Thru-Tubing Systems

Phone 337-606-0031 Fax 337-606-0039

Thru-Tubing
Screen Hang-Off
Recommended Procedure
Quote#:

Oil Co.
Generic

Prepared for:

Service Point Prepared By: Lee W. Coulon III


New Iberia, LA. June 26, 2019
337-606-0031 Acct Rep: Josh Clark
337-606-0031
WELL INFORMATION
PREPARED FOR:

WELL INFO:

TUBING: 3 ½” 9.3# L-80 BTS-8

CASING: 9-5/8” 47.0# HCP-110 LTC

MINIMUM ID: 2.750”

PERFORATIONS:

GROSS PERFS:

NET PERFS:

PBTD:

FORMATION:

FLUID TYPE: N/A

BHP: N/A

BHT: N/A

MAX. DEV
\
Thru-Tubing Pre-Pack Screen Hang-Off
1. Prep well as per Oil Co. procedures.

2. R/U slick-line, RIH with 2.725” gauge to?. Note and record T.D. and any tight spots in the
tubing. POOH.

3. RIH hole with the following WL bottom hole assembly:


OD ID LENGTH DEPTH
(Feet) (Feet)
End of Bull Plug
A Bull Plug, 1-1/2” NU 10 RD 2.200 /////// 0.33
B 1-1/2" NU 10RD Premium Screens (125 Micron) 2.300 1.610 20.00
L-80 2.300" O.D. x 1.610" I.D. 4.83lbs/ft 10 ft
Long (6 Jts.)
C 1 ½” NU 10 RD N-80/L-80 Blank Pipe w/ 2.200” 1.900 1.610 10.00
OD Collars
D 1-1/2" NU 10RD Long Safety Joint 2.500" O.D. 2.500 1.500 2.29
with 2 1/2" GS Fish Neck
E 3-1/2" 9.3# Hang-off Crossover for Paragon II 2.700 1.610 0.33
Packers 1-1/2" NU 10RD Pin
F 3-1/2" 9.3# Paragon II Packer 2.725" O.D. x 2.725 1.625 3.80
1.625" I.D. Seal Bore
Total Length Left in Well Bore 36.75
G 3-1/2” 9.3# E-line Adapter Kit 2.700 ////// 1.05
H E-line Setting Tool 1.690 /////// 6.23
Total BHA Length 44.03
Note: Wire-Line Company will supply power charge and igniter.

4. Go in hole with BHA at a maximum in-hole rate of 60' per minute. Record pick-up, neutral
and slack-off weights every 1000’. Run correlation log and tie-in tool string. Stop at ?.
Confirm depth. Set packer at ? and release the assembly. POOH.

5. Return well to production as per Oil Co. procedures. Recommend starting at low flow rate
with gradual increases over time while monitoring.
TITLE:
Proposed Screen Hang-Off

SERVICE SPECIALIST:

SIZE WEIGHT GRADE THREAD

COMP. INHIBITOR COATING CASING 5 17 L-80


FLUID: : :
SCREEN SAND JOB LINER
SIZE: SIZE: #:
BHP BHT (° MAX. ZONE TUBING 3 1/2 9.2 N-80 NEW VAM
(psi): F): DEV.: DEV.:

No. DEPTH-FT. LENGTH-FT. O.D. I.D. DESCRIPTION

1 1 3.80 2.725 1.625 3-1/2" 9.3# PII Packer 2.725" O.D. x


1.625" I.D. Seal Bore

2 2 0.33 2.700 1.610 3-1/2" 9.3# Hangoff Crossover

3 3 2.29 2.500 1.500 1-1/2" NU 10RD Shear Joint w/ 2-1/2" GS

4 4 10.00 1.900 1.610 1-1/2" NU10RD Blank Pipe w/ 2.200 " OD Collars

5 5 20.00 2.300 1.610 1-1/2" NU 10RD Premium Screens (2 Jts.) L-80


2.300" O.D. x 1.610" I.D. 4.83lbs/ft 10.00ft

6 6 0.33 2.200 N/A 1-1/2' NU10RD Bull Plug

NOTES:
36.75 Total Length of Assembly
Thru-Tubing Fishing Procedure
1. Prep well as per Oil Co. procedure(s).
(Note the retrieving tool may be run on CT w/ jars, accelerator and BSC’s)

2. R/U Slick-Line. RIH with 2.725” OD impression block. Tag the top of fish (Release Neck)
at set depth. Note and record T.D. and any tight spots in the tubing. POOH. Inspect
impression block for scars and markings.

3. RIH with Slick-Line BSC, Wt. Bars, Spang Jars, BSC and TTS buttress Pulling Tool.

4. Locate Buttress Shear Down Pulling Tool on fishing neck of the Packer, Tap-down slightly
to fully engage fish neck on the plug.

5. Jar-up to unset Packer (±4,800 lbs over pick-up weight). Slowly pick-up to ensure plug
has been released. Stop. Shut down for 1 hour to ensure elastomers are in the relax
stage.

6. After waiting, proceed in pulling assembly out the hole. It may be necessary to continue to
Jar to release the screens as well as the packer. Note: Watch carefully while POOH. Utilize
jars if needed during fishing operations. POOH.

7. Repeat steps 6 thru 9 to fish out screen. Note: Shear joint has a 2-1/2” GS Profile fish
neck.

8. Continue Oil Co. procedure.