Scoring Standalone Booting Procedure
Scoring Standalone Booting Procedure
This document outlines the procedures for placing QubicaAMF scoring systems into standalone mode, which enables
them to function independent of the Conqueror Pro/Conqueror X management systems. This process allows bowling
centers to continue to operate in the event of a systems failure or other emergency. The most common QubicaAMF
scoring systems are covered in the document.
Contents
Standalone Operation for VDB Scoring System .................................................................................................................... 2
Standalone Operation for RDB & 3QT Scoring System ......................................................................................................... 4
Standalone Operation for 4HD & 5HD Scoring System ......................................................................................................... 6
1|Page
Standalone Operation for VDB Scoring System
1. Locate the ET Host, usually located next to the Front Desk 1 computer (Figure 1).
2. Disconnect the electrical power cord to the unit and leave disconnected.
3. Reboot each of the VDBs in the bowling center.
Figure 1
1. Press the red key on the bowler keypad. The overhead monitor will display the name entry screen. Using
the bowler keypad, press the letter “O” for open play and “L” for league play. (Figure 2).
Figure 2
2|Page
2. Insert the first bowler’s name then use the down arrow to go to the next line. Repeat until all names have been
entered (Figure 3).
Figure 3
3. Press the “Red” key to start the game.
3|Page
Standalone Operation for RDB & 3QT Scoring System
1. Locate the scoring switch, which is usually on the curtain wall that has the RDB or 3QT network cables
(Cat 5 cable) plugged into it (Figure 4—switches may look slightly different depending on the model). In
case of centers that are large enough to require multiple switches, locate the switch that is referred to as
the “master” switch, usually located in the middle of the curtain wall.
Figure 4
2. Once the master switch/only switch (usually under 30 lanes) is located, disconnect the power from this switch.
3. Reboot all of the RDBs or 3QTs by unplugging the power supplies and reconnecting them.
Figure 5
4|Page
2. Select the desired environment (if the option is available for the center – Figure 6) by using the number
associated with that environment.
Figure 6
3. Using the bowler keyboard enter the first bowler’s name. Use the down arrow key to enter the next
bowler (Figure 7). Once all names have been entered, press the “Red” key for the bowler keyboard with
the grey background (Figure 8) or the check mark for the console with the black background (Figure 9).
Figure 7
4. To start the game, press the “Red” key for the consoles with the grey background or the check mark for
the console with the black background.
5|Page
Standalone Operation for 4HD & 5HD Scoring System
1. Locate the scoring switch, which is usually on the curtain wall that has the 4HD or 5HD network cables
(Cat 5 cable) plugged into it (Figure 10—switches may look slightly different depending on the model). In
case of centers that are large enough to require multiple switches, locate the switch that is referred to as
the “master” switch, usually located in the middle of the curtain wall.
Figure 10
2. Once the master switch/only switch (usually under 30 lanes) is located, disconnect the power from this switch.
3. Reboot all of the 4HD or 5HD hubs by unplugging the power supplies and reconnecting them.