Software Testing Methodologies
Software Testing Methodologies
∑ MOTIVATION:
o Flow graphs are being an abstract representation of programs.
o Any question about a program can be cast into an equivalent question about an
appropriate flowgraph.
o Most software development, testing and debugging tools use flow graphs
analysis techniques.
∑ PATH PRODUCTS:
o Normally flow graphs used to denote only control flow connectivity.
o The simplest weight we can give to a link is a name.
o Using link names as weights, we then convert the graphical flow graph into an
equivalent algebraic like expressions which denotes the set of all possible paths
from entry to exit for the flow graph.
o Every link of a graph can be given a name.
o The link name will be denoted by lower case italic letters In tracing a path or
path segment through a flow graph, you traverse a succession of link names.
o The name of the path or path segment that corresponds to those links is
expressed naturally by concatenating those link names.
o For example, if you traverse links a,b,c and d along some path, the name for that
path segment is abcd. This path name is also called a path product. Figure 5.1
shows some examples:
70
Figure 5.1: Examples of paths.
∑ PATH EXPRESSION:
o Consider a pair of nodes in a graph and the set of paths between those node.
o Denote that set of paths by Upper case letter such as X,Y. From Figure 5.1c,
the members of the path set can be listed as follows:
ac, abc, abbc, abbbc, abbbbc.............
o Alternatively, the same set of paths can be denoted by :
ac+abc+abbc+abbbc+abbbbc+...........
o The + sign is understood to mean "or" between the two nodes of interest, paths
ac, or abc, or abbc, and so on can be taken.
o Any expression that consists of path names and "OR"s and which denotes a set
of paths between two nodes is called a "Path Expression”.
∑ PATH PRODUCTS:
o The name of a path that consists of two successive path segments is
conveniently expressed by the concatenation or Path Product of the segment
names.
o For example, if X and Y are defined as X=abcde,Y=fghij,then the path
corresponding to X followed by Y is denoted by
XY=abcdefghij
o Similarly,
YX=fghijabcde
aX=aabcde
Xa=abcdea
XaX=abcdeaabcde
o If X and Y represent sets of paths or path expressions, their product represents
the set of paths that can be obtained by following every element of X by any
element of Y in all possible ways. For example,
o X = abc + def + ghi
71
o Y = uvw + z
Then,
XY = abcuvw + defuvw + ghiuvw + abcz + defz + ghiz
o If a link or segment name is repeated, that fact is denoted by an exponent.
The exponent's value denotes the number of repetitions:
o a1 = a; a2 = aa; a3 = aaa; an = aaaa . . . n times.
Similarly, if X = abcde then
X1 = abcde
X2 = abcdeabcde = (abcde)2
X3 = abcdeabcdeabcde = (abcde)2abcde
= abcde(abcde)2 = (abcde)3
o The path product is not commutative (that is XY!=YX).
o The path product is Associative.
RULE 1: A(BC)=(AB)C=ABC
where A,B,C are path names, set of path names or path expressions.
o The zeroth power of a link name, path product, or path expression is also
needed for completeness. It is denoted by the numeral "1" and denotes the
"path" whose length is zero - that is, the path that doesn't have any links.
o a0 = 1
o X0 = 1
∑ PATH SUMS:
o The "+" sign was used to denote the fact that path names were part of the same
set of paths.
o The "PATH SUM" denotes paths in parallel between nodes.
o Links a and b in Figure 5.1a are parallel paths and are denoted by a + b. Similarly,
links c and d are parallel paths between the next two nodes and are denoted by
c + d.
o The set of all paths between nodes 1 and 2 can be thought of as a set of parallel
paths and denoted by eacf+eadf+ebcf+ebdf.
o If X and Y are sets of paths that lie between the same pair of nodes, then X+Y
denotes the UNION of those set of paths. For example, in Figure 5.2:
∑ ABSORPTION RULE:
o If X and Y denote the same set of paths, then the union of these sets is
unchanged; consequently,
RULE 5: X+X=X (Absorption Rule)
o If a set consists of paths names and a member of that set is added to it, the
"new" name, which is already in that set of names, contributes nothing and can
be ignored.
o For example,
o if X=a+aa+abc+abcd+def then
X+a = X+aa = X+abc = X+abcd = X+def = X
It follows that any arbitrary sum of identical path expressions reduces to the same path expression.
∑ LOOPS:
Loops can be understood as an infinite set of parallel paths. Say that the loop consists of a single link b.
then the set of all paths through that loop point is b0+b1+b2+b3+b4+b5+..............
RULES 6 - 16:
o The following rules can be derived from the previous rules:
73
o RULE 6: Xn + Xm = Xn if n>m
RULE 6: Xn + Xm = Xm if m>n
RULE 7: XnXm = Xn+m
RULE 8: XnX* = X*Xn = X* RULE 9: XnX+ = X+Xn = X+ RULE
10: X*X+ = X+X* = X+ RULE 11: 1 + 1 = 1
RULE 12: 1X = X1 = X
Following or preceding a set of paths by a path of zero length does not change the set.
RULE 13: 1n = 1n = 1* = 1+ = 1
No matter how often you traverse a path of zero length,It is a path of zero length. RULE 14: 1++1 = 1*=1
The null set of paths is denoted by the numeral 0. it obeys the following
rules:
RULE 15: X+0=0+X=X
RULE 16: 0X=X0=0
If you block the paths of a graph for or aft by a graph that has no paths , there won’t be any paths.
REDUCTION PROCEDURE:
o In the first way, we remove the self-loop and then multiply all outgoing links by
Z*.
o In the second way, we split the node into two equivalent nodes, call them A and
A' and put in a link between them whose path expression is Z*. Then we remove
node A' using steps 4 and 5 to yield outgoing links whose path expressions are
Z*X and Z*Y.
75
o Remove node 9 by applying step4 and 5 to yield
o You can practice by applying the algorithm on the following flowgraphs and
generate their respective path expressions:
77
Figure 5.6: Some graphs and their path expressions.
APPLICATIONS:
o The purpose of the node removal algorithm is to present one very generalized
concept- the path expression and way of getting it.
o Every application follows this common pattern:
1. Convert the program or graph into a path expression.
2. Identify a property of interest and derive an appropriate set of "arithmetic"
rules that characterizes the property.
Replace the link names by the link weights for the property of interest. The path expression has now been
converted to an expression in some algebra, such as
1. Ordinary algebra, regular expressions, or boolean algebra. This
algebraic expression summarizes the property of interest over the set
of all paths.
2. Simplify or evaluate the resulting "algebraic" expression to answer the
question you asked.
Each link represents a single link and consequently is given a weight of "1" to start. Let’s
say the outer loop will be taken exactly four times and inner Loop Can be taken zero or
three times Its path expression, with a little work, is:
Path expression: a(b+c)d{e(fi)*fgj(m+l)k}*e(fi)*fgh
ß A: The flow graph should be annotated by replacing the link name with
the maximum of paths through that link (1) and also note the number
of times for looping.
ß B: Combine the first pair of parallel loops outside the loop and also
the pair in the outer loop.
ß C: Multiply the things out and remove nodes to clear the clutter.
79
1. For the Inner Loop:
D:Calculate the total weight of inner loop, which can execute a min. of 0 times and max.
of 3 times. So, it inner loop can be evaluated as follows:
13 = 10 + 11 + 12 + 13 = 1 + 1 + 1 + 1 = 4
2. E: Multiply the link weights inside the loop: 1 X 4 = 4
3. F: Evaluate the loop by multiplying the link wieghts: 2 X 4 = 8.
4. G: Simpifying the loop further results in the total maximum number
of paths in the flowgraph:
2 X 84 X 2 = 32,768.
80
Alternatively, you could have substituted a "1" for each link in the path expression and then simplified, as follows:
a(b+c)d{e(fi)*fgj(m+l)k}*e(fi)*fgh
= 1(1 + 1)1(1(1 x 1)31 x 1 x 1(1 + 1)1)41(1 x 1)31 x 1 x 1
= 2(131 x (2))413
= 2(4 x 2)4 x 4
= 2 x 84 x 4 = 32,768
This is the same result we got graphically.Actually, the outer loop should be taken exactly four times. That doesn't
mean it will be taken zero or four times. Consequently, there is a superfluous "4" on the outlink in the last step.
Therefore the maximum number of different paths is 8192 rather than 32,768.
STRUCTURED FLOWGRAPH:
Structured code can be defined in several different ways that do not involve ad-hoc rules such as not using
GOTOs.
A structured flowgraph is one that can be reduced to a single link by successive application of the
transformations of Figure 5.7.
The node-by-node reduction procedure can also be used as a test for structured code.Flow graphs that DO NOT
contain one or more of the graphs shown below (Figure 5.8) as subgraphs are structured.
1. Jumping into loops
2. Jumping out of loops
3. Branching into decisions
4. Branching out of decisions
81
Figure 5.8: Un-structured sub-graphs.
LOWER PATH COUNT ARITHMETIC:
A lower bound on the number of paths in a routine can be approximated for structured flow graphs.
The arithmetic is as follows:
The values of the weights are the number of members in a set of paths.
EXAMPLE:
ß Applying the arithmetic to the earlier example gives us the identical
steps unitl step 3 (C) as below:
82
ß From Step 4, the it would be different from the previous example:
ß If you observe the original graph, it takes at least two paths to cover
and that it can be done in two paths.
ß If you have fewer paths in your test plan than this minimum you
probably haven't covered. It's another check.
This question can be answered under suitable assumptions primarily that all probabilities involved are
independent, which is to say that all decisions are independent and uncorrelated. We use the same algorithm as
before: node-by-node removal of uninteresting nodes.
Weights, Notations and Arithmetic:
ß Probabilities can come into the act only at decisions (including decisions
associated with loops).
ß Annotate each outlink with a weight equal to the probability of going in
that direction.
ß Evidently, the sum of the outlink probabilities must equal 1
ß For a simple loop, if the loop will be taken a mean of N times, the looping
probability is N/(N + 1) and the probability of not looping is 1/(N + 1).
ß A link that is not part of a decision node has a probability of 1.
ß The arithmetic rules are those of ordinary arithmetic.
ß In this table, in case of a loop, PA is the probability of the link leaving the
loop and PL is the probability of looping.
ß The rules are those of ordinary probability theory.
1. If you can do something either from column A with a probability
of PA or from column B with a probability PB, then the probability
that you do either is PA + PB.
2. For the series case, if you must do both things, and their
probabilities are independent (as assumed), then the probability
that you do both is the product of their probabilities.
ß For example, a loop node has a looping probability of PL and a probability
of not looping of PA, which is obviously equal to I - PL.
84
ß Following the above rule, all we've done is replace the outgoing
probability with 1 - so why the complicated rule? After a few steps in
which you've removed nodes, combined parallel terms, removed loops
and the like, you might find something like this:
85
which is what we've postulated for any decision. In other words, division by 1 - PL
renormalizes the outlink probabilities so that their sum equals unity after the loop is
removed.
EXAMPLE:
ß Here is a complicated bit of logic. We want to know the probability
associated with cases A, B, and C.
ß Let us do this in three parts, starting with case A. Note that the sum of
the probabilities at each decision node is equal to 1. Start by throwing
away anything that isn't on the way to case A, and then apply the
reduction procedure. To avoid clutter, we usually leave out probabilities
equal to 1.
CASE A:
86
ß Case B is simpler:
ß These checks. It's a good idea when doing this sort of thing to calculate all
the probabilities and to verify that the sum of the routine's exit
probabilities does equal 1.
ß If it doesn't, then you've made calculation error or, more likely, you've left
out some bra How about path probabilities? That's easy. Just trace the
path of interest and multiply the probabilities as you go.
ß Alternatively, write down the path name and do the indicated arithmetic
operation.
87
ß Say that a path consisted of links a, b, c, d, e, and the associated
probabilities were .2, .5, 1., .01, and I respectively. Path
abcbcbcdeabddea would have a probability of 5 x 10-10.
ß Long paths are usually improbable.
EXAMPLE:
1. Start with the original flow graph annotated with probabilities and processing time.
2.Combine the parallel links of the outer loop. The result is just the mean of the
processing times for the links because there aren't any other links leaving the first
node. Also combine the pair of links at the beginning of the flow graph.
88
4. Use the cross-term step to eliminate a node and to create the inner self - loop.
5.Finally, you can get the mean processing time, by using the arithmetic rules as
follows:
PUSH/POP, GET/RETURN:
This model can be used to answer several different questions that can turn up in debugging. It can also help
decide which test cases to design.
The question is:
Given a pair of complementary operations such as PUSH (the stack) and POP
(the stack), considering the set of all possible paths through the routine, what
is the net effect of the routine? PUSH or POP? How many times? Under what
conditions?
Here are some other examples of complementary operations to which this model applies: GET/RETURN a
resource block.
OPEN/CLOSE a file.
START/STOP a device or process.
89
EXAMPLE 1 (PUSH / POP):
ß Here is the Push/Pop Arithmetic:
90
Figure 5.9: Result of the PUSH / POP Graph Analysis.
ß These expressions state that the stack will be popped only if the inner
loop is not taken.
ß The stack will be left alone only if the inner loop is iterated once, but it
may also be pushed.
ß For all other values of the inner loop, the stack will only be pushed.
91
complementary operations in which the total number of operations in either direction
is cumulative.
ß The arithmetic tables for GET/RETURN are:
ß G(G + R)G(GR)*GGR*R
= G(G + R)G3R*R
= (G + R)G3R*
= (G4 + G2)R*
ß This expression specifies the conditions under which the resources will be
balanced on leaving the routine.
ß If the upper branch is taken at the first decision, the second loop must be
taken four times.
ß If the lower branch is taken at the first decision, the second loop must be
taken twice.
ß For any other values, the routine will not balance. Therefore, the first
loop does not have to be instrumented to verify this behavior because its
impact should be nil.
92
REGULAR EXPRESSIONS AND FLOW ANOMALY DETECTION:
∑ THE PROBLEM:
o The generic flow-anomaly detection problem (note: not just data-flow
anomalies, but any flow anomaly) is that of looking for a specific sequence of
options considering all possible paths through a routine.
o Let the operations be SET and RESET, denoted by s and r respectively, and we
want to know if there is a SET followed immediately a SET or a RESET followed
immediately by a RESET (an ss or an rr sequence).
o Some more application examples:
1. A file can be opened (o), closed (c), read (r), or written (w). If the file is
read or written to after it's been closed, the sequence is nonsensical.
Therefore, cr and cw are anomalous. Similarly, if the file is read before
it's been written, just after opening, we may have a bug. Therefore, or is
also anomalous. Furthermore, oo and cc, though not actual bugs, are a
waste of time and therefore should also be examined.
2. A tape transport can do a rewind (d), fast-forward (f), read (r), write (w),
stop (p), and skip (k). There are rules concerning the use of the transport;
for example, you cannot go from rewind to fast-forward without an
intervening stop or from rewind or fast-forward to read or write without
an intervening stop. The following sequences are anomalous: df, dr, dw,
fd, and fr. Does the flowgraph lead to anomalous sequences on any path?
If so, what sequences and under what circumstances?
3. The data-flow anomalies discussed in Unit 4 requires us to detect the
dd, dk, kk, and ku sequences. Are there paths with anomalous data
flows?
∑ THE METHOD:
o Annotate each link in the graph with the appropriate operator or the null
operator 1.
o Simplify things to the extent possible, using the fact that a + a = a and 12 = 1.
o You now have a regular expression that denotes all the possible sequences
of operators in that graph. You can now examine that regular expression for
the sequences of interest.
o EXAMPLE: Let A, B, C, be nonempty sets of character sequences whose smallest
string is at least one character long. Let T be a two-character string of characters.
Then if T is a substring of (i.e., if T appears within) ABnC, then T will appear in
AB2C. (HUANG's Theorem)
As an example, let
o A = pp
B = srr
C = rp
T = ss
93
The theorem states that ss will appear in pp(srr)nrp if it appears in pp(srr)2rp.
o However, let
A = p + pp + ps
B = psr + ps(r + ps)
C = rp
T = P4
Is it obvious that there is a p4 sequence in ABnC? The theorem states that we have only to look at
∑ LIMITATIONS:
o Huang's theorem can be easily generalized to cover sequences of greater length
than two characters. Beyond three characters, though, things get complex and
this method has probably reached its utilitarian limit for manual application.
o There are some nice theorems for finding sequences that occur at the beginnings
and ends of strings but no nice algorithms for finding strings buried in an
expression.
o Static flow analysis methods can't determine whether a path is or is not
achievable. Unless the flow analysis includes symbolic execution or similar
techniques, the impact of unachievable paths will not be included in the analysis.
The flow-anomaly application, for example, doesn't tell us that there will be a flow anomaly - it tells us
that if the path is achievable, then there will be a flow anomaly. Such analytical problems go away, of
course, if you take the trouble to design routines for which all paths are achievable.
94