100% found this document useful (1 vote)
866 views2 pages

Foa New

Uploaded by

RS MANIKANDAN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
866 views2 pages

Foa New

Uploaded by

RS MANIKANDAN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

FOA FOR ABNORMALITIES

FIRST PIECE APPROVAL REPORT FOR ABNORMALITIES Doc. No.F09QA03


Rev NO / Dt :01/ 30/04/2015

DIMENSIONS (mm) Date:


OBSERVED VISUAL REMARKS
CAVITY POWER CUT INSPECTION SPECIFICA
SHIFT NO.
PART NAME PART NO PARAMATER GOOD SIGN
TIME METHOD TION 1 2 3 4 5 INS QTY REJ QTY
QTY

REVIEWED BY : CHECKED BY : APPROVED BY :


Note:- SAMPLES COLLECTING
1. First piece approval for any Abnormalities of man machine and methods LOCATION
2. Any Abnormalities like undercure,short fill,tear don't allow to continued the production
3. In case of power failure, first piece approval for dimensional inspection is required.
4. In case of m/c breakdown, first piece approval after m/c getting repaired is required for dimensional inspection.
5. In case of dimensional inspection not covered for all the cavities till mould change over, then remaining cavities will be covered whenever mould will be reloaded.
FIRST PIECE APPROVAL REPORT Doc. No. F09QA02
Rev
PART NAME : PART NUMBER : Date : NO / Dt :02/ 30/04/2015

DIMENSIONS (mm) VISUAL Rejection Details


NUMBER REQ. OBSERVED
SHIFT OF TIME REMARKS SIGN
CAVITIES
PARAMETER INSPECTION METHOD SPECIFICATION 1 2 3 4 5
Ins. Qty. Rej.Qty. C.M S.F U.C A.B T.R S.U.C OTHER
S

II

REVIEWED BY : CHECKED BY : APPROVED BY :

Note:-

1. First piece approval for appearance (Visual parameters) will be done per shift.
2. To avoid under cure don’t allow starting production of 1st shot till the mid (setting) temp. For the mould is achieved.
3. In case of power failure, first piece approval for dimensional inspection is required.
4. In case of m/c breakdown, first piece approval after m/c getting repaired is required for dimensional inspection.
5.Visual Inspection will be Carried out once in 3 hours.