Time & Work - 2 (Bank Basic Solution)
Time & Work - 2 (Bank Basic Solution)
eng
hi
Q-2 CA: 3
eng
hi
Q-3 CA: 2
eng
hi
Contact: 7052477777,7052577777
https://new.mahendras.org/
Q-4 CA: 4
eng 120
Ateek = 15 min------8
hi 120
अतीक = 15 मिनट------8
Q-5 CA: 1
eng Since they works for same time hence there share will be divided in the ration of
efficiency
hi चूँकि वे एि ही समय िे किए िाम िरते हैं इसकिए दक्षता िे अनपु ात में कहस्सा िो बाूँटा जाएगा
(रमेश) / (रणजीत) =
Contact: 7052477777,7052577777
https://new.mahendras.org/
रमेश: रणजीत = 9:5
Q-6 CA: 1
eng
Remaining work =
day
hi
शेष काि=
दिन
Q-7 CA: 3
eng
hi
Q-8 CA: 3
Contact: 7052477777,7052577777
https://new.mahendras.org/
eng
Ratio of efficiency of A: B: C =
= 9:9:8
hi
A: B: C िी िाययक्षमता िा अनपु ात =
= 9:9:8
Q-9 CA: 1
eng
1 = 16, 3 = 48
Remaining work = 102
B took = = 17 days
Contact: 7052477777,7052577777
https://new.mahendras.org/
hi
1 = 16, 3 = 48
शेष कार्य = 102
Q-10 CA: 4
eng LCM = 36
A 18 2
B 12 3
last three days work done by A = 6
Remaining work = 30
5 --------------1
1-----------------
30 -------- = 6 days
Total days = 6 + 3 = 9 days
hi ल.स.प. = 36
A 18 2
B 12 3
1-------------
30 -------- = 6 fnu
कुल दिन
= 6 + 3 = 9 दिन
Q-11 CA: 1
Contact: 7052477777,7052577777
https://new.mahendras.org/
eng Time Work Efficiency
A+ - 18 days 4
B+ - 24 days 72 3
C- - 36 days -2
ATQ—
(A+B)x+(A+B –C)(x+24/ 5) = 72
7x+5( x+24/5) = 72
12x = 48 ⇒ x = 4
(A + B + C) कि करते है = 4+ = दिन
Q-12 CA: 3
eng Total work = LCM of 40 and 45 = 360
One day work of A = 9 and one day work of B = 8
Now , 9y + 8 (y+0.625) = 360/4 = 90 ➔ y = 5
Q-13 CA: 4
eng 6 days
hi 6 दिन
Q-14 CA: 1
eng Carpenter can build cup-board in 80 hours.
Contact: 7052477777,7052577777
https://new.mahendras.org/
Let total work be 80 units.
Efficiency = 1 unit/hr
After 15 hours break cup-board build in = (80-20) = 60 units
Q-15 CA: 3
eng
hi
Q-16 CA: 3
eng Given the ratio of working rates on the four types of vegetables = 46: 69: 46:
69 = 2: 3: 2: 3
Let he cut N vegetables in the first K mins
K/4 min were spent cutting say 2x radish
K/4 mins were spent cutting 3x onions
K/4 mins were spent cutting 2x cucumbers
Contact: 7052477777,7052577777
https://new.mahendras.org/
K/4 mins were spent cutting 3x okras
During the next K mins, the time distribution was in the ratio =
Contact: 7052477777,7052577777
https://new.mahendras.org/
उसने k/4 कमनट में 2x गाजर िाटे
उसने k/4 कमनट में 3x प्याज िाटे
उसने k/4 कमनट में 2x खीरे िाटे
उसने k/4 कमनट में 2x िबं ी क ंडी िाटी
अगिे K कमनट िे दौरान, समय कवतरण िा अनुपात =
Q-17 CA: 3
Contact: 7052477777,7052577777
https://new.mahendras.org/
eng
hi
Q-18 CA: 3
eng
The ratio sows that 3 unit grass will grow in 10 days. So in 10 days the
quantity of grass is 9.
X=90 cows
hi
Contact: 7052477777,7052577777
https://new.mahendras.org/
अनपु ात से पता चिता है कि 10 कदनों में 3 यकनट घास बढेगी। तो 10 कदनों में घास िी मात्रा 9 है।
X=90 गाय
Q-19 CA: 3
eng
Contact: 7052477777,7052577777
https://new.mahendras.org/
hi
Q-20 CA: 1
eng Ratio of efficiencies = 7:5:4
B alone complete 75 % of the task=
Contact: 7052477777,7052577777
https://new.mahendras.org/
hi क्षिताओं का अनुपात = 7:5:4
B अकेले कायय का 75% कायय पूरा करे गा =
Q-21 CA: 4
eng
9 + 4 = 13
= 1 p.m.
hi
9 + 4 = 13
= 1 p.m.
Q-22 CA: 1
eng
Q-23 CA: 3
eng 91= n/2(2+(n-1))
Contact: 7052477777,7052577777
https://new.mahendras.org/
n=13
hi 91= n/2(2+(n-1))
n=13
Q-24 CA: 1
eng
hi
Q-25 CA: 3
eng Let A does x units per day and B does y units per day.
According to the question,
2x + 9y = 1 ...(I)
3x + 6y = 1 ...(II)
From (I) and (II), we get
x= ,y=
B alone can do a piece of work in 15 days
x= ,y=
B अकेला एक कायय को 15 दिनों िें पूरा कर सकता है |
Q-26 CA: 3
eng Let time taken by B to finish the work= x
Let time taken by A to finish the work= 2x
Let time taken by C to finish the work= 3x
So, time taken by (A+B+C) to finish the work
Contact: 7052477777,7052577777
https://new.mahendras.org/
Let time by A finish the work = 2x
= 2 × 33 = 66
Q-27 CA: 4
eng Work should be completed in 24 days by 6 men initially.
Part of work completed by 1 man in 1 day = 1/(6 × 24) = 1/144
Total work = 1
Part of work completed in 2 days by 6 men = 2 × 6 × 1/144 = 1/12th part
Now, 6 men are added.
Part of work completed in 4 days = 1/12 + 2 × 12 × 1/144 = 1/12 + 1/6 = 1/4th
Now, 6 men are added.
Part of work completed in 6 days = 1/4 + 2 × 18 × 1/144 = ½
Now, 6 men are added
Part of work completed in 8 days = 1/2 + 2 × 24 × 1/144 = 5/6th
Now 6 men are added.
Part of work left = 1/6th
Total number of men = 30
Time taken to complete 1/6th of the work by 30 men = 144 × 1/6 × 1/30 = 24/30
= 4/5 days
hi कायय शरू
ु िें 6 परु
ु षों द्वारा 24 दिन िें परू ा ककया जाना चादहए।
1 दिन िें 1 व्यक्तत द्वारा पूरा ककया गया कायय का दहस्सा = 1 / (6 × 24) =
1/144
कुल कायय = 1
2 दिन िें 6 पुरुषों द्वारा पूरा ककया गया कायय का दहस्सा = 2 × 6 × 1/144 = 1/12
अब, 6 पुरुष जोडे गए,
Contact: 7052477777,7052577777
https://new.mahendras.org/
4 दिन िें पूरा ककया गया कायय का दहस्सा = 1/12 + 2 × 12 × 1/144 = 1/12 + 1/6
= 1/4
अब, 6 पुरुष जोडे गए हैं।
6 दिन िें पूरा ककया गया कायय का दहस्सा = 1/4 + 2 × 18 × 1/144 = ½ अब, 6
पुरुष जोडे गए हैं
8 दिन िें पूरा ककया गया कायय का दहस्सा = 1/2 + 2 × 24 × 1/144 = 5/6
अब 6 परु
ु ष जोडे गए हैं।
बचा हुआ कायय का दहस्सा = 1/6
परु
ु षों की कुल संख्या = 30
30 परु
ु षों द्वारा कायय के 1/6 वें भाग को परू ा करने के मलए मलया गया सिय
= 144 × 1/6 × 1/30 = 24/30 = 4/5 दिन
Q-28 CA: 4
eng x×100=(x-10)×110
x=110 days
hi x×100=(x-10)×110
x=110 दिन
Q-29 CA: 3
eng A is twice as good as B
(A+B) = 2B + B = 3B
3B complete job in 24 days
B will complete job in 24 × 3 = 72 days
hi A, B से िोगुना अच्छा है
(A+B) = 2B + B = 3B
3B, 24 दिनों में परू ा काम करे गा
B = 24 × 3 = 72 दिनों में कार्य परू ा करे गा
Q-30 CA: 3
eng A does the work in 8 days. B does the work in days.
A + B do the work in
days
Contact: 7052477777,7052577777
https://new.mahendras.org/
hi A कायय को 8 दिन िें करता है B कायय को 16 दिन िें करता है ।
A+B िोनों कायय करें गे
दिन
Q-31 CA: 5
eng
hi
Q-32 CA: 1
eng Time taken by A and B together to complete the work =
= = = 10/3
hours
= = = 10/3
घटं े
Q-33 CA: 5
eng L.C.M. of 15 and 25 is 75
So assuming 75 unit as the whole work.
Work done by A in a day
= 75/15
= 5 units
Work done by B in a day
Contact: 7052477777,7052577777
https://new.mahendras.org/
= 75/25
= 3 units
Work done by both of them in 5 days
= 5(5+3)
= 40 unit
Work done by B when A is on a leave of 5 days
= 5×3
= 15 units
Total remaining work for A to do alone
= 75-(40+15)
= 20 units
Number of days required by A to complete the remaining work alone
= 20/5
= 4 days
hi 15 और 25 का ल.स.पा. 75 है
अतः 75 इकाई को पूरा काि िानने के बाि
A द्वारा एक दिन िें ककया जाने वाला काि
= 75/15
= 5 इकाई
B द्वारा एक दिन िें ककया जाने वाला काि
= 75/25
= 3 इकाई
5 दिन िें िोनों द्वारा एक साथ ककया जाने वाला काि
= 5(5+3)
= 40 इकाई
जब A छुट्टी पर था तब B द्वारा ककया जाने वाला काि
= 5×3
= 15 इकाई
बचा हुआ काि जोकक A को अकेले पूरा करना होगा
= 75-(40+15)
= 20 यतू नट्स
बचे हुए काि को परू ा करने िें A द्वारा मलया गया सिय
= 20/5
= 4 दिन
Q-34 CA: 1
eng
Contact: 7052477777,7052577777
https://new.mahendras.org/
hi
Q-35 CA: 5
eng
hi
Q-36 CA: 4
eng A ------------- 40 39
B -------------60 1560 26
C ------------ 39 40
Work done by A, B and C in three days (i.e. 1cycle) = 39 + 26 + 40 = 105 units
Number of cycles = = 14
Remaining work = 1560 - 1470 = 90 units
= days
hi A ------------- 40 39
B -------------60 1560 26
C ------------ 39 40
तीन दिनों िें A, B और C द्वारा ककया गया कायय = 39 + 26 + 40 = 105 इकाई
चक्रो की संख्या = = 14
शेष कायय = 1560 - 1470 = 90 इकाई
Contact: 7052477777,7052577777
https://new.mahendras.org/
अभीष्ट सिय = (14×3) + 1 + 1 +
= दिन
Q-37 CA: 3
eng Made roties in 360 minutes by A, B and C,
= 524
= 524 रोदटयां
Q-38 CA: 3
eng
hi
Contact: 7052477777,7052577777
https://new.mahendras.org/
D = 12
िुि कदन = 12+ 4+8 = 24
Q-39 CA: 4
eng (A+B)'s work = 13/19
(B+C)'s work = 11/19
Now,
(A+B+B+C) - (A+B+C) = B
13/19 + 11/19 - 1 = B
B = (24/19) - 1 = 5/19
A + B = 13/19
A = 13/19 - 5/19 = 8/19
B + C = 11/19
C = 11/19 - 5/19 = 6/19
So, Ratio of distribution = (8/19): (5/19): (6/19) = 8: 5: 6
B is the least efficient person so,
B's share = (5/19)×3230 = Rs.850
hi (A + B) का कायय = 13/19
(B + C) का कायय = 11/19
अब,
(A+B+B+C) - (A+B+C) = B
13/19 + 11/19 - 1 = B
B = (24/19) - 1 = 5/19
A + B = 13/19
A = 13/19 - 5/19 = 8/19
B + C = 11/19
C = 11/19 - 5/19 = 6/19
तो, ववतरण का अनप ु ात = (8/19): (5/19): (6/19) = 8: 5: 6
B सबसे कि कुशल व्यक्तत है , इसमलए,
B का दहस्सा = (5/19) × 3230 = 850 रुपये
Q-40 CA: 2
eng
6 × 6 = 36
8 × 2 = 16
36 + 16 = 52
Contact: 7052477777,7052577777
https://new.mahendras.org/
96 – 52 = 44
hi
6 × 6 = 36
8 × 2 = 16
36 + 16 = 52
96 – 52 = 44
Q-41 CA: 2
eng 3(1/18+1/9)+ x(1/18+1/9+1/3) =1
x =1
total =3+1 = 4
hi 3(1/18+1/9)+ x(1/18+1/9+1/3) =1
x =1
कुल=3+1 = 4
Q-42 CA: 5
eng Ratio of efficiency between them is
Aman : Akash = 4:3
so, total work is 7×18 = 126 unit
Q-43 CA: 3
eng A:R:J=1/2:1/3:1/6=3:2:1
Contact: 7052477777,7052577777
https://new.mahendras.org/
hi A:R:J=1/2:1/3:1/6=3:2:1
Q-44 CA: 4
eng Time Efficiency
Anita 16 3
Total work = 48
Bindu 12 4
hi समय दक्षता
अकनता 16 3
िुि िायय = 48
कबन्द 12 4
20 िायय कबन्द द्वारा अिे िे किया गया, अिे िे िायय िा समय = 20/4 = 5 कदन
Q-45 CA: 4
eng (1/x) + 1/(x+5) = 9/100
Put the value of x = 20 days
hi (1 / x) + 1 / (x + 5) = 9/100
x = 20 कदन
Q-46 CA: 4
eng Charu’s one day’s work,
= (1/3)−(1/6+1/8) =1/24
Therefore,
Annu: Bhanu: Charu = Ratio of their one day’s work
Contact: 7052477777,7052577777
https://new.mahendras.org/
= (1/6): (1/8): (1/24) = 4: 3: 1
Annu’s share,
= 600×(4/8) = Rs.300
Bhanu’s share,
= 600×(3/8) = Rs.225
Charu’s share,
= [600−(300+225)] = Rs.75
Q-47 CA: 4
eng
x= 4 days
hi
x= 4 दिन
Q-48 CA: 3
eng Let the total amount of work be ‘100’ unit
And ‘A’ does ‘a’ unit and ‘B’ does ‘b’ unit work per day
Then
Contact: 7052477777,7052577777
https://new.mahendras.org/
…….. (1)
And
……… (2)
From equation (1) and (2)
a= unit
b = unit
Now work done by A and B in one day working together
= unit
So, number of days required by A and B working together to complete the whole
work =
= = 10.5 days
…….. (1)
और
……… (2)
समीिरण (1) और (2) से
a= इिाई
b = इिाई
अब A और B द्वारा एि कदन में एि साथ किया गया िाम
Contact: 7052477777,7052577777
https://new.mahendras.org/
=
= इिाई
Q-49 CA: 4
eng (12m+16b)×20 = (52m + 96b)×4
1m = 2b
so, 15m = 30b
then,
50b × p = 40b × 20
p = 16 days
Q-50 CA: 2
eng 5M+3W =15 days
Contact: 7052477777,7052577777
https://new.mahendras.org/