Asemota Resume - 10th April 2024-6
Asemota Resume - 10th April 2024-6
Asemota Resume - 10th April 2024-6
PERSONAL DATA
SURNAME ASEMOTA
FIRST NAME/INITIALS OGHOGHO/O
DATE OF BIRTH 30TH APRIL 1970
STATE OF ORIGIN EDO
LGA OREDO
SEX MALE
MARITAL STATUS MARRIED
CONTACT ADDRESS 11 AKALI STREET, OFF EKEHUAN ROAD, UZEBU QUARTERS, BENIN CITY
CONTACT PHONE NUMBER +234 812 201 4363, +234 803 37 120 57, +234 805 20 986 91
E-MAIL ADDRESS [email protected]
PROFESSIONAL INTRODUCTION
OGHOGHO ASEMOTA is a COREN Registered Mechanical Engineer (R25119) with over 20 years’
experience in the Oil &Gas, and Steel sectors.
Front End engineering activities for various Oil and Gas projects and the Development of
marginal fields in on-shore and off-shore the Niger Delta area of Nigeria.
Various Gas utilization and solution studies
He has been part of the transition team, as a Senior Facilities Engineer and one of the Hijuka Ltd
assignee on behalf of the prospective new owner of OML 25, as part of the Shell divestment
exercise in Nigeria.
He holds a Bachelor’s of engineering degree in Mechanical Engineering and a Master of Science degree
in Engineering Management from the University of Benin, Benin City.
EDUCATIONAL QUALIFICATION DATE
WORK EXPERIENCE
Audit and verification of OML 42 (NPDC/Neconde JV) re-entry Project works (Flowstations,
compressor station, flowlines, oil and gas pipelines, wellhead platforms etc.) for purpose of
Reserve base lending by Lending Institutions led by Standard Bank.
Participated as part of the Hijuka Ltd team in the development of Operational Readiness
Assurance plan for Crestar Limited to ensure that the People, System, Processes, and Contracts
were ready to ensure effective operation of the OML 25 facilities (Flow stations, Gas plants,
Pipelines,etc).
Participation in the OML 25 Transition team on behalf of the prospective new owner of the
Block. Reviewed OML 25 (Flow stations, Gas plants, Pipelines etc.) handover documents for
Crestar Ltd.
Managed all activities leading to and including the Insulation of Vessels, piping, pumps etc.
Liaised with client authorized personnel.
Managed the company’s equipment
Ensured that that project was executed in safe and timely manner
Ensured that project was delivered in accordance with client’s quality requirement
Participated actively in the preparation of Expression of Interest (EOI) document for the
development of a balanced Scorecard System (BSC), the due diligence of an Early Production
Facility for funding purpose, the field development plan of various marginal fields.
Participated in the preparation of Tender Documents and subsequent evaluation, Scope of work
for Clients projects.
Lead project engineer in the delivery of world class oil and gas development projects.
Worked with the Development Engineer and others to agree project requirements, design basis,
level 1-3 cost estimates, and technical specifications.
Carried out project management and engineering activities based on agreed concept and
ensured that the Design Basis are effectively translated to project specifications, with level 4
schedule and cost estimates.
Lead and participated in planning, scheduling, costing, contracting, contractor supervision,
design reviews, progress tracking, control, and reporting for the design, execution and
commissioning of facilities required for the production of oil and gas including flow lines and
tie-in to producing facilities, leading up to project delivery and hand over.
To ensure that the project is brought from paper to life / finished product fit for hand over for
Operations by carrying out activities that include overseeing fabrication works, planning and
execution of site works, procurement of project materials, supervision of execution contracts
and contractors in a manner to ensure safe delivery of projects.
Planning/Execution of the installation of 30m3 water treatment plant and its associated pipings
in Forcados Terminal, secondary Zone including managing sub-contractors and laising with SPDC
Engineers
Fabrication/Installation water treatment Piping including preparation of welding procedure
documentations. Optimization of the supplied water supply system with the provision of
additional treatment plant units, ring main supply laying and installation of Waterline pipes
Piping system, additional overhead tank and redeveloping an existing additional well.
Follow up on Quality Control/Quality assurance program and standards such as Shell std const.
Spec.
Ensured compliance to safety rules and regulations.
Delta Steel Company LTD Plant Rehabilitation Project: Supervisory role in the following:
Planning and execution of the rehabilitation of the plant water supply/sewerage system including
commissioning as per under list:
Overhaul of Industrial water supply (Circuit I-IV and scale pit.) and Water Treatment plant
circulating Pumps.
Installation of new Chemical Dosing System (Pumps, Mixers,and Piping ) in water treatment
plant & Industrial water supply(Circuit II,IV & V).
Fabrication /installation of Wellhead Risers pipes complete with fittings for the above flowlines
and gas lines
Integrity checks of existing flowlines by hydro-test of the various lines
Management of Site (consisting of 100 personnel, sub-contractors),equipment (such as
Houseboat,Swamp excavators,Cranes, barges, Tug boats etc.)
Liaising with SPDC engineer and station operators in the execution of the various jobs.
Follow up on Quality Control/Quality assurance program and standards.
Ensured compliance to Health, safety and Environmental standards and regulations.
Company: DEC OIL and GAS LTD
Position: Project Engineer
Duration: October 1998 –May 2000
Responsibilities:
EGWA I/II FIELDS:- Supervisory roles in the following:
Planned the monthly routine pigging programme for both land and swamp areas and reporting same
to management and SPDC.
Ensured that the pigging of all lines is carried out according to plan and specification including
evacuation
of drained crude oil to nearby flowstation or saver pit.
Ensured that the workshop is equipped to maintain the pigs and accessories in good condition at all
times.
Ensured that any case of stuck pig in the line is rectified by activating the auxiliary Pumping
programme for stuck pig retrieval.
Ensured maintenance of pigging barrel facilities such as drain line valves,barrel doors etc. and report
status of each pigging manifold facilities.
Provision of logistic support in the execution of intelligent pigging of lines.
Provision of pigging/pig maintenance data for the company for invoicing purpose.
Participated in the commissioning of the 24” Trans-Remos pipeline from Opukushi flow station to
Forcados Terminal.
Follow up on Quality Control/Quality assurance program and standards.
Ensured compliance to Health, safety and Environmental standards and regulations
SKILLS ACQUIRED
COURSES ATTENDED
Project Management
Quality management.
Reliability in engineering
Human factor engineering
Enhanced contract management 1 ( ECM 01)
Environmental Management (ISO 14001) in Pipeline operations.
Waste management in SPDC