( MS-04.00 ) DUCT WORK

Download as pdf or txt
Download as pdf or txt
You are on page 1of 32

Project Name : Face Lift Project

Owner : Dreem
Main Consultant : Elite Consolidated Engineers
Main Contractor : Aircom Electromechanics

Material Submittal No. ( PO Number MS-(M/E/STL/C/Arch)-01-00 )

Owner : Dreem Date : 28 - 09 -2024

Main Consultant : Elite Consolidated Engineers To : ECE

Main Contractor : Aircom Electromechanics Subject : MS-04-00

Material Submittal Category :

Structural Civil Architectural Mechanical Electrical


Firefighting Low Current
Location : ALL FLOORS Spec. Ref : 15815 HVAC Fire Alarm
Plumbing Lighting
Drawing Ref : ALL DRAWINGS BOQ Ref : ITEM NO 15815 ( ‫) ح‬ Power

Item Material Submittal Description Attachments NO. Of Copies Notes


1 DUCT WORK FACTORY BROCHURE 1

For Approval Reviewed


Information Others

Contractor Sign

Technical Engineer
Signature :
Name : ABDALLA RAMADAN

Consultant Sign

Consultant Receiving
Signature :
Document Controller :

Consultant Comment:

Approved (A) Approved as Noted (B) Revise and Resubmit (C) Rejected (D)

Consultant Engineer : PM Engineer : Contractor Engineer : Owner Engineer :

Date : Date : Date : Date :

ECE-SD-01 1/1 Issue Date: 8/8/2022