanent and temporal basis for local community. The facility is
proposed on total area of about 0.2797 hectare. The project is bordered by: roads in south,
East and west, and industry in north direction. The facility is designed to compose of
sheds, this area comprises simply machines installation place, raw materials storing
sheds, products storing sheds, the administration spaces, the sanitary units, and other
essential service rooms. The project will supply more Construction material
manufacturing for domestic and foreign market.
4. Project location
2
5 Time Schedule
The work will be carried out, in the town according to the following schedule.
Table 1: work schedules
S.N Types of activities Number of days required for
activities
1 Screening: Deciding if an ESIA is required 2
2 Scoping and consideration of alternatives: 2
3 Public consultation 5
3 Collecting data 2
4 Impact Prediction 2
5 Analysis of Mitigation measures 2
4 Synthesizing the ESIA Report 7
6. Sources of Data
primary and secondary data are used for the work. Primary data will be obtained from
project affected communities, district administration and Gelan sub city EPA
professionals through consultation and interview. Secondary data sources are obtained
from water supply and sanitation office, urban agriculture office, education office, health
office, trade and industry, planning office, labor and social affair office, urban
beatification and greenery office, District administration, children youth and women
affairs office, and town administration, national and regional laws and proclamations,
CSA, and others.
The following methodology is used to collect data:
Semi- structured interview: this involved holding individual interviews with
the project manager and his coworkers using a pre- prepared interview checklist
and recording the feedback.
Consultation about the Project: the aim of the consultation with the locally
affected people by the project has a paramount importance to hear and
incorporate the views and opinions of the those communities around the area.
3
Literature review: this involved the review of all literature and data relevant to
the project. The literature included legislation, data kept by the proponent and
government agencies.
Site observation: this involves a transect walk across the site and the
neighboring area to get acquainted with the natural environment and also to cross
check issues, arising from the interviews above. Furthermore, field visit will be
undertaken to understand the likely impacts of a development project i.e
Aluminum frame and profile Manufacturing Project in this case on the
environment around the project site through making transect walking along the
intended project site. This field survey also helped to gather the base line
environmental condition of the area for better prediction and evaluation of the
adverse environmental and social impacts. Bright star management and
14. Market Destination The residents of the wereda and the surrounding area
Merchants and drivers
Business community
Different occasional guest
Domestic and foreign tourists and visitors
15. Recommendation The project is economically, financially and socially feasible. For
instance, financially, the project’s IRR is 63.45% which is greater
than discount rate (12%) and NPV is equal to Br. 12,994,064.32.
Unkn
None
Medi
High
Low
own
Soil erosion or flooding concerns (e.g., due to highly um
erodible Construction material or steep gradients)
Number of stream crossings or disturbances
Wet season excavation
Creation of quarry sites or borrow pits
Significant vegetation removal
Wildlife habitats or populations disturbed
Be located within or nearby environmentally Sensitive
areas (e.g. intact natural forests, Wetlands, etc.)?
Cultural or religious sites disturbed
Economic or physical resettlement required
New settlement pressures created
Create solid waste on the sites (including excess fill
materials from grading and excavation activities, scrap
wood and Gelanls, and small concrete spills).
Cause poor water drainage and increase the risk of
5
water-related diseases such as malaria or Bilharzias?
Cause air pollution? (Fugitive dust, etc.)
Cause contaminated land?
Create Noise and vibration
Aesthetic disruption to the surrounding areas?
Cause Potential Physical hazards ( Like accident or
injury or illness due to repetitive exposure to
mechanical action or work activity)
Cause and spread communicable disease (poor
sanitation and, sexual transmission and vector-borne
infections)
Cause poor Water Quality and less water Availability
Cause traffic congestion (Traffic accidents, injuries
and fatalities among members of the Community )
Cause flood and gully formation at the outlet or end
point of drainage canals
Possible impact on individual’s property, including
impact on houses, fences and other structures
cause more traffic accidents, since pedestrian walk way
is not properly considered as part of the road design
Affect any air quality standard or contribute substantially to
an existing or projected air quality problems
6
Conflict with any local policies or ordinances
protecting biological resources, such as a tree
preservation policy or ordinance