Sunday 4PM To 1230AM Mainframe Operations Schedule - Revised
Sunday 4PM To 1230AM Mainframe Operations Schedule - Revised
16:00 –
o Check clipboard for Schedules, Tech Change Sheets and Requests. Review
Turnover Log.
19:30 –
Run the CA7 Backups, after UCJW0001 is released and in TSO on hold.
o IN TSO1/SDSF enter pre ucjw0001;i This will display the job. Look to the
right side of the display under ‘Status’ it should say HOLD. Then proceed to
the next step
o Shut down CA7
o You must be logged into CA7 with ca7con/master to shutdown
CA7
o In CA7 type “/shutdown,z3”. Verify that CA7 is down by checking
TSO1; CA7ONL should not be displayed in the active jobs.
o Once CA7ONL has ended, type “i” into TSO1. This will bring up the
input queue. Scroll to the job UCJW0001 and place an “a” next to it
and press CTRL. This will run the CA7 backups. Once completed
check for error codes.
00:00 –
Shut down CICS regions on IPO1
IMPORTANT: CICS must be brought down before IDMS
o From the MVS Master Console type “s shutcics”, or from your desktop
enter /s shutcics… this will bring down regions:
CICSP500
CICSP400
CICSP300
CICSP0IT
CICSP200
CICSP100
o Confirm all CICS regions are down before continuing!
o Verify CICS Regions are down, then enter “S DB2DOWN” and press
CTRL. This will shut down:
o DSN1MSTR
o DSN1DBM1
o DSN1DIST
o DSN1SPAS
o WTOR on IPO1
o @---> NOTICE ****** NOTICE
o @---> THIS WILL BRING DOWN DB2 AND DSN1ADMT!!!!!
o @---> ARE YOU SURE YOU WANT TO DO THIS?
o @---> PLEASE SHUTDOWN ARSSOCKD PRIOR TO REPLYING
o @---> TO THIS MESSAGE !!!!!
o @---> REPLY C TO CONTINUE OR
o @---> CANCEL THIS PROCEDURE BY ISSUING (C DB2DOWN)
o Reply C to Continue
o Confirm that all the DSN’s are down by displaying all active jobs in the
TSO1 sessions (use the command “DA”) and make sure that the DSN’s
listed above are longer displayed.
o Confirm all previous steps are complete before continuing!
Shutdown IDMSPROD V1
o From the MVS Master Console type “ d r,l” to view reply number or
from your desktop in TSO1/SDSF enter “sr” this will display system
requests
o IDMSPROD @xx REPLY TO @@@$$$>>>>> IDMSPROD <<<<<$$
$@@@: xx= reply number
o Type the reply number and shutdown on the console.
Example: 24shutdown
There will be 1 WTOR that needs replied
o @xx ENTER CV NUMBER (01) TO CONFIRM SHUTDOWN OF
IDMSPROD
o Enter xx,01
o After the command is entered continue to monitor the main console for
IDJI0103 jobs. Once they have ended successfully confirm that
IDMSPROD is no longer displayed in the active jobs view of the TSO
session. (Use the command “DA”). Once IDMSPROD is down continue to
the next step.
Note: all previous steps must be completed before running the splits.
00:10 –
o Release BUDTRIG1 in CA7 after IDMS & CICS regions are down on
IPO1 & the IPO1 defrags completed successfully. (You will be able to log
on to TSO1 and/or TSO2)
o This will trigger BUDDBS2D on IPO2
o BUDDBS2D triggers BUDCA7RD on IPO1
o Verify that BUDDBS2D & BUDCA7RD have completed
before moving to the next step
o Release BUDSTART in CA7
o This will trigger three jobs” Jobs BUDSNPCR, BUDSNPLK, and
BUDSPQRB which will run on IPO2/TSO2 consecutively.
o NOTE: These jobs output to IPO1.
o After these jobs have completed check the output for condition codes
o From the IPO1/TSO1 session in the command input field type
“pre buds*;o”
o These run on IPO2
o Then place an “S” next to each job output and press CTRL, the first
output will display, press F3 to scroll thru each output. With a clean
run of each job continue to the next step.
00:15 –
o Successful completion of BUDSPQRB will trigger BUDTAPON.
This starts the backups and will kick off ISJW0047 (Submit time of 00:45)
o Around this time ISJDCHCK will run automatically – this issues a WTOR
message on the IPO1 console to check if CICSP0IT is up
@========> *** OPS ***
@========> CHECK TO SEE THAT CICSP0IT IS ACTIVE
@13 REPLY C TO CANCEL MESSAGE
Verify that CICSP0IT is up. In SDSF on IPO1, enter
Pre cicsp0it;da. Once it is verified that CICSP0IT is up, reply C to the
WTOR. xx,c