Resume
Resume
Resume
com
Mobile: +91-8438471171
LinkedIn: https://www.linkedin.com/in/marikani-g-547b1b119/
SNAPSHOT
• Supply Chain professional with over 7.3+ years of experience in Project management, Supply
planning & control, Product development, NPI, Capacity Planning & Constraints, ERP, Material &
Order Management, Logistics, Procurement, Engineering Change Management, BOM Management
and Scrum Framework.
• Enthusiastic and solutions-focused Supply Chain Consultant, Specializing in leading teams from
Product development through successful product launches.
AREAS OF EXPERTISE:
- Project Management - SAP PLM / Baan ERP
- Forecasting & Capacity Planning - Product Development
- Demand Planning - Warehouse Management
- Resource allocation - Supply Chain Management
- Bill of Materials - Shortage Risk Management
- Cost management
CORE COMPETENCIES
• Responsible for product development phase from proto part to serial production.
• Responsible for implementation of frequent design changes.
• Identify cost reduction opportunities through category management/spend analysis and Price Negotiation
with the vendors.
• Efficiently maintaining the inventory by evaluating supplier, prepare Documentation, Purchasing new
inventory and Track inventory.
• Develop and evaluate all forecasts depending on statistical modeling and marketing strategies.
• Fast Learner with good communication, collaborative with conflict resolution, and interpersonal skills.
• Data analytics capability - Intermediate in Tableau / Power BI visualization tools.
WORK EXPERIENCE - 1
Ford Motor Company |Material Planning & Logistics Engineer | Oct 2021 – Till Date
• Lead strategic sourcing initiatives in order to drive process improvements, reduce costs and
leverage supplier relationships.
• Create bid packages and perform bid analysis, reviewing findings and recommendations with
purchasing management and Project Team for assigned commodities.
• Manage suppliers to build trust to resolve issues regarding performance, timelines, product quality,
delivery, and commitments.
• Cost saving project management, negotiation of favorable payment terms, pricing, MOQ, with suppliers as
assigned.
• Find innovative solutions to deliver cost efficiencies to create enhanced value.
WORK EXPERIENCE - 2
Renault Nissan Technology Business Centre India (Payroll – Altran India) | Engineer | Feb 2018 – Oct 2021
• Identifying the vendors as per the client’s requirements, to work in conjunction with key
stakeholders to understand the business requirements and propose suitable sourcing strategies
and methodologies.
• Working in Renault customized BOM tool – SIGNE for change management.
• Blanks & Coil BOM management for Body in white parts of Renault cars.
• New BOM creation for Production trials, New Concepts, Prototypes, Assembly structure
management in BOM (Based on Renault standards)
• New part numbering, BOM historization, NPDM Index or revision management
2D & 3D drawings standardization & release, E-BOM Management, Project BOM Creation.
• Create new Part numbers as per the Vehicle design requirement.
• Handle Project & Serial Life Change Management.
• Complex Top-Level Assembly Management for BIW Parameters.
• Communicating with Designers to resolve issues.
• Index Evolution, Diversity Management and Color Part Management.
• Modification of BOM and release of design note as per the Design requirement.
• Parameter vice graph generating using the macro excels.
• Standard name creation as per the part requirement.
WORK EXPERIENCE – 3
Ford India Pvt Ltd | Graduate Apprenticeship Trainee | Feb 2017 – Feb 2018
• Development of New eco sport 2017; actively involved in MCA Eco sport export to North America,
Middle East & GCC country co-ordination with Cross functional team activities for improving quality
and to maintain the paint shop in positive pressure.
Supported for six sigma green belt & black belt projects.
• Spray booth running time optimization.
• 3Wet ASU inlet taking the hot air from shop floor.
• Condenser water temperature high.
• Installed exhaust at the under-body sealer robot to prevent the sealer fumes to stick over other car
body.
• Saving of water 60 KL per day by connecting ASU condensate water to the cooling tower
HIGHLIGHTS:
• Awarded with Functional Excellence from Ford Motor company for identifying and processing a
huge volume of PCNs in a short lead-time.
• Successfully completed Basic training programs on Bill of materials.
• Successful completed various projects using Global 8 disciplines and six sigma approaches.
TECHNICAL SKILLS:
• Expertise in GPIRS and WERS tool.
• Proficient in Microsoft Office (Excel, PowerPoint & Word).
ACADEMIC CREDENTIALS:
PERSONAL INFORMATION:
DECLARATION:
I hereby declare that the above-written particulars are true to the best of my knowledge and belief.
Date:
Place: Chennai [Marikani.G]