The propsed project Rural Trade Hubs addresses these critical issues by
providing a structured, centralized marketplace and essential tools for
processing, storage, and distribution. Through these trade hubs, farmers of
Barangay Tinago will gain better control over the quality and pricing of their
products, access training on sustainable production practices, and connect
directly with buyers and markets. By enhancing the resilience and productivity
of Barangay Tinago’s agricultural sector, this project aims to empower
farmers, reduce post-harvest losses, and promote long-term economic growth
and self-sufficiency within the rural community.
Objectives
Generally, the objective of this study is to establish rural trade hubs that
empower rural farmers and producers by providing them with direct market
access, reducing their reliance on intermediaries, and increasing their
profitability.
Particularly, this aims on the following objectives:
1. Improved direct access to larger markets through the establishment of
trade centers in key locations, enabling them to sell their goods at
reasonable rates.
2. Improved infrastructure in order to decrease post-harvest losses and
improve the flow of products.
3. Improved farmers ability in investing in their enterprises and increasing
productivity.
Work Breakdown Structure
Project Team
Formation
Identify Monitor and
Necessary Evaluate Rural Trade
Utilities and Hub Transfer
Needs of Ownership
Risk Intallation of
Assessment Electricity
Estimate Cost
RURAL TRADE HUB ACTION PLAN
Activities Budget (Php) Personnel-in-Charge
Initiation
1.Project Charter Development
Php 80,000 Project Manager,
Establish the projects Goals and Objectives
2.Project Team Formation
Determine and Examine Stakeholders Php 100,000 Project Manager,
Describe the roles and responsibilities of stakeholders.
3.Risk Assessment
Determine the possible risk. Php 170,000 Risk Management Team
Create specialized plans for every danger.
Planning
4.Design and planning of the Rural Trade Hub
Determine the size, layout, and specific infrastructure
Project Manager
Develop Detailed Design Drawings Php 80,000.00
Conduct Design Reviews
5.Cost Estimation Plan
Prepare a Work Breakdown Structure (WBS) Php 80,000.00 Project Architect & Engineer,
Estimate Costs for Each Task
6.Identify necessary Facility Needs equipment
Classify Equipment by Function Php 50,000.00 Project Architect/Engineer
Prioritize Equipment Based on Importance
Execution
7.Construction and Infrastructure Development
Construction Manager,
Employ contractors and supervise the construction process Php 300,000.00
Contractor
Constructing the primary building components
9.Installation of Utilities
Set up an a system for electricity Php 100,000.00 Installation Team
Closing
10.Project Completion
Audit
Financial Reporting Php 50,000.00 Project Manager
Ensure transparency and accountability in financial management
RURAL TRADE HUB PROJECT SCHEDULE
2024 2025
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Activities
Initiation
Establish the
projects Goals
and Objectives
Determine and
Examine
Stakeholders
Describe the
roles and
responsibilities
of stakeholders
Determine the
possible risk.
Create
specialized
plans for every
danger
Determine the
size, layout,
and specific
infrastructure
2025 2024
Activities Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Develop
Detailed
Design
Drawings
Conduct
Design
Reviews
Prepare a
Work
RURAL TRADE HUB GANTT CHART
August
Activities 1 2 3 4 5 6 7 8 9 10 11 12 1 14 15 16 1 18 1 2 21 2 23 2 25 2 2 28 2 3
3 7 9 0 2 4 6 7 9 0
Th F Su S M T W Th F Su S S M T W Th F Su S M T W Th F Su S M T W T
h
Initiation Phase
Project Team
Formation
Establish the
projects Goals
and Objectives
Determine and
Examine
Stakeholders
Describe the
roles and
responsibilities
of stakeholders