Automated Estimate - Structural

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 36

STRUCTURAL E

FOOTING WALL FOOTING


TURAL ESTIMATE
INPUT ON GRAY CELLS

COLUMN BEAM
TIMATE
INPUT ON GRAY CELLS ONLY

SLAB WALL
MATERIALS PRICE LIST
FOOTI

Concrete Mix Class


Concrete AA

FOOTING Quantity
Length Width Thickness Concrete Cover
(m) (m) (m) (mm)

F-1 4.00 1.50 2.00 0.30 70


F-2
F-3
F-4
F-5
F-6
F-7
F-8
F-9
F-10

MATERIA
FOOTING ITEM
Cement
Sand
Gravel
Tie Wire
F-1 16mm Ø X 12m
F-1 12mm Ø X 9m
TOTAL M
LABOR COST (% of Materials

Excavation =
Backfill =

EXC

ONE-BAGGER MIXER OUTP


TOTAL DAYS (rounded up to 1 da
ONE-BAGGER MIXER RENTAL RAT
ONE-BAGGER MIXE
FOOTING ESTIMATE
FOOTING DETAILS
ncrete Mix Class
AA
Reinforcement (Rebar Length
Along Length

Depth (m) Economical


Top Bar Bottom Bar
Bar Size Bar Length Cutting Length
(pcs) (pcs)
(m)

1.5 16mm Ø 12 1.66 10 10


-
-
-
-
-
-
-
-
-

MATERIALS
QUANTITY UNIT PRICE TOTAL COST
44 bags ₱ 220.00 ₱ 9,680.00
1.8 cu.m ₱ 875.00 ₱ 1,575.00
3.6 cu.m ₱ 1,875.00 ₱ 6,750.00
6.00 kg ₱ 95.00 ₱ 570.00
12.00 pcs #N/A #N/A
16.00 pcs #N/A #N/A
TOTAL MATERIAL COST = #N/A
LABOR COST (% of Materials) = 35% #N/A

18.90 cu.m ₱ 200.00 per cu.m


15.12 cu.m ₱ 125.00 per cu.m

EXCAVATION COST = ₱ 3,780.00


BACKFILL COST = ₱ 1,890.00

ONE-BAGGER MIXER OUTPUT = 8.00 cu.m per day


AL DAYS (rounded up to 1 day) = 1.00 day
-BAGGER MIXER RENTAL RATE = ₱ 1,200.00 per day
ONE-BAGGER MIXER RENTAL COST = ₱ 1,200.00

TOTAL COST = #N/A


ar Length = Automatic)
Along Width

Economical
Cutting Top Bar Bottom
Bar Size Bar Length
Length (pcs) Bar (pcs)
(m)

12mm Ø 9 2.16 8 8
- 12mm Ø
- 16mm Ø
- 20mm Ø
- 25mm Ø
- 28mm Ø
- 32mm Ø
-
-
-
###
###
Tie Wire
Sand
Gravel
WALL FOOTING
WALL FOOTING DE
Concrete Mix Class
Concrete B

WALL
Quantity
FOOTING
Length Width Thickness Concrete Cover
(m) (m) (m) (mm)

WF-1 3.00 10.00 0.75 0.25 40


WF-2
WF-3
WF-4
WF-5
WF-6
WF-7
WF-8
WF-9
WF-10

MATERI
FOOTING ITEM
Cement
Sand
Gravel
Tie Wire
WF-1 12mm Ø X 6m
WF-1 10mm Ø X 6m
TOTA
LABOR COST (% of Material

Excavation =
Backfill =

ONE-BAGGER MIXER OUTP


TOTAL DAYS (rounded up to 1 d
ONE-BAGGER MIXER RENTAL RA
ONE-BAGGER MI
FOOTING ESTIMATE
WALL FOOTING DETAILS
ncrete Mix Class
B
Reinforcement (Rebar Length = Manual
Along Length

Depth (m) Main


Economical Bar
Bar Size Steel Bars Length Bars
Length (m)
(pcs)

1 12mm Ø 6.00 6.00 4


-
-
-
-
-
-
-
-
-

MATERIALS
QUANTITY UNIT PRICE TOTAL COST
45 bags ₱ 220.00 ₱ 9,900.00
2.8125 cu.m ₱ 875.00 ₱ 2,460.94
5.625 cu.m ₱ 1,875.00 ₱ 10,546.88
2.50 kg ₱ 95.00 ₱ 237.50
22.00 pcs ₱ 235.88 ₱ 5,189.37
10.00 pcs ₱ 165.00 ₱ 1,650.00
TOTAL MATERIAL COST = ₱ 29,984.68
LABOR COST (% of Materials) = 35% ₱ 10,494.64

23.63 cu.m ₱ 200.00 per cu.m


17.72 cu.m ₱ 125.00 per cu.m

EXCAVATION COST = ₱ 4,725.00


BACKFILL COST = ₱ 2,214.84

ONE-BAGGER MIXER OUTPUT = 8.00 cu.m per day


AL DAYS (rounded up to 1 day) = 1.00 day
-BAGGER MIXER RENTAL RATE = ₱ 1,200.00 per day
ONE-BAGGER MIXER RENTAL COST = ₱ 1,200.00

TOTAL COST = ₱ 48,619.16


ength = Manual)

Temperature Bars
(spacing) (mm)

400 10mm Ø
12mm Ø
16mm Ø
20mm Ø
25mm Ø
28mm Ø
32mm Ø

###
###
Tie Wire
Sand
Gravel
COLUM
C
Concrete Mix Class
Concrete AA

COLUMN Quantity
B1 (m) B2 (m) Height (m) Concrete Cover (mm)

C-1 4.00 0.40 0.40 4.00 40


C-2
C-3
C-4
C-5
C-6
C-7
C-8
C-9
C-10

MATERIA
COLUMN ITEM
Cement
Sand
Gravel
Tie Wire
2x3x8 Good Lumber
2x2x8 Good Lumber
3/4" Phenolic Board
Common Nail 2"
Common Nail 3"
C-1 16mm Ø X 6m
C-1 10mm Ø X 12m
TO
LABOR COST (% of Mate

ONE-BAGGER MIXER O
TOTAL DAYS (rounded up to
ONE-BAGGER MIXER RENTAL
ONE-BAGGER
COLUMN ESTIMATE
COLUMN DETAILS
ete Mix Class
AA
Reinforcement (Rebar Length = A
MAIN REINFORCEMENT

Footing
Depth if Economical
Ground Steel Bars Top Bar Bottom Bar
Bar Size Bar Length
Column Length (pcs) (pcs)
(m)

1.5 16mm Ø 6 5.96 3 3


-
-
-
-
-
-
-
-
-

MATERIALS
QUANTITY UNIT PRICE TOTAL COST
31 bags ₱ 220.00 ₱ 6,820.00
1.28 cu.m ₱ 875.00 ₱ 1,120.00
2.56 cu.m ₱ 1,875.00 ₱ 4,800.00
7.00 kg ₱ 95.00 ₱ 665.00
46.00 pcs ₱ 275.00 ₱ 12,650.00
46.00 pcs ₱ 210.00 ₱ 9,660.00
9.00 pcs ₱ 1,200.00 ₱ 10,800.00
6.00 kg ₱ 90.00 ₱ 540.00
6.00 kg ₱ 90.00 ₱ 540.00
24.00 pcs ₱ 419.47 ₱ 10,067.32
15.00 pcs ₱ 328.84 ₱ 4,932.57
TOTAL MATERIAL COST = ₱ 62,594.89
LABOR COST (% of Materials) = 35% ₱ 21,908.21

ONE-BAGGER MIXER OUTPUT = 8.00 cu.m per day


AL DAYS (rounded up to 1 day) = 1.00 day
-BAGGER MIXER RENTAL RATE = ₱ 1,200.00 per day
ONE-BAGGER MIXER RENTAL COST = ₱ 1,200.00

TOTAL COST = ₱ 85,703.11


r Length = Automatic)
LATERAL TIES

Economical MAIN TIES


Cutting
Bar Size Bar Length SPACING
Length
(m) (mm)

10mm Ø 12 1.54 ###


200
- ###
- ###
- ###
- ###
- ###
- ###
- ###
- ###
- ###
###
###
Tie Wire
Sand
Gravel
APPROXIMA

Concrete Mix Class


Concrete
AA

BEAM Quantity

Concrete Cover
B (m) H(m) Length (m)
(mm)

FTB-1
FTB-2
B-1 1.00 0.30 0.90 8.40 40
B-2
B-3
B-4
B-5
RB-1
RB-2
RB-3

MATERIA
COLUMN ITEM
Cement
Sand
Gravel
Tie Wire
2x3x8 Good Lumber
2x2x8 Good Lumber
3/4" Phenolic Board
Common Nail 2"
Common Nail 3"
B-1 16mm Ø X 6m
B-1 10mm Ø X 12m

TOTA
LABOR COST (% of Materi

SHORING JAC
Area =
Required Qty. =

SHORING JACK R

ONE-BAGGER MIXER OU
TOTAL DAYS (rounded up to 1
ONE-BAGGER MIXER RENTAL R
ONE-BAGGER MI
PROXIMATE BEAM ESTIMATE
BEAM DETAILS
rete Mix Class
Reinforcement ( Main Rebar Lengt
AA

MAIN REINFORCEMENT

Development
Length (m) Economical
Steel Bars At
Bar Size Bar Length At Midspan
Length Support
(m)

-
-
0.2 16mm Ø 6.00 6.00 4 4
-
-
-
-
-
-
-

MATERIALS
QUANTITY UNIT PRICE TOTAL COST
28 bags ₱ 220.00 ₱ 6,160.00
1.134 cu.m ₱ 875.00 ₱ 992.25
2.268 cu.m ₱ 1,875.00 ₱ 4,252.50
3.50 kg ₱ 95.00 ₱ 332.50
54.00 pcs ₱ 275.00 ₱ 14,850.00
54.00 pcs ₱ 210.00 ₱ 11,340.00
7.00 pcs ₱ 1,200.00 ₱ 8,400.00
5.00 kg ₱ 90.00 ₱ 450.00
5.00 kg ₱ 90.00 ₱ 450.00
5.00 pcs ₱ 419.47 ₱ 2,097.36
10.00 pcs ₱ 328.84 ₱ 3,288.38

TOTAL MATERIAL COST = ₱ 52,612.99


LABOR COST (% of Materials) = 35% ₱ 18,414.55

SHORING JACK
2.52 sq.m ₱ 300.00 per pc. Rental
rate
5.00 pcs

SHORING JACK RENTAL (28 DAYS) = ₱ 1,500.00

ONE-BAGGER MIXER OUTPUT = 8.00 cu.m per day


AL DAYS (rounded up to 1 day) = 1.00 day
-BAGGER MIXER RENTAL RATE = ₱ 1,200.00 per day
ONE-BAGGER MIXER RENTAL COST = ₱ 1,200.00

TOTAL COST = ₱ 73,727.54


ATE

Rebar Length = Manual)

STIRRUPS

Economical MAIN TIES


Cutting Bottom
Bar Size Bar Length SPACING
Length Bar (pcs)
(m) (mm)

- -
- -
10mm Ø 12 2.34 200 -
- -
- -
- -
- -
- -
- -
- -
###
###
Tie Wire
###
###
###
###
###
SL

Concrete Mix Class


Concrete AA

SLAB Quantity
Length Width Thickness Concrete Cover
(m) (m) (m) (mm)

S-1 2.00 3.33 2.49 0.125 20


S-2 2.00 3.33 2.49 0.125 20
S-3
S-4
S-5
S-6
S-7
S-8
S-9
S-10

MATER
FOOTING ITEM
Cement
Sand
Gravel
Tie Wire
3/4" Phenolic Board
2x2x12 Good Lumber
Common Nail 3"
Common Nail 2"
S-1 10mm Ø X 10.5m
S-1 10mm Ø X 10.5m
S-2 10mm Ø X 10.5m
S-2 10mm Ø X 10.5m
TO
LABOR COST (% of Mat

SHORING
Area =
Required Qty. =

SHORING JAC

ONE-BAGGER MIXER O
TOTAL DAYS (rounded up to
ONE-BAGGER MIXER RENTAL
ONE-BAGGER
SLAB ESTIMATE
SLAB DETAILS
crete Mix Class
AA
Reinforcement (Rebar Len
Along Length

Ground or Economical Top Bar


Suspended Bar Size Bar Length Cutting Length (spacing)
(m) (mm)

Suspended 10mm Ø 10.5 3.42 200


Suspended 10mm Ø 10.5 3.42 200
-
-
-
-
-
-
-
-

MATERIALS
QUANTITY UNIT PRICE TOTAL COST
50 bags ₱ 220.00 ₱ 11,000.00
2.072925 cu.m ₱ 875.00 ₱ 1,813.81
4.14585 cu.m ₱ 1,875.00 ₱ 7,773.47
6.00 kg ₱ 95.00 ₱ 570.00
12.00 pcs ₱ 1,200.00 ₱ 14,400.00
51.00 pcs ₱ 320.00 ₱ 16,320.00
4.00 kg ₱ 90.00 ₱ 360.00
2.00 kg ₱ 90.00 ₱ 180.00
22.00 pcs #N/A #N/A
13.00 pcs #N/A #N/A
22.00 pcs #N/A #N/A
13.00 pcs #N/A #N/A
TOTAL MATERIAL COST = #N/A
LABOR COST (% of Materials) = 35% #N/A

SHORING JACK
33.17 sq.m ₱ 300.00 per pc. Rental rate
56.00 pcs

SHORING JACK RENTAL (28 DAYS) = ₱ 16,800.00

ONE-BAGGER MIXER OUTPUT = 8.00 cu.m per day


TAL DAYS (rounded up to 1 day) = 1.00 day
NE-BAGGER MIXER RENTAL RATE = ₱ 1,200.00 per day
ONE-BAGGER MIXER RENTAL COST = ₱ 1,200.00

TOTAL COST = #N/A


nt (Rebar Length = Automatic)
Along Width

Bottom Bar Economical Top Bar Bottom Bar


Cutting
(spacing) Bar Size Bar Length (spacing) (spacing)
Length
(mm) (m) (mm) (mm)

200 10mm Ø 10.5 2.58 200 200


200 10mm Ø 10.5 2.58 200 200
- ###
- 20mm Ø
- 25mm Ø
- 28mm Ø
- 32mm Ø
-
-
-
###
###
Tie Wire
Sand
Gravel
WALL EST
WALL DETA
Mortar Mix Class
Concrete B

WALL Quantity
Length Height Plaster Thickness
Thickness
(m) (m) Sides (1 or 2)

W-1 3.00 3.00 2.40 _150mm 2


W-2
W-3
W-4
W-5
W-6
W-7
W-8
W-9
W-10

MATER
FOOTING ITEM
Cement
Sand
Tie Wire
100mm CHB
150mm CHB
200mm CHB
W-1 12mm Ø X 9m
TOTA
LABOR COST (% of Mater
WALL ESTIMATE
WALL DETAILS
rtar Mix Class
B
Reinforcement (Rebar Length = Manual
Along Length

Deductible
Areas (ex. Vertical
Doors & Economical
Bars
Windows) Bar Size Bar Length Steel Bars Length
Spacing
(sq.m) (m)
(mm)

0.85 12mm Ø 9.00 9.00 800

MATERIALS
QUANTITY UNIT PRICE TOTAL COST
Err:508 bags Err:508 Err:508
2.90 cu.m ₱ 875.00 ₱ 2,540.16
1.00 kg ₱ 95.00 ₱ 95.00
- pcs ₱ 14.00 ₱ -
270.00 pcs ₱ 18.00 ₱ 4,860.00
- pcs ₱ 25.00 ₱ -
7.00 pcs ₱ 354.40 ₱ 2,480.81
TOTAL MATERIAL COST = Err:508
LABOR COST (% of Materials) = 35% Err:508

TOTAL COST = Err:508


gth = Manual) MORTAR

Horizontal Bars
###
Spacing (mm)

###
800
###
###
###
###
28mm Ø
32mm Ø

###
###
Tie Wire
Sand
150mm CHB
200mm CHB

A
B
C_
Name Price
Cement ₱ 220.00
Sand ₱ 875.00
Gravel ₱ 1,875.00
Tie Wire ₱ 95.00
10mm Ø X 6m ₱ 165.00
10mm Ø X 7.5m ₱ 205.67
10mm Ø X 9m ₱ 247.50
10mm Ø X 10.5m ₱ 288.17
10mm Ø X 12m ₱ 328.84
12mm Ø X 6m ₱ 235.88
12mm Ø X 7.5m ₱ 295.14
12mm Ø X 9m ₱ 354.40
12mm Ø X 10.5m ₱ 413.66
12mm Ø X 12m ₱ 471.76
16mm Ø X 6m ₱ 419.47
16mm Ø X 7.5m ₱ 524.05
16mm Ø X 9m ₱ 628.63
16mm Ø X 10.5m ₱ 733.20
16mm Ø X 12m ₱ 837.78
20mm Ø X 6m ₱ 655.35
20mm Ø X 7.5m ₱ 818.03
20mm Ø X 9m ₱ 981.87
20mm Ø X 10.5m ₱ 1,145.70
20mm Ø X 12m ₱ 1,309.54
25mm Ø X 6m ₱ 1,020.21
25mm Ø X 7.5m ₱ 1,275.85
25mm Ø X 9m ₱ 1,530.32
25mm Ø X 10.5m ₱ 1,785.95
25mm Ø X 12m ₱ 2,040.42
28mm Ø X 6m ₱ 1,280.49
28mm Ø X 7.5m ₱ 1,600.04
28mm Ø X 9m ₱ 1,919.58
28mm Ø X 10.5m ₱ 2,240.28
28mm Ø X 12m ₱ 2,559.82
32mm Ø X 6m ₱ 1,672.08
32mm Ø X 7.5m ₱ 2,090.39
32mm Ø X 9m ₱ 2,508.70
32mm Ø X 10.5m ₱ 2,925.85
32mm Ø X 12m ₱ 3,344.15
One-Bagger Mixer ₱ 1,200.00
100mm CHB ₱ 14.00
150mm CHB ₱ 18.00
200mm CHB ₱ 25.00
2x3x8 Good Lumber ₱ 275.00
2x2x8 Good Lumber ₱ 210.00
2x2x12 Good Lumber ₱ 320.00
3/4" Phenolic Board ₱ 1,200.00
Common Nail 2" ₱ 90.00
Common Nail 3" ₱ 90.00

You might also like