Assign
Assign
• Target consumers:
• Customer Segmentation: To concentrate on the range of consumers who will be utilizing the car
wash facility, it will be beneficial to concentrate on individual automobile owners, taxi services,
business delivery services, and car rental services.
• Surveys: In order to manage rush hours, I could either perform a survey or secondary research on
the frequency of car wash services used by potential clients as well as the best time and day to do
so.
• Present Demand: Determining the demand and frequency of washing will be made easier with the
help of an estimate of the number of vehicles in Dehradun.
By considering options like touchless By choosing a location with high Verifying that the site has access to
brush or conveyor-based systems traffic flow and easy access will water, electricity, and drainage.And
and the evaluation based on water ensure proximity to target customers for the betterment, installing water
and necessary utilities like
and energy consumption, recycling systems for environmental
(electricity, water, drainage).
operational efficiency, maintenance sustainability will be apprreciated.
needs, and customer preferences.
2. Competitor Analysis
• I can analyze the competition that will be encountered when putting up a car wash facility by
identifying the current car wash centers in the area that utilize both automated and manual
methods, evaluating their price and service quality, and analyzing the technology they employ.
• If the gaps listed below are taken into account, competitor analysis can also be performed;
1. Service flaws such as protracted wait periods and uneven hand washing quality.
2. Technological gaps, such as rivals' lack of eco-friendly procedures or contemporary technologies.
3. Pricing Gaps: It's possible that rivals charge exorbitant prices without providing better value.
Market Size Estimation: To estimate the market size, one can calculate the total number of possible
clients and estimate the revenue generated by each vehicle wash.
a) 1. Technical Feasibility: This section will discuss how to choose intelligently and take into
account the factors required for better outcomes, which may make the car wash center operate
more smoothly and efficiently.
2. Financial Feasibility: To determine whether the project's costs are reasonable, we will
perform a financial analysis, NPV computation, and sensitivity analysis in this section.
b) Financial Analysis:
c) NPV Calculation:
5550 5550
D Foundation Work & Structural Construction C 5 6660 6660 6660 6660 6660
6660
H Develop Staffing Plan & Recruit Staff G 2 13320 13320
I Conduct Training Session & Evaluate Staff Readiness H 2
6660 6660
J Marketing and Promotion H 3 5920.00 5920.00 5920.00
K Grand Opening Event & Post Launch Review I,J 4 2220 2220 2220 2220 2220
Period Cost 0 18500.00 18500.00 18500.00 4440 4440 5550 5550 6660 6660 6660 6660 6660 8140 8140 8140 7770 7770 6660 13320 13320 12580 12580 5920 2220 2220 2220 2220 2220
Cumulative Cost 0 18500.00 37000.00 55500.00 59940.00 64380.00 69930.00 75480.00 82140.00 88800.00 95460.00 102120.00 108780.00 116920.00 125060.00 133200.00 140970.00 148740.00 155400.00 168720.00 182040.00 194620.00 207200.00 213120.00 215340.00 217560.00 219780.00 222000.00 224220.00
WEEK 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
PERIOD COST 0 19158.33 19158.33 19158.33 4598 4598 5747.5 5747.5 6897 6897 6897 6897 6897 8429.666667 8429.666667 8429.666667 8046.5 8046.5 6897 13794 13794 13027.66667 13027.66667 6130.666667 2299 2299 2299 2299 2299
WEEK 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
Cumulative Cost 0 19158.33 38316.67 57475.00 62073.00 66671.00 72418.50 78166.00 85063.00 91960.00 98857.00 105754.00 112651.00 121080.67 129510.33 137940.00 145986.50 154033.00 160930.00 174724.00 188518.00 201545.67 214573.33 220704.00 223003.00 225302.00 227601.00 229900.00 232199.00
4. Legal and Environmental Considerations:
In India, local municipal administrations or development authorities are usually in charge of zoning
laws and land-use permits. My legal process will go more smoothly if I get in touch with the Dehradun
Municipal Corporation for zoning information.The land use for different regions, including as
residential, commercial, industrial, and mixed-use zones, is outlined in Dehradun's master plan. By
confirming if the suggested site is inside an area that permits business operations, especially for
service-oriented enterprises like car washes.Because certain locations may have restrictions or
particular requirements for businesses that use a lot of water or discharge wastewater, this car wash
project will undoubtedly be eligible by checking the precise zoning regulations for the car wash
center. The car wash center will open on schedule if the planned location satisfies the requirements
for businesses that handle water treatment and disposal.Additionally, by reviewing the Water
Management and Environmental Regulations, this Car wash facilities frequently have to abide by
environmental laws, especially those pertaining to water use and wastewater treatment, and they
may need to seek advice from the Uttarakhand Pollution Control Board on wastewater disposal.You
must apply for permissions after verifying that the region is permitted for a vehicle wash. These could
include permits for water and sewage hookups, environmental clearances, and company
licenses.Seeking Legal Counsel: To make sure that all zoning and permit requirements are met, it
could also be helpful to speak with a local legal professional who specializes in real estate and
business rules.
1. Project Manager
• Role: He oversees the synchronization of various levels and the overall project oversight.
• Duties: Oversees the project from inception to completion.
• Assures that the project remains within budget and on schedule.
• Facilitates coordination between various teams, including operations, construction, technical,
and finance.
oversees all stakeholder communications.
2. Operations Manager
• Function: Managing daily tasks, such as equipment management and site setup.
• Accountabilities: • Oversight of the car wash facility's setup.
• Will oversee the procurement of supplies and equipment.
• Overseeing personnel training and ensuring operational readiness.
oversees daily operations after the vehicle wash facility is up and running.
3. Financial Manager
• Function: He will oversee cost control, funding, and budgeting.
Creating and overseeing the project budget is one of the duties.
• He will be in charge of obtaining project finance.
• Keeps track of spending and guarantees financial effectiveness.
• Create reports on cost variations and financial performance.
4. Construction Team
• Function: This group, which consists of contractors, architects, and civil engineers, collaborates
and manages the building phase.
Creating the construction plan and making sure it complies with specifications are among the
duties.
• Oversees engineers' and architects' work.
• Oversees the construction schedule and advancement.
• Assures adherence to regional safety and construction codes.
5. Technical Team
• Function: This group is in charge of choosing, setting up, and testing the automated vehicle
wash system.
Identifying and choosing an automated car wash system that will satisfy operational requirements
is one of the responsibilities.
• Oversees the installation process.
• Testing is carried out to guarantee system performance and functionality.
supplying equipment maintenance and technical assistance.
Conclusion
The aforementioned stepwise strategy guarantees comprehensive planning, including all crucial
aspects of organizing, scheduling, financial requirements, and feasibility for the successful proposal
of the automated car wash center in Dehradun.
This project is doable and will proceed according to the budgetary estimates.
----------------------------------------------------------------------------------------------------------------------