RESUME

PERSONAL DATA

SURNAME ASEMOTA
FIRST NAME/INITIALS OGHOGHO/O
DATE OF BIRTH 30TH APRIL 1970
STATE OF ORIGIN EDO
LGA OREDO
SEX MALE
MARITAL STATUS MARRIED
CONTACT ADDRESS 11 AKALI STREET, OFF EKEHUAN ROAD, UZEBU QUARTERS, BENIN CITY
CONTACT PHONE NUMBER +234 812 201 4363, +234 803 37 120 57, +234 805 20 986 91
E-MAIL ADDRESS [email protected]

PROFESSIONAL INTRODUCTION

OGHOGHO ASEMOTA is a COREN Registered Mechanical Engineer (R25119) with over 20 years’
experience in the Oil &Gas, and Steel sectors.

Oghogho has successfully managed projects in the following areas:

 Modification and Upgrade of Oil and Gas Producing Facilities


 Oil and Gas Pipelines/Flow-lines design, fabrication, construction, and installation
 Installation Water treatment plants and supply system
 Wellhead platforms fabrication and Installation
 Oil and Gas Pipeline and facilities upgrade works in Shell’s Western Division ( Egwa, Odidi, Jones
Creek, Tunu,etc),
 Chevron’s Escravos Gas to Liquid plant insulation project, etc.

He has also contributed to:

 Front End engineering activities for various Oil and Gas projects and the Development of
marginal fields in on-shore and off-shore the Niger Delta area of Nigeria.
 Various Gas utilization and solution studies
 He has been part of the transition team, as a Senior Facilities Engineer and one of the Hijuka Ltd
assignee on behalf of the prospective new owner of OML 25, as part of the Shell divestment
exercise in Nigeria.

He holds a Bachelor’s of engineering degree in Mechanical Engineering and a Master of Science degree
in Engineering Management from the University of Benin, Benin City.
EDUCATIONAL QUALIFICATION DATE

B. ENG (Hons) - Mechanical Engineering 1989


University of Benin, Benin City, Nigeria

M.Sc. - Engineering Management 2008


University of Benin, Benin City, Nigeria

WORK EXPERIENCE

Company: PELFACO Limited


Position: Project Manager
Duration: April 2017 to Date
Responsibilities: Manage the construction/execution/Installation of Oil and Gas Facilities
( Pipelines, Flowlines, Jackets and platforms) construction activities including
piling works.
Manage the removal of Boulders and Wrecks from Lagos River Channel

Company: HIJUKA Limited


Position: Project Management & Facilities Engineering Consultant
Duration: June 2014 to March 2017
Responsibilities:

 Audit and verification of OML 42 (NPDC/Neconde JV) re-entry Project works (Flowstations,
compressor station, flowlines, oil and gas pipelines, wellhead platforms etc.) for purpose of
Reserve base lending by Lending Institutions led by Standard Bank.
 Participated as part of the Hijuka Ltd team in the development of Operational Readiness
Assurance plan for Crestar Limited to ensure that the People, System, Processes, and Contracts
were ready to ensure effective operation of the OML 25 facilities (Flow stations, Gas plants,
Pipelines,etc).
 Participation in the OML 25 Transition team on behalf of the prospective new owner of the
Block. Reviewed OML 25 (Flow stations, Gas plants, Pipelines etc.) handover documents for
Crestar Ltd.

Company: Midwestern Oil and Gas Company Plc


Position: Project Engineer
Duration: August 2012 to June 2014
Responsibilities:

 Participated in Gas Solution/utilization study as a team member


 Participated in the development of relevant Operational Readiness Assurance activities and
documents to ensure that the People, System, Processes, and Contracts were ready to ensure
effective operation of the pipeline.
 Participated in Front end, conceptual and detailed engineering designs aspects of the
Umusadege to Eriemu 12” X 52Km Pipeline and associated end facilities/appurtenances
(Pumps, LACT units, Storage tanks, Pig trap system etc.) project scope.
 Participated in Placing orders for pipeline and ancillary materials procurement, shipping, and
custom clearance.
 Prepared project execution strategy plan and most of contract documents for the project with
others.
 Participated in planning activities leading up to the award of the construction contracts,
including community related works to ensure timely delivery of the project.
 Participated in HAZOP reviews of the design for Umusadege to Eriemu 12” Pipeline and
associated appurtenances.
 Supervised the construction/commissioning of the above 12” pipeline and the installation of the
associated appurtenances.
 Followed up on Quality Control/Quality assurance program and standards.
 Ensured compliance to safety rules and regulations.

Company: Everest Engineering services Limited


Position: Site Manager (Escravos gas to liquid Project)
Duration: April 2010 to July 2012
Responsibilities:

 Managed all activities leading to and including the Insulation of Vessels, piping, pumps etc.
 Liaised with client authorized personnel.
 Managed the company’s equipment
 Ensured that that project was executed in safe and timely manner
 Ensured that project was delivered in accordance with client’s quality requirement

Company: HIJUKA Limited


Position: Lead Project Engineer
Duration: April 2009 to March 2010
Responsibilities:

 Participated actively in the preparation of Expression of Interest (EOI) document for the
development of a balanced Scorecard System (BSC), the due diligence of an Early Production
Facility for funding purpose, the field development plan of various marginal fields.
 Participated in the preparation of Tender Documents and subsequent evaluation, Scope of work
for Clients projects.

Company: GEC Petroleum Development Company Ltd, Victoria Island, Lagos


Position: Lead Project Engineer
Duration: June 2008 – March 2009
Responsibilities:

 Lead project engineer in the delivery of world class oil and gas development projects.
 Worked with the Development Engineer and others to agree project requirements, design basis,
level 1-3 cost estimates, and technical specifications.
 Carried out project management and engineering activities based on agreed concept and
ensured that the Design Basis are effectively translated to project specifications, with level 4
schedule and cost estimates.
 Lead and participated in planning, scheduling, costing, contracting, contractor supervision,
design reviews, progress tracking, control, and reporting for the design, execution and
commissioning of facilities required for the production of oil and gas including flow lines and
tie-in to producing facilities, leading up to project delivery and hand over.
 To ensure that the project is brought from paper to life / finished product fit for hand over for
Operations by carrying out activities that include overseeing fabrication works, planning and
execution of site works, procurement of project materials, supervision of execution contracts
and contractors in a manner to ensure safe delivery of projects.

Additional responsibilities included the following-


 To work with the Operations Readiness Engineer to ensure that the Systems, the Processes, the
People, and Contracts for the Operate Phase are ready before project hand over.
 To ensure with others that Quality control and Quality Assurance are incorporated and
implemented in the delivery of projects from planning phase through execution to control and
Hand-over phase.
 To ensure with others that the execution of project deliverables meet Engineering standards
and agreed specifications
 To ensure with others that HSE issues are considered and implemented in all phases of the
project delivery.
 To participate in the pre-mobilization of the various contractors.

Company: The Shell Petroleum Development Company of Nig. Ltd.(Forcados-yokri


integrated Project(FYIP))
Position: Project Engineer
Duration: August 2006- May 2008
Responsibilities:

Supervisory roles in the following:


 Fabrication/installation of Off-shore cluster platforms
 Review of Design for Existing Offshore cluster platforms upgrade.
 Conceptual design of cluster platform upgrades
 Laying of bulklines from cluster platforms to associated flowstations
 Commissioning of the Cluster Platforms and associated bulklines..

Company: The Shell Petroleum Development Company of Nig. Ltd.


Position: Company Site Representative
Duration: May 2005-July 2006
Responsibilities:

 Provision of water supply facilities to outstation/rig locations


 Sizing/installation of submersible Pumps in outstation/drilling Rig locations.
 Laying and installation of Waterline pipes
 Redevelopment/flushing of existing low yield water wells.
 Preparation of contract scope of work (e.g fishing of dropped pumps, drilling of new boreholes
etc).
 Supervision of water borehole Drilling activities
 Premobilisation, mobilization and supervision of water supply contractors.
 Follow up on Quality Control/Quality assurance program and standards such as Shell std const.
Spec.
 Ensured compliance to safety rules and regulations.

Company: Environex Environmental Services Ltd.


Position: Project Manager
Duration: March 2002 - April 2005
Responsibilities:

 Planning/Execution of the installation of 30m3 water treatment plant and its associated pipings
in Forcados Terminal, secondary Zone including managing sub-contractors and laising with SPDC
Engineers
 Fabrication/Installation water treatment Piping including preparation of welding procedure
documentations. Optimization of the supplied water supply system with the provision of
additional treatment plant units, ring main supply laying and installation of Waterline pipes
 Piping system, additional overhead tank and redeveloping an existing additional well.
 Follow up on Quality Control/Quality assurance program and standards such as Shell std const.
Spec.
 Ensured compliance to safety rules and regulations.

Delta Steel Company LTD Plant Rehabilitation Project: Supervisory role in the following:
Planning and execution of the rehabilitation of the plant water supply/sewerage system including
commissioning as per under list:
 Overhaul of Industrial water supply (Circuit I-IV and scale pit.) and Water Treatment plant
circulating Pumps.
 Installation of new Chemical Dosing System (Pumps, Mixers,and Piping ) in water treatment
plant & Industrial water supply(Circuit II,IV & V).

Company: GRAMEN PETROSERVE NIG. LTD

Position: Project Engineer


Duration: May 2001 - Feb.2002
Responsibilities:
SPDC PROJECTS: Managerial/Supervisory role in the following:
 Construction of Delivery lines of various sizes
 Fabrication/Installation and modification of Pipeline Pigging barrels to accommodate intelligent
pig on various delivery lines in SPDC western division such as Uzere pigging manifold, Egwa II
Pigging Manifold etc..
 Follow up on Quality Control/Quality assurance program and standards.
 Ensured compliance to safety rules and regulations
NIGERIAN GAS COMPANY LTD PROJECT:
 Supervision of the Fabrication/installation of 2 Nos. Pig receiving barrels for 10” gas line and 1
No. Pig launching barrels for 12” gas line at NGC Olomoro pigging manifold.
 Preparation of welding documents such as welding procedure specification sheet,welding
procedure qualification specification etc.
 Preparation of project close-out report and as-built drawings
 Follow up on Quality Control/Quality assurance program and standards.
 Ensured compliance to safety rules and regulations.
Company: GREDOR NIGERIA LTD
Position: Site Manager
Duration: June 2000 - May 2001
Responsibilities

JONES CREEK FIELDS:-Managerial/Supervisory roles in the following:


 Fabrication and installation/replacement of 40 Nos.double deck wellhead platforms in Jones
Creek fields including the salvaging of the existing wellhead platforms.
 Laying and welding of 4” Flowlines from various wellheads in Jones creek field to the flow
station including Ditching/back filling works, tie-ins, River crossing of the lines, line
flushing,hook-up of the completed lines to the well and station manifold andCommissioning of
the various lines. Also included is the salvaging of the old lines.
 Laying and welding of 4”gaslines (to replace 2” Lines) from various wellheads in Jones creek field
to the compressor station including Ditching/back filling works, tie-ins, River crossing of the
lines, line flushing, Hook-up of the laid lines to the well and station manifoldand Commissioning
of the various lines. Also included is the salvaging of the old lines/risers.

 Fabrication /installation of Wellhead Risers pipes complete with fittings for the above flowlines
and gas lines
 Integrity checks of existing flowlines by hydro-test of the various lines
 Management of Site (consisting of 100 personnel, sub-contractors),equipment (such as
Houseboat,Swamp excavators,Cranes, barges, Tug boats etc.)
 Liaising with SPDC engineer and station operators in the execution of the various jobs.
 Follow up on Quality Control/Quality assurance program and standards.
 Ensured compliance to Health, safety and Environmental standards and regulations.


Company: DEC OIL and GAS LTD
Position: Project Engineer
Duration: October 1998 –May 2000
Responsibilities:
EGWA I/II FIELDS:- Supervisory roles in the following:

 Fabrication and installation/replacement of 40 Nos.double deck wellhead platforms in EgwaI/II


fields. Including the salvaging of the existing wellhead platforms.
 Laying / welding of 4”flow lines from various wellheads in EgwaI/II field to the flow stations
including Ditching/back filling works,Tie-ins, River crossing of the lines, line flushing,hook-up of
the completed line to the well and station manifold andCommissioning of the various lines. Also
included is the salvaging of the old lines and wellhead risers
 Laying /welding of 4”gaslines/Risers (to replace 2” Lines) from various wellheads in EgwaI/II
field to the compressor station including Ditching/back filling works, tie-ins, River crossing of the
lines, flushing, Hook-up of the laid lines to the well and station manifoldand Commissioning of
the various lines. Also included is the salvaging of the old lines
 Fabrication /installation of Wellhead Risers pipes complete with fittings for the above flowlines
and gas lines.
TUNU FIELDS:- Supervisory role in the following:
Fabrication and installation of 1Nos multi-well cluster (6- wells) platform on TUDP 2 Location in Tunu Fields
(Swamp) complete with the following:
 7 Nos vertical pig launching barrels consisting of 10” ,12” sizes complete with all accessories such as
Ball valves, pig signaler set, piping from wellhead to pig launcher, 7 Nos Riser/Approach Piping and
well head Hook-up Arms.
 6 Nos. individual Xmas tree upper deck, 2 Nos Pigging facility Platform complete with 2” removable
handrails and ladder and 4 Nos Jib Cranes with thrust bearings.
 I Nos. Protective deck with topside lined with Ekki Wood.
 1 set 3” Diameter removable Handrails and Boat landing Facilities.
 Grit blasting/painting of all civil/mechanical/Piping structure on the cluster platform in accordance
with shell std. Spec.
 Installation of Petro-tech Instrument panel and all instrument tubings (sub-contractedto KAMACON
Engineering Ltd).
 Function testing of the Jib Cranes to its designed safe working load of 1.5 Tons and Xmas tree upper
deck ,Commissioning of the Cluster Platform and instrumentation panel.
 Preparation of work procedures, welding procedures, As-built drawings documentation and project
close-out report.
 Management of Site (consisting of 100 personnel, sub-contractors,equipment (suchas Houseboat,
Swamp Excavators, Cranes, barges, Tug boats etc.).
 Follow up on Quality Control/Quality assurance program and standards including Hydrotest of pipings
and integrity test of ball valves.
 Ensured compliance to safety rules and regulations.
 Construction of delivery lines of various sizes from cluster platform to Tunu flow station

Company: EnerNational Nigeria LTD


Position: Project Co-Ordinator
Duration: 1994 - 1998
Responsibilities:

Supervisory role in the following:


Coordinating and supervising the execution of the routine pigging of all Trunk and delivery lines in SPDC
western division using unidirectional and bi-directional pigs.

 Planned the monthly routine pigging programme for both land and swamp areas and reporting same
to management and SPDC.
 Ensured that the pigging of all lines is carried out according to plan and specification including
evacuation
of drained crude oil to nearby flowstation or saver pit.
 Ensured that the workshop is equipped to maintain the pigs and accessories in good condition at all
times.
 Ensured that any case of stuck pig in the line is rectified by activating the auxiliary Pumping
programme for stuck pig retrieval.
 Ensured maintenance of pigging barrel facilities such as drain line valves,barrel doors etc. and report
status of each pigging manifold facilities.
 Provision of logistic support in the execution of intelligent pigging of lines.
 Provision of pigging/pig maintenance data for the company for invoicing purpose.
 Participated in the commissioning of the 24” Trans-Remos pipeline from Opukushi flow station to
Forcados Terminal.
 Follow up on Quality Control/Quality assurance program and standards.
 Ensured compliance to Health, safety and Environmental standards and regulations

Company: Rosula Nig. Ltd


Position: Project Engineer
Duration: 1993 - 1994
Responsibilities:

Supervisory role in the following:


 Supervised the installation of Angelo-Po kitchen Equipment such as Deep fry, Electric/gas cooker
ranges, boiling pans, serving trys etc. including the water and gas supply piping and electrical
supply to the various equipment.

Company: (National Youth Service Corps Scheme)


Position: Maintenance Engineer
Duration: 1990 - 1991
Responsibilities:

Vehicle Maintenance Activities.


 Ensured that routine, break –down and the planned preventive maintenance of the vehicles are
carried out by the workshop and with parts used, properly log in the maintenance job cards
 Ensured that routine, break –down and planned maintenance are carried out using high quality
parts and only certified repaired vehicles are released to the Transport department.
 Monitoring of maintenance cost for each Vehicle

SKILLS ACQUIRED

 Conceptual, Excellent interpersonal skill, Managerial, and Technical skills.


 Computer literacy (MS-word, MS –Excel, MS –Project, MS-PowerPoint, Outlook, etc).
 Extensive knowledge and application of design codes and Engineering practice and standard
construction specifications.
 Quality assurance and Quality control in construction activities.

COURSES ATTENDED
 Project Management
 Quality management.
 Reliability in engineering
 Human factor engineering
 Enhanced contract management 1 ( ECM 01)
 Environmental Management (ISO 14001) in Pipeline operations.
 Waste management in SPDC

You might also like