CSP Imp Question
CSP Imp Question
Figure No. 1
Find out
i) Types of system & Kp, Kv, Kq.,
ii) Steady state error for U/P =
b) Compare Relay logic control and Programmable logic control. (min. 6 points)
c) Draw ladder diagram for 3 motor operation for following condition.
i) Start push button, start motor M1.
ii) When motor M1 is ON after 8 minutes M2 is ON and M1 is OFF.
iii) When M2 is ON, after 15 minutes M3 is ON and M2 is OFF. and when stop push button is pressed M3 is OFF.
c) Write any three advantages and disadvantages of Routh's criterion. Also describe different cases to find stability of
a system.
i) Pole’s
ii) Zero’s
iii) Characteristics equation
iv) Plot Pole’s and Zero’s in S-plain.
b) State the need of PLC in automation.
c) Draw the ladder logic diagram
i) Half Adder
ii) Half Substractor
d) Explain scanning cycle of PLC.
3. Attempt any THREE of the following: 12
a) Derive the transfer function of following circuit.
Refer Fig. No. 1.
Fig. No. 1.
b) Describe ON-OFF control action with equation and response curve.
c) Sketch the block diagram of PLC.
d) Explain the Sourcing and Sinking concept in D.C. Input module.
c) Calcualte range of K for the given unity feedback system to be stable with G(S).
Obtain its
i) Poles, ii) Zeroes, f) Give any two application of Servo System.
g) State the mathematical expression and principle of proportional control action.
Fig. No. 2
e) Draw and describe the block diagram of AC discrete input module of PLC. P.T.O.
Determine
i) Type of system
ii) Error constant Kp, Kv and Ka
b) With respect to PLC
i) Draw PLC scan cycle
ii) Describe memory organization of PLC
c) Draw the ladder diagram to verify : OR gate, AND gate and EX-OR Gate logic.
Fig. No. 3
c) Define stability and sketch root locations in s-plane for stable system, unstable system and critically stable system.
Find –
i) Rise time
ii) Peak overshoot
iii) Settling time
b) Draw the block diagram of power supply used in PLC and explain the function of each block.
c) For two motor system draw the ladder diagram –
i) Start switch starts Motor 1 10 seconds later Motor 2 starts.
ii) Stop switch stops Motor 1 and Motor 2 simultaneously.
Fig. No. 2
c) A second order unity feedback system is given by
i) Peak time Tp
ii) Peak Overshoot % Mp
iii) Settling time Ts.
a) List any four names of PLC programming languages.
***b) Define transient response and steady state response for any system.
c) Calculate the order of following system.
Obtain its
i) Poles, ii) Zeroes, f) Give any two application of Servo System.
g) State the mathematical expression and principle of proportional control action.