0% found this document useful (0 votes)
39 views7 pages

Proposal Compilement

Uploaded by

April Jurica
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views7 pages

Proposal Compilement

Uploaded by

April Jurica
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 7

Rural Trade Hubs: A Consolidation Project for Rural Farmes Product in

Barangay Tinago Norala South Cotabato

The proposed project, *Rural Trade Hubs: A Consolidation Project for


Rural Farmers' Products, aims to support small-scale farmers in Barangay
Tinago, Norala, South Cotabato, this proposed project will start on August 18.
2024 and will end in December 30, 2025, by establishing centralized hubs for
the collection, processing, and distribution of agricultural products. These
trade hubs will act as a resource for farmers, providing essential infrastructure
such as storage facilities, modern processing equipment, and direct market
linkages. By creating efficient, localized trade centers, the project seeks to
alleviate common barriers that rural farmers face, such as limited access to
larger markets and the lack of efficient storage and handling facilities, which
often reduce the quality and marketability of their products.

Currently, farmers in Barangay Tinago struggle with post-harvest losses,


limited market access, and insufficient resources for product processing and
storage. Without adequate infrastructure, farmers are forced to sell their
products at lower prices to intermediaries or risk product spoilage, impacting
their income and economic stability. This situation also limits their ability to
compete in larger markets, as they lack the means to add value to their
products or maintain consistent quality. The absence of a consolidated
marketplace and support network means that farmers are often isolated, with
limited knowledge of market demands, fair pricing, and effective marketing
strategies.

The propsed project Rural Trade Hubs addresses these critical issues by
providing a structured, centralized marketplace and essential tools for
processing, storage, and distribution. Through these trade hubs, farmers of
Barangay Tinago will gain better control over the quality and pricing of their
products, access training on sustainable production practices, and connect
directly with buyers and markets. By enhancing the resilience and productivity
of Barangay Tinago’s agricultural sector, this project aims to empower
farmers, reduce post-harvest losses, and promote long-term economic growth
and self-sufficiency within the rural community.

Objectives
Generally, the objective of this study is to establish rural trade hubs that
empower rural farmers and producers by providing them with direct market
access, reducing their reliance on intermediaries, and increasing their
profitability.
Particularly, this aims on the following objectives:
1. Improved direct access to larger markets through the establishment of
trade centers in key locations, enabling them to sell their goods at
reasonable rates.
2. Improved infrastructure in order to decrease post-harvest losses and
improve the flow of products.
3. Improved farmers ability in investing in their enterprises and increasing
productivity.
Work Breakdown Structure

Rural Trade Hubs: A Consolidation Project for Rural


Farmers Product in Barangay Tinago Norala South
Cotabato

Initiation Planning Execution Close out

Project Design and Construct Rural


Charter planning of Trade Hub
Project
Development the Rural Facility
Completion
Trade Hub

Project Team
Formation
Identify Monitor and
Necessary Evaluate Rural Trade
Utilities and Hub Transfer
Needs of Ownership

Risk Intallation of
Assessment Electricity
Estimate Cost
RURAL TRADE HUB ACTION PLAN
Activities Budget (Php) Personnel-in-Charge

Initiation
1.Project Charter Development
Php 80,000 Project Manager,
Establish the projects Goals and Objectives
2.Project Team Formation
Determine and Examine Stakeholders Php 100,000 Project Manager,
Describe the roles and responsibilities of stakeholders.
3.Risk Assessment
Determine the possible risk. Php 170,000 Risk Management Team
Create specialized plans for every danger.
Planning
4.Design and planning of the Rural Trade Hub
Determine the size, layout, and specific infrastructure
Project Manager
Develop Detailed Design Drawings Php 80,000.00
Conduct Design Reviews
5.Cost Estimation Plan
Prepare a Work Breakdown Structure (WBS) Php 80,000.00 Project Architect & Engineer,
Estimate Costs for Each Task
6.Identify necessary Facility Needs equipment
Classify Equipment by Function Php 50,000.00 Project Architect/Engineer
Prioritize Equipment Based on Importance
Execution
7.Construction and Infrastructure Development
Construction Manager,
Employ contractors and supervise the construction process Php 300,000.00
Contractor
Constructing the primary building components

Activities Budget (Php) Personnel-in-Charge


8.Monitor and Evaluate
Determine what needs to be improved Php 600,000.00 Procurement Team

9.Installation of Utilities
Set up an a system for electricity Php 100,000.00 Installation Team

Closing
10.Project Completion
Audit
Financial Reporting Php 50,000.00 Project Manager
Ensure transparency and accountability in financial management
RURAL TRADE HUB PROJECT SCHEDULE
2024 2025
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Activities
Initiation
Establish the
projects Goals
and Objectives
Determine and
Examine
Stakeholders
Describe the
roles and
responsibilities
of stakeholders
Determine the
possible risk.
Create
specialized
plans for every
danger

Determine the
size, layout,
and specific
infrastructure

2025 2024
Activities Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Develop
Detailed
Design
Drawings
Conduct
Design
Reviews
Prepare a
Work
RURAL TRADE HUB GANTT CHART
August
Activities 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 1 18 1 2 21 2 23 2 25 2 2 28 2 3
3 7 9 0 2 4 6 7 9 0
Th F Su S M T W Th F Su S S M T W Th F Su S M T W Th F Su S M T W T
h
Initiation Phase
Project Team
Formation

Establish the
projects Goals
and Objectives

Determine and
Examine
Stakeholders

Describe the
roles and
responsibilities
of stakeholders