3a) Reply on P&P 3.2 Km Review of BC P&P...-41

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

KCC Walajahpet &xpressway Private Limited.

Dedicatian le Cuality
Ref: No.:KCC/
BCE/Walajahpet Arakkonam/2022-23/41
-

Date: 26-07-2022

To
The Team Leader,
MSV International Inc.,
Plot-06, Nehru Street, Indra Nagar,
Opposite to Ponnerikarai, Kanchipuram
Tamil Nadu-631502
Email: [email protected]

Kind Attn.: Mr.Srinivas


Reddy Peddi -

Teamm leader
Sub: Construction of Four lane
Bangalore Chennai Expressway from Km 180.000 to Km
204.500 (VWalajahpet to Arakkonam Section in the State of Tamil
on Hybrid Annuity Mode
Nadu) under Bharatmala
(Phase llI-Package Il) -Reg: Request for review of Plan
&Profile, TCS Schedule, and drawings of Box Culverts, SVUPs& VUPs submitted
by
Concessionaire.
Ref:
1. Concessionaire's letter KCC/BCEWA-II/FY2022-23/045 dated 18-07-2022
no.
2. Independent Engineer (IE)letter no. MSV/PRJ/NHAI/IE/B-C EXP/TN/2022/TLIKCC-P2
010 dated 15-07-2022.
3. Concessionaire's letter no. KCC/BCEWA-I/FY2021-22/037 dated 05-07-2022
4. Concessionaire's letter no. KCC/BCEWA-I/FY2021-22/033 dated 28-06-2022
Dear Sir,

Concessionaire thankfully acknowledges the receipt of IE's letter cited under ref. 02, vide which
approval for Plan & Profile between Km. 179+998 to Km. 191+000 and between Km. 197+000
to Km. 204+495 has been communicated
subject to fulfilment of terms & conditions stated
therein
However, approval for following sections of submitted Plan &Profile drawings, kept under hold
by IE, for the want of HFL data.

S. No. Chainage Chainage Length


From To
(Rmt)
184+200 184+610 0.410
2 186+520 186+670 0.150
3 186+940 186+980 0.040
4 187+950 188+870 0.920
190+350D 191+000 0.650
198+400 199+200 0.800
203+550 203+850 0.300 Receive
Total Length in Km. >>» 3.270
O22

Registered Office : BU-5, S.F.S. Flats, Outer Ring Road, Pitampura (Delhi), West Delhi, India - 110034 91-124-4338000

Corporate Office 5th Floor, JMD Empire, Golf Course Ext. Road, Sector-62, Gurugram (Haryana) 122102 www.kccbuildcon.co.in

CIN U45400DL2021PTC385531 [email protected]


In this regard, Concessionaire would like to draw your kind attention toward its letter under ret.
no. 04, vide which Executive Engineer, Water Resource Department, Vellore, Tamil nadu, was
requested to provide the HFL data for captioned project alignment. Although, during discussion
with the WRD department, it was conveyed that as the sestretches do not fall under their
jurisdiction, therefore, HFL data pertaining to the same is not available with the department.

Further, the Concessionaire has ingquired the Local Residents/ Sarpanch/ Gram Panchayat
Members etc., to explore the HFL data, and subsequently comes to know that the areas faling
within the project alignment have never experienced fiood in past 50 years.

for P&P
In light of the is requested to, kindly scrutinize, and accord your concurrence
above, it
drawing of balance 3.27 Km stretch, as stated above.

no. 01, vide which Plan &Profile


Moreover, also refer to concessionaire's letter under ref.
kindly VUPs&
TCS Schedule, Drawings of Box Culverts,
between Km. 191+000 to 197+000 along with
concurrence for
submitted. It is kindly requested that the
SVUPsfor various chainage have been
at the earliest.
the same may also be conveyed

and assuring our best cooperation at all times.


Thanking you

Yours truly,
Pvt. Ltd.
For, KCC Walajahpet Expressway

(Authorized Signatory)
Street, Tambaram
PIU Kanchipuram, 7/216, Govindarajan
to: The Project Director,
-

Copy
West 600045