Automated Estimate - Structural
Automated Estimate - Structural
Automated Estimate - Structural
COLUMN BEAM
TIMATE
INPUT ON GRAY CELLS ONLY
SLAB WALL
MATERIALS PRICE LIST
FOOTI
FOOTING Quantity
Length Width Thickness Concrete Cover
(m) (m) (m) (mm)
MATERIA
FOOTING ITEM
Cement
Sand
Gravel
Tie Wire
F-1 16mm Ø X 12m
F-1 12mm Ø X 9m
TOTAL M
LABOR COST (% of Materials
Excavation =
Backfill =
EXC
MATERIALS
QUANTITY UNIT PRICE TOTAL COST
44 bags ₱ 220.00 ₱ 9,680.00
1.8 cu.m ₱ 875.00 ₱ 1,575.00
3.6 cu.m ₱ 1,875.00 ₱ 6,750.00
6.00 kg ₱ 95.00 ₱ 570.00
12.00 pcs #N/A #N/A
16.00 pcs #N/A #N/A
TOTAL MATERIAL COST = #N/A
LABOR COST (% of Materials) = 35% #N/A
Economical
Cutting Top Bar Bottom
Bar Size Bar Length
Length (pcs) Bar (pcs)
(m)
12mm Ø 9 2.16 8 8
- 12mm Ø
- 16mm Ø
- 20mm Ø
- 25mm Ø
- 28mm Ø
- 32mm Ø
-
-
-
###
###
Tie Wire
Sand
Gravel
WALL FOOTING
WALL FOOTING DE
Concrete Mix Class
Concrete B
WALL
Quantity
FOOTING
Length Width Thickness Concrete Cover
(m) (m) (m) (mm)
MATERI
FOOTING ITEM
Cement
Sand
Gravel
Tie Wire
WF-1 12mm Ø X 6m
WF-1 10mm Ø X 6m
TOTA
LABOR COST (% of Material
Excavation =
Backfill =
MATERIALS
QUANTITY UNIT PRICE TOTAL COST
45 bags ₱ 220.00 ₱ 9,900.00
2.8125 cu.m ₱ 875.00 ₱ 2,460.94
5.625 cu.m ₱ 1,875.00 ₱ 10,546.88
2.50 kg ₱ 95.00 ₱ 237.50
22.00 pcs ₱ 235.88 ₱ 5,189.37
10.00 pcs ₱ 165.00 ₱ 1,650.00
TOTAL MATERIAL COST = ₱ 29,984.68
LABOR COST (% of Materials) = 35% ₱ 10,494.64
Temperature Bars
(spacing) (mm)
400 10mm Ø
12mm Ø
16mm Ø
20mm Ø
25mm Ø
28mm Ø
32mm Ø
###
###
Tie Wire
Sand
Gravel
COLUM
C
Concrete Mix Class
Concrete AA
COLUMN Quantity
B1 (m) B2 (m) Height (m) Concrete Cover (mm)
MATERIA
COLUMN ITEM
Cement
Sand
Gravel
Tie Wire
2x3x8 Good Lumber
2x2x8 Good Lumber
3/4" Phenolic Board
Common Nail 2"
Common Nail 3"
C-1 16mm Ø X 6m
C-1 10mm Ø X 12m
TO
LABOR COST (% of Mate
ONE-BAGGER MIXER O
TOTAL DAYS (rounded up to
ONE-BAGGER MIXER RENTAL
ONE-BAGGER
COLUMN ESTIMATE
COLUMN DETAILS
ete Mix Class
AA
Reinforcement (Rebar Length = A
MAIN REINFORCEMENT
Footing
Depth if Economical
Ground Steel Bars Top Bar Bottom Bar
Bar Size Bar Length
Column Length (pcs) (pcs)
(m)
MATERIALS
QUANTITY UNIT PRICE TOTAL COST
31 bags ₱ 220.00 ₱ 6,820.00
1.28 cu.m ₱ 875.00 ₱ 1,120.00
2.56 cu.m ₱ 1,875.00 ₱ 4,800.00
7.00 kg ₱ 95.00 ₱ 665.00
46.00 pcs ₱ 275.00 ₱ 12,650.00
46.00 pcs ₱ 210.00 ₱ 9,660.00
9.00 pcs ₱ 1,200.00 ₱ 10,800.00
6.00 kg ₱ 90.00 ₱ 540.00
6.00 kg ₱ 90.00 ₱ 540.00
24.00 pcs ₱ 419.47 ₱ 10,067.32
15.00 pcs ₱ 328.84 ₱ 4,932.57
TOTAL MATERIAL COST = ₱ 62,594.89
LABOR COST (% of Materials) = 35% ₱ 21,908.21
BEAM Quantity
Concrete Cover
B (m) H(m) Length (m)
(mm)
FTB-1
FTB-2
B-1 1.00 0.30 0.90 8.40 40
B-2
B-3
B-4
B-5
RB-1
RB-2
RB-3
MATERIA
COLUMN ITEM
Cement
Sand
Gravel
Tie Wire
2x3x8 Good Lumber
2x2x8 Good Lumber
3/4" Phenolic Board
Common Nail 2"
Common Nail 3"
B-1 16mm Ø X 6m
B-1 10mm Ø X 12m
TOTA
LABOR COST (% of Materi
SHORING JAC
Area =
Required Qty. =
SHORING JACK R
ONE-BAGGER MIXER OU
TOTAL DAYS (rounded up to 1
ONE-BAGGER MIXER RENTAL R
ONE-BAGGER MI
PROXIMATE BEAM ESTIMATE
BEAM DETAILS
rete Mix Class
Reinforcement ( Main Rebar Lengt
AA
MAIN REINFORCEMENT
Development
Length (m) Economical
Steel Bars At
Bar Size Bar Length At Midspan
Length Support
(m)
-
-
0.2 16mm Ø 6.00 6.00 4 4
-
-
-
-
-
-
-
MATERIALS
QUANTITY UNIT PRICE TOTAL COST
28 bags ₱ 220.00 ₱ 6,160.00
1.134 cu.m ₱ 875.00 ₱ 992.25
2.268 cu.m ₱ 1,875.00 ₱ 4,252.50
3.50 kg ₱ 95.00 ₱ 332.50
54.00 pcs ₱ 275.00 ₱ 14,850.00
54.00 pcs ₱ 210.00 ₱ 11,340.00
7.00 pcs ₱ 1,200.00 ₱ 8,400.00
5.00 kg ₱ 90.00 ₱ 450.00
5.00 kg ₱ 90.00 ₱ 450.00
5.00 pcs ₱ 419.47 ₱ 2,097.36
10.00 pcs ₱ 328.84 ₱ 3,288.38
SHORING JACK
2.52 sq.m ₱ 300.00 per pc. Rental
rate
5.00 pcs
STIRRUPS
- -
- -
10mm Ø 12 2.34 200 -
- -
- -
- -
- -
- -
- -
- -
###
###
Tie Wire
###
###
###
###
###
SL
SLAB Quantity
Length Width Thickness Concrete Cover
(m) (m) (m) (mm)
MATER
FOOTING ITEM
Cement
Sand
Gravel
Tie Wire
3/4" Phenolic Board
2x2x12 Good Lumber
Common Nail 3"
Common Nail 2"
S-1 10mm Ø X 10.5m
S-1 10mm Ø X 10.5m
S-2 10mm Ø X 10.5m
S-2 10mm Ø X 10.5m
TO
LABOR COST (% of Mat
SHORING
Area =
Required Qty. =
SHORING JAC
ONE-BAGGER MIXER O
TOTAL DAYS (rounded up to
ONE-BAGGER MIXER RENTAL
ONE-BAGGER
SLAB ESTIMATE
SLAB DETAILS
crete Mix Class
AA
Reinforcement (Rebar Len
Along Length
MATERIALS
QUANTITY UNIT PRICE TOTAL COST
50 bags ₱ 220.00 ₱ 11,000.00
2.072925 cu.m ₱ 875.00 ₱ 1,813.81
4.14585 cu.m ₱ 1,875.00 ₱ 7,773.47
6.00 kg ₱ 95.00 ₱ 570.00
12.00 pcs ₱ 1,200.00 ₱ 14,400.00
51.00 pcs ₱ 320.00 ₱ 16,320.00
4.00 kg ₱ 90.00 ₱ 360.00
2.00 kg ₱ 90.00 ₱ 180.00
22.00 pcs #N/A #N/A
13.00 pcs #N/A #N/A
22.00 pcs #N/A #N/A
13.00 pcs #N/A #N/A
TOTAL MATERIAL COST = #N/A
LABOR COST (% of Materials) = 35% #N/A
SHORING JACK
33.17 sq.m ₱ 300.00 per pc. Rental rate
56.00 pcs
WALL Quantity
Length Height Plaster Thickness
Thickness
(m) (m) Sides (1 or 2)
MATER
FOOTING ITEM
Cement
Sand
Tie Wire
100mm CHB
150mm CHB
200mm CHB
W-1 12mm Ø X 9m
TOTA
LABOR COST (% of Mater
WALL ESTIMATE
WALL DETAILS
rtar Mix Class
B
Reinforcement (Rebar Length = Manual
Along Length
Deductible
Areas (ex. Vertical
Doors & Economical
Bars
Windows) Bar Size Bar Length Steel Bars Length
Spacing
(sq.m) (m)
(mm)
MATERIALS
QUANTITY UNIT PRICE TOTAL COST
Err:508 bags Err:508 Err:508
2.90 cu.m ₱ 875.00 ₱ 2,540.16
1.00 kg ₱ 95.00 ₱ 95.00
- pcs ₱ 14.00 ₱ -
270.00 pcs ₱ 18.00 ₱ 4,860.00
- pcs ₱ 25.00 ₱ -
7.00 pcs ₱ 354.40 ₱ 2,480.81
TOTAL MATERIAL COST = Err:508
LABOR COST (% of Materials) = 35% Err:508
Horizontal Bars
###
Spacing (mm)
###
800
###
###
###
###
28mm Ø
32mm Ø
###
###
Tie Wire
Sand
150mm CHB
200mm CHB
A
B
C_
Name Price
Cement ₱ 220.00
Sand ₱ 875.00
Gravel ₱ 1,875.00
Tie Wire ₱ 95.00
10mm Ø X 6m ₱ 165.00
10mm Ø X 7.5m ₱ 205.67
10mm Ø X 9m ₱ 247.50
10mm Ø X 10.5m ₱ 288.17
10mm Ø X 12m ₱ 328.84
12mm Ø X 6m ₱ 235.88
12mm Ø X 7.5m ₱ 295.14
12mm Ø X 9m ₱ 354.40
12mm Ø X 10.5m ₱ 413.66
12mm Ø X 12m ₱ 471.76
16mm Ø X 6m ₱ 419.47
16mm Ø X 7.5m ₱ 524.05
16mm Ø X 9m ₱ 628.63
16mm Ø X 10.5m ₱ 733.20
16mm Ø X 12m ₱ 837.78
20mm Ø X 6m ₱ 655.35
20mm Ø X 7.5m ₱ 818.03
20mm Ø X 9m ₱ 981.87
20mm Ø X 10.5m ₱ 1,145.70
20mm Ø X 12m ₱ 1,309.54
25mm Ø X 6m ₱ 1,020.21
25mm Ø X 7.5m ₱ 1,275.85
25mm Ø X 9m ₱ 1,530.32
25mm Ø X 10.5m ₱ 1,785.95
25mm Ø X 12m ₱ 2,040.42
28mm Ø X 6m ₱ 1,280.49
28mm Ø X 7.5m ₱ 1,600.04
28mm Ø X 9m ₱ 1,919.58
28mm Ø X 10.5m ₱ 2,240.28
28mm Ø X 12m ₱ 2,559.82
32mm Ø X 6m ₱ 1,672.08
32mm Ø X 7.5m ₱ 2,090.39
32mm Ø X 9m ₱ 2,508.70
32mm Ø X 10.5m ₱ 2,925.85
32mm Ø X 12m ₱ 3,344.15
One-Bagger Mixer ₱ 1,200.00
100mm CHB ₱ 14.00
150mm CHB ₱ 18.00
200mm CHB ₱ 25.00
2x3x8 Good Lumber ₱ 275.00
2x2x8 Good Lumber ₱ 210.00
2x2x12 Good Lumber ₱ 320.00
3/4" Phenolic Board ₱ 1,200.00
Common Nail 2" ₱ 90.00
Common Nail 3" ₱ 90.00