Safety Observation Report


SOR# 23 Date: 12/5/2024 Contractor: BCC Issued By:
Severity Rating
REF # AJE-SOR-BCC-000023 Project: ROSHN Dammam Project RICKY CABALO

High Immediately
Note: These observation are issued in accordance with ROSHN and AJ HSSE Standards and procedures. Failure to rectify and closeout identified HSSE observations
may result in the issuing of ROSHN HSE Violation. Medium 48 Hours
Low 3 Days

No. Zone Location Category Observation Action Required Observation Picture(s) Contractor's Response Closeout Photo(s)

For all mobile construction plant


and vehicle operations where a
Construction Plant & Equipments have been banks-man is required, the
1 ZONE-1 SITE Vehicle observed moving around banks-man must be positioned in
Management the site without banks-men front of the equipment with clear
line
of sight to the operator.

All operatives must wear safety


footwear, safety helmet, safety
A worker has been
General Safe glasses and any other personal
2 ZONE-1 SITE observed not wearing PPE
Working Practices protective equipment (PPE)
at construction site.
appropriate for the work that
they are undertaking.

Two or more people shall not


Lightweight Staging, 2 workers have been work from the same step-ladder
3 ZONE-1 SITE Trestles, Steps & observed on the same
Ladders or ladder. Ladder safety shall be
ladder.
discuss in TBT.
Sensitive #

electrical cable has been


ensure that cables are routed in
found on the ground where
Temporary Electrical such a manner as to prevent an
4 ZONE-1 SITE workers are walking
Safety obstruction, cable damage or a
around and causing trip
trip hazard.
hazard.

All excavations and trenches


5 ZONE-1 SITE
Excavations & excavation found without shall be appropriately identified
Trenching barricade and signage. with signs, warnings and
barricades.

Lack of cooled drinking Contractor shall supply cooled


Construction Site
6 ZONE-1 SITE
Welfare water near the workers at water at all times during the day
site has been observed. for the entire workforce.

Signature:
High Risk Medium Risk Low Risk

Fall Arrest & Work


Restraint Systems, Nets
& Rope Access

Roofing, Fragile
Surfaces & Openings
HSE Coverage
Demolitions
Stability of Structures
(Temporary works (use
of falsework))

Asbestos
Confined Space
Management
Excavations &
Trenching
Work near energized
electrical lines
Work in a
contaminated/flammabl
e atmosphere

Positioning of pre-cast
panels
Work on, adjacent to a
live traffic route
Traffic & Logistics
Management
Diving operations
Stored Energy – Lock-
out / Tag-Out (LOTO)
Lifting Operations
Temporary Electrical
SafetyWork
Hazardous
PermitsPlant &
Construction
Vehicle Management
Scaffolding
Hot Works
Lightweight Staging,
Trestles, Steps &
Ladders
Man-Lifts
Working Platforms
Manual Handling
Operations
Hot & Cold Injuries
Control of Substances
Hazardous to Health
(CoSHH)

Barricade
HSE Communication
Access Control
Engineering & Vehicle
Workshops
Fire Prevention &
Protection
Detection of Buried
Services
Storage of Materials
Noise & Vibration
Management
Occupational Health
Surveillance
Air Quality
Signage
Housekeeping
Site Office Safety
Personal Protective
Equipment (PPE)
Construction Site
Welfare
Medical Services &
Management
General Safe Working
Practices
Fall Arrest & Work Restraint Systems, Nets & Rope Access, Roofing, Fragile Surfaces &
Openings, Demolitions, Stability of Structures (Temporary works (use of
falsework)),Asbestos, Confined Space Management,, Excavations & Trenching, Work near
energized electrical lines, Work in a contaminated/flammable atmosphere, Positioning of
pre-cast panels,Work on, adjacent to a live traffic route, Traffic & Logistics Management,
Diving operations, Stored Energy – Lock-out / Tag-Out (LOTO), Lifting Operations, Temporary
Electrical Safety, Hazardous Work Permits.
Fall Arrest & Work Restraint Systems, Nets & Rope Access
Access Control
Air Quality
Asbestos
Confined Space Management
Construction Plant & Vehicle Management
Construction Site Welfare
Control of Substances Hazardous to Health (CoSHH)
Demolitions
Detection of Buried Services
Diving operations
Engineering & Vehicle Workshops
Excavations & Trenching
Fire Prevention & Protection
General Safe Working Practices
Housekeeping
Signage
Hazardous Work Permits
Hot & Cold Injuries
Hot Works
Barricades
HSE Coverage
Lifting Operations
Lightweight Staging, Trestles, Steps & Ladders
Man-Lifts
Manual Handling Operations
Medical Services & Management
Noise & Vibration Management
Occupational Health Surveillance
Personal Protective Equipment (PPE)
Positioning of pre-cast panels
Roofing, Fragile Surfaces & Openings
Scaffolding
HSE Communication
Site Office Safety
Stability of Structures (Temporary works (use of falsework)
Storage of Materials
Stored Energy – Lock-out / Tag-Out (LOTO)
Temporary Electrical Safety
Traffic & Logistics Management
Work in a contaminated/flammable atmosphere
Work near energized electrical lines
Work on, adjacent to a live traffic route
Working Platforms
Rope Access
of falsework)

You might also like