0% found this document useful (0 votes)
141 views2 pages

Breeam Contractor Checklist v2

Uploaded by

kachan x
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
141 views2 pages

Breeam Contractor Checklist v2

Uploaded by

kachan x
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

BREEAM Checklist

Contractor Site Requirements

Issue Completed Link


RIBA Stage 2

Wst01 Undertake a Pre-demolition waste audit. ☐


Ensure that an Ecology Review has been undertaken
LE all during RIBA Stage 2 and prior to ANY works being ☐
placed or carried out on site.
Review and implement the Responsible Construction
Man03 Management Criteria. This can be supported using ☐
the Considerate Constructors Scheme.
Review the SRE Man03 Site monitoring sheets and
Man03 plan for their implementation once the site becomes ☐
active.
RIBA Stage 4 / 5

Appoint an on-site commissioning manager and complete


Man04
the Commissioning and Testing Schedule. ☐

Review and collate material, product and finishes VOC


Hea02
datasheets. ☐
Review and collate material and product EPD certificates
Mat03 (aim to use only BES 6001 and ISO 14001 certified
materials).

Review the Resource Management Plan commitments


Wst01
and ensure the site is set up for compliance. ☐

Man04 Submit the air test results. ☐


RIBA Stage 6

Undertake a Thermographic Survey and rectify any


Man04
insulation/cold bridge defects. ☐

Note: This document is intended as guidance only. Consult your BREEAM AP or


Assessor to ensure compliance is achieved.

Copyright © 2020 by SRE Limited


[email protected]
01730 710044
Issue Completed Link

Complete two Building User Guides and Training


Schedules
Man04 - 1 technical guide for facilities management ☐
staff.
- 1 non-technical guide for building occupants.

Ensure the Indoor Air Quality Plan requirements are


Hea02
carried out. ☐


RIBA Stage 6

Hea05 Submit the acoustic testing results.

Ene02 and Ensure all energy and water meter labelling is simple
Wat02 (not coded) clear and visible. ☐

Tra02 Check that cycle storage is compliant. ☐

Compile data and finalise the Resource Management


Wst01
Plan. ☐

Ensure Waste storage signage is in place to clearly


Wst03
segregate recyclable waste storage areas. ☐

Pol05 Provide the results of the noise impact assessment. ☐

Note: This document is intended as guidance only. Consult your BREEAM AP or


Assessor to ensure compliance is achieved.

Copyright © 2020 by SRE Limited


[email protected]
01730 710044

You might also like