HB P1 P2 Head End Arrangement Sheet 1
HB P1 P2 Head End Arrangement Sheet 1
HB P1 P2 Head End Arrangement Sheet 1
s
600 SQUARE ACCESS DOOR &
P1
1111 387 1905 83 BLOCKED CHUTE SWITCH
9-CHUTE PLATES LINED ON THE I/S FACES WITH
OR
55
53 3 823 I.P.s 99 50
20
95
REF DRAWING FOR BLOCKED
EY
B.H.P. IRON ORE STANDARD DOMITE WEAR BARS 36
259 128 83 2 28
75
NV
I CHUTE SWITCH - 007-M-0125
E
WEAR BARS SHOP BOLTED TO PLATES AT MAX 250 CTRS 13 .P.
UT
s
5
98 6
CO
21
E
30°
16
FOR WEAR BAR MARKS & LOCATION SEE DRAWINGS REF DRG FOR DOOR 007-M-0173
N
9 95 22
UT
CH
0
OF
087-M-2875,2902,2903,2904 & 2905.
CH
0
22 10
ER
22
0
s
19
>
P.
SF
12
AD
06 22 85
0 2875
.
20
I
AN
I
HE
0
3 22 .P.
B
22
s
6
0
TR
114
ALL DIMs GIVEN ARE
R
22 GENERAL NOTES:
FO
DUST HOODS 0 2875
0
R
4
s
TO CHUTE I.P.s
22
P.
FO
5
22
TS
0
75
REF DRAWING 087-M-2880 28
.
1174 I
(inside plates) s 75 1. ALL HOLES <18 U.N.O.
0
PL
28
22
P.
22
0
.
I
1655
40
31
I
CONVEYOR P2
0
22 3. ALL WELDS 6 C.F.W. U.N.O.
27
22
29
00
0
14
27
90
964
21
55 WELD 100 MISS 200 I/S
20
>
A STIFFENERS WELD 150 MISS 150 STAGGERED
0
2875
22
WELD 150 B/S AT ENDS
10
s
4. ALL NOTCHES TO HAVE 12mm RAD
P.
0
7
22
CONVEYOR P2
.
I
55
AT INTERNAL CORNERS.
2
94
0
22
P1 HEAD CHUTE
15
5. ALL FITTINGS LOCATED CENTRAL U.N.O.
s
P.
2875
REF DRAWING 087-M-2871
.
964 I
6.SURFACE TREATMENT TO COMPLY WITH
0
6
52
3
22
81
15
B.H.P.I.O. SPEC 000-S-0061 SYSTEM PF/1A
2875
55
0
93 7. ALL MARK NUMBERS HARD STAMPED &
22
717
8
5
PAINTED AFTER TREATMENT & LOCATED
115
18
16
5
9
95
16
14 AS SHOWN ON DETAILS.
09
s
P.
96
0
8. ALL MARK NUMBERS PREFIXED
55
22
.
380 I
118
IMPACT PLATE 118
8 9. ALL SNIPES 15 x 15 U.N.O.
REF DRAWING 087-M-2873
0
22
10.ALL WELDS CATAGORY S.P. U.N.O.
1004 1623 776 53
E
s
P.
11.ALL PLATEWORK 10 mm THICK U.N.O.
0
2875
22
.
579 I
83
s
83 12.ALL FLANGES & STIFF's 90 x 10 FLAT U.N.O.
P.
s
13
P.
P1 HEAD CHUTE 6
.
I
22
22
.
435 I
REF DRAWING 087-M-2871 0
3
111
68
22
84 0
2
4 22
15
C I
.P. 0
s 22 D
0
0
21
2875
31 60 2875
77
CONVEYOR P1 CARRY BELT DUST HOODS 5 16
I
.P. 0
s
12 THICK ULTRA HIGH MOLECULAR POLYETHYLENE s 22
P.
3
REF DRAWING 087-M-2880 0
14
.
I
FIXED TO I/S FACE OF CHUTE BACK WALL 22 ERECTION NOTES
0
9
0
43
EL -2.184 M. USING THE WELD WASHER METHOD - 22
22
> P1 HEAD PULLEY 0
POLYETHYLENE TO COVER THE UPPER 22
771
DATUMN 12
0
88 0
22
THIRD OF THE CHUTE WALLS.
981
7 20
3
1) REFER DRAWING NUMBER 087-M-2911
28
s
FOR SUGGESTED ERECTION PROCEDURE
P.
75
0
22
.
I
210
8
107 I.P.s 219
118
1516 I.P.s 557 2) SITE CHECK ALL RELEVANT DIMENSIONS
0
22
84
PRIOR TO COMMENCING INSTALLATION
12
1004 I.P.s
0
1623 I.P.s 776 I.P.s
PACKS
22
3600
1520
1609
THIS DRAWING G
25 NOM
96
2875
DIRECT CONVERSIONS FROM ORIGINAL
2875
s
P.
303
IMPERIAL LEVELS
RTS
.
80 I
SKI
323
100 960 3
412
466
634
O.
997
301
TO T.
88 12 811 I.P.s 99 50
THIS DRAWING TO BE READ IN
20
P.
687
.
I
20
s
78
7°
P.
1
s
.
EL-5.784 M.
P.
563 I
7 087-M-2875
.
2875 9
5 1
609 I
729
7
500
5 1
509
U/S BELT 7
1
I.P.
55
s
456
P.
1
NE
24
.
I
293
BELT LI
s
7
3580
P.
.
19
3I
24
55
351
509
41
7
1
I
0
s
30
P.
P.
410
1
s
24
.
80
I
33
7
3 125
63
2
128
s
P.
130
42
588 TAIL END OF CONVEYOR P2
.
2
PLATE
I
s
P.
7°
FOR GENERAL ARRANGEMENT H
291
.
TE
s
303 I
281
P.
1
416 SEE DRAWING 087-M-2876
ATE
VEE PLA
.
E PL 2875
I
CK VE P.s
20 THI 0
17 .
1I STANDARD DOMITE WEAR BARS 000-M-0227
KEY PLAN SCALE 1 : 40
65
9
2 P.
.
9I s 482 CONV P1 / P2 TRANSFER UPGRADE
9 230 087-M-2875
TRANSFER CHUTE ARRGT SHT 2
20 THK
0
156 - 8
O.
N. CHUTE
E" S97"U. ATE U/S OF 2292 I.P.s 1063 I.P.s CONV P1 / P2 TRANSFER UPGRADE
RD TYP USTING PL 74 - ANGE 10 087-M-2881
P.STANDA 0 THK A
DJ 00 BTM FL P2 TAIL END MARKING PLAN
35
H. 02
65
S B. 2 0 20
AR PLATE D ON A 2324 0 20 70
60
220 K 9
65
ALL WE S4" MOUNTE 2005 8
01 CONV P1 / P2 TRANSFER UPGRADE
E" 00 J 087-M-2877
AR PLATE TYP 00L G 0
1 0200 200 2
2875 P.s P1 HEAD END MARKING PLAN
1-WE
D HOLES x1 1
00 200 20
2875 239 .
8I
LOTTE 200 2
A2 2S 0 200
40
087-M-2911
341
90
64
235
292
7 35
964
094
1
ANGE CONV P1 / P2 TRANSFER UPGRADE
1
1
964
0FL
5
90x1 087-M-2880
1
0
1
7
8
S1 TYP) ARRANGEMENT OF DUST HOODS
1
1
220 21
7(
0 21
S9
96
ATE-
292
E PL 087-M-2879
35
96 1
SI
220 22
NG WE
I NF L CONV P1 / P2 TRANSFER UPGRADE
SUPPORT
1
TYP)
7( < HOLESI DE OF > 087-M-2876
ES S4 S9 22 S SI
THI
HOL G.A. OF P2 TAIL END
52 1
DA
I
220
64
964
5-22
D HOLES DE OF >
64
IA SL 0FL
65
2D 1
1
x
1
60
2 03 087-M-2873
35 1
3- E PLATE 1
1
'GI
220
0L
7 220
x1 0
65
0x0F
1 LANGE CONV P1 / P2 TRANSFER UPGRADE
TTOM 9 0 6 4
1
0 087-M-2872
8
S1 TE D TO BO 00 2002 CONV. P1 HEADCHUTE ARRG'T SHT 2.
30
SHOP BO
L 8 BOL
. TS 2 200 2
0 GR 8
7
CK- 0 23
0 THI
21
TH M2 0
21
0 2
80
5
21 5
21 5
212 E PLATE 2 HUTE W
I ATE 0 200 20 CONV P1 / P2 TRANSFER UPGRADE087-M-2871
5 VE E PL
0
5 5
2121 ERC N VE 0 20
21 TRANSF
1
5 5
21 5
21 5
21 F LONG I 200 20 CONV. P1 HEADCHUTE ARRG'T SHT 1.
45
1 5
121 LANGE O S x 52 00 200 5
131 NE
I RS
F D HOLE 0 2 EL
P.s TTE 0020 USTABL
35
4I. S LO 02 ADJ
35
50
8
19 A2 2 220 ATE &
90
Email: [email protected]
www.handbmining.com.au
H & B Mining design and supply a range of “Easy Maintenance” conveyor transfer products to the Australian
mining industry with the aim of providing a safer, easier to maintain and more efficient working environment
at conveyor transfer points.
H & B Mining was established in April 1993 with the promise of providing a standalone conveyor design
service tailored to accommodate the mines of Australia. After witnessing maintenance crews struggling to
maintain and change out poorly designed products for conveyor transfers H & B decided to expand its
portfolio by developing its own range of ‘Easy Maintenance Products’ for conveyor transfer points including:
conveyor idlers, conveyor skirting systems, hinged dust covers, conveyor guards, conveyor diversion
plough, streamline conveyor transfer design and the retractable loading boot.
The “Easy Maintenance” conveyor product range harnesses H & B’s vast experience in the field along with
the innovative design technology nurtured over the years within the H & B design team. The Australian
mining industry has benefited from H & B’s toil, witnessing enhanced overall productivity, reduced shutdown
time and improved safety whilst gaining cost effective mining conveyor operations. H & B Mining products
have been installed as mine standard by Rio Tinto, BHP Billiton, Roy Hill and FMG, amongst others.
H & B Mining has an in-house design team specialising in materials handling projects for new and/or existing
mines. The design work produced by H & B Mining incorporates mechanical, structural and civil engineering
along with drafting at competitive rates.H & B’s in-house design team have collaborated over the years and
collectively contributed to the development of the easy maintenance product range. The team specialises in
conveyor transfer upgrades and materials handling projects but have also handled numerous structural,
mechanical and civil projects over the years. Whilst being able to offer a service where design work can be
tailored to suit each clients needs, H & B can also offer their innovative development service.H & B have helped
clients develop new designs to incorporate safe and simple operation and maintenance procedures to suit the
clients required applications and on site conditions. H & B’s team are continuously reviewing existing designs that
are regarded as standards in the Australian mining industry, and exploring ways to improve, simplify and make a
safer working environment for all maintenance teams.