II
Note:-
1. First piece approval for appearance (Visual parameters) will be done per shift.
2. To avoid under cure don’t allow starting production of 1st shot till the mid (setting) temp. For the mould is achieved.
3. In case of power failure, first piece approval for dimensional inspection is required.
4. In case of m/c breakdown, first piece approval after m/c getting repaired is required for dimensional inspection.
5.Visual Inspection will be Carried out once in 3 hours.