0% found this document useful (0 votes)
31 views1 page

Time - Work

Uploaded by

ap s
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views1 page

Time - Work

Uploaded by

ap s
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Time work

1. Anu can do a job in 10 days. Banu can do the same job in 5 days. In how many days they can
complete the job if they work together?
2. A and B can do a piece of work in 4 days, while C and D can do the same work in 12 days. In how
many days will A, B, C and D do it together?
3. A can do a work in 15 days and B in 20 days. If they work on it together for 4 days, then the
fraction of the work that is left is?
4. Ravi and Babu can do a job in 8 days. Babu and Charan can do the same job in 12 days. Ravi,
Babu and Charan can do the job in 6 days. In how many days Ravi and Charan can complete the
job?
5. If Arati and Rita can do a job in 8 hours (working together at their respective constant rates) and
Arati can do the job alone in 12 hours. In how many hours can Rita do the job alone?
6. A can do a piece of work in 60 days, which B can do in 40 days. Both started the work but A left
10 days before the completion of the work. The work was finished in how many days?
7. A can do a piece of work in 24 days and B in 20 days but with the help of C they finished the
work in 8 days. C alone can do the work in how many days?
8. If machine X can produce 1,000 bolts in 8 hours and machine Y can produce 1,000 bolts in 24
hours. In how many hours can machines X and Y, working together at these constant rates,
produce 1,000 bolts?
9. 8 men can do farming in 80 acres in 24 days. How many acres farming can 36 men do in 30
days?
10. 15 men can type 3240 pages in 6 days working 2 hours per day. how many men would be
required to type 5400 pages working 4 hours per day for 3 days?
11. If 72 men can build a wall of 280m length in 21 days,how many men could take 18 days to build
a similar type of wall of length 100m?
12. 39 persons can repair a road in 12 days working 5 hours a day. in how many days will 30 persons
working 6 hours a day complete the work?
13. In the beginning, Ram works at a rate such that he can finish a piece of work in 24 hrs, but he
only works at this rate for 16 hrs. After that, he works at a rate such that he can do the whole
work in 18 hrs. If Ram is to finish this work at a stretch, how many hours will he take to finish
this work?
14. A can do a piece of work in 12 days. B can do this work in 16 days. A started the work alone.
After how many days should B join him, so that the work is finished in 9 days?
15. A and B can do a piece of work in 36 days, B and C in 48 days, A and C can do this work in 72
days. In what time can they do it all working together?
16. A can do a piece of work in 48 days and B in 72 days but with the help of C they finished the
work in 24 days. Out of the total payment of Rs. 3000, how much should be given to C?
17. Daku and Tamatar can do a piece of work in 70 and 60 days respectively. They began the work
together, but Daku leaves after some days and Tamatar finished the remaining work in 47 days.
After how many days did Daku leave?
18. Ajay and Vijay undertake to do a piece of work for Rs. 480. Ajay alone can do it in 75 days while
Vijay alone can do it in 40 days. With the help of Pradeep, they finish the work in 25 days. How