Er.

VYANKATESH SATYANARAYAN
GUNDU (M.E. CIVIL & B.E. CIVIL)
QUANTITY SURVEYOR
Contact No.: +91-8983711695
+91-7020641228

Email: [email protected]

CAREER OBJECTIVE:
To acquire a challenge in a reputed organization where I can enhance my Experience, Knowledge and
from my academic learning give my best to the organization to be abreast with technology.

ACADEMICS:

Qualification Name of Institute Board/ Year Marks/


University Percentage
ME-CIVIL Imperial Institute of Technology (IIT), Nagpur 2019-2021 A Grade
BE-CIVIL Nagesh Karajagi Orchid Solapur 2017-2018 93.00%
TE-CIVIL College of Engineering and University 2016-2017 89.00%
SE-CIVIL Technology, Solapur 2015-2016 84.00%
FE-CIVIL 2014-2015 83.00%
H.S.C. M.G.K. Junior College of Maharashtra
2013-2014 53.18%
(SCIENCE) Science, Solapur Board
Sambhaji Rao Shinde High
S.S.C. Maharashtra 2011-2012 65.27%
School, Solapur Board
MES (MPSC) Mains Qualified 2019

Gate Qualified Three Times 2019, 2020 & 2021 (Given for Knowledge Purpose only)

WORK EXPERIENCE:

MONARCH SURVEYORS AND ENGINEERING CONSULTANTS LIMITED, PUNE


Position: - SENIOR QUANTITY SURVEYOR (QS)
Working Period: - September 2023 to Till Date
Package: - 9.67 LPA CTC
Work Done: -
 Cost Estimate of Road Projects & Railway Projects
 Cost Estimate of Structures (Major Bridge, Flyover, Trumpet Interchange, Viaduct, ROB,
RUB, VOP, VUP, LVUP, SVUP, Minor Bridge, Slab Culverts, Box Culverts, Pipe Culverts,
Railway Flyover, Retaining Wall, Breast Wall)
 Detailed Estimation of Following Road Projects:
1. Nagpur Gondia Expressway (Tender Floated)
2. Bhandara Gadchiroli Expressway (Tender Floated)
3. Nagpur Chandrapur Expreesway (Tender Floated)
4. Pune Ring Road Eastern Package 5, 6 &7 (Tender Floated)
5. Pune Nashik Industrial Expressway
6. Shegaon Sindkhed Raja Expressway
7. Navegoan More- Konsari - Hedri - Surjagarh Mines State Highway
8. Nagar Karamala Temburni Pkg 3 (NKT) (Tender Floated)
9. Allapalli Bypass from Muktapur -Wadlapeth to Yelachil State Highway
10. Badnera Samuruddhi Yavtamal Connectors
11. Pune Satara road Project
12. Padgha - Titwala Road Project
13. Mankoli Shilphata Road Project
14. Thane Bhiwandi Links Bridges and Approach Road Project

 Detailed Estimation of Following Railway Projects:


1. Itarsi Khandwa (3rd & 4th Line) – 187.096 Km
2. Gaziabad Moradabad (Double Line) – 140.520 Km
3. Roza Sitapur (Double Line) – 87.356 Km
4. Chengannur-Pumba (Double Line) - 59.228 Km
5. Dankuni Goods shed Howrah Section

And Many Other Small Projects

TPF ENGINEERING PRIVATE LIMITED, PUNE


Position: - ASSISTANT MANAGER (ESTIMATION)
Working Period: - April 2022 to March 2023
Package: - 4.62 LPA CTC
Work Done: -

 Cost Estimate of Road Work


 Cost Estimate of Structures (Major Bridge, Flyover, Viaduct, VOP, VUP, LVUP, SVUP,
Minor Bridge, Slab Culverts, Box Culverts, Pipe Culverts)
 Cost Estimate of Utility Shifting

Detailed Project Reports Estimation of following Road Projects:


1. Preparation of DPR For Development of Economic Corridors, Inter Corridors and Feeder
Routes to Improve the Efficiency of Freight Movement in India Under Bharatmala Pariyojana
(Route No. Ec-20) (Lot-5/Pkg.-4). Route: Hassan Huliyar Hiriyur
Cost Project: - Approx. Rs. 3850 Cr.
2. Preparation of Detailed Project Report of Pune Ring Road, Urse to Paud Road to Khed -
Shivapur Phase - II (Western Part)
Cost of Project: - Approx. Rs. 7315 Cr.
3. Consultancy Services to Conduct Detailed Technical Assessment of the Corridor to Identify
Issues Impacting the Efficiency of the Corridor and Its Design solutions on Panipat Jalandhar
Section Of NH-1 (New NH-44) From Km. 96.00 To Km. 387.100 in the State of Haryana and
Punjab.
Cost of Project: - Approx. Rs. 588.53 Cr

TATA CONSULTING ENGINEERS LIMITED, SURAT


Position: - BILLING ENGINEER
Working Period: - Nov 2021 to March 2022
Package: - 4.29 LPA
Project Name: - Mumbai Ahmedabad High Speed Rail Project (MAHSR) (India’s First Bullet
Train)
Work Done: -

Billing
Planning
Quantity Breakdown Approval
Request for Inspection (RFI) Assigning and Closing
Piling Special Study
Project Management

SHRI S. M. AUTADE PVT. LTD., PUNE

Position: - CIVIL ENGINEER


Working Period: - May 2019 to Nov 2021

 Tendering and BOQ Preparation with detailed Estimation and Rate Analysis
 Estimation Standards and Rate Analysis standards
 Billing and Planning
 Review of Highway, Structure, RS Wall, Toll Plaza, Miscellaneous Drawings. Co-
ordination with Design Consultant.
 Machinery Hour Rate Workout
 Special Study on ROB/RUB-Estimation, Current Rates and
DesignRequirements Review
 ERP Software Development: - Planning, Consumption, Controlling
Project Name: - Mohol Wakhri NH965 Pkg 1 Road Project
Cost of Project: - Rs. 730.89 Crore
Work Done: -

Overall Management of Site such DPR, WPR & MPR and Profit Loss Statement
Preparation
Monitoring progress by comparing planned and achieved progress.
Letter Drafting of compliance letters to Authority and higher Authority.
Construction Programme, Cash Flow
Change of Scope Proposal for an amount of Rs. 57.23 Crore

Project Name: - SH 204 Barshi Solapur Road Project


Cost of Project: - Rs. 160.85 Crore
Work Done: -

Preparation the Contract Agreement and Contract Documents


Overall Management of Site such DPR, WPR & MPR and Profit Loss Statement
Preparation
Monitoring progress by comparing planned and achieved progress.
Construction Programme, Cash Flow
Environment Impact Study such Air Quality, Water Quality, Soil Testing, Forest Study,
Wildlife Study, Solid Waste Management, Rainwater Harvesting, Noise Barrier for
Sensitive Locations, Roadside Plantation
Letter Drafting of compliance letters to Authority and higher Authority.
Change of Scope Proposal for an amount of Rs. 40 Crore

Project Name: - NH965G Jath Sangola Road Project


Cost of Project: - Rs. 165.00 Crore
Work Done: -

Design Drawings Checking and Getting Approval from Proof, Safety & Authority’s
Engineer
Letter Drafting of compliance letters to Authority and higher Authority.

Project Name: - NH 150E Akkalkot Road Project


Cost of Project: - 132.22 Crore
Work Done: -

As Built Drawings (Structures, Pavement and Signage) Checking and Finalization


based on IRC Codes
Maintenance Bill and Maintenance Correspondence
Bonus Proposal and Bonus Correspondence
Change of Scope Proposal for an amount of 11 Crore and 6 Crore

And Many Other Small Projects (PMGSY & MMGSY Projects)


EDUCATION PROJECTS (ACADEMICS)

BE Project

Title : - Analysis and Design of LONGITUDINAL GIRDERS OF T-BEAM BRIDGE


Structure.
Duration : - 1 Year
Summary : - This project deals with studying the existing problems of T-beam bridges in terms of
load caring capacity and cost and give best alternative to those problems by altering
the girder position and girder number
TE Project

Title : - Improvement of Expansive Soil by Using Geo grid


Duration : - 6 Months
Summary : - This project deals with investigation of the use of the geogrids as reinforcement for
increasing the stability and strength of the BLACK COTTON SOIL
(MONTMORILLONITE SOIL) (EXPANISIVE SOIL)

ADDITIONAL SKILLS/COURSES/SOFTWARES:

MS-Office with Excel Programming


AutoCAD (Civil)
Staad Pro (Design)
Tekla Structure Designer (TDS) (Design, Detailing)
CSI Etabs (Design)
CSI Detail (Detailing)
CSI SAFE (Foundation Design)
MS-Project (Planning)
Primavera (Planning)
Google SketchUp
Diploma in Office Management
Language C
Primavera Oracle (Project Management)

EXPERIMENTAL LEARNING (INDUSTRIAL TRAINING):

Company : - Vyankateshwara Developers, Solapur.


Duration : - 15 days
Learning : - Managing various resources, construction activities and roles Of a Civil engineerof G+
7 apartments and industrial steel shed and concept of designing ofcontinuous beams

Company : - Thumbkar Industry, Solapur


Duration : - 15 days
Learning : - Construction activities in factory building, need of safety, schedule of project,
shuttering for concreting
CO-CURRICULAR ACTIVITIES:

1st Rank in Solapur University in THIRD YEAR Engineering


2nd Rank in Solapur University in FINAL YEAR Engineering
5th Rank in Solapur University in Bachelor of Engineering (BE)
15th Rank in NAGESH KARAJAGI ORCHID COLLEGE OF ENGG. AND TECH.
SOLAPUR in FIRST YEAR Engineering
THIRD PRIZE in Pirates of Surveying in Orchitech organized by NKOCET in 2015

EXTRA CO-CURRICULAR ACTIVITIES: -

Worked as VOLUNTEER in ORCHITECH 2018


Class Representative (CR) for BE-Class.

PERSONALITY SKILLS:

Initiative-taking and Eager to Learn New Things


Good Team Leader can get with New People with ease.
Time Management, Adaptable and able to Manage pressure.

HOBBIES/INTERESTS:
World Tour, Playing Chess, Listening Songs

MISCELLANEOUS INFORMATION:
Date of birth: -08th January 1997.
Address: - 196, Chakote Nagar, Old Vidi Gharkul, Hyderabad Road, Solapur
413005.
Languages: - English, Hindi, Marathi, and Telugu.

DECLARATION:

I hereby declare that the above given statements and information are true and correct to the best
of my knowledge.

Date: 12-11-2024
Place: Solapur (Er. VYANKATESH S. GUNDU)