Agile-Process-Innovation

Download as pdf or txt
Download as pdf or txt
You are on page 1of 79

Agile

Process Innovation

Hacking Lean Six Sigma


to Maximize Results

Jay Arthur

© MMXIX KnowWare International Inc. www.qimacros.com 1


Trends Affecting Lean Six Sigma
1. Changes in the U.S. economy
Motorola developed Six Sigma for a manufacturing, but this is no longer a main part
of the economy. Service industries such as healthcare do not need all the tools in the
Six Sigma toolkit. Trying to teach services everything needed for jobs in
manufacturing is foolish and unnecessary. It’s overproduction.

2. Continuous, Accelerating, Disruptive Change


Growing up in the 1950s, everything seemed stable. Then in the 1960s we had civil
rights, women’s rights, the Vietnam war, Haight-Ashbury, the space race and the
internet. I went to work for Mountain Bell, one of the Baby Bells, in 1973. It was a
cash cow that had been solid and unchanging for over 50 years. I worked at Bell Labs
from 1975-1978 using Unix which became the operating system for internet servers
all over the world. Apple launched their first computer in the late 70s; IBM followed
in the early 80s. Moore’s law has been doubling the speed and halving the cost of
computing for over 30 years with no end in sight. Bandwidth has been doubling in
speed and having in cost ever nine months. My smart phone has more computing
power and storage than the entire planet when I started working.

Cable companies started wiring homes for high-speed data. Cell phones began to
replace landline phones. While the Justice Department was dismantling AT&T,
technological disruption was jackhammering its very foundation. The phone company
couldn’t see or embrace the changes. GE, once the shining star of Six Sigma, has
fallen in to trouble. Motorola, the birthplace of Six Sigma, fell from grace in the cell
phone market to be replaced by iPhones and Galaxies. Google launched in 1998.

© MMXIX KnowWare International Inc. www.qimacros.com 2


3. Agile Methodologies
Faced with continuous, accelerating, disruptive change, businesses have had to find
ways to respond. Surprisingly, they found a faster, better, cheaper path in Information
Technologies (IT) of all places.
While Moore’s law was making hardware massively more powerful and productive,
software productivity had barely improved since the 1960s. In 2001, a group of
software engineers banded together to adapt Lean principles to software engineering.
They called this new methodology Agile.
In the last decade, Agile methodologies have worked their way into HR, procurement,
sales, marketing and other business functions. In the last few years, the Harvard
Business Review has published many articles about the power of Agile.
Lean Six Sigma is anything but agile. Spending months training Black Belts to train
Green Belts and waiting months or years for results is no longer acceptable. This
might have been possible in the last century, but it won’t work for 21st Century
quality. We need to adapt Agile to Lean Six Sigma.

Better, Faster and Cheaper


In 1990, when I first got involved in quality improvement at US West, one of the Baby Bells,
I told my boss that quality was about getting better, faster and cheaper. In typical Bell System
fashion, he told me that I could have any two of the three: better and faster, but not cheaper;
faster and cheaper, but not better; or better and cheaper, but not faster.

© MMXIX KnowWare International Inc. www.qimacros.com 3


The basic goal is to do things faster, cheaper, safer, better.
– Mark Albrecht, director of the White House National Space Council, 1990

I was in one of the first groups trained in Total Quality Management (TQM) that would later
evolve into Six Sigma. I was trained as a trainer and we started training lots of team leaders. We
started hundreds of teams. A year later, only three teams had delivered any results. The rest were
stuck or had been abandoned. I see this often in companies that launch Six Sigma.

Even though our training was excellent, it didn’t seem to translate into fixing the phone
company. I decided to use the principles of TQM on itself and treat each failed team as a defect.
Then I started to apply the tools of quality to team failures. I did some root cause analysis. Here’s
what I found:

 The five-day training and big 3-ring binders telegraphed the message that this was
difficult and time consuming (not true).
Solution: I created a 24-page “Coloring book” to simplify learning the key tools and I
used Accelerated Learning methods to teach them in four hours while simultaneously
solving a business problem or two. Download the current version from
www.qimacros.com/pdf/six-sigma-action-plan.pdf.

 Teams were formed before they knew what problem they needed to solve which caused
teams to flounder. They usually wanted to fix someone else’s process—their suppliers,
customers or management, not their own process.

© MMXIX KnowWare International Inc. www.qimacros.com 4


Solution: I started using data analysis to laser focus the improvement before we picked
the team. I found that if I could create a control chart and Pareto charts of defects,
mistakes or errors, I could ensure the team’s success. And I could often do this in a few
hours or days, not weeks or months. QI Macros Data Mining Wizard will now do this in
seconds. Automation is one of the keys to Agile.

 Teams met for only one hour a week, which slowed progress to a halt and violated two
Lean principles: eliminate delays and institute one-piece flow.
Solution: I switched to two-hour root cause sessions based on the data analysis.

 I developed some rules such as:


o Whalebone diagramming (instead of fishbone) is a sure sign of failure to properly
focus the improvement.

o Never start a team that can’t succeed.


o Let data analysis pick the problem to be solved (never brainstorm).
… And others that you’ll discover in this book.

Fool-Proof Six Sigma Recipe


It was midway through my second year as a team leader that I stumbled upon a fool-proof
recipe for Six Sigma success. The head of our division thought there were too many false fire
alarms in our building. I sat down with the building manager and we reviewed the data and
created our first successful improvement story in an afternoon.

© MMXIX KnowWare International Inc. www.qimacros.com 5


That’s when I learned it was possible to use the tools to solve problems in hours, not weeks,
months or years. I began to use the same strategy with every team. We found ways to save $20
million in postage and $16 million in adjustments in a matter of hours. We found ways to
eliminate 8,000 unnecessary repair appointments a month, again in a matter of hours.

Sadly, in 1995, after five years of TQM, primarily focused on flowcharting processes not
improving them, the leadership team shut down the quality department. Five years later, Qwest
bought US West and in 18 months the stock went from $60 to $1 per share. Employment went
from 70,000 to 30,000. A decade later, CenturyLink bought Qwest. I believe that our failure to
solve the company’s core business problems left it vulnerable to takeover and ultimately its
demise.

Free, Perfect and Now


I no longer say that quality is about getting better, faster and cheaper, because the paradigm
has shifted. Google, Amazon and Apple have taught people that you can get whatever you want
free, perfect and now! In the new environment, it’s no longer good enough to be better, faster
and cheaper.

I remember when I used to go to a brick-and-mortar bookstore to buy a book. If they didn’t


have it in stock, they would order it for me and I’d wait a week for delivery. Then Amazon made
it possible to order the book online (now) and have it delivered overnight if necessary (now). In

© MMXIX KnowWare International Inc. www.qimacros.com 6


2007, the book industry took a huge leap toward now: you can download any eBook to a Kindle,
Nook, or iPad immediately and pay less than you would for printed copy of the book (cheaper,
but not quite free).

Amazon understands America’s obsession with now (saving time). Amazon and publishers
understand that they can make as much money selling an eBook at a lower cost than they can if
they print, store and ship a physical book. E-books eclipsed the sales of physical books in 2011.
Digital books and entertainment are the new “Gold Rush.” Amazon cut 2.5 hours off its order-to-
ship time in the last couple of years.

The iPhone and Android phones make it possible to search the web and consume TV and
audio media right now. Same is true of iPads and other tablets; and it’s “free.”

Internet bandwidth is doubling in speed and halving in cost every nine months. As Chris
Anderson, author of Free, says: “When something halves in price each year, zero is inevitable!”

Now most people will say: “But everything can’t be free!” True, but I say the new standard
every business will be judged by is how close they can get to free, perfect and now. To do this
companies need fast, affordable and flawless execution.

Unfortunately, the old trial-and-error, gut-feel approaches to improving performance are too
slow and error-prone to deliver anything close to free, perfect and now. The only hope any
business has is to adopt the methods and tools of Lean Six Sigma to simplify, streamline and
optimize performance. Lean Six Sigma will not fix a company’s inability to innovate, but it will
ensure that any innovation is delivered in a fast, affordable and flawless manner.

Customers have changed. Customers are smarter than most businesses. They quickly figure
out which restaurants, retail shops, plumbers or whatever are fast, affordable and flawless.
Critical care centers have sprung up because hospital emergency departments, in spite of their
name, are too slow, averaging four hours for each patient according to Press Ganey. This statistic
has not changed for a decade. It’s not that some hospitals aren’t doing it faster and with better
outcomes for patients; it’s just that most are not.

Most service businesses haven’t explored Lean Six Sigma because they think it only applies
to manufacturing. Information technologies departments haven’t explored it because they don’t

© MMXIX KnowWare International Inc. www.qimacros.com 7


think it applies to their software artisans. Of course, this is just lazy humans hoping the storm of
free, perfect and now will somehow pass them by.

Lean Six Sigma can be applied anywhere to any business process. Anytime anything is
produced or delivered, from a haircut to a jet engine, it’s because people follow a process. It may
be a fast, affordable, flawless process or a sluggish, error-prone costly one, but it’s still a process.
And Lean Six Sigma will simplify, streamline and optimize any process.

Unfortunately, Lean Six Sigma has its own problems. People think it costs too much, takes
too long and is too complex. Based on how most people implement it, this is no surprise. Over
half the time, it fails to put down roots or is plucked like a weed by a new CEO or leadership
team.

Unstoppable Lean Six Sigma


Lean Six Sigma can be fast, affordable and flawless, maximizing results while minimizing
costs. To do so requires a fresh approach using what I call the Magnificent Seven Tools (more
about these tools later). Training doesn’t have to take weeks or months; it can be done in a matter
of hours. Projects don’t have to take weeks or months to complete; I’ve done million-dollar
projects in five days or less. The actual analysis can be done in under four hours, but sometimes
implementation can take longer because it has to go through some sluggish, error-prone process
(software enhancements for example).

Now some people will ask why everyone seems to be using the traditional Lean Six Sigma
implementation approach. Are they all wrong? I say, not all, but most service businesses are
headed for disappointment. Traditional Six Sigma training is designed to teach you everything

© MMXIX KnowWare International Inc. www.qimacros.com 8


you need to know to improve a manufacturing plant’s factory floor. Since only one person in
100 works on a factory floor, those are the people who need the traditional approach. The other
99 out of 100 don’t need all that stuff and it creates confusion, not results.

You can spend a lot of time and money training a lot of multicolored “belts,” start teams that
flounder and wonder what went wrong. Don’t let this happen to you.

There is a better way, but you have to be willing to ease into it rather than jump into it. You
have to be willing to narrow your focus, because performance problems aren’t spread evenly
over the company like butter on bread; they cluster in a few activities and gaps. To narrow your
focus, you have to be willing to reduce the number of people involved. That’s right, to accelerate
adoption of Lean Six Sigma and increase results, you will want to reduce the number of people
involved. No more wall-to-wall, floor-to-ceiling implementations. Lean Six Sigma needs teams
laser-focused on solving core problems using data.

No one needs yet another jargon-ridden, statistical recipe book on how to bake Lean Six
Sigma into a corporate culture. It doesn’t work because cultures aren’t cakes. Cultures are more
like a herd of bison or a school of fish always moving and shifting, sometimes slowly, sometimes
quickly. We need a way to nudge the culture toward excellence that doesn’t invite a charge from
the bulls or trigger a stampede.

Companies don’t need more Green Belts or Black Belts. They need more
Money Belts—people who can quickly find ways to save time and money to
boost productivity and profitability. They have to learn how to eliminate the
Three Silent Killers of productivity and profitability: Delay, Defects and
Deviation. When they eliminate the delays, it makes the product or service available now. When
they eliminate defects and deviation, products and services become perfect. Eliminating defects
and deviation reduces costs so that products and services become more affordable, even free.

Agile Process Innovation will focus on the Magnificent Seven “Money Belt” Tools necessary
to achieve stunning, breakthrough results. Master these and you can then add other methods and
tools as required. As you improve, you’ll begin to see opportunities to innovate.

© MMXIX KnowWare International Inc. www.qimacros.com 9


Eliminate delay, defects and deviation, and your business will experience a quantum leap
toward free, perfect and now. To do so you don’t need long, expensive training or endless team
meetings. You need 4-hour Money Belts focused on the most critical problems to start getting
results immediately. It won’t take long for customers to notice the improvement.

My Story

I took a couple of programming courses in college and computer software has been the focus
of my life ever since. I’ve written and maintained software for mainframes, minicomputers and
microcomputers (e.g., QI Macros®). I’ve used methodologies from Structured Programming to
Waterfall to inventing my own (Rapid Evolutionary Development) which is an early version of
what would become Agile. I’ve been doing “Agile” software development most of my adult life.

I know how to build error-prone software slowly and how to grow robust software quickly.
By bridging my understanding of Agile software development and quality improvement, I’ve
come to an approach I call Agile Process Innovation.

I’ve been involved with quality since 1990, long before Six Sigma became popular and right
at the beginning of awareness of the Toyota Production System (TPS – a.k.a. Lean). My goal has
been to spread the ‘gospel’ of quality and to create 100 Million Money Belts worldwide. This is
a challenge because most people are afraid of math and statistics.

What if you could automate the math, statistics and much of Lean Six Sigma’s analysis with
software such as QI Macros? Could you shortcut everyone’s learning experience? Could you
help them achieve results in minutes or hours instead of months and years?

As the author of the QI Macros, Lean Six Sigma Demystified and Lean Six Sigma for
Hospitals, I sit at a strange crossroads. I talk with many people who have been trained in Six
Sigma but have never done a project. I find this wildly disappointing. If employees have been
trained, but never done a project, I’d have to consider their training to have been a waste of time
and money; it’s a form of overproduction—one of the speed bumps of Lean.

I’m equally disappointed when employees finally try to apply Lean Six Sigma, that they are
often confused about where to start. Their training covered so many methods and tools

© MMXIX KnowWare International Inc. www.qimacros.com 10


(overproduction) that they aren’t sure what to do first. And this confusion stems from Six
Sigma’s roots in manufacturing.

While the U.S. manufacturing is still a two trillion-dollar business, manufacturing


employment has been shrinking…shrinking to the point that only one employee out of every 100
needs all of the tools in Lean Six Sigma. The other 99 only need a few tools to solve most
service-oriented operational problems.

The Long Tail of Tools

Lean Six Sigma training covers what I call the “long tail” of improvement methods and tools.
This includes every tool you might ever need if you work in manufacturing. But they are overkill
when starting the Six Sigma journey. And Black Belts freely admit that when faced with a more
complex problem, they often have to look up what to do because they’ve forgotten everything
from their training

Solution: Let’s get back to the fundamentals. What few key tools does a person need to know to
solve most operational problems? What are the fundamentals?

“Whenever I read a ‘simple’ recipe, my first question is can I use half the ingredients and
half the steps and get something people will not just love, but perhaps even prefer?”
-Timothy Ferriss – author of The 4-Hour Chef

In my 20+ years of improvement projects, I have found that a few key tools used in the right
order can help companies save millions of dollars, cut costs, boost profits, boost productivity and
even save lives. I’ve had months of quality training on everything from TQM to DOE, yet I have
found that the Magnificent Seven Tools diagnose and treat almost everything. And when I

© MMXIX KnowWare International Inc. www.qimacros.com 11


occasionally do need to add another tool, there are plenty of examples and insights that are only a
Google away.

In other words, you don’t need to know everything to start getting results. You don’t need
months of training to start solving problems. You don’t need to know formulas, decision trees or
a lot of jargon. You just need to know a handful of tools, use software to create them and apply
them to start getting results immediately.

Tim Ferriss and The 4-Hour Chef

Tim Ferriss, author of The 4-Hour Workweek, The 4-Hour Body and The 4-Hour Chef, is
obsessed with accelerated learning and, as far as I can tell, wants to learn everything. The first
chapter of The 4-Hour Chef is about "meta learning” – learning how to learn fast, because, he
says, “Speed of learning determines value.” And this is one of the problems with Lean Six Sigma
training—it’s too slow.

Two skills—fast learning and clear thinking are the key to 21st-century personal skills.
- Colin Rose and Malcolm J. Nichol- Accelerated Learning for the 21st Century.

Reading Ferriss’ book led me to examine my own approach to helping people grasp Lean Six
Sigma.

My Quality Journey

In the early 1990s, I attended a four-day workshop with W. Edwards Deming. While it was
great to see the grand master in action, my “trainer” mind was thinking that if he’d used some
accelerated learning techniques, we could have covered the same ground in one day with greater
comprehension.

In 1990, when our five-day training classes with big 3-ring binders failed to produce
successful teams and results, I started applying Six Sigma to itself. I applied everything I know
about accelerated learning to Six Sigma, and later, Lean. I quickly reduced my classes to a one-
day workshop.

I used to spend time teaching participants how to choose the right control chart, but I found
that I could build these decisions into the QI Macros software. I found that with the QI Macros

© MMXIX KnowWare International Inc. www.qimacros.com 12


Wizards—Chart, Control Chart, Data Mining, PivotTable and Statistics—almost anyone could
start drawing charts and solving problems immediately.

I found that when I teach the tools in the proper sequence: 1) control chart, 2) Pareto chart, 3)
fishbone, and have participants practice immediately using test data provided with the QI
Macros, they skip over their fear of statistics. Then I have them jump into analyzing their own
data. There’s nothing more satisfying than getting participants to analyze their own data and start
doing root cause analysis and solving seemingly unsolvable problems right in the classroom.
One company I trained found $90,000 in savings that afternoon. You can too.

The tools of learning are not fixed, nor is the amount of time needed to become
world-class.
– Timothy Ferriss

I teach Lean complete with value stream maps, spaghetti diagrams and action plans to
simplify and streamline key processes immediately in less than four hours. And I teach Six Sigma
while delivering projects ready for root cause analysis or implementation in less than four hours.
In one day, my students leave the classroom knowing more about Six Sigma than I knew after
weeks of excellent training in 1990.

So, can you learn to be instantly productive with Six Sigma in four hours? Yes, I believe you
can. Will you know everything in the Six Sigma body of knowledge (BOK)? Not a chance, but
this way you can start solving the most common types of problems immediately and then add
methods and tools as needed.

© MMXIX KnowWare International Inc. www.qimacros.com 13


Will you be instantly proficient? No, but who is? It can take one-to-two years and $250,000
to bring a Black Belt fully up to speed. By applying the Magnificent Seven Tools for only a few
hours every week using QI Macros, you’ll be able to move your department or company from 3-
sigma to 5-sigma in 18-24 months. You’ll start solving seemingly unsolvable problems in a
matter of hours.

4-Hour Lean Six Sigma Training

It is possible to vastly compress most learning. – Timothy Ferriss

To make these 4-hour training sessions easily accessible and affordable, I’ve put my Agile
Lean Six Sigma Yellow Belt training online, for free, at www.lssyb.com. I call it ”Money Belt”
training, because it focuses on using the key tools to save time and money while boosting
productivity and profitability. Now anyone can learn to be a Money Belt.

Certification

People learn from projects, not training.


-Ken Norton – author of We Don’t Make Widgets

Sadly, I have found that many people only want a Green Belt or Black Belt certification to
enhance their resume, not their company. Many certification programs do not require an
improvement project to demonstrate competency. Most certification programs do not provide the
student with Six Sigma software (e.g., QI Macros®).

I think that finding ways to make a business faster, better, cheaper and safer is a lot of fun.
It’s a skill you can use forever, wherever you work. It will spill over into your personal life,
leaving you more time for family and friends. And it will leave the world a better place. But hey,
it’s up to you. Haven’t you waited long enough to start learning Agile Process Innovation?

Jay Arthur
Denver, CO
January 2019

© MMXIX KnowWare International Inc. www.qimacros.com 14


© MMXIX KnowWare International Inc. www.qimacros.com 15
If you don’t have the time to read this book, here’s what it says:
Lean Six Sigma, as it is traditionally implemented, takes too long, costs too
much and often fails to deliver the expected results. Instead of 160 hours over four
months, you can learn the core skills and start making improvements in four hours
or less. You don’t need to know everything to do anything; you only need to know
how to use a handful of tools in the proper sequence to start getting results
immediately. This is what I call Agile Process Innovation.
The future belongs to companies whose “Money Belts” can use these tools to
maximize productivity and profits while minimizing costs.

Questions this book answers:


1. What is Agile Process Innovation?
2. Why do we need it now?
3. Why is it foolish to spend two-to-four weeks learning Lean Six Sigma when
you can do it in eight hours or less?
4. What are the key tools you need to solve 99% of all business problems?
5. How can every business, large and small, service and manufacturing use the
methods and tools of Lean Six Sigma to start achieving breakthroughs in
speed, quality and profitability quickly and at low cost?
Choose the highest-yield material and you can be an idiot and enjoy
stunning success. –Timothy Ferriss – Author of the 4-Hour Chef

 Yes, this book is short, because if it’s short, it’s more likely to be used and
because I believe that you don’t need to know everything about Lean Six
Sigma to start getting results, process improvements and process
innovations. Unless you work on a manufacturing factory floor, there’s a
limit to how much is useful to learn.

© MMXIX KnowWare International Inc. www.qimacros.com 16


Agile Process Innovation
Over time, every business process becomes increasingly complicated. Exceptions, workarounds
and all manner of process tweaks turn simple processes into complex, unmanageable ones.

In the 1990s, I was assigned to a team attempting to “reengineer” the phone company’s billing
computer system and processes. This system had evolved over decades so it knew more about
how we invoiced customers that anyone could possibly redesign. After several years and tens of
millions of dollars, the project was shelved.

Meanwhile, I worked with teams that figured out how to save $20 million in postage costs by
redesigning the bill (not the whole billing system). We saved $16 million in adjustments. By
attacking the most expensive and problematic portions of the billing system, we found ways to
make breakthrough improvements while the reengineering effort was grinding toward failure.

Reengineering became a popular movement to improve business operations. Reengineering


presupposed that business is a “machine” that could be redesigned. Attempting to reengineer an
entire business process usually came with a high cost and catastrophic results because businesses
aren’t machines. Businesses are more like a living system—people, processes and technology
working in harmony to serve customers.

I have found that improving processes to simplify, streamline and optimize performance leads to
insights about how to redesign the process. Process innovations grow out of improvements.

© MMXIX KnowWare International Inc. www.qimacros.com 17


To achieve Agile Process Innovation, you will want both: improvement and innovation.

Innovate Improve

Improve

The tools of quality improvement have been around for almost 100 years. Whether you call it
TQM, Six Sigma, Lean, Operational Excellence or something else, I think we have to wonder
why the tools of quality aren’t in every business worldwide. My theory: the quality community
has made improvement too complicated.

In today’s economy, people don’t have time to learn complicated methodologies and
technologies. Smart phones have taught them that complicated things can be simplified and
learned quickly. People often ask: “Is there an app for that?”

With all of the progress made in software for smart phones, websites and so on, why is Lean Six
Sigma still taught in the slow, methodical way it was taught in the 1990s?

An October 2016 Harvard Business Review article calls this “The Great Training Robbery.” The
authors say, “For the most part, the learning doesn’t lead to better organizational performance,
because people soon revert to their old ways of doing things.” One study found that, “Companies
that tried to launch major transformations by training hundreds of thousands of employees across
many units lagged behind the companies that didn’t kick-start their transformation this way.”

Sounds like the traditional method of implementing Six Sigma, doesn’t it? Lots of training,
before results.

More recently, the Editor-in-Chief of Harvard Business Review said: “Corporate survival today
requires the capacity for rapid change and forward-thinking. HR departments are taking their

© MMXIX KnowWare International Inc. www.qimacros.com 18


cues from a surprising source—the IT department, which at many organizations has adopted
agile processes to speed its evolution and better serve customer needs.” The article, HR Goes
Agile, references a 2017 Deloitte survey in which 79% of global executive rated agile
performance management as a high organizational priority. If today’s executives expect Agile
(think: voice of the customer), then why aren’t we delivering it?

Whenever you find yourself on the side of the majority, it is time to pause and
reflect. – Mark Twain

The writing is on the wall—Lean Six Sigma needs to pivot to a new way of achieving desired
results. Integrating Agile into Lean Six Sigma is an easy way to do it.

What is Agile? A method that “is characterized by the division of tasks into short phrases of
work and frequent reassessment and adaptation of plans.” Agile focuses on speed and
adaptability, not rigid adherence to archaic methods.

Innovative process transformations emerge from simplifying, streamlining and optimizing key
processes using the Magnificent Seven Tools of Lean Six Sigma (described in a later chapter). I
would like you to consider that any attempt to “reengineer” a complex business process will fail
without this prework.

© MMXIX KnowWare International Inc. www.qimacros.com 19


Agile Lean Six Sigma

The January-February 2017 Harvard Business Review article on problem solving found that 85%
of C-suite executives say their companies struggle with problem diagnosis, not problem solving,
and that this comes with a significant cost. (Joseph Juran often said that companies spend 25-
33% of costs on waste and rework. This is the hidden cost of problems.) Six Sigma is too
complex and time-consuming to fit into a regular workday, says author, Thomas Wedell-
Wedellsborg. We need tools that don’t require the entire organization to undergo weeks-long
training programs.

I’d like you to consider that the Six Sigma body of knowledge and training was designed for
improving a manufacturing plant—20th Century quality. That’s why we need a simplified and
streamlined, 21st Century approach to Lean Six Sigma that fits services, because that’s where the
jobs are.

Origins of Agile

For many decades, the method of software development was called Waterfall development. It
took too long and often failed to deliver the expected output. Then in 2000, a rogue group of
programmers got together and applied the principles of Lean to software development. They
came up with a fresh approach to software that they named Agile.

Consider that Agile grew out of Lean, so Lean Six Sigma can also benefit from Agile. Over the
years I’ve applied Lean principles and techniques to both Lean and Six Sigma for service

©MMXIX www.qimacros.com 20
companies. The result is faster implementation with rapid results. Accelerating Lean Six Sigma
improves productivity and profits and creates buzz.

The Agile programmers came up with a new set of values and objectives.

The Agile Values:

• Individuals and interactions over processes and tools


• Working software over comprehensive documentation
• Customer collaboration over contract negotiation
• Responding to change over following a plan
• Numerous small experiments over a few large bets
• Testing and data over opinions and habits (sounds like Six Sigma doesn’t it?)
• Engagement and transparency over posturing

I believe that we can adapt these values to Lean Six Sigma:

The Agile Lean Six Sigma Values:

• Results over rigor

$
• Working improvements over comprehensive documentation

©MMXIX www.qimacros.com 21
• Cross-functional collaboration over silo analysis

• Responding to change over following a plan

• Numerous small experiments over a few large bets

• Testing, data and charts over opinions and conventions

Blah, Blah,
Blah

vs

• Engagement and transparency over posturing

©MMXIX www.qimacros.com 22
Lean Six Sigma Agile Manifesto

By changing one word, software to improvement, I believe we can also adapt the Agile
Manifesto. The Lean Six Sigma Agile Manifesto is based on twelve principles:

1. Satisfy customers by early and continuous delivery of valuable improvements


2. Welcome changing requirements, even late in the improvement
3. Deliver working improvements frequently (in hours or days rather than weeks)
4. Close, daily cooperation between business people and improvers
5. Build projects around motivated individuals, who should be trusted
6. Face-to-face conversation is the best form of communication (co-location)
7. Working improvements are the primary measure of progress
8. Sustainable improvements, able to maintain a constant pace
9. Continuous attention to technical excellence and good design
10. Simplicity—the art of maximizing the amount of work not done—is essential
11. Self-organizing teams deliver the best architectures, requirements, and
12. Regular team reflection on how to become more effective and adjusts accordingly

Agile Lean Six Sigma Misconceptions

When trying to adjust to Agile Lean Six Sigma as a way of working, people often try to find
excuses why it won’t work. If you’ve spent a lot of time learning long-form Six Sigma, you will
feel uncomfortable in a sprint. Here are some misconceptions:
• Agile is a sloppy, ad-hoc approach to Lean Six Sigma. If anything, it’s an
accelerated application of the methods and tools that starts with data and achieves
results much more quickly.

©MMXIX www.qimacros.com 23
• Agile improvement isn’t predictable. Because Agile LSS restricts the methods and
tools to seven key tools used on the most common types of business problems, it is
much more predictable. It always delivers working improvements.

• Agile improvements are hard to manage. Since improvement teams only meet for a
few hours to develop root causes and countermeasures, teams are easier to manage.
Implementing the improvement is also easier to manage.
• Agile LSS means no documentation. Every project should consist of control charts,
Pareto charts or histograms, fishbone diagrams, countermeasures and action plans.
These are the minimum viable outputs of a project. Other tools can be used but may
be unnecessary.
• Agile Process Innovation is the solution to all of your problems. No, Agile LSS is
the solution to the most common problems experienced by service businesses.
Manufacturing plants may require Design of Experiments, Measurement Systems
Analysis and other tools that are not needed in service businesses.
• There is only one way to do Agile Process Innovation. The Agile Process
Innovation Manifesto lays out core values and principles. It does not say “how” to do
it. I’m offering my version as a starting point: simplify, streamline, optimize and
innovate (SSOI).

©MMXIX www.qimacros.com 24
Hacking Lean Six Sigma

Is it possible to accelerate the adoption and use of Lean Six Sigma by hacking how it’s
implemented? By hacking, I mean the good kind of hacking (white hat not black hat)—
simplifying, streamlining and optimizing the methods and tools to maximize results with
minimal investment.

Hackers try to build the best services over the long term by quickly releasing and learning from
smaller iterations rather than trying to get everything right all at once.
-Mark Zuckerberg – The Hacker Way (https://www.wired.com/2012/02/zuck- letter/)
The spirit of hacking [can] be adapted and applied to general business management, not just
technical innovation. Scott Brinker – Hacking Marketing

Lean Agile

Six Sigma
+ = Process
Agile Innovation

Modern performance improvement has a lot in common with software development.

Parallel Revolutions

• From rigid processes to agile


• From maintaining the status quo to accelerating speed and adaptability

©MMXIX www.qimacros.com 25
• From big projects to evolving customer experiences
• From silos to engagement
• From complexity to simplicity

Hacking Lean

Is it possible to accelerate the adoption and use of Lean methods and tools by hacking Lean? I
believe the answer to this question is YES!

While Lean came from the world of manufacturing—the Toyota Production System (TPS)—80
percent of American businesses are service businesses. Can these businesses use a subset of Lean
to maximize performance? Yes, again.

We now live in a digital world. The key characteristics of the digital world, according to Scott
Brinker, author of Hacking Marketing are speed and adaptability. Brinker says the challenges in
a digital world are:

1. How do we execute faster?


2. How do we resist unwise knee-jerk reactions or overheated churn?

If you look at Lean Six Sigma training, it is essentially unchanged for decades. I believe that this
model no longer serves U.S. service businesses and slows the tempo of change.

In manufacturing companies, most of the unnecessary delays and movement have been
eliminated from the factory floor. But in service companies, delays between processing steps
represent the vast majority of performance problems. To eliminate unnecessary delays,
employees only need two tools: value stream mapping and spaghetti diagramming to redesign
process flow and movement.

That’s it! That’s all you need to start hacking Lean in a service environment. Joseph Juran talked
about the “Vital few, trivial many.” It applies to methods and tools as well as improvements.

©MMXIX www.qimacros.com 26
Because most service delays occur in the arrows between steps, you don’t need to know
TAKT time, change over time or anything about optimizing the steps until you eliminate the
delays between steps. That’s how we hack Lean for services.

Lean Sprints

The week-long Kaizen blitz is a thing of the past unless you work someplace where you can shut
down for five days. You just can’t shut down a nursing unit for a week. You have to transform
the unit in operation. This suggests the need for an agile approach to improvement. In other
words, a sprint.

Using a one-to-two hour timebox, focus on one element of improvement at a time. A series of
these small bets will find the best solution more quickly.

All you need are a pad of Post-it® Notes and a flipchart to map the process flow or movement.
This can be done in less than an hour. Once you know the current state, you can design a desired
state that eliminates delay and movement. This can also be done in less than an hour. Then it’s
just a matter of changing procedures and layouts to achieve the desired state. Some can be done
immediately; some may take a while.

In an hour or less, I’ve seen nurses redesign a nursing unit in ways that reduce nurse travel by 50
percent or more. This means more time with patients, better patient outcomes, better patient
satisfaction and better nursing satisfaction.

In an hour or two, I’ve seen a computer operation group rethink nightly batch processing and
reduce the cycle time from nine hours to one.

Eliminating unnecessary delays and movement will automatically reduce waste and rework
because you eliminate the opportunity to miss a step or do a step twice. It may automatically
reduce overproduction, inventory and non-value-added processing.

It doesn’t matter what service you provide, there’s always a way to reduce unnecessary delay and
movement.

©MMXIX www.qimacros.com 27
Hacking Six Sigma

Is it possible to accelerate the adoption and use of Six Sigma methods and tools by hacking Six
Sigma? I believe the answer to this question is YES!

Traditional Lean Six Sigma implementations take months or even years to see results: months of
training followed by projects that take months to complete. This is the traditional method of
implementing Lean Six Sigma, but not the best way.

Agile Lean Six Sigma training takes a different approach. Using existing data and QI Macros, we
can train employees in a day or less and solve real problems:

©MMXIX www.qimacros.com 28
Hacking is the art of invention. – Scott Brinker
Hacking just means building something quickly or testing the boundaries of what can be done.
-Mark Zuckerberg – The Hacker Way

Recommendation: Stop managing for activities (number of teams started) and start managing
for outcomes (bottom-line, profit-enhancing results).

Vital Few, Trivial Many

A handful of tools will solve most business problems, especially in service industries:

• PivotTables – to analyze raw data and find the invisible low-hanging fruit

• Control Charts – XmR chart of defect rates or cycle times. Dr. Donald Wheeler calls the
XmR Chart the Swiss Army Knife of control charts.

• Pareto Charts – Types of defects

• Histograms – cycle (turnaround) times

• Fishbone (Ishikawa) Diagrams – root cause analysis

©MMXIX www.qimacros.com 29
• Countermeasures and Action Plans (Matrices)

These tools will diagnose and solve the vast majority of operational problems. Are there more
complex problems that need more exotic tools? Of course there are, but first solve all of the less
complicated problems.

Agile Principles

Under an agile business management model, agile techniques, practices, principles and values
are expressed across five domains:

1. Cross-functional engagement – to embed customers and suppliers within any project


process to share accountability for product/service improveme nt.
2. Facilitation-based management – adopting agile management models to facilitate the
day-to-day operation of teams.
3. Agile work practices – adopting specific iterative and incremental work practices.
4. An enabling organizational structure – with a focus on staff engagement, personal
autonomy and outcomes-based governance.
5. An education model that blends agile practices and philosophies to create micro-schools
that emphasize collaborative culture creation and self-directed learning.

Benefits of Agile Lean Six Sigma

1. Better improvements
2. Higher satisfaction
3. Higher team morale
4. Increased collaboration and ownership
5. More relevant metrics
6. Improved performance
7. Improved project predictability

©MMXIX www.qimacros.com 30
Agile Metrics

• Sprint success rates – LSS velocity


• Defects and turnaround times
• Total project duration
• Time to implement
• Total project cost
• ROI

How to Hack the Lean Six Sigma Learning Curve

Have you ever tried to learn something one way and found it too hard, but then you tried another
way and it was easy? I grew up in Tucson, Arizona in the heart of the Sonoran Desert. When I
moved to Denver, my coworkers hauled me up to the ski slopes, helped me rent 5.5-foot skis and
sent me off to the bunny hill for lessons. The instructors used the snowplow method to teach us
how to ski—you shape the skis into an inverted V and bend your knees in to carve a turn. I
couldn’t get it.

A couple of years later, the ski club at Bell Labs invited me up to Vermont with the promise of a
magical new way to learn to ski called graduated-length method. I started at 9am on 3.5 ft. skis.
Graduated to 4.5 ft. skis by lunch. Moved up to 5.5 ft. skis the next morning. I went from zero to
hero in 24 hours. On Maui, I learned how to play ukulele in one-hour from Jason Jerome at
Lahaina Music.

Can we do the same thing with Lean Six Sigma?

How do we solve the Six Sigma learning problem?

• First, remove everything that is purely manufacturing focused (e.g., hypothesis testing,
DOE, etc.) because over 80% of U.S. employees work in service industries.
• Second, eliminate formulas and manual calculations. Six Sigma trainers forget that most
people are terrified of math and statistics. Let QI Macros do the math and statistics. Let
people analyze the resulting insights and charts, then make improvements.
• Automate everything that can be automated.

©MMXIX www.qimacros.com 31
How to Hack DMAIC Project Development and Selection

I’m about to propose a solution you might consider a shameless plug, but it’s in keeping
with Toyota’s concept of autonomation—automation with the human touch. We can solve
Six Sigma implementation delays by letting software (e.g., QI Macros) do the heavy
lifting. Feel free to use any other Six Sigma software you prefer, but I have tweaked QI
Macros to eliminate the learning curve and get people to actionable improvement stories
in minutes, not weeks, months or years. No other software can do what QI Macros does.

Problem: Most Six Sigma Training spends at least three days on the methods and tools of
Define, Measure and Analyze. When you spread the training out over multiple days, it makes Six
Sigma seem slow and cumbersome.

Solution: Use the QI Macros Data Mining Wizard on Raw Data to Create Projects

• One minute of Data Mining Wizard will turn raw data into the PivotTables, control
charts, Pareto charts and fishbones required for root cause analysis. Yes—QI Macros
Data Mining Wizard can create entire improvement projects, ready for analysis, in
seconds!

• Two hours of understanding the output and selecting projects

How to Collapse Control Chart Training

Problem: Five-day Control Chart classes focus on manually calculating the formulas and
drawing XmR, XbarR, XbarS, c, np, p, u charts. There is no reason to do this manually. I used to
spend hours teaching people how to navigate a control chart decision tree, but people don’t
naturally think in decision trees. In 2006 I figured out how to automate the control chart decision
tree in QI Macros. Problem solved!

©MMXIX www.qimacros.com 32
Solution: Use the QI Macros Control Chart Wizard to select the right chart automatically.

• One minute using QI Macros Control Chart Wizard to create a control chart.

• Two hours of understanding the patterns in control charts:


o Special Causes – out-of-control points that should only occur 3 times out of 1000
o Common Causes – variation
o Outcomes: 1) move the center line up or down, 2) reduce variation.

Once people understand the patterns they are looking for and the outcomes to be
achieved, they quickly orient themselves to figuring out how to win the game.

How to Collapse Capability Analysis

Problem: Capability Analysis training focuses on manually drawing histograms and calculating
Cp, Cpk, Pp and Ppk. This is slow, confusing and unnecessary.

Solution: Use QI Macros Histogram or Capability Suite

• One minute to create a histogram or Capability Suite consisting of a control chart,


histogram, normal probability plot and so on.

©MMXIX www.qimacros.com 33
• Two hours of understanding the patterns in histograms:
o Capable (Cp>1, Cpk>1) vs Not Capable (Cp<1, Cpk<1)
o Outcomes: 1) center the data, 2) reduce variation.

Again, once people understand the desired transformation, they will figure out
how to win the game.
o Consider using Weibull histogram for non-normal data if needed.

How to Collapse Hypothesis Testing

Problem: Hypothesis testing mainly focuses on comparing central tendency and variation. This
takes a day or more. Honestly, I’ve never used hypothesis testing because I don’t work in
manufacturing or research. I work on achieving business results: speed, quality and profitability.

Solution: Eliminate Hypothesis Testing all together. Stop trying to turn people into statisticians.
If you must teach hypothesis testing, use the QI Macros Stat Wizard.

• One minute of Stat Wizard will do t-tests, F-tests, ANOVA, or Levenes test on sample
data.
• One hour of understanding the results:
o Forget the statistical jargon (e.g., “cannot reject the null hypothesis”). Stop trying
to teach normal people to speak like statisticians. Focus on results:
▪ Means are the same or different
▪ Variation is the same or different
▪ What to do in either case

©MMXIX www.qimacros.com 34
Non-Normal Data

Problem: People agonize over what kind of data they have and what to do with it.

Solution: Don’t cover non-normal data. Control charts are robust to non-normal data. Service
turnaround times are often non-normal, but the goal is to reduce variation and move the average.
Agonizing over normality will not simplify the analysis.

Team Dynamics

Problem: Most Six Sigma training includes topics like brainstorming, multivoting, team
dynamics (form, storm, norm, perform), etc. I have found that given a meaningful project to
work on, teams will jump into action.

Solution: Let the data pick the project. Teams should never brainstorm what problem to solve,
because they usually want to fix someone else—customers, suppliers, management or
subordinates. Instead, use the Data Mining Wizard to analyze raw data. Then select team
members based on the results of the data analysis. The team will self-organize to solve the
problems revealed. Only teach specific methods when they are needed for a real project.

Measurement Systems Analysis (MSA),

Problem: Most Six Sigma courses teach MSA, GageR&R, Design of Experiments (DOE) and
other complex tools used only on manufacturing factory floors.

Solution: Don’t teach these methods to service companies, because it’s a waste of time and
causes confusion. It’s a form of overproduction, which violates a basic rule of Lean.

Six Sigma History

Problem: Most Six Sigma courses teach the history of Six Sigma from Shewhart, Juran and
Deming to the present. This is also a non-value-added waste of time.

Solution: Point people to excellent online references about this if they want to know the history.
People don’t need to know the origins of quality; they want to know the future of quality.

©MMXIX www.qimacros.com 35
Comparing Lean Six Sigma Bodies of Knowledge

I took the ASQ LSS Yellow Belt Body of Knowledge (BOK) and stripped out everything not
required to solve problems in a service environment. The word count dropped from 1281 words
to 144, an 89% reduction. Think of it as using 5S on Lean Six Sigma.

I believe that Agile LSS Yellow Belt training is all that is required to solve the vast majority of
problems facing American business. Anything else is overkill and problematic.

I did the same thing with the LSS Green Belt BOK. The word count fell from 3133 to 2178; a
30% reduction. I think GB and BB trainings are ideal for people who work on a manufacturing
factory floor that represents less than 2% of the workforce. About 2% work in agriculture.
Everyone else works in services. Most of the people employed in manufacturing work in the
service side of the business: sales, marketing, ordering, invoic ing, purchasing and customer
service. They only need Agile Money Belt tools.

When I went to college to study systems engineering, I learned operations research, differential
equations and all kinds of stuff that I might need. I have never used any of it. Similarly, teaching
service employees how to improve a factory is a foolish waste of time, money and resources.

If we can get people using QI Macros to solve problems immediately using real data, they will
embrace Lean Six Sigma and accelerate the quality transformation. So far, I have seen only
limited signs of real improvement across many industries. Why not?

I believe it’s because we’re still trying to teach Six Sigma the same way it has been done for the
last two decades to prepare people for non-existent jobs in manufacturing. Most Six Sigma
software is cumbersome and doesn’t help analyze data, select the right charts or statistics
automatically. QI Macros simplifies, streamlines and optimizes the learning experience. I
routinely take people from zero to hero in one day using QI Macros.

We can cling to our traditions or embrace a new and improved way to engage people in problem
solving that gets results. I believe it’s time for Agile Lean Six Sigma.

©MMXIX www.qimacros.com 36
The Magnificent Seven Tools of Lean Six Sigma
The 1960s film, The Magnificent Seven, starred Yul Brenner, Steve McQueen, Charles Bronson,
James Coburn, Robert Vaughn, Brad Dexter and Horst Buckholz. These seven hired gunmen
protect a Mexican village from the bandit Calvera played by Eli Wallach. The film was an
Americanization of the Japanese film The Seven Samurai. The film implies that you don't need
an army to win the war, just seven top "gun men."

The Magnificent Seven of Lean Six Sigma

Becoming a master of karate was not about learning 4,000 moves but about doing
just a handful of moves 4,000 times. – Chet Holmes

Over the years, in project after project, I have found myself returning to the same Magnificent
Seven Tools:

The Magnificent Seven

P rocess Mapping Tools:

Value Stream Maps to identify and remove delays in


any process.

Spaghetti Diagrams to identify and eliminate


unnecessary movement of people or materials.

Excel PivotTables to summarize defect data.


2 Every million-dollar improvement project I’ve ever
worked on began with PivotTables.

© MMXIX KnowWare International Inc. www.qimacros.com 37


Control Charts to measure and monitor the
performance of any process.
3
I have found that no one can sustain an improvement
without control charts.

Pareto Charts to identify the most common types of


defects.
4
Pareto charts are my go-to chart for pinpointing
problems and solutions.

Histograms to evaluate deviation in process


performance.
5
I use these in service industries to analyze turnaround
times (e.g., hospital wait times, lab turnaround times,
etc.)

Ishikawa diagrams to document the root causes of


6 each "big bar" on the Pareto chart or out-of-spec
products on the histogram.

Matrix diagrams like check sheets, countermeasures


and action plans to collect data and prioritize
7 corrective actions.

Sometimes we collect data manually using a check


sheet to get a quick read on a problem area.

I have found that these seven tools can help teams solve 99% of the problems facing a typical
business. Sure, you will need more exotic tools to solve problems in the last one percent, but you
won't need them for a while, maybe a long while.

© MMXIX KnowWare International Inc. www.qimacros.com 38


Are you stuck trying to figure out what tools to use in what order? Try the Magnificent Seven to
deliver breakthrough improvements. You'll be surprised how far you can go with just these tools.

The unexamined process becomes sluggish and error-prone. -Jay Arthur

If you have preventable:

• Delays – use value stream maps and spaghetti diagrams to evaluate the work flow and
remove delay.

• Defects – use PivotTables, control charts, Pareto charts and Fishbone diagrams (QI
Macros Data Mining Wizard) to pinpoint and fix the root causes of defects.

• Deviation – use control charts, histograms and Fishbone diagrams to pinpoint and
eliminate the root causes of variation.

© MMXIX KnowWare International Inc. www.qimacros.com 39


The 4-Hour Lean Hack

Agile is Lean applied to software development. I wrote a book about a similar


methodology called Rapid Evolutionary Development back in 1989. Both are about rapid
iteration to converge on a deliverable solution when “the problem is complicated,
solutions are initially unknown and product requirements will most likely change.”
In many ways, Agile is like the Lean Startup methodology: Build, Measure, Learn.
We also find it in the OODA Loop (observe, orient, decide, act) developed by fighter
pilot John Boyd. “Thinking about operating at a quicker tempo…engaging in activity that
is so quick it is disorienting [and] inhibits the adversary’s ability to adapt. Whoever can
handle the quickest rate of change is the one who survives.” Even Systems Thinking
argued that the company that learns faster than its competition wins. From these and
other sources I think we can begin to consider that rapid learning, faster iteration and
rapid prototyping are the key to blitzscaling a company’s performance. Agile approaches
to management have begun to spill over from IT into adjacent customer and management
arenas.

Agile sounds more desirable than Lean, doesn’t it? Would you rather be agile or lean?
Maybe this is a new way to approach implementing Lean or the Toyota Production
System in a company. Rather than wall-to-wall, floor-to-ceiling implementations of Lean,
start in IT and let the methods spill over into neighboring work units until it reaches a
critical mass.

© MMXIX KnowWare International Inc.www.qimacros.com 40


This is how cultures adopt, adapt or reject change. It might be worth a try
Nike’s slogan is “Just Do It!” For businesses, the new slogan is “Just Do It NOW!”
Customers no longer want to wait for anything if they know it’s possible to get it right
now. So, every business has two choices: 1) figure out how to deliver the product or
service immediately or 2) wait for someone else to figure out how to just do it now and
put you out of business. It only takes about four hours to start getting results.
Fortunately, Lean has figured out how to simplify and streamline any business
process to make it lightning fast. There’s a simple acronym that covers the speed bumps
of Lean that inhibit a company’s ability to just do it now—DOWNTIME:

• Delay – Unnecessary delays between steps in a process


• Overproduction – making stuff that no customer has ordered
• Waste and Rework – caused by mistakes, errors, defects and deviation
• Non-value-added (NVA) processing (e.g., inspection and rework)
• Transportation – unnecessary movement of materials
• Inventory – unnecessary raw materials, work in process (WIP) or finished
goods
• Motion – unnecessary movement of employees
• Employee creativity – unused wisdom of the workers
While most manufacturing companies have figured out how to optimize the
production line using these tools, the vast majority of service companies are barely aware
of how to simplify and streamline business operations. Based on my experience in all
kinds of industries from healthcare to telecom to IT to manufacturing, a couple of key
tools will slash the time it takes to do anything.

© MMXIX KnowWare International Inc.www.qimacros.com 41


Delay
In most service businesses and the “back room” functions of all businesses (orders,
invoicing, purchasing, payments, HR, IT, etc.), unnecessary delays between steps (i.e.,
arrows) are the main cause of sluggish performance. Most business processes grow up in
an ad-hoc fashion over time. To deal with inconsistencies, they develop too many
workarounds and rework loops. They become Frankenprocesses. They suffer from too
many unnecessary delays between steps.

When most people look at a process flow, they see a flowchart that looks like this:

I see something very different, huge delays and piles of unfinished work products—work
in process (i.e., inventory):

There’s very little actual “doing” in most processes and a whole lot of delay (i.e.,
waiting around). And most business processes do things in big batches so that there is
always work in process (WIP) waiting for the next step in its development. Big batches

© MMXIX KnowWare International Inc.www.qimacros.com 42


supposedly create economies of scale, but all they do is create opportunities for mistakes,
errors and additional delays.
This leads us to a few simple rules (adapted from Stalk and Hout’s book, Competing
Against Time):
The 3-57 Rule: In most businesses, employees are only
working on the product or service for 3 minutes out of every
hour, leaving 57 minutes of delay. To this most managers will
say: “But my people are busy!” Yes they are, but the thing
going through the process is not. It’s idle 95 percent of the
time—57 minutes per hour. Don’t believe me? Start with any
customer’s order and follow it around. Bring a novel to pass
the time.
The Dark Side of the 3-57 Rule: Trying to make people faster is a waste of time,
because employees only account for 3 minutes out of every 60. Even if you make your
people twice as fast, you’ll only save 1.5 minutes per hour. You have to make your lazy
product faster by eliminating the delays between processing steps.

Trying to make employees faster will only save a minute or two out of
every hour of elapsed time. -Jay Arthur

The 15-2-20 Rule: For every 15 minutes per hour you reduce
those 57 minutes of delay, you will double productivity and
increase profit margins by 20 percent. Since it’s usually easy
to eliminate these delays, it’s possible to boost productivity
two-four-eight-fold and profit margins by 20-40-80-100
percent. With Lean tools it’s easy to do this quickly.

The Dark Side of the 15-2-20 Rule: Every increase in delay decreases productivity and
profitability. Example: approvals required before doing anything.

© MMXIX KnowWare International Inc.www.qimacros.com 43


The 3x2 Rule: Reducing delays will enable any business to grow three times faster than
their competition and double productivity.
The Dark Side of the 3x2 Rule: If you don’t get faster, your competitors will.

How do we achieve these breakthrough reductions in delay?


At the heart of every difficult decision lie three tough choices: What to
pursue versus what to ignore. What to leave in versus what to leave out.
What to do versus what to don’t. The key is to remove the stupid stuff:
anything obviously excessive, confusing, wasteful, unnatural, hazardous,
hard to use or ugly. This is the art of subtraction. – Matthew E May

First, Simplify the Workspace


Any workspace collects clutter. The “5S” process is like spring cleaning. Just get a
small team to spend a few hours to:
• Sort the needed from the unneeded (e.g., outdated forms, unused machines
and materials, etc.). Dispose of the unneeded stuff.
• Straighten by making everything visual and self-explanatory (e.g., color-code
things and label them).
• Shine – clean the workspace.
• Standardize the ongoing sorting, straightening and shining of the workspace.
• Sustain the simplification process by repeating every few months.
Once you’ve simplified the workspace using 5S, it’s easy to redesign the workflow
and workspace for optimal performance.
Then, Map the Value Stream to Reduce Delays
It’s easy to eliminate delays. Simply flowchart or map the value stream. (Watch my
video at www.qimacros.com/Moneybelt/lean-value-stream-map-patient-scheduling.html).
Put times on each arrow of the process. You’ll quickly discover that most of the cycle
time is consumed between steps.
There are only two main ways to radically speed up a process:
• Redesign the process to eliminate delays.
• Redesign the process to do some steps in parallel.

© MMXIX KnowWare International Inc.www.qimacros.com 44


You should be able to eliminate 80-90 percent of the overall cycle time which will
boost productivity and profits by 50 percent or more.
Four-Hour Sprint: It only takes a handful of Post-it® Notes, a flipchart, a few
subject-matter experts and a maximum of four hours to diagnose and redesign most
processes for improved efficiency and effectiveness.

Then Spaghetti Diagram the Workspace to Reduce Movement

Again, using Post-its and a flipchart, a handful of employees can diagram the
workspace and movement of employees, customers and materials through the space. If
you’re not sure how to do it, just follow a variety of customer orders around the office,
factory, hospital or other facility. An aptly named “spaghetti diagram” will arise from this
analysis.
www.qimacros.com/Moneybelt/lean-spaghetti-diagram.html

Simply rearrange processing “stations” to minimize movement of people and


products. It’s not unusual to reduce movement by 50 percent or more and slash cycle
time.

Then Shift from Economies of Scale to Economies of Speed


One of the secrets of Toyota’s Production System is called one-piece flow. The idea is
to get down to a batch size of one, not 100 or 1000. When you can make one of anything
immediately, you don’t need any inventory. If Taco Bell can take a drive-through order,
make a taco and a burrito, take payment and deliver the order in 180 seconds, why can’t
you do the same thing with whatever it is that you do?
What if you don’t make anything? Sure you do. Every office worker produces forms.
Service reps produce orders. Computers produce transactions (e.g., real-time vs batch).
Simply redesign the process to reduce batch sizes, ideally to a size of one. An
exception to this rule might occur when customers always order 100 a month. From a
load-leveling perspective, it may be more efficient to produce 25 a week.
I worked with a company that printed national magazines. They printed a million at a
time (big batch). But the bindery could only glue or staple 200,000 a day (smaller batch).
The other 800,000 (overproduction and unnecessary inventory) had to be stored
somewhere (unnecessary movement), where they could be hit by passing forklifts (waste

© MMXIX KnowWare International Inc.www.qimacros.com 45


and rework). By switching to a quick changeover process, they could print 250,000 the
first day and an additional 200,000 each subsequent day until they had met the volume
required. This made it easier to schedule other, higher profit jobs between runs. It
eliminated unnecessary inventory and motion. If they discovered a printing error in the
bindery (waste and rework), they didn’t have to reprint the entire magazine run.
I worked with a hospital lab. We had the lab techs wear pedometers for a week and
record their travel distances. Techs were walking two-to-four miles a day (unnecessary
motion) in the 2400 sq. ft. lab. By rearranging the machines in the lab, putting the highest
volume ones into work cells, we were able to reduce movement by over 50 percent
saving an estimated seven hours of delay per day, accelerating diagnosis, treatment and
discharge of patients. www.qimacros.com/Moneybelt/lean-spaghetti-diagram.html
I worked with a computer operations group that couldn’t get nightly batch processing
done in time to bring up the online systems in the morning. They thought they were going
to have to buy a new mainframe computer at a cost of several million dollars. After
laying out the nightly process, we found 32 decision points where the process waited on a
technician to verify and release the next job in the string. A new employee suggested that
the computer’s operating system could handle most of these checks (employee wisdom).
By giving 30 of the 32 decisions to the computer system, the nightly batch run fell from
nine hours to just one. www.qimacros.com/Moneybelt/value-stream-mapping-computer-
operations.html
These opportunities exist in every business.
So, there you have it, the essence of hacking Lean—eliminate the arrows. There’s a
lot more depth to be explored, but for most companies, delays are the number one
problem. Once those are gone, you’ll be ready for ways to reduce unnecessary movement
of people and materials. When that’s done, you can refine the steps in the process, but
first, spend some time simplifying and streamlining the existing process. And there are
added benefits.

Lean’s Secret Byproduct


One of the lesser known byproducts of simplifying and streamlining the process is a
50 percent reduction in defects. When employees don’t have to pick up where they left
off, remember where they were, do something and set the product or service back down

© MMXIX KnowWare International Inc.www.qimacros.com 46


to wait for the next step in processing, when they can handle it using one-piece flow, they
have no opportunity to make a mistake, miss a step or do a step twice. The chance of
error falls dramatically.
People sometimes ask: “Jay, should I start with Lean or Six Sigma?” I say if delays
are costing you customers, start with Lean. Defect reduction is a byproduct. It doesn’t
take a lot of fancy tools or methods. The process is simple.

Lean: Simplify and Streamline the Process


1. 5S the workspace.
2. Map the Value Stream paying special attention to the delays between work
activities.
3. Map unnecessary movement of people and products using a Spaghetti Diagram.
4. Redesign to eliminate the delays.
5. Redesign to eliminate unnecessary movement.
6. Redesign for one-piece flow.
7. Repeat until you can just do it now!

Video Learning (one hour)


Watch the Lean Videos at: http://www.qimacros.com/Moneybelt/what-is-lean-video.html
Practice (one hour): Use Post-it Notes® to lay out a value stream map (process) and/or
spaghetti diagram (workspace) of one of your processes. How would you change it to
eliminate DOWNTIME?
Improvement Team (two-four hours): Gather a team to reduce delays and movement in
one of your key processes. Use Post-it Notes to develop the before and after value stream
map and/or spaghetti diagram. Implement changes immediately or develop an action plan
to implement them within the next week.

© MMXIX KnowWare International Inc.www.qimacros.com 47


The 4-Hour Six Sigma Hack

Learning effectively requires massive elimination and removal of options.


–Timothy Ferriss

Can you learn every method and tool of Six Sigma in four hours? Of course not. Can
you, however, learn the Magnificent Seven tools that will solve 99 percent of the key
business problems? You bet. And, with the right software (QI Macros), you can learn
them in less than four hours and start making immediate improvements.

There is simply no limit on better. -Matthew E. May

Defects
Where Lean focuses on the delays between process steps, Six Sigma focuses on the
steps where defects and deviation occur. Defects and deviation are the enemies of
productivity and profitability. A defective product is infinitely more costly than one that
works right the first time. Like it or not, every process produces defects. Defects aren’t
spread all over a company like cream cheese on a bagel. They are more like mold
growing in one corner or another. To eliminate defects requires laser focus, which brings
us to the 4-50 Rule.

The 4-50 Rule: Four percent of any


business (one step out of every 25) causes
over 50 percent of the mistakes, errors,
hitches, glitches, waste and rework. Simple
tools like control charts and Pareto charts
can laser focus improvement efforts on just
the four percent causing the bulk of the
problem. A SWAT (fast reaction) team of
employees can usually figure out the root causes and countermeasures to solve the
problem in a matter of hours.

www.qimacros.com/Moneybelt/six-sigma-4-50-rule-video.html

© MMXIX KnowWare International Inc.www.qimacros.com 48


The Dark Side of the 4-50 Rule – 50 percent of an unfocused, widespread Six Sigma
effort will only yield 4 percent of the benefit which leads to cancellation of Six Sigma.
Don’t let this happen to you; use data (i.e., facts and figures) to laser-focus the
improvement effort for maximum results with minimum effort.

Six Sigma Tar Pit: Trying to create a new measurement system. If defects matter to the
business, someone is already tracking them. Use the data that’s already available to save
time and start getting results immediately.

Four-Minute Six Sigma Hack

The most dramatic way to improve productivity is to go down to your local


computer store and buy off-the-shelf, cheap, powerful shrink-wrap software.
Such tools must emphasize ease of use for the casual user not a professional.
- Frederick Brooks The Mythical Man Month

Every million-dollar improvement project I’ve ever worked on began with Excel
PivotTables. So, to maximize the results from Six Sigma, you will first need to
summarize your data using QI Macros Data Mining Wizard.
www.qimacros.com/Moneybelt/six-sigma-pivottable-projects-video.html
Once you have summarized the data, finding and solving problems with defects
involves four main tools used in this order: 1) control charts, 2) Pareto charts 3) Ishikawa

© MMXIX KnowWare International Inc.www.qimacros.com 49


or fishbone diagrams and 4) matrix diagrams (countermeasures and action plans). QI
Macros can create these easily in Microsoft Excel. Download a 30-day trial at
https://www.qimacros.com.

Here’s the 4-minute Six Sigma hack: the QI Macros Data Mining Wizard will take
raw data about defects and create most of your improvement project for you: PivotTables,
control chart, Pareto charts and fishbone diagram. Then you can decide how best to
proceed. https://www.qimacros.com/training/videos/data-mining-wizard/

First, Chart Your Performance


Begin by tracking the number of defects (mistakes, errors, or glitches) that occur over
time. Control charts, like a heart monitor, will track the rise and fall of defect rates,
identifying when a process starts to get into trouble and enable rapid response to prevent
a catastrophic failure.

Six Sigma Tar Pit: Using data that has been summarized by week, month or quarter.
The detail needed for analysis has been lost. Start with the raw data and use the QI
Macros Data Mining Wizard.
For non-manufacturing companies, the most common control chart will be the XmR
(individuals and moving range) chart. This chart can monitor cycle or turnaround times
per order. It can monitor defect rates (defects per 100, 1000 or 1,000,000 units). It can
monitor costs like billing adjustments. Attribute charts like the c, p and u charts can also
monitor defects, but first master the XmR.
www.qimacros.com/Moneybelt/control-chart.html.

© MMXIX KnowWare International Inc.www.qimacros.com 50


Then, Narrow Your Focus
Once the process is stable, count and group defects into various types or categories.
These show up on a Pareto chart as the “big bars.” A few “big bars” out of many
indicates that there are one or more problems to solve.
www.qimacros.com/Moneybelt/pareto-chart.html
Six Sigma Tarpit: If all the bars are of equal height (a flat Pareto), there is nothing
special going on. You haven’t found the 4% causing 50% of the defects. Trying to
solve problems based on a “parflato” chart is a waste of time, but teams often try:

vs

Data Collection
Given sufficient data about defects, this analysis can be done in a matter of minutes or
hours. If not, it may take a week or two of collecting data to enable analysis, but it
doesn’t take months or years. You don’t have to wait on measurement systems to be built
and installed. Simple manual data collection using a check sheet will suffice.

www.qimacros.com/lean-six-sigma-articles/data-collection

Fishbone or Ishikawa Diagrams

www.qimacros.com/Moneybelt/root-cause-analysis-video.html
Each “big bar” of the Pareto chart becomes the head of a fishbone, Ishikawa or cause-
effect diagram. Once you know what problem you’re trying to solve, it’s easy to figure
out who should be on the root cause analysis team. Until you’ve narrowed your focus
using control and Pareto charts, it’s impossible to know who should be on a team!

© MMXIX KnowWare International Inc.www.qimacros.com 51


Six Sigma Tar Pit: Never convene a team without a laser-focused problem to solve
or it will be more likely to fail and discredit Six Sigma.

Six Sigma Tar Pit: Never let a team work on more than one “big bar” at a time.
Trying to analyze the root causes of multiple bars rarely works and often leads to
whalebone diagramming.

SWAT teams meet for a few hours to identify the root causes of the problem and
countermeasures. Disband the root cause analysis team and form an implementation
team. Choose a project manager to run the implementation. Keep your Money Belt’s
focused on solving problems, not implementing solutions.
Six Sigma Tar Pit: If the team starts whalebone diagramming—filling a conference
room with sheets and sheets of causes, the problem wasn’t narrowly focused enough
using Pareto charts. Stop! Back up and narrow the focus using additional, lower-level
Pareto charts.

Implementation
Depending on the changes required, the implementation team may include some or
none of the root-cause team’s members. Implementing countermeasures can take minutes
or months. Simple process changes can be implemented immediately. IT system changes
may take months to schedule, test and implement.

Validation
Once the countermeasures have been put in place, just track the defect rates and types
to determine if the problem has been reduced or eliminated.

© MMXIX KnowWare International Inc.www.qimacros.com 52


If performance has improved, great! If not, the team didn’t find the real root causes. If
the error rate has fallen to zero (perfect), stop, otherwise analyze the next “big bar.”
A defect-reduction project should be able to figure out how to eliminate defects in a
few hours, not months or years. Using data to laser-focus the improvement is the key to
pinpointing and eliminating defects.

Deviation
In a manufacturing environment, Six Sigma focuses on reducing variation, but I think
that variation sounds too benign. Deviation points to the product or service deviating
from the perfection customers now expect. Deviation results in warranties, recalls,
returns, scrap, waste and rework that devour productivity and profitability.
Finding and solving problems with deviation involves four tools used in this order: 1)
control charts, 2) histograms 3) fishbone diagrams and 4) matrix diagrams
(countermeasures and action plans). QI Macros can draw these charts easily in Microsoft
Excel.

In service industries, most deviation involves cycle time or turnaround time. In other
words, it takes too long to deliver the service. Lean can slash cycle time by eliminating
unnecessary delays and movement. Control charts and histograms are excellent ways to
display improved performance. Mapping the value stream or process flow will be the
quickest way to solve these problems. Gather process subject matter experts in a room for
a few hours to map the current process and redesign to eliminate delays, eliminate
unnecessary movement, eliminate inventory and deliver one-piece flow.
In manufacturing, deviation involves adjustments in methods, materials and
machines to perfect the product. If you’re in manufacturing, you already probably know
how to do this or you would be out of business. However, you may still have too many

© MMXIX KnowWare International Inc.www.qimacros.com 53


problems caused by order errors, billing errors, etc. Focus the tools of quality on all of
the support functions that turn your perfect product into a nightmare for the customer.

First, Analyze Current Performance


Manufacturing companies use XbarR charts and histograms to monitor stability and
capability of production processes that suffer from deviation.
www.qimacros.com/Moneybelt/six-sigma-spc-auto-xbarr-chart-video.html

Four-minute Six Sigma deviation hack: Use QI Macros Capability Suite to create a
control chart and histogram of the current performance. If, and only if, the process is
stable (no special causes), continue to analyze capability.
QI Macros histograms provide two key indicators of how well a product meets the
customer’s requirements: Cp and Cpk. Cp evaluates if the process will fit within the
customer’s specifications. Cpk evaluates how centered the process is on the target value.
Cp and Cpk should be greater than 1.33 (4-sigma), preferably 1.66 (5-sigma) or 2.0 (6-
sigma). QI Macros will calculate these for you. No formulas required.
www.qimacros.com/Moneybelt/six-sigma-spc-histograms-Cp-Cpk-video.html
Service companies will most often use an XmR chart to analyze turnaround times.
The upper specification limit (USL) is the maximum allowed. There is no lower
specification limit (LSL). Histograms will show how close each process comes to
delivering the service now.

Then, Analyze Causes of Deviation


SWAT teams analyze root causes of deviation using Ishikawa/fishbone diagrams.
This can be done in a matter of hours.

© MMXIX KnowWare International Inc.www.qimacros.com 54


Validation
Once countermeasures have been put in place, teams track deviation to determine
how much the problem has been reduced or eliminated.

If performance has improved, great! If not, the team did not find the real root causes.
If the deviation has fallen to zero (perfection in Six Sigma is 3.4 defects per million),
stop, otherwise continue analysis.

The Journey to Perfection (Six Sigma)


Most companies think that because it’s taken a long time to get to their current level
of quality that it will take a lot longer to get to Six Sigma. Not true. By laser-focusing
improvements on the 4% of the business producing over 50% of the defects and deviation
(4-50 Rule), companies can go from their current 3-sigma performance to 5-sigma
performance in 18-24 months.

Don’t try to fix everything; just fix the “vital few” things of critical importance.
-Jay Arthur

Once a company has made the leap from 3-to-5 sigma, the next step will involve
developing more expertise. In the rise from 3-to-5 sigma, employees with the drive and
passion required to become a Six Sigma Green or Black Belt will become apparent. Send
them to advanced training and focus their attention on the next round of improvement
projects. Going from 5-to-6 sigma will take a greater depth of methods and tools than are
presented here.
This is the Agile Six Sigma Hack—use QI Macros and a few key tools to rapidly go
from 3-to-5 Sigma. Don’t waste time training multicolored belts until you discover who
loves improvement. (Hint: not everyone does.)

© MMXIX KnowWare International Inc.www.qimacros.com 55


Video Learning (2-3 hours)
Watch the Six Sigma videos and case studies at: www.qimacros.com/Moneybelt/toc.html
Do the practice exercises using the QI Macros to practice creating control charts, Paretos
and histograms.

Data Analysis (one hour): Find some data about defects, mistakes and errors in your
business (look at QI Macros pivottable.xlsx or datamining.xlsx files for examples). Use
the QI Macros Data Mining Wizard to create a PivotTable (defects), control chart
(defects or deviation) and Pareto chart (defect types) or histogram (deviation) of the
process. Then figure out who should be on the root cause analysis team.

Improvement SWAT Team (two-four hours): Gather a team to reduce defects or


deviation in one of your key processes. Use the data analysis—control charts, pareto
charts or histograms—to laser-focus the improvement effort. Conduct a root cause
analysis. Use an Ishikawa/fishbone diagram to show the results of root cause analysis.
Use countermeasures and action plans to identify the improvements. Implement changes
immediately or within the next week. Use the same control chart and Pareto chart or
histogram to verify that the improvement worked.

© MMXIX KnowWare International Inc.www.qimacros.com 56


Agile Process Innovation Manifesto
I worked with a metal manufacturer grossing $200 million a year. They had been
using Lean, but not Six Sigma. Why just Lean and not Six Sigma?
Like many other companies, they thought Six Sigma would take too long, cost too
much and not deliver results. Sadly, for most Six Sigma implementations, this is true. It’s
one of the reasons so many Six Sigma implementations fail in the first three years.
The Holy Grail for anyone who runs a company, service or manufacturing, is fast,
affordable, flawless execution.
Flawed execution is costly in time, money and customers. Flawless execution is
priceless to you and your customer.
We live in a world where employees actively resist change. So, it’s imperative to stop
trying to change them and, instead, create an environment where they participate in
changing the process to achieve flawless execution.

Lean Six Sigma Can Be Fast, Simple and Amazing


I worked with the metal manufacturing company’s leadership team for just three
days. The first day, we focused on learning the essential methods and tools of Six Sigma
using QI Macros® In the afternoon, we started analyzing their data about defects like
inclusions in the finished product. The next day teams dove into solving key production
and delivery problems.
After just a few hours using QI Macros with my bare-bones, laser-focused Agile Lean
Six Sigma process, the team had developed three killer improvement projects revolving
around cycle time and defects. The only thing left to do was implement the changes and
measure results. This company is on track to cut scrap from 12 to less than 7 percent
saving millions.
If you have tools like QI Macros and some data about delay, defects and deviation,
it’s easy to find the “invisible low hanging fruit” in any business.

What’s Wrong with DMAIC?


DMAIC is a simple process to understand—Define, Measure, Analyze, Improve and
Control. Steps are completed one at a time which presupposes that you need to start at the

© MMXIX KnowWare International Inc.www.qimacros.com 57


beginning with Define leading to Measure and so on. Each step is clearly delineated
which makes it easy to manage, but you don’t get improvements until late in the process.
Consider that in most cases companies already have tons of data about delays, defects
and deviation. What they lack is the ability to analyze the data. So, you don’t need to
Define the problem or create new Measurements (DM); you just need to be able to
Analyze, Improve and Control (AIC).

The Three Silent Killers of Productivity and Profits


Ask any business owner or executive, they know that something is killing
productivity and profits, but that it is hard to put a finger on the culprit. While many
people look for someone to blame, the problem is rarely a person. Invariably it’s the
system or process.
In any business, there are three silent killers of productivity and profitability:

Delays: Most business processes grow up in an ad-hoc fashion over time. They involve
too many workarounds and rework loops. They suffer from too many unnecessary delays
between steps.
Delays are killing your productivity and profitability.

Defects: Like it or not, every process produces defects. Even a profitable business can
suffer from a three-percent error rate across sales, marketing, ordering, fulfillment,
invoicing, etc. These defects are costing a typical business one-third of total revenues.
Defects are killing your productivity and profitability.

Deviation: Some products are a little too big or too small, too long or too short, too wide
or too narrow. Some customer service processes take too long or cost too much. These

© MMXIX KnowWare International Inc.www.qimacros.com 58


are all forms of deviation (i.e., variation from a customer’s ideal target value). Deviation
results in warranties, recalls, returns, scrap, waste and rework that devour profits.
Deviation is killing your productivity and profitability.

Simple tools like control charts, Pareto charts and histograms can diagnose problems
with defects and deviation. Employee SWAT teams can quickly identify the root causes
of these kinds of problems and implement countermeasures. In Agile, this is known as a
sprint.
Once these problems are solved, productivity and profitability begin to flow easily
from the business. It plugs the leaks in your cash flow. And, best of all, it helps to
distinguish your company in the marketplace. Customers appreciate fast, affordable,
flawless services and products, and they will tell their friends.
Most people think that problems are spread evenly all over the business. They are
wrong. You don’t have to fix everything in your business. To maximize results and
minimize costs, you have to focus on the few key places causing most of the delay,
defects and deviation which causes the most lost profit and productivity.

Learn to FISH
I “grew up” in the time between the end of TQM and the beginning of Six Sigma. I
developed my own acronym for improvement. My secret to Lean Six Sigma is learning
how to use performance measurements to FISH—Focus, Improve, Sustain and Honor:

Focus: Laser-focus the improvement effort, because problems aren't spread all over your
business, they are clustered in small areas that you can find and fix. There are hidden
gold mines in your business, but you will need the tools of Agile Lean Six Sigma to
find them!
Laser focus requires only a handful of methods and tools. You can learn these
methods and tools in a matter of hours at: www.agileprocessinnovation.com

Improve: Analyze the root causes and make improvements that will systematically cut
costs and boost profits by $25 or more out of every $100 you spend.
• To eliminate unnecessary delays, you need Post-it Notes®.

© MMXIX KnowWare International Inc.www.qimacros.com 59


• To reduce or eliminate defects and deviation you will need control charts, Pareto
charts and histograms. These are easily created in Microsoft Excel using the QI
Macros (www.qimacros.com/excel-spc-software).

Sustain: Monitor and maintain the new, higher level of improvements; otherwise you'll
fall back into old habits and lower levels of performance. To sustain the
improvement, your employees will need control charts, Pareto charts and histograms.
Again, use the QI Macros control chart templates for monitoring performance.

Honor: Honor your progress. Recognize and reward improvements. Refocus and start on
a new problem or issue.

Your Fix-It Factory


Every company has two factories and I use the word “factory” loosely. It’s not about
manufacturing or services; it applies to any business process:
• One factory creates and delivers your product or service.
• The other, hidden, “Fix-it” factory cleans up all the mistakes and errors that occur
in the main factory.
If you’re a 3-Sigma company (and most companies are no better than 3-Sigma), the
Fix-it Factory is costing you $25-$40 of every $100 you spend.
If you’re a $1 million company, that's $250,000-$400,000. In a $10 million company,
that’s $2.5-$4 million that could be added back to your bottom line. If you’re a $100
million company, that’s $25-40 million Just think what saving a fraction of that money
could do for your productivity and profitability! You need only a few methods and tools
to do it.
My advice: Spend a few hours learning and applying the “Magnificent Seven” tools
that will solve most problems, and then add in the tools from the long-tail, either through
training, reading a book or online resource.
Using these tools you can move rapidly from 3-sigma to 5-sigma using maps of work
flow, a few key problem solving tools (control chart, pareto chart, histogram and root
cause analysis), and control charts to monitor and sustain the improvements.

© MMXIX KnowWare International Inc.www.qimacros.com 60


Be a Money Belt!
If you have sluggish, error-prone processes that irritate customers and employees,
those processes are consuming a third or more of your revenues and preventing business
growth.
No one can afford to spend months or years implementing Lean Six Sigma. Most
people can't afford the time or money to attend the 10-20 day trainings. It's overkill. You
can, however, learn the essential tools quickly and start using them immediately.
www.agileprocessinnovation.com.

Are You An Agile Process Innovation Success Story?


I've lived through wall-to-wall, floor-to-ceiling implementations of Lean Six Sigma
methods. I've made all of the mistakes and learned how to avoid them. The methods and
tools are easy; getting people to want to use them is hard. So, I’ve had to find ways to
make it as fast, affordable and flawless as possible.
From my perspective, there are too many people trained and certified as belts. Too
many teams started. And not enough results. This causes most Lean Six Sigma programs
to die after about three years.
The hype, jargon and mass trainings normally associated with Lean Six Sigma aren't
necessary to achieve dramatic, lasting improvements quickly.

Why is Agile Process Innovation So Important?


1. In a winner-take-all global economy, if you aren’t willing to chase the dream of
fast, affordable, flawless execution, someone else will. The early adopters achieve
an unbeatable lead.
2. We waste too much time, money and resources fixing stuff that shouldn’t be
broken.
3. The profit from plugging the leaks in your cash flow is huge—a third or more of
total revenues.
4. The productivity that comes from plugging the leaks in your cash flow is also
huge—2X, 4X, even 8X improvements are possible.
5. Fast, affordable, flawless companies will create an unstoppable economy in those
countries that jump on the Agile Process Innovation bandwagon.

© MMXIX KnowWare International Inc.www.qimacros.com 61


Five Ways Agile Process Innovation Can Help You:
1. When customers realize that they don’t have to wait for your product or service
they will tell everyone they know, and those people will beat a path to your door.
2. When customers realize that there are no hidden costs for repairs, returns or other
issues with your product or service, word of mouth and word of mouse will fill
your store.
3. When your do-it-yourself product goes together effortlessly without missing parts
or pieces, customers will love you.
4. When your restaurant customers get exactly what they ordered, quickly, with an
accurate bill every time, they will encourage their friends to try it.
5. When your software and operating system never crash, hang or stall, that
company will win your repeat business.

Use this book with the video training at www.agileprocessinnovation.com. Every quick
video of key methods and tools will be short—under 10 minutes. You can watch them
over and over again as needed to learn the methods and tools.
There will be case studies you can download to test your skills.
You might be wondering, Jay why are you giving this video training away for free?

1. First, it's just not possible to train 99% of the world's population in Money Belt Skills
even if I started today and trained 100s of trainers. But it is possible online.
2. Second, many people who want Lean Six Sigma training can't afford it. But they can
afford Money Belt training because it's free. Or they can't afford the one-to-four
weeks it takes to get the traditional Lean Six Sigma training. No one can afford to
spend 14 weeks solving a problem.
3. Third, Six Sigma requires software to analyze the data in ways that pinpoints where
to make improvements. While I'm offering a free 30-day trial of the QI Macros
software at www.qimacros.com, I hope everyone will buy a copy because they will
need it to find and fix the problems that consume a third or more of total revenue.
Then they will need QI Macros control charts to monitor and sustain the
improvement.

© MMXIX KnowWare International Inc.www.qimacros.com 62


4. Finally, you might consider having us analyze some of your data to focus your initial
improvement efforts: https://www.qimacros.com/services/shortcut-to-results/.
5. And, if nothing else, a faster, better, cheaper experience in every restaurant and
business you do business with would make your time on this planet much more
pleasant. Aren’t you tired of being part of someone else’s Fix-It Factory?

Four-Hour Money Belts who can help companies get closer to free, perfect and now will
always be in demand.
Be a Money Belt!

© MMXIX KnowWare International Inc.www.qimacros.com 63


Implementing Agile Process Innovation

Let's face it, nobody wants Lean Six Sigma. Companies want the bottom-line, profit-
enhancing results they think Lean Six Sigma will deliver.

Companies are asking: "Isn't there a better way to implement Lean Six Sigma?"
The 10-to-20 day "belt" certifications that span several months are too expensive and
slow for most companies.

I say, "Companies don't need lots of training and belts; they need 'Money Belts' who
can find ways to save time and money and add those savings to the bottom line.” To
make it easier for employees and companies to deploy Six Sigma without the high costs,
I’ve developed a complete, no-cost, four-hour Money Belt video training at
www.agileprocessinnovation.com.

As I’ve suggested in this manifesto, Agile Process


Innovation consists of four main steps:

• Simplify – 5S the process

• Streamline – Use Value Stream Maps and


Spaghetti Diagrams to eliminate delay and
movement.

© MMXIX KnowWare International Inc.www.qimacros.com 64


• Optimize – Use QI Macros and the Magnificent Seven Tools of Lean Six Sigma
to eliminate defects and deviation.

• Innovate – As processes become more effective and efficient, better ways to


handle the whole process will reveal themselves. Prototype the new process and
implement it.

Companies are asking: "How soon can I get results?" Most Six Sigma folklore
suggests it will take months or years.

I say: "One-to-five days." I have helped teams solve million-dollar problems in


anywhere from a few hours to a few days using Lean Six Sigma Demystified and QI
Macros. I helped one hospital system save $5 million a year in just five days using Lean
Six Sigma for Hospitals and QI Macros

Companies are turning away from certifying "belts." Healthcare companies are
training "improvement advisors" rather than certifying belts because adding certifications
to an employee's resume leads to turnover, not improvement. Since the recession,
companies would rather hire Six Sigma expertise than spend time training existing
employees.

Companies are balking at buying expensive Six Sigma software. Six Sigma
trainers across America have been calling about QI Macros because their clients are
asking for more affordable Six Sigma software that works in Excel. QI Macros is an

© MMXIX KnowWare International Inc.www.qimacros.com 65


easy-to-use Excel add-in that will do all of the math, graphs and statistics for Six Sigma.
Companies can buy 10 copies of QI Macros for the price of a one copy of big name
statistical packages.
Employees balk at learning Six Sigma formulas and statistics.
I say: "You don't need to know electrical engineering to turn on a light switch. So,
you don't need to be a statistician to do Six Sigma. Drawing charts and graphs should be
as easy as clicking your mouse." QI Macros has four powerful "wizards" that demystify
data analysis, statistics and charts.
Lean Six Sigma needs to drink its own Kool-Aid and slash cycle time, delays, defects
and deviation to achieve results faster than most people believe is possible.

Start Using the Magnificent Seven Tools to Solve Problems Now!


What are you waiting for?
• You can learn the Magnificent Seven methods and tools in one day.
• It doesn’t cost a fortune. It’s free at www.agileprocessinnovation.com.
The training is FREE. Certification, however, will incur a small fee.
Start with the Yellow Belt Certification.
• Your software should do most of the thinking for you. It should help you
select the right chart, analyze the data and point you in the right direction. And
it shouldn’t cost a fortune. Download a 30-day trial at www.qimacros.com or
buy a copy at www.qimacros.com/store.

What If You Don’t Want To Learn Lean Six Sigma Or QI Macros?


Great! We can take your data and turn it into an improvement project ready for
analysis. No waiting! We will need raw data about defects, mistakes and errors. We will
need the what, where, when, how, who and how much about each defect, but then we can
turn it into a “ready to bake” improvement project. (We can’t do the root cause analysis
for you; that’s your job.)
Start Now: https://www.qimacros.com/services/shortcut-to-results/

© MMXIX KnowWare International Inc.www.qimacros.com 66


Process Innovation
Process innovation is often harder to accomplish than one might expect. The answers rarely lie
within your industry or business. Every business suffers from the “curse of knowledge:” You
know too much about how your business is supposed to work. The answers you want are often
found outside of your industry.

Kodak invented the digital camera but could not capitalize on it. Xerox invented the mouse and
icon-based computer screens we use today but couldn’t capitalize on it. Most Baby Bell
telephone companies couldn’t grasp the significance of cellular or cable and missed out on the
opportunity of a lifetime. Too often industries become blind to changes around them. Marriott
didn’t invent Airbnb. Quality improvement, TQM and Lean Six Sigma suffer from the same
myopia.

The software industry adapted insights from Lean manufacturing to create Agile software
engineering. I’m suggesting that we can adapt the insights from Agile software and apply them
to Lean Six Sigma to get a robust, high-performance way to simplify, streamline and optimize
any business process.

© MMXIX KnowWare International Inc. www.qimacros.com 67


Innovate Improve

Improve

I have found that through repeated cycles of simplification and optimization that revolutionary
ways to deliver products or services will jump out at you. There are many tools in the Six Sigma
toolkit to help with defining and implementing this new way of doing business—voice of the
customer (VOC), quality function deployment (QFD) and others.

One of the easiest ways to get going is develop a transition matrix describing where you are now
and the journey to world-class performance. You will want to look at other industries to find
ways to transform your business.

Transition Planning
Change management begins by asking: "Where are we?" and "Where do we want to be?" To fill
in the blanks between the current state and desired state we ask a third question: "How do we get
there?"

The QI Macros Transition Planning Matrix provides a tool and a method for answering all three
questions. You can find the Transition Planning Matrix under Lean Six Sigma Templates,
Planning Tools. While you may not need the whole transition planning matrix for every
improvement, it will help you think about the change in a more robust way.

Where Are You? Where Do You Want To Be?


The Transition Planning matrix has a column to describe the current environment and one to
describe the future desired environment. While it's often easy to describe the current state of
affairs, it takes some thinking and Post-it notes to describe the desired state.

© MMXIX KnowWare International Inc. www.qimacros.com 68


How Do You Get There?
Four key steps describe most transitions involving Lean Six Sigma Projects:
1. Simplify and Streamline (Lean)

2. Optimize (Six Sigma)

3. Expand into New Domains (Innovation)

4. Competitive Advantage (pulling ahead of the competition)

Most changes will require changes to people, processes and technology.

SPOT - Strategy, Process, Organization and Technology


The transition planning matrix has four main sections: Strategy, Process, Organization and
Technology (SPOT) that describe the key elements of a business transition.

© MMXIX KnowWare International Inc. www.qimacros.com 69


Strategy

Business strategy consists of three key elements: innovation, improvement and impression. To
survive and thrive, businesses need to maximize one of these elements to establish their
uniqueness and optimize the other two in service of the core strategy. Apple is known
for innovation. Wal-Mart is known for improvement and operational efficiency. Nordstroms is
known for impression and customer satisfaction. Steve Jobs was known for innovation, but Tim
Cook made Apple the operational excellence juggernaut that it is today.

Is your change about innovation, improvement or impression? How will this affect your
communication about it? The Strategy section will help you address this facet of change.

© MMXIX KnowWare International Inc. www.qimacros.com 70


Process

The ability to consistently deliver a product or service is a function of process. This section of
the Transition Planning Matrix covers essential business processes. There are six key processes:
1) understanding the customer's needs and wants (i.e., voice of the customer), 2) involving
customers in design and delivery, 3) marketing and selling, 5) customer service and 6) managing
customer information.

How does your change impact and improve one or more of these key business processes?

© MMXIX KnowWare International Inc. www.qimacros.com 71


Organization

This section covers various aspects of the human element of the company and its transitional
needs. Will this change the organization's structure or role? How will it affect core
competencies? What changes will be required in the recognition and rewards systems? What
training will be required? How will you create awareness and desire for this change?

© MMXIX KnowWare International Inc. www.qimacros.com 72


Technology

This section covers necessary technology changes like data, hardware and software. What
information system changes will be required to implement your improvement? How long will
that take? How will you get IT on your side to make the changes? Are there "off-the-shelf" tools
like QI Macros that can meet your needs?

Transition Planning
Once you know where you are and where you want to go, the next step is to identify all of the
activities required to move all four elements of the SPOT forward, in sync, to achieve the desired
future. This involves thinking, because if you try to shift the Process or Technology without a
plan to get the employees on board to support it, it will fail. The forces of inertia will hold the old
behavior in place.

© MMXIX KnowWare International Inc. www.qimacros.com 73


Every step forward requires the synchronized movement of all four elements. This is why new
Technology (T) often sits idle waiting for the Strategy, Process and Organization (SPO) to catch
up. Or a process change waits on technology. Or an organization change doesn't have the desired
effect.

Once a company starts shifting all four elements toward the desired future, it's easy to sustain the
movement, but getting started is often hard.

Where do you want to be?


Every change, large or small, needs to be examined to determine what else needs to be aligned to
ensure its success. I've seen too many projects fail to achieve desired results because teams
forgot to align strategy, process, organization and people in service of the change. I've seen too
many projects fail because the change wasn't woven into the new employee orientation training
and reward systems.

The transition planning matrix helps you envision the future, identify the tarpits along the way
and implement countermeasures to make sure the change survives and thrives.

© MMXIX KnowWare International Inc. www.qimacros.com 74


© MMXIX KnowWare International Inc. www.qimacros.com 75
Agile Process Innovation Mini-Manifesto
Is it possible to accelerate the adoption and use of Lean Six Sigma methods and tools by hacking
Lean Six Sigma? I believe the answer to this question is YES!
While Lean Six Sigma came from manufacturing, 80 percent of American businesses are service
businesses. Can these businesses use a subset of Lean Six Sigma methods and tools to maximize
results? Yes, again.
Traditional Lean Six Sigma implementations take months or even years to see results:

Agile Lean Six Sigma training takes a different approach. Using existing defect data and
software, we can train employees in a day or less and solve real problems:

I’m an Agile Lean Six Sigma Process Innovator!


© MMXIX KnowWare International Inc. www.qimacros.com
I value:
• Results over rigor

$
NOT
• Working improvements over comprehensive paperwork

• Cross-functional collaboration over silo analysis

• Responding to change over following a plan

• Numerous small experiments over a few large bets

• Testing, data and charts over opinions and conventions

Blah, Blah,
Blah

vs

© MMXIX KnowWare International Inc. www.qimacros.com


• Engagement and transparency over posturing

Agile Lean Six Sigma Principles

1. Satisfy customers by early and continuous delivery of valuable improvements


2. Welcome changing requirements, even late in the improvement
3. Deliver working improvements frequently (in hours or days rather than weeks)
4. Close, daily cooperation between business people and improvers
5. Build projects around motivated individuals, who should be trusted
6. Face-to-face conversation is the best form of communication (co-location)
7. Working improvement is the primary measure of progress
8. Sustainable improvements, able to maintain a constant pace
9. Continuous attention to technical excellence and good design
10. Simplicity—the art of maximizing the amount of work not done—is essential
11. Self-organizing teams deliver the best architectures, requirements, and designs
12. Regular reflection helps the team become more effective and adjust accordingly

Innovative process transformations emerge from simplifying, streamlining and optimizing key
processes using the Magnificent Seven Tools of Lean Six Sigma. Any attempt to “reengineer” a
complex business process will fail without this prework.

© MMXIX KnowWare International Inc. www.qimacros.com


Agile Process Innovation Cheat Sheet

Four-Hour Lean Hack – Simplify and Streamline

5S – Sort,
Straighten, Shine,
Standardize, Sustain
Eliminate Delays and Movement

Four-Hour Six Sigma Hack – Optimize


Focus Four-Minute Six Sigma Hack (Data Mining Wizard)

Improve

Sustain

Honor Recognize, Reward, Refocus, Repeat


Innovate Improve
Improve

Improve

Innovation

© MMXIX KnowWare International Inc. www.qimacros.com

You might also like