Struct
Struct
Struct
DPWH
OFFICE OF THE BUILDING OFFICIAL
RE
TA
A B C E F IN G H I J
NG
IN
B' D G
CITY/MUNICIPALITY
TI
WA
A'
O
LL
FO
FO
OT
L
AL
IN
G
W
NGI
IN
TA
RE
4.25 M
8 TB/LB 6.00 M
C1F1
TB/LB 6.00 M 38.11 M
STRUCTURAL
C1F1
6.00 M
5.69 M TB/LB
C1F1
B
TB/L
6.00 M
C1F1 TB/LB
6.01 M
C1F1 TB/LB
3.85 M
TB/LB
TB/LB
7 C1F1
TB/LB
C1F1 C1F1
C1F1 8
TB/LB
TB/LB
TB/LB
B
6.03 M
TB/L
TB/LB
TB/LB
5.46 M 5.70 M
C1F1 TB/LB
C1F1 9.28 M
TB/LB
C1F1
C1F1 TB/LB
C1F1
TB/LB C1F1
B
TB/LB
TB/L
TB/L
C1F1
6 5.99 M
0.79 M TB/LB C1F1
6.00 M
3.85 M
C1F1 3.41 M 6
C1F1 C1F1 TB/L
5 B
C1F1 TB/LB TB/LB C1F1
4.28 M TB/L
B
C1F1
B
B
5.20 M
TB/L
TB/L
6.00 M 6.21 M
5.64 M
0.71 M
PERIMETER WAL
C1F1 C1F1 C1F1
4
TB/LB TB/LB
L/PROPE
B
6.00 M
TB/L
TB/L
5.79 M
RTY LINE
C1F1 TB/LB C1F1 TB/LB C1F1
3
2.27 M
2.18 M
C2F1 TB/LB C2F1 TB/LB C2F1 TB/LB C2F1
2
7.89 M
9.42 M
1 10.99 M
5.30 M 6.18 M 6.29 M
PROPERTY LINE
S FOUNDATION PLAN
1 SCALE : 1:200
CERTIFIED BY : PRC : VALIDITY : PROJECT TITLE : APPROVED BY/ REPRESENTATIVE : DRAFT BY : SHEET NO. :
40CM X 30CM CONCRETE COLUMN 0.1m concrete slab 150 mm THK CHB
1.50 M
compacted soil 2.0M x 2.0M CONCRETE FOOTING
0.15 M
0.30 M 2.00 M
SCHEDULE OF COLUMN PEDESTAL/FOOTING
COLUMN FOOTING
LABEL depth width 16mm Ø 10mm Ø depth length width height
B.W.
(mm) (mm) (mm) ties (mm) (mm) (mm) (mm)
MIN.
C1F1 400 300 8 5 @ 50mm, 5 @ 75mm,
5 @ 100mm, REST @150mm 800
2000 2000 400 16 - 16 Ø
16MMØ HORIZONTAL BARS AT 280MM SPACING O.C.
C2 400 300 8 5 @ 50mm, 5 @ 75mm,
5 @ 100mm, REST @150mm
1.80 M
C3 400 300 8 5 @ 50mm, 5 @ 75mm,
5 @ 100mm, REST @150mm
REGULAR SOIL BACKFILL
RETAINING WALL FOOTING
GRANULAR BACKFILL
20MMØ BARS AT 100MM SPACING O.C. 2.30 M
PERFORATED DRAIN PIPE 0.4M x 0.3M COLUMN
0.70 M 1.40 M
0.50 M
2.30 M
DETAIL OF TRUSS
S STRUCTURAL DETAIL
3 SCALE : NTS
CERTIFIED BY : PRC : VALIDITY : PROJECT TITLE : APPROVED BY/ REPRESENTATIVE : DRAFT BY : SHEET NO. :