NEOM-11 Regional Infrastructure

Al-Rawaf Contracting Company

Contract No. 4800000640


Design and Build of Magna Break Pressure Tank (BPT) & Water Transmission Pipeline
Contract Title from Magna BPT to Magna Reservoir
Work/Service Order No. 000 Main Contract
Design and Build of Magna Break Pressure Tank (BPT) & Water Transmission Pipeline
Work Order Title from Magna BPT to Magna Reservoir
STAGE 3C: Book 03_HVAC Detailed Design Report
Document No. 11-152110-4800000640-RWF-MEC-RPT-000001
Document Revision History:
Status Prepared by Checked by Approved by
Rev Revision Date
(Reason for Issue) (Name/Position) (Name/Position) (Name/Position)
Description
Engineering Mohammed Youssef Mohammed Youssef
A First Issue For Approval 03-05-2023 Team / Project Manager / Project Manager

Mohamed Mostafa Moawed AD Malik


B Second Issue For Approval 28-09-2023 Zahran / Project / Engineering / Sn. Project
Director Manager Manager
Mohamed Mostafa Moawed AD Malik
C Third Issue For Approval 15-01-2024 Zahran / Project / Engineering / Sn. Project
Director Manager Manager

Signatures:

Document Review Status Date: Name/Signature:

1 - Work May Proceed


2 - Incorporate Comments - Proceed
3 - Revise & Re-submit. Do NOT proceed
4 - Review Not Required - Proceed

Electronic documents once printed, are uncontrolled and may become out-dated. Refer to Aconex for current revision

Template Reference: 11-000000-0000100854-BEC-DCC-TMP-000003_01


DESIGN AND BUILD OF MAGNA BREAK PRESSURE TANK (BPT) & WATER
TRENSMISSION PIPELINE FROM MAGNA BPT TO MAGNA RESERVOIR

STAGE 3C: Book 03_HVAC Detailed Design Report


11-152110-4800000640-RWF–MEC-RPT-000001 Rev C

JAN2024
Document History

Revision code Description of changes Purpose of issue Date

A First Issue For Approval 03.05.2023

B Second Issue For Approval 28.09.2023

C Third Issue For Approval 15.01.2024

Document Approval

Prepared by Reviewed by Approved by


Name Nishad P Ihab Talaat Mohamed Zahran
Job Title Mechanical Engineer Design Manager Project Director

Signature

Jan 15, 2024 Jan 15, 2024 Jan 15, 2024

D O C U M E N T C O D E: 1 1 - 1 5 2 1 1 0 - 4 8 0 0 0 0 0 6 4 0 - R W F – C I V - R P T - 0 0 0 0 0 1 R E V I S I O N C O D E: C PAG E 1 OF 1
CONTENTS

Pages

1. HVAC 4
1.1. APPLICABLE CODES, REGULATIONS AND STANDARDS 4
1.2. DESIGN CRITERIA 4
1.2.1. OUTSIDE WEATHER CONDITIONS 4
1.2.2. INDOOR DESIGN CONDITIONS 5
1.2.3. OCCUPANCY ESTIMATE 5
1.2.4. LIGHTING POWER DENSITY (LPD) AND DEVICES 5
1.3. VENTILATION AND FRESH AIR RATES 6
1.4. INTERNAL HEAT GAIN 6
1.5. NOISE CRITERIA 7
1.6. COOLING LOAD ESTIMATE 7
1.7. HVAC SYSTEM DESCRIPTION 8
1.7.1. HVAC SYSTEM DESCRIPTION FOR EACH BUILDING 8
1.7.2. EMERGENCY POWER SUPPLY AND REDUNDANCY 9

DOCUMENT CODE: 11 -152110-4800000640-RWF-MEC-RPT -000001 REVISION CODE: C PAG E 3 OF 9


1. HVAC

1.1. APPLICABLE CODES, REGULATIONS AND STANDARDS

The design of the Heating, Ventilation and Air-Conditioning systems (HVAC) shall be
designed in accordance with NEOM NEOM-NEN-SCH-005- List of technical codes and
standards in addition to the latest editions’ requirements and recommendations of the below:

 SBC- Saudi Building Code


 NFPA 5000-Code for Building Construction and safety.
 NFPA 101 -Life Safety Code.
 NFPA 90A -Standards for the Installation of Air-conditioning and Ventilating System.
 NFPA 92-Standard for Smoke Control Systems.
 NFPA 92B -Standard for Smoke Management Systems in Malls, Atria, and Large Spaces.
 NPFA 204 -Guide for Smoke and Heat Venting.
 ASHRAE-Handbook and Standards of American Society of Heating, Refrigerating and Air-
conditioning Engineers.
 SMACNA-HVAC duct construction standards.
 ARI-American Refrigeration Institute
 Saudi energy & green building code (601 &1001)
 AMCA-Air Movement and Control Association
 ASTM-American Society for Testing Materials
 ANSI-American National Standards Institute Inc.
 ASME-American Society of Mechanical Engineers
 IBC-International Building Code - 2009
 IMC-International Mechanical Code – 2009

1.2. DESIGN CRITERIA

HVAC load calculations shall be done on the following design data for Aqaba city, which is
the nearest city to magna pressure tank:

1.2.1. Outside Weather Conditions

 Latitude: 29.612 N
 Longitude: 35.018 E
 Elevation: 53 M

Condition Dry Bulb °C Wet Bulb °C


Summer Outside Conditions 44.5 29.3
Winter Outside Conditions 5.5

DOCUMENT CODE: 11 -152110-4800000640-RWF-MEC-RPT -000001 REVISION CODE: C PAG E 4 OF 9


Notes:
 HVAC equipment shall be sized to meet the peak load at both extreme dry-bulb and
extreme wet- bulb conditions.
 The equipment shall be selected to operate at least 5 degrees above the outdoor design
conditions.

1.2.2. Indoor Design Conditions

Indoor comfort conditions shall be based on recommendations of ASHRAE Standard 55.

The following table represents the indoor design condition that shall be met for
Summer/Winter seasons:

Summer Winter
Space Dry Bulb Temp. (°C)Relative Humidity (%) Dry Bulb Temp.
(°C)
Office 23 50 21
Corridors 23 50 21
Control Rooms 22 40 - 50 21
Laboratory 23 50 21
Battery room 26 50 -
Electrical room 22 - -

Notes:
 Tolerances: Temperature: +/- 1 °C
 Relative Humidity: +/- 5%

1.2.3. Occupancy Estimate

The occupancy rates used in the preliminary calculations shall be on the latest edition of
ASHRAE Standard 62.1,the final occupancy figures shall be validated from NEOM
Water/ETSD.

Space Occupancy / 100m2


Office 5
Corridors -
Battery room -
Control room 5
laboratory 25

1.2.4. Lighting Power Density (LPD) and Devices

The lighting and devices shall be calculated according to given data from Electrical
department or as per ASHRAE STANDARD 90.1-latest version and operator guide as follows.

Space LPD ( W/M2)


Office 12
Corridors 12

DOCUMENT CODE: 11 -152110-4800000640-RWF-MEC-RPT -000001 REVISION CODE: C PAG E 5 OF 9


Battery room 10
Control room 15
laboratory 16.5
Electrical room 15

1.3. VENTILATION AND FRESH AIR RATES

The ventilation rate shall be based on the ASHRAE standards 62.1 (2019)

People Rate Area Rate


Space
L/s per person L/s per m2
Office 2.5 0.3
Corridors - 0.3
Control room 2.5 0.3
laboratory 5 0.9

Exhaust Extraction Requirements

Area Rate
Space
L/s per m2
Sum pit 5
Locker Rooms 2.5
Toilets—Private 25 L/s/WC
Shower 25 L/s/unit
Battery room 10 ACH
Laboratory 5.1

Fresh Air INTAKE LOUVERS

Fresh air intake louvers shall be of sand trap and sized on maximum face velocity of 1 m\s
with respect to the net area.

Exhaust Air Discharge Louvers

Exhaust air discharge shall be sized on face velocities of 2 m\s with respect to the net area.

1.4. INTERNAL HEAT GAIN

Internal heat gain shall consist mainly of:

 The Lighting Loads: The lighting load used in the preliminary calculations shall be done on
the latest edition of ASHRAE Standard 90.1 space by space method, final figures shall be
verified on the actual interior lighting layouts.
 Equipment Loads: Equipment load shall be allowed for in the air-conditioning load estimate
and shall include heat emissions from the computer terminals and printers in the office
areas and any other ancillary equipment used for a specific application, heat dissipation
rates shall base on ASHRAE handbook recommendations

DOCUMENT CODE: 11 -152110-4800000640-RWF-MEC-RPT -000001 REVISION CODE: C PAG E 6 OF 9


 Occupancy Load: Occupancy loads are determined in accordance with the design
population capacity for each area and their relevant activity level within each space as per
ASHRAE 55 recommendations and as per below table

Activity Level Sensible W Latent W


Seated at Rest 67 35
Office Work 72 60
Sedentary Work 82 79
Medium Work 86 133
Dancing 89 160
Heavy Work 154 271
Athletics 208 320

1.5. NOISE CRITERIA

All equipment shall be installed to meet “ASHRAE applications handbook” recommendations


with respect to noise and vibration control. The HVAC systems is to be designed to ensure a
sound level not exceeding the following values:

Octave Band Approximate Overall


Room Type Analysis Sound Pressure Level
(NC/RC) (dBA) (dBC)
Office Private Offices 30 35 60
Corridors and Lobbies 40 45 65
Laboratory Research 50 55 75
General Building Areas
Public Toilets 40 45 65
Control room 30 35 60
Battery room 40 45 65
Electrical room 40 45 65
Mechanical room 40 45 65

1.6. COOLING LOAD ESTIMATE

The preliminary HVAC equipment load for control building has been estimated at
approximately about 53 KW as follow:

 Battery room: Estimated load 2.8 KW, air flow 186 l/s, fresh air 0 l/s
 Control room: Estimated load 29.8 KW, air flow 2513 l/s, fresh air 80 l/s
 Corridor: Estimated load 4.8 KW, air flow 255 l/s, fresh air 35 l/s
 Laboratory: Estimated load 4.6 KW, air flow 132 l/s, fresh air 55 l/s
 Office: Estimated load 4.3 KW, air flow 203 l/s, fresh air 35 l/s
 UPS: Estimated load 6.8 KW, air flow 672 l/s, fresh air 0 l/s

The preliminary HVAC ventilation and exhaust equipment as follow:

DOCUMENT CODE: 11 -152110-4800000640-RWF-MEC-RPT -000001 REVISION CODE: C PAG E 7 OF 9


 FAF-01: Central Inline fresh air fan 205 l/s.
 EF-01: Inline exhaust fan for toilet 70 l/s.
 EF-02: Inline exhaust fan for Sum pit 50 l/s.
 EF-03: Two Inline exhaust fan for battery room (1-standby) 240 l/s.
 EF-04: Inline exhaust fan for laboratory 60 l/s.
 EF-05: Purge fan for firefighting system gas 300 l/s.

Note: For detailed calculation, refer to attached appendix –HVAC calculation.

1.7. HVAC SYSTEM DESCRIPTION

HVAC systems shall be selected and designed taking into consideration the selection of
optimum and most efficient systems in relation with function and application for each space.

All spaces within magna pressure tank shall be served by means of a standalone DX system
meeting sustainability requirement as described in sustainability sections and as per SBC
601/602, SBC 1001 and ASHRAE 90.1

 Outdoor equipment shall be located outside at building surface or any area opened to sky.
 Different areas shall be served by means of individual DX Split Heat pumps for standalone
Units,
 DX Split decorative cooling unit shall be used for battery room, or similar areas without
reflected ceiling.
 Indoor units shall be installed in BOH areas where possible as per actual architecture
layout to reduce accessibility for these units from front of house areas.
 In case selected Heat Pump or DX with integrated heating coil cannot cater for the heating
load, then duct mounted electric coil shall be considered to offset the heating load.

1.7.1. HVAC System Description for Each Building

a) Control building:
Control building shall be served by DX systems using separated concealed split units.
 Control room shall be served by four concealed splits DX Heat pumps with one standby
to achieve air flow.
 Battery room shall be served by dedicated of two hi-wall split DX cooling only (one
standby) and ventilated with two dedicated inline exhaust fans one (stand by) at outdoor
area opened to sky at rate not less than (5.1 l/s/m2) of floor area of room interfaced
with H2 sensors at the room to control H2 emissions rates. The maximum concentration
of H2 shall be limited to one percent of the total volume of the room.
 the battery room shall be maintained at negative pressure and equipped with an
explosion-proof fan and motor..
 Office and corridor shall be served by separated concealed split DX Heat pumps.
 Laboratory shall be served by concealed split DX heat pumps and ventilated by dedicated
inline exhaust fan at outdoor area opened to sky for dilution ventilation.
 The laboratory shall be maintained at negative pressure.

DOCUMENT CODE: 11 -152110-4800000640-RWF-MEC-RPT -000001 REVISION CODE: C PAG E 8 OF 9


 Electrical room shall be served by dedicated of two hi-wall split DX cooling only (one
standby)
 Central Inline fresh air fan at outdoor area opened to sky shall be provide the control
building with needed fresh air.
 Dedicated Inline exhaust fan located outdoor area opened to sky shall be provided for
toilet and locker.
 Sum pit shall be ventilated by dedicated inline exhaust fan at outdoor area opened to sky.
 Purge fans shall used for control room, battery room and Electrical room to be ventilated
in case of use gas firefighting system at outdoor area opened to sky.
 All HVAC equipment will fall down in case of fire except those connected to fire control
panel, after releasing firefighting gas in fired space pure fan will work to ventilate fired area
from firefighting gas, for detailed interlocked between HVAC units and fire alarm system
refer to ICT work (11-152110-4800000640-RWF-ICT-RPT-000001, section 1.2 . Fire
alarm and detection system, page 4&5).
 Using inverter technology in DX system will save at least 35% of electricity consumption
for every unit.

1.7.2. Emergency Power Supply.

The following equipment shall be connected to the emergency power supply

 Life Safety System


 DX AC Units Serving battery/ control Rooms and Electrical room.
 Smoke System as Applicable.
 Smoke Control System
 Battery room exhaust fans.
 Purge fans.

DOCUMENT CODE: 11 -152110-4800000640-RWF-MEC-RPT -000001 REVISION CODE: C PAG E 9 OF 9


Design Weather Parameters & MSHGs
3291-CONTROL BUILDING 09/2/2023
05:10PM

Design Parameters:

City Name .......................................................................................................... AQBA


Location ................................................................................................. Saudi Arabia
Latitude ................................................................................................................. 29.6 Deg.
Longitude .............................................................................................................. 35.0 Deg.
Elevation ............................................................................................................... 53.0 m
Summer Design Dry-Bulb ..................................................................................... 44.5 °C
Summer Coincident Wet-Bulb .............................................................................. 29.3 °C
Summer Daily Range ........................................................................................... 13.3 K
Winter Design Dry-Bulb .......................................................................................... 5.5 °C
Winter Design Wet-Bulb ......................................................................................... 3.2 °C
Atmospheric Clearness Number ........................................................................... 1.00
Average Ground Reflectance ............................................................................... 0.20
Soil Conductivity ................................................................................................. 1.385 W/(m K)
Local Time Zone (GMT +/- N hours) ....................................................................... 3.0 hours
Consider Daylight Savings Time ............................................................................. No
Simulation Weather Data ....................................................................................... N/A
Current Data is .................................................................................... User Modified
Design Cooling Months ........................................................... January to December

Design Day Maximum Solar Heat Gains

(The MSHG values are expressed in W/m² )

Month N NNE NE ENE E ESE SE SSE S


January 77.7 77.7 104.6 353.6 569.7 735.1 785.2 782.2 762.3
February 89.3 89.3 222.8 485.0 656.5 770.5 778.7 716.5 671.1
March 101.6 123.3 350.9 586.4 724.6 750.5 704.9 591.2 519.9
April 113.4 259.8 481.0 630.7 713.5 688.2 569.6 411.2 322.7
May 124.7 357.1 549.1 656.4 686.3 621.6 463.9 278.1 200.1
June 159.2 392.0 565.2 655.0 670.9 588.0 415.6 230.3 165.9
July 128.1 356.8 532.8 648.3 677.2 605.7 452.8 271.8 195.8
August 118.6 259.2 459.7 617.5 691.1 660.9 551.5 397.4 312.1
September 104.8 115.3 346.6 546.7 688.4 725.6 675.4 572.2 505.7
October 91.2 91.2 221.1 454.8 648.2 740.8 754.1 695.6 648.7
November 78.3 78.3 88.0 353.0 567.6 710.2 785.9 775.3 747.8
December 72.4 72.4 72.4 306.1 519.0 705.5 781.0 796.9 783.1
Month SSW SW WSW W WNW NW NNW HOR Mult
January 783.2 787.5 734.8 566.9 356.2 103.0 77.7 593.9 1.00
February 717.9 781.4 764.0 666.9 485.6 212.0 89.3 716.2 1.00
March 591.1 705.1 745.5 723.2 588.6 357.2 122.6 819.5 1.00
April 413.9 575.4 675.3 715.4 646.1 479.0 255.8 867.0 1.00
May 282.0 470.7 613.2 693.3 669.0 544.8 350.0 878.4 1.00
June 232.3 421.4 584.0 676.0 667.4 560.1 387.0 875.1 1.00
July 272.8 455.7 603.0 678.9 653.6 532.0 354.1 867.1 1.00
August 398.8 554.4 651.0 690.2 625.0 466.7 253.8 849.2 1.00
September 570.4 673.3 726.7 669.5 554.0 354.1 104.8 789.7 1.00
October 693.0 750.5 746.0 645.2 444.0 226.4 91.2 696.6 1.00
November 773.2 785.4 711.0 573.2 340.1 105.8 78.3 585.2 1.00
December 794.3 788.0 700.3 537.7 279.3 72.4 72.4 538.6 1.00
Mult. = User-defined solar multiplier factor.

Hourly Analysis Program v5.11 Page 1 of 1


Space Input Data
3291-CONTROL BUILDING 09/18/2023
05:15PM

G02-CONTROL ROOM

1. General Details:
Floor Area ......................................................... 36.0 m²
Avg. Ceiling Height ............................................. 3.3 m
Building Weight ............................................... 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ..................................... User-Defined
OA Requirement 1 ............................................ 80.0 L/s
OA Requirement 2 .............................................. 0.0 L/s
Space Usage Defaults ....... ASHRAE Std 62.1-2016

2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ........................ Recessed (Unvented) Occupancy .......................................................... 4.0 People
Wattage .......................................................... 15.00 W/m² Activity Level ........................................ Office Work
Ballast Multiplier ............................................... 1.25 Sensible ............................................................ 71.8 W/person
Schedule .................................... Sample Schedule Latent ............................................................... 60.1 W/person
Schedule .................................... Sample Schedule

2.2. Task Lighting: 2.5. Miscellaneous Loads:


Wattage ............................................................ 0.00 W/m² Sensible ................................................................. 0 W
Schedule ........................................................ None Schedule ......................................................... None
Latent .................................................................... 0 W
Schedule ......................................................... None
2.3. Electrical Equipment:
Wattage ...................................................... 21000.0 Watts
Schedule .................................... Sample Schedule

3. Walls, Windows, Doors:

Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
NE 10.0 0 0 0

3.1. Construction Types for Exposure NE


Wall Type .................................. WALL CONSTRUCTION

4. Roofs, Skylights:

Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 36.0 0 0

4.1. Construction Types for Exposure H


Roof Type .................................. ROOF CONSTRUCTION

5. Infiltration:
Design Cooling ................................................. 0.00 L/s
Design Heating ................................................. 0.00 L/s
Energy Analysis ................................................ 0.00 L/s
Infiltration occurs only when the fan is off.

6. Floors:
Type ................................ Slab Floor Below Grade
Floor Area ......................................................... 36.0 m²
Exposed Perimeter ............................................. 0.0 m
Total Floor U-Value ......................................... 0.568 W/(m²·K)
Floor Depth ......................................................... 2.5 m
Basement Wall U-Value .................................. 0.568 W/(m²·K)
Wall Insulation R-Value ..................................... 0.00 (m²·K)/W
Wall Insulation Depth .......................................... 0.0 m

7. Partitions:
(No partition data).

Hourly Analysis Program v5.11 Page 1 of 6


Space Input Data
3291-CONTROL BUILDING 09/18/2023
05:15PM

G03-ELECTRICAL ROOM

1. General Details:
Floor Area ......................................................... 19.0 m²
Avg. Ceiling Height ............................................. 3.3 m
Building Weight ............................................... 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ..................................... User-Defined
OA Requirement 1 .............................................. 0.0 L/s/person
OA Requirement 2 ............................................ 0.00 L/(s·m²)
Space Usage Defaults ....... ASHRAE Std 62.1-2016

2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ........................ Recessed (Unvented) Occupancy .......................................................... 0.0 Person
Wattage .......................................................... 10.00 W/m² Activity Level ........................................ Office Work
Ballast Multiplier ............................................... 1.25 Sensible ............................................................ 71.8 W/person
Schedule .................................... Sample Schedule Latent ............................................................... 60.1 W/person
Schedule .................................... Sample Schedule

2.2. Task Lighting: 2.5. Miscellaneous Loads:


Wattage ............................................................ 0.00 W/m² Sensible ................................................................. 0 W
Schedule ........................................................ None Schedule ......................................................... None
Latent .................................................................... 0 W
Schedule ......................................................... None
2.3. Electrical Equipment:
Wattage ........................................................ 5300.0 Watts
Schedule .................................... Sample Schedule

3. Walls, Windows, Doors:

Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
NE 8.0 0 0 0

3.1. Construction Types for Exposure NE


Wall Type .................................. WALL CONSTRUCTION

4. Roofs, Skylights:

Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 19.0 0 0

4.1. Construction Types for Exposure H


Roof Type .................................. ROOF CONSTRUCTION

5. Infiltration:
Design Cooling ................................................. 0.00 L/s
Design Heating ................................................. 0.00 L/s
Energy Analysis ................................................ 0.00 L/s
Infiltration occurs only when the fan is off.

6. Floors:
Type ................................ Slab Floor Below Grade
Floor Area ......................................................... 19.0 m²
Exposed Perimeter ............................................. 0.0 m
Total Floor U-Value ......................................... 0.568 W/(m²·K)
Floor Depth ......................................................... 2.5 m
Basement Wall U-Value .................................. 0.568 W/(m²·K)
Wall Insulation R-Value ..................................... 0.00 (m²·K)/W
Wall Insulation Depth .......................................... 0.0 m

7. Partitions:
(No partition data).

Hourly Analysis Program v5.11 Page 2 of 6


Space Input Data
3291-CONTROL BUILDING 09/18/2023
05:15PM

G04&G09-CORIDDOR

1. General Details:
Floor Area ......................................................... 25.0 m²
Avg. Ceiling Height ............................................. 3.3 m
Building Weight ............................................... 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ..................................... User-Defined
OA Requirement 1 ............................................ 35.0 L/s
OA Requirement 2 .............................................. 0.0 L/s
Space Usage Defaults ....... ASHRAE Std 62.1-2016

2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ........................ Recessed (Unvented) Occupancy .......................................................... 0.0 Person
Wattage .......................................................... 12.00 W/m² Activity Level ........................................ Office Work
Ballast Multiplier ............................................... 1.25 Sensible ............................................................ 71.8 W/person
Schedule .................................... Sample Schedule Latent ............................................................... 60.1 W/person
Schedule .................................... Sample Schedule

2.2. Task Lighting: 2.5. Miscellaneous Loads:


Wattage ............................................................ 0.00 W/m² Sensible ................................................................. 0 W
Schedule ........................................................ None Schedule ......................................................... None
Latent .................................................................... 0 W
Schedule ......................................................... None
2.3. Electrical Equipment:
Wattage .............................................................. 0.0 Watts
Schedule .................................... Sample Schedule

3. Walls, Windows, Doors:


(No Wall, Window, Door data).

4. Roofs, Skylights:

Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 25.0 0 0

4.1. Construction Types for Exposure H


Roof Type .................................. ROOF CONSTRUCTION

5. Infiltration:
Design Cooling ................................................. 0.00 L/s
Design Heating ................................................. 0.00 L/s
Energy Analysis ................................................ 0.00 L/s
Infiltration occurs only when the fan is off.

6. Floors:
Type ................................ Slab Floor Below Grade
Floor Area ......................................................... 25.0 m²
Exposed Perimeter ............................................. 0.0 m
Total Floor U-Value ......................................... 0.568 W/(m²·K)
Floor Depth ......................................................... 2.5 m
Basement Wall U-Value .................................. 0.568 W/(m²·K)
Wall Insulation R-Value ..................................... 0.00 (m²·K)/W
Wall Insulation Depth .......................................... 0.0 m

7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ................................... Wall Partition (No partition data).
Area .................................................................. 50.0 m²
U-Value .......................................................... 2.839 W/(m²·K)
Uncondit. Space Max Temp .............................. 39.5 °C
Ambient at Space Max Temp ............................ 44.5 °C
Uncondit. Space Min Temp ............................... 10.5 °C
Ambient at Space Min Temp ............................... 5.5 °C

Hourly Analysis Program v5.11 Page 3 of 6


Space Input Data
3291-CONTROL BUILDING 09/18/2023
05:15PM

G05-BATTERY ROOM

1. General Details:
Floor Area ......................................................... 26.0 m²
Avg. Ceiling Height ............................................. 3.3 m
Building Weight ............................................... 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ..................................... User-Defined
OA Requirement 1 .............................................. 0.0 L/s/person
OA Requirement 2 ............................................ 0.00 L/(s·m²)
Space Usage Defaults ....... ASHRAE Std 62.1-2016

2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ........................ Recessed (Unvented) Occupancy .......................................................... 0.0 Person
Wattage .......................................................... 10.00 W/m² Activity Level ........................................ Office Work
Ballast Multiplier ............................................... 1.25 Sensible ............................................................ 71.8 W/person
Schedule .................................... Sample Schedule Latent ............................................................... 60.1 W/person
Schedule .................................... Sample Schedule

2.2. Task Lighting: 2.5. Miscellaneous Loads:


Wattage ............................................................ 0.00 W/m² Sensible ................................................................. 0 W
Schedule ........................................................ None Schedule ......................................................... None
Latent .................................................................... 0 W
Schedule ......................................................... None
2.3. Electrical Equipment:
Wattage .......................................................... 50.00 W/m²
Schedule .................................... Sample Schedule

3. Walls, Windows, Doors:

Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
NE 9.0 0 0 0

3.1. Construction Types for Exposure NE


Wall Type .................................. WALL CONSTRUCTION

4. Roofs, Skylights:

Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 26.0 0 0

4.1. Construction Types for Exposure H


Roof Type .................................. ROOF CONSTRUCTION

5. Infiltration:
Design Cooling ................................................. 0.00 L/s
Design Heating ................................................. 0.00 L/s
Energy Analysis ................................................ 0.00 L/s
Infiltration occurs only when the fan is off.

6. Floors:
Type ................................ Slab Floor Below Grade
Floor Area ......................................................... 26.0 m²
Exposed Perimeter ............................................. 0.0 m
Total Floor U-Value ......................................... 0.568 W/(m²·K)
Floor Depth ......................................................... 2.5 m
Basement Wall U-Value .................................. 0.568 W/(m²·K)
Wall Insulation R-Value ..................................... 0.00 (m²·K)/W
Wall Insulation Depth .......................................... 0.0 m

7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ................................... Wall Partition (No partition data).
Area .................................................................. 12.0 m²
U-Value .......................................................... 2.839 W/(m²·K)
Uncondit. Space Max Temp .............................. 39.5 °C
Ambient at Space Max Temp ............................ 44.5 °C
Uncondit. Space Min Temp ............................... 10.5 °C
Ambient at Space Min Temp ............................... 5.5 °C

Hourly Analysis Program v5.11 Page 4 of 6


Space Input Data
3291-CONTROL BUILDING 09/18/2023
05:15PM

G06-LABORATORY

1. General Details:
Floor Area ......................................................... 12.0 m²
Avg. Ceiling Height ............................................. 3.3 m
Building Weight ............................................... 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ..................................... User-Defined
OA Requirement 1 ............................................ 55.0 L/s
OA Requirement 2 .............................................. 0.0 L/s
Space Usage Defaults ....... ASHRAE Std 62.1-2016

2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ........................ Recessed (Unvented) Occupancy .......................................................... 3.0 People
Wattage .......................................................... 16.50 W/m² Activity Level ........................................ Office Work
Ballast Multiplier ............................................... 1.25 Sensible ............................................................ 71.8 W/person
Schedule .................................... Sample Schedule Latent ............................................................... 60.1 W/person
Schedule .................................... Sample Schedule

2.2. Task Lighting: 2.5. Miscellaneous Loads:


Wattage ............................................................ 0.00 W/m² Sensible ................................................................. 0 W
Schedule ........................................................ None Schedule ......................................................... None
Latent .................................................................... 0 W
Schedule ......................................................... None
2.3. Electrical Equipment:
Wattage .............................................................. 0.0 Watts
Schedule .................................... Sample Schedule

3. Walls, Windows, Doors:

Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
NE 5.0 0 0 0

3.1. Construction Types for Exposure NE


Wall Type .................................. WALL CONSTRUCTION

4. Roofs, Skylights:

Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 12.0 0 0

4.1. Construction Types for Exposure H


Roof Type .................................. ROOF CONSTRUCTION

5. Infiltration:
Design Cooling ................................................. 0.00 L/s
Design Heating ................................................. 0.00 L/s
Energy Analysis ................................................ 0.00 L/s
Infiltration occurs only when the fan is off.

6. Floors:
Type ................................ Slab Floor Below Grade
Floor Area ......................................................... 12.0 m²
Exposed Perimeter ............................................. 0.0 m
Total Floor U-Value ......................................... 0.568 W/(m²·K)
Floor Depth ......................................................... 2.5 m
Basement Wall U-Value .................................. 0.568 W/(m²·K)
Wall Insulation R-Value ..................................... 0.00 (m²·K)/W
Wall Insulation Depth .......................................... 0.0 m

7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ................................... Wall Partition (No partition data).
Area .................................................................. 14.0 m²
U-Value .......................................................... 2.839 W/(m²·K)
Uncondit. Space Max Temp .............................. 39.5 °C
Ambient at Space Max Temp ............................ 44.5 °C
Uncondit. Space Min Temp ............................... 10.5 °C
Ambient at Space Min Temp ............................... 5.5 °C

Hourly Analysis Program v5.11 Page 5 of 6


Space Input Data
3291-CONTROL BUILDING 09/18/2023
05:15PM

G08-OFFICE

1. General Details:
Floor Area ......................................................... 25.0 m²
Avg. Ceiling Height ............................................. 3.3 m
Building Weight ............................................... 341.8 kg/m²
1.1. OA Ventilation Requirements:
Space Usage ..................................... User-Defined
OA Requirement 1 ............................................ 35.0 L/s
OA Requirement 2 .............................................. 0.0 L/s
Space Usage Defaults ....... ASHRAE Std 62.1-2016

2. Internals:
2.1. Overhead Lighting: 2.4. People:
Fixture Type ........................ Recessed (Unvented) Occupancy .......................................................... 2.0 People
Wattage .......................................................... 12.00 W/m² Activity Level ........................................ Office Work
Ballast Multiplier ............................................... 1.25 Sensible ............................................................ 71.8 W/person
Schedule .................................... Sample Schedule Latent ............................................................... 60.1 W/person
Schedule .................................... Sample Schedule

2.2. Task Lighting: 2.5. Miscellaneous Loads:


Wattage ............................................................ 0.00 W/m² Sensible ................................................................. 0 W
Schedule ........................................................ None Schedule ......................................................... None
Latent .................................................................... 0 W
Schedule ......................................................... None
2.3. Electrical Equipment:
Wattage .......................................................... 500.0 Watts
Schedule .................................... Sample Schedule

3. Walls, Windows, Doors:

Exp. Wall Gross Area (m²) Window 1 Qty. Window 2 Qty. Door 1 Qty.
NE 7.0 0 0 0

3.1. Construction Types for Exposure NE


Wall Type .................................. WALL CONSTRUCTION

4. Roofs, Skylights:

Exp. Roof Gross Area (m²) Roof Slope (deg.) Skylight Qty.
H 25.0 0 0

4.1. Construction Types for Exposure H


Roof Type .................................. ROOF CONSTRUCTION

5. Infiltration:
Design Cooling ................................................. 0.00 L/s
Design Heating ................................................. 0.00 L/s
Energy Analysis ................................................ 0.00 L/s
Infiltration occurs only when the fan is off.

6. Floors:
Type ................................ Slab Floor Below Grade
Floor Area ......................................................... 25.0 m²
Exposed Perimeter ............................................. 0.0 m
Total Floor U-Value ......................................... 0.568 W/(m²·K)
Floor Depth ......................................................... 2.5 m
Basement Wall U-Value .................................. 0.568 W/(m²·K)
Wall Insulation R-Value ..................................... 0.00 (m²·K)/W
Wall Insulation Depth .......................................... 0.0 m

7. Partitions:
7.1. 1st Partition Details: 7.2. 2nd Partition Details:
Partition Type ................................... Wall Partition (No partition data).
Area .................................................................. 15.0 m²
U-Value .......................................................... 2.839 W/(m²·K)
Uncondit. Space Max Temp .............................. 39.5 °C
Ambient at Space Max Temp ............................ 44.5 °C
Uncondit. Space Min Temp ............................... 10.5 °C
Ambient at Space Min Temp ............................... 5.5 °C

Hourly Analysis Program v5.11 Page 6 of 6


Wall Constructions
3291-CONTROL BUILDING 09/18/2023
05:46PM

WALL CONSTRUCTION

Wall Details
Outside Surface Color ................................ Medium
Absorptivity ..................................................... 0.675
Overall U-Value .............................................. 1.663 W/(m²·K)

Wall Layers Details (Inside to Outside)


Thickness Density Specific Ht. R-Value Weight
Layers mm kg/m³ kJ / (kg K) (m²·K)/W kg/m²
Inside surface resistance 0.000 0.0 0.00 0.15064 0.0
400 mm concrete 400.000 2500.0 0.84 0.23112 1000.0
20mm plaster 20.000 1858.1 0.84 0.02771 37.2
external acrylic paint 8.000 1180.0 1.46 0.00555 9.4
Outside surface resistance 0.000 0.0 0.00 0.18640 0.0
Totals 428.000 - 0.60142 1046.6

Hourly Analysis Program v5.11 Page 1 of 1


Roof Constructions
3291-CONTROL BUILDING 09/18/2023
05:47PM

ROOF CONSTRUCTION

Roof Details
Outside Surface Color ................................ Medium
Absorptivity ..................................................... 0.675
Overall U-Value .............................................. 0.363 W/(m²·K)

Roof Layers Details (Inside to Outside)


Thickness Density Specific Ht. R-Value Weight
Layers mm kg/m³ kJ / (kg K) (m²·K)/W kg/m²
Inside surface resistance 0.000 0.0 0.00 0.12064 0.0
300 mm concrete 300.000 2500.0 0.84 0.17334 750.0
100 mm polystyrene insulation 100.000 35.0 1.20 2.22722 3.5
water proof membrane 4.000 1200.0 1.40 0.02451 4.8
102mm common brick 101.600 1922.2 0.84 0.13977 195.3
Outside surface resistance 0.000 0.0 0.00 0.06640 0.0
Totals 505.600 - 2.75188 953.6

Hourly Analysis Program v5.11 Page 1 of 1


CONTROL BUILDING DX SYSTEM Input Data
Project Name: 3291-CONTROL BUILDING 09/18/2023
05:27PM

1. General Details:
Air System Name ................................. CONTROL BUILDING DX SYSTEM
Equipment Type .................................................................. Terminal Units
Air System Type .............................................................. Split DX Fan Coil
Number of zones ....................................................................................... 6
Ventilation ................................................. Dedicated Outdoor Air System

2. Dedicated Outdoor Air System Components:


Ventilation Air Data:
Airflow Control .............................................. Constant Ventilation Airflow
Ventilation Sizing Method ................................ Sum of Space OA Airflows
Unocc. Damper Position .................................................................. Closed
Damper Leak Rate ..................................................................................... 0 %
Outdoor Air CO2 Level .......................................................................... 400 ppm

Ventilation Fan Data:


Fan Type .......................................................................... Forward Curved
Configuration ............................................................................... Draw-thru
Fan Performance ................................................................................... 250 Pa
Overall Efficiency ..................................................................................... 54 %

% Airflow 100 90 80 70 60 50
% kW 100 91 81 72 61 54

% Airflow 40 30 20 10 0
% kW 46 40 33 27 21

Duct System Data:


Return Duct or Plenum Data:
Return Air Via ............................................................... Return Air Plenum
Wall Heat Gain to Plenum .......................................................................... 0 %
Roof Heat Gain to Plenum ....................................................................... 70 %
Lighting Heat Gain to Plenum .................................................................. 30 %

3. Zone Components:
Space Assignments:

Zone 1: Zone 1
G05-BATTERY ROOM x1
Zone 2: Zone 2
G02-CONTROL ROOM x1
Zone 3: Zone 3
G04&G09-CORIDDOR x1
Zone 4: Zone 4
G06-LABORATORY x1
Zone 5: Zone 5
G08-OFFICE x1
Zone 6: Zone 6
G03-ELECTRICAL ROOM x1

Thermostats and Zone Data:

T-Stat
Cooling T-Stat Cooling T-Stat Heating T-Stat Heating T-Stat Throttling
Zone Occ. Unocc. Occ. Unocc. Range
(°C) (°C) (°C) (°C) (°C)
1 25.0 27.0 21.1 18.3 0.83
2 21.0 23.0 20.0 18.3 0.83
3 22.0 24.0 21.1 18.3 0.83
4 22.0 24.0 21.1 18.3 0.83
5 22.0 24.0 21.1 18.3 0.83
6 21.0 23.0 20.1 18.3 0.83

Thermostat Schedule ........................................ Fan/Thermostat Schedule


Unoccupied Cooling is .................................................................. Available

Common Terminal Unit Data:

Hourly Analysis Program 5.11 Page 1 of 2


CONTROL BUILDING DX SYSTEM Input Data
Project Name: 3291-CONTROL BUILDING 09/18/2023
05:27PM

Cooling Coil:
Design Supply Temp. ........................................................................... 12.8 °C
Coil Bypass Factor .............................................................................. 0.100
Cooling Source .................................................................... Air-Cooled DX
Schedule ........................................................................ JFMAMJJASOND

Heating Coil:
Design Supply Temp. ........................................................................... 30.0 °C
Heating Source ....................................................... Air Source Heat Pump
Schedule ........................................................................ JFMAMJJASOND

Fan Control ...................................................................................... Fan On

Terminal Units Data:

Air
Distribution Air Design
Air Effectiveness Distribution Fan Supply
Zone Terminal Type Distribution Specification Effectiveness Minimum Airflow Fan Performance Efficiency Temp.
Ceiling supply /
1 Fan coil Not Used - 0.00 L/s/person 50 Pa 50 % -
ceiling return
Ceiling supply /
2 Fan coil Not Used - 0.00 L/s/person 50 Pa 50 % -
ceiling return
Ceiling supply /
3 Fan coil Not Used - 0.00 L/s/person 50 Pa 50 % -
ceiling return
Ceiling supply /
4 Fan coil Not Used - 0.00 L/s/person 50 Pa 50 % -
ceiling return
Ceiling supply /
5 Fan coil Not Used - 0.00 L/s/person 50 Pa 50 % -
ceiling return
Ceiling supply /
6 Fan coil Not Used - 0.00 L/s/person 50 Pa 50 % -
ceiling return

4. Sizing Data (Computer-Generated):


System Sizing Data:
Sizing Data:
Hydronic Sizing Specifications:
Chilled Water Delta-T ............................................................................. 5.6 K
Hot Water Delta-T ................................................................................. 11.1 K

Safety Factors:
Cooling Sensible ...................................................................................... 10 %
Cooling Latent ......................................................................................... 10 %
Heating ...................................................................................................... 5 %

Zone Sizing Data:


Zone Airflow Sizing Method ............................. Sum of space airflow rates
Space Airflow Sizing Method ......................... Individual peak space loads

Hourly Analysis Program 5.11 Page 2 of 2


Dedicated Outdoor Air System (DOAS) Sizing Summary for CONTROL BUILDING DX
SYSTEM
Project Name: 3291-CONTROL BUILDING 09/18/2023
05:42PM

Air System Information


Air System Name CONTROL BUILDING DX SYSTEM Number of zones .......................................................... 6
Equipment Class ........................................... TERM Floor Area ............................................................. 143.0 m²
Air System Type ....................................... SPLT-FC Location ....................................... AQBA, Saudi Arabia

Sizing Calculation Information

Calculation Months ................................ Jan to Dec Zone L/s Sizing ................. Sum of space airflow rates
Sizing Data ............................................ Calculated Space L/s Sizing ............. Individual peak space loads

Ventilation Fan Sizing Data

Actual max L/s ................................................... 205 L/s Fan motor BHP ....................................................... 0.12 BHP
Standard L/s ...................................................... 204 L/s Fan motor kW ......................................................... 0.09 kW
Actual max L/(s·m²) .......................................... 1.43 L/(s·m²) Fan static ................................................................. 250 Pa

Outdoor Ventilation Air Data


Design airflow L/s .............................................. 205 L/s L/s/person ............................................................. 22.78 L/s/person
L/(s·m²) ............................................................. 1.43 L/(s·m²)

Hourly Analysis Program 5.11 Page 1 of 15


Zone Sizing Summary for CONTROL BUILDING DX SYSTEM
Project Name: 3291-CONTROL BUILDING 09/18/2023
05:42PM

Air System Information


Air System Name CONTROL BUILDING DX SYSTEM Number of zones .......................................................... 6
Equipment Class ........................................... TERM Floor Area ............................................................. 143.0 m²
Air System Type ....................................... SPLT-FC Location ....................................... AQBA, Saudi Arabia

Sizing Calculation Information

Calculation Months ................................ Jan to Dec Zone L/s Sizing ................. Sum of space airflow rates
Sizing Data ............................................ Calculated Space L/s Sizing ............. Individual peak space loads

Terminal Unit Sizing Data - Cooling

Total Sens Coil Coil Water Time


Coil Coil Entering Leaving Flow of
Load Load DB / WB DB / WB @ 5.6 K Peak Coil Zone
Zone Name (kW) (kW) (°C) (°C) (L/s) Load L/(s·m²)
Zone 1 2.8 2.7 25.7 / 17.5 13.5 / 12.8 - Jul 1500 7.17
Zone 2 29.8 27.1 22.3 / 16.5 13.3 / 12.7 - Jun 1500 69.80
Zone 3 4.8 3.7 25.7 / 18.7 13.7 / 13.1 - Aug 1600 10.21
Zone 4 4.6 2.9 32.0 / 22.7 13.7 / 13.0 - Jul 1500 10.99
Zone 5 4.3 3.1 26.5 / 19.3 13.6 / 13.0 - Jun 1500 8.10
Zone 6 6.8 6.7 21.6 / 16.0 13.3 / 12.8 - Jun 0000 35.36

Terminal Unit Sizing Data - Heating, Fan, Ventilation

Heating Htg Coil


Heating Coil Water Fan OA Vent
Coil Ent/Lvg Flow Design Fan Fan Design
Load DB @11.1 K Airflow Motor Motor Airflow
Zone Name (kW) (°C) (L/s) (L/s) (BHP) (kW) (L/s)
Zone 1 0.7 20.8 / 23.9 - 186 0.023 0.019 0
Zone 2 1.7 20.5 / 21.0 - 2513 0.317 0.251 80
Zone 3 2.2 18.6 / 25.8 - 255 0.032 0.026 35
Zone 4 1.6 14.7 / 24.9 - 132 0.017 0.013 55
Zone 5 1.4 18.4 / 24.3 - 203 0.026 0.020 35
Zone 6 0.3 20.7 / 21.0 - 672 0.085 0.067 0

Zone Peak Sensible Loads

Zone Zone Zone


Cooling Time of Heating Floor
Sensible Peak Sensible Load Area
Zone Name (kW) Cooling Load (kW) (m²)
Zone 1 2.7 Jul 1600 0.8 26.0
Zone 2 24.7 Jun 2200 0.5 36.0
Zone 3 2.8 Jul 1500 1.7 25.0
Zone 4 1.5 Jul 1500 0.7 12.0
Zone 5 2.2 Jul 1600 0.8 25.0
Zone 6 6.6 Jun 2200 0.3 19.0

Space Loads and Airflows

Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(s·m²)
Zone 1
G05-BATTERY ROOM 1 2.7 Jul 1600 186 0.8 26.0 7.17
Zone 2
G02-CONTROL ROOM 1 24.7 Jun 2200 2513 0.5 36.0 69.80
Zone 3
G04&G09-CORIDDOR 1 2.8 Jul 1500 255 1.7 25.0 10.21
Zone 4
G06-LABORATORY 1 1.5 Jul 1500 132 0.7 12.0 10.99
Zone 5

Hourly Analysis Program 5.11 Page 2 of 15


Zone Sizing Summary for CONTROL BUILDING DX SYSTEM
Project Name: 3291-CONTROL BUILDING 09/18/2023
05:42PM

Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(s·m²)
G08-OFFICE 1 2.2 Jul 1600 203 0.8 25.0 8.10
Zone 6
G03-ELECTRICAL ROOM 1 6.6 Jun 2200 672 0.3 19.0 35.36

Hourly Analysis Program 5.11 Page 3 of 15


Ventilation Sizing Summary for CONTROL BUILDING DX SYSTEM
Project Name: 3291-CONTROL BUILDING 09/18/2023
05:42PM

1. Summary
Ventilation Sizing Method ................................ Sum of Space OA Airflows
Design Ventilation Airflow Rate .............................................................. 205 L/s

2. Space Ventilation Analysis

2.1 Zone: Zone 1


Floor Maximum Required Required Required Required Uncorrected
Area Maximum Supply Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air
Zone Name / Space Name Mult. (m²) Occupants (L/s) (L/s/person) (L/(s·m²)) (L/s) (% of supply) (L/s)
Zone 1
G05-BATTERY ROOM 1 26.0 0.0 186.4 0.00 0.00 0.0 0.0 0.0
Totals (incl. Space Multipliers) 186.4 0.0

2.2 Zone: Zone 2


Floor Maximum Required Required Required Required Uncorrected
Area Maximum Supply Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air
Zone Name / Space Name Mult. (m²) Occupants (L/s) (L/s/person) (L/(s·m²)) (L/s) (% of supply) (L/s)
Zone 2
G02-CONTROL ROOM 1 36.0 4.0 2512.9 0.00 0.00 80.0 0.0 80.0
Totals (incl. Space Multipliers) 2512.9 80.0

2.3 Zone: Zone 3


Floor Maximum Required Required Required Required Uncorrected
Area Maximum Supply Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air
Zone Name / Space Name Mult. (m²) Occupants (L/s) (L/s/person) (L/(s·m²)) (L/s) (% of supply) (L/s)
Zone 3
G04&G09-CORIDDOR 1 25.0 0.0 255.4 0.00 0.00 35.0 0.0 35.0
Totals (incl. Space Multipliers) 255.4 35.0

2.4 Zone: Zone 4


Floor Maximum Required Required Required Required Uncorrected
Area Maximum Supply Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air
Zone Name / Space Name Mult. (m²) Occupants (L/s) (L/s/person) (L/(s·m²)) (L/s) (% of supply) (L/s)
Zone 4
G06-LABORATORY 1 12.0 3.0 131.9 0.00 0.00 55.0 0.0 55.0
Totals (incl. Space Multipliers) 131.9 55.0

2.5 Zone: Zone 5


Floor Maximum Required Required Required Required Uncorrected
Area Maximum Supply Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air
Zone Name / Space Name Mult. (m²) Occupants (L/s) (L/s/person) (L/(s·m²)) (L/s) (% of supply) (L/s)
Zone 5
G08-OFFICE 1 25.0 2.0 202.6 0.00 0.00 35.0 0.0 35.0
Totals (incl. Space Multipliers) 202.6 35.0

Hourly Analysis Program 5.11 Page 4 of 15


Ventilation Sizing Summary for CONTROL BUILDING DX SYSTEM
Project Name: 3291-CONTROL BUILDING 09/18/2023
05:42PM

2.6 Zone: Zone 6


Floor Maximum Required Required Required Required Uncorrected
Area Maximum Supply Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air Outdoor Air
Zone Name / Space Name Mult. (m²) Occupants (L/s) (L/s/person) (L/(s·m²)) (L/s) (% of supply) (L/s)
Zone 6
G03-ELECTRICAL ROOM 1 19.0 0.0 671.8 0.00 0.00 0.0 0.0 0.0
Totals (incl. Space Multipliers) 671.8 0.0

Hourly Analysis Program 5.11 Page 5 of 15


Air System Design Load Summary for CONTROL BUILDING DX SYSTEM
Project Name: 3291-CONTROL BUILDING 09/18/2023
05:42PM

DESIGN COOLING DESIGN HEATING


COOLING DATA AT Jul 1500 HEATING DATA AT DES HTG
COOLING OA DB / WB 44.5 °C / 29.3 °C HEATING OA DB / WB 5.5 °C / 3.2 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 39 m² 2149 - 39 m² 980 -
Roof Transmission 143 m² 381 - 143 m² 790 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 143 m² 0 - 143 m² 0 -
Partitions 91 m² 3961 - 91 m² 2741 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 2235 W 1564 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 28100 W 28099 - 0 0 -
People 9 646 541 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 10% / 10% 3680 54 5% 226 0
>> Total Zone Loads - 40480 595 - 4737 0
Zone Conditioning - 40150 595 - 4607 0
Plenum Wall Load 0% 0 - 0 0 -
Plenum Roof Load 70% 888 - 0 0 -
Plenum Lighting Load 30% 670 - 0 0 -
Exhaust Fan Load 205 L/s 0 - 205 L/s 0 -
Ventilation Load 205 L/s 3924 6323 205 L/s 3764 0
Ventilation Fan Load 205 L/s 95 - 205 L/s -95 -
Space Fan Coil Fans - 396 - - -396 -
Duct Heat Gain / Loss 0% 0 - 0% 0 -
>> Total System Loads - 46123 6917 - 7880 0
Terminal Unit Cooling - 46123 6924 - 0 0
Terminal Unit Heating - 0 - - 7880 -
>> Total Conditioning - 46123 6924 - 7880 0
Key: Positive values are clg loads Positive values are htg loads
Negative values are htg loads Negative values are clg loads

Hourly Analysis Program 5.11 Page 6 of 15


Zone Design Load Summary for CONTROL BUILDING DX SYSTEM
Project Name: 3291-CONTROL BUILDING 09/18/2023
05:42PM

Zone 1 DESIGN COOLING DESIGN HEATING


COOLING DATA AT Jul 1600 HEATING DATA AT DES HTG
COOLING OA DB / WB 44.1 °C / 29.2 °C HEATING OA DB / WB 5.5 °C / 3.2 °C
OCCUPIED T-STAT 25.0 °C OCCUPIED T-STAT 21.1 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 9 m² 460 - 9 m² 234 -
Roof Transmission 26 m² 61 - 26 m² 147 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 26 m² 0 - 26 m² 0 -
Partitions 12 m² 431 - 12 m² 361 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 325 W 227 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 1300 W 1300 - 0 0 -
People 0 0 0 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 10% / 10% 248 0 5% 37 0
>> Total Zone Loads - 2728 0 - 780 0

Zone 2 DESIGN COOLING DESIGN HEATING


COOLING DATA AT Jun 2200 HEATING DATA AT DES HTG
COOLING OA DB / WB 34.9 °C / 27.3 °C HEATING OA DB / WB 5.5 °C / 3.2 °C
OCCUPIED T-STAT 21.0 °C OCCUPIED T-STAT 20.0 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 10 m² 607 - 10 m² 241 -
Roof Transmission 36 m² 106 - 36 m² 190 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 36 m² 0 - 36 m² 0 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 675 W 472 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 21000 W 20999 - 0 0 -
People 4 287 240 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 10% / 10% 2247 24 5% 22 0
>> Total Zone Loads - 24719 264 - 452 0

Hourly Analysis Program 5.11 Page 7 of 15


Zone Design Load Summary for CONTROL BUILDING DX SYSTEM
Project Name: 3291-CONTROL BUILDING 09/18/2023
05:42PM

Zone 3 DESIGN COOLING DESIGN HEATING


COOLING DATA AT Jul 1500 HEATING DATA AT DES HTG
COOLING OA DB / WB 44.5 °C / 29.3 °C HEATING OA DB / WB 5.5 °C / 3.2 °C
OCCUPIED T-STAT 22.0 °C OCCUPIED T-STAT 21.1 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 0 m² 0 - 0 m² 0 -
Roof Transmission 25 m² 67 - 25 m² 142 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 25 m² 0 - 25 m² 0 -
Partitions 50 m² 2233 - 50 m² 1506 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 375 W 262 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 0W 0 - 0 0 -
People 0 0 0 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 10% / 10% 256 0 5% 82 0
>> Total Zone Loads - 2818 0 - 1731 0

Zone 4 DESIGN COOLING DESIGN HEATING


COOLING DATA AT Jul 1500 HEATING DATA AT DES HTG
COOLING OA DB / WB 44.5 °C / 29.3 °C HEATING OA DB / WB 5.5 °C / 3.2 °C
OCCUPIED T-STAT 22.0 °C OCCUPIED T-STAT 21.1 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 5 m² 277 - 5 m² 130 -
Roof Transmission 12 m² 32 - 12 m² 68 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 12 m² 0 - 12 m² 0 -
Partitions 14 m² 625 - 14 m² 422 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 248 W 173 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 0W 0 - 0 0 -
People 3 215 180 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 10% / 10% 132 18 5% 31 0
>> Total Zone Loads - 1456 198 - 651 0

Hourly Analysis Program 5.11 Page 8 of 15


Zone Design Load Summary for CONTROL BUILDING DX SYSTEM
Project Name: 3291-CONTROL BUILDING 09/18/2023
05:42PM

Zone 5 DESIGN COOLING DESIGN HEATING


COOLING DATA AT Jul 1600 HEATING DATA AT DES HTG
COOLING OA DB / WB 44.1 °C / 29.2 °C HEATING OA DB / WB 5.5 °C / 3.2 °C
OCCUPIED T-STAT 22.0 °C OCCUPIED T-STAT 21.1 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 7 m² 393 - 7 m² 182 -
Roof Transmission 25 m² 67 - 25 m² 142 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 25 m² 0 - 25 m² 0 -
Partitions 15 m² 666 - 15 m² 452 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 375 W 262 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 500 W 500 - 0 0 -
People 2 144 120 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 10% / 10% 203 12 5% 39 0
>> Total Zone Loads - 2236 132 - 814 0

Zone 6 DESIGN COOLING DESIGN HEATING


COOLING DATA AT Jun 2200 HEATING DATA AT DES HTG
COOLING OA DB / WB 34.9 °C / 27.3 °C HEATING OA DB / WB 5.5 °C / 3.2 °C
OCCUPIED T-STAT 21.0 °C OCCUPIED T-STAT 20.1 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 8 m² 486 - 8 m² 194 -
Roof Transmission 19 m² 56 - 19 m² 101 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 19 m² 0 - 19 m² 0 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 238 W 166 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 5300 W 5300 - 0 0 -
People 0 0 0 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 10% / 10% 601 0 5% 15 0
>> Total Zone Loads - 6608 0 - 310 0

Hourly Analysis Program 5.11 Page 9 of 15


Space Design Load Summary for CONTROL BUILDING DX SYSTEM
Project Name: 3291-CONTROL BUILDING 09/18/2023
05:42PM

TABLE 1.1.A. Component Loads For Space "G05-BATTERY ROOM" In Zone "Zone 1"
DESIGN COOLING DESIGN HEATING
COOLING DATA AT Jul 1600 HEATING DATA AT DES HTG
COOLING OA DB / WB 44.1 °C / 29.2 °C HEATING OA DB / WB 5.5 °C / 3.2 °C
OCCUPIED T-STAT 25.0 °C OCCUPIED T-STAT 21.1 °C
Sensible Latent Sensible Latent
SPACE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 9 m² 460 - 9 m² 234 -
Roof Transmission 26 m² 61 - 26 m² 147 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 26 m² 0 - 26 m² 0 -
Partitions 12 m² 431 - 12 m² 361 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 325 W 227 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 1300 W 1300 - 0 0 -
People 0 0 0 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 10% / 10% 248 0 5% 37 0
>> Total Zone Loads - 2728 0 - 780 0

TABLE 1.1.B. Envelope Loads For Space "G05-BATTERY ROOM" In Zone "Zone 1"
COOLING COOLING HEATING
Area U-Value Shade TRANS SOLAR TRANS
(m²) (W/(m²·K)) Coeff. (W) (W) (W)
NE EXPOSURE
WALL 9 1.663 - 460 - 234
H EXPOSURE
ROOF 26 0.363 - 61 - 147

Hourly Analysis Program 5.11 Page 10 of 15


Space Design Load Summary for CONTROL BUILDING DX SYSTEM
Project Name: 3291-CONTROL BUILDING 09/18/2023
05:42PM

TABLE 2.1.A. Component Loads For Space "G02-CONTROL ROOM" In Zone "Zone 2"
DESIGN COOLING DESIGN HEATING
COOLING DATA AT Jun 2200 HEATING DATA AT DES HTG
COOLING OA DB / WB 34.9 °C / 27.3 °C HEATING OA DB / WB 5.5 °C / 3.2 °C
OCCUPIED T-STAT 21.0 °C OCCUPIED T-STAT 20.0 °C
Sensible Latent Sensible Latent
SPACE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 10 m² 607 - 10 m² 241 -
Roof Transmission 36 m² 106 - 36 m² 190 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 36 m² 0 - 36 m² 0 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 675 W 472 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 21000 W 20999 - 0 0 -
People 4 287 240 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 10% / 10% 2247 24 5% 22 0
>> Total Zone Loads - 24719 264 - 452 0

TABLE 2.1.B. Envelope Loads For Space "G02-CONTROL ROOM" In Zone "Zone 2"
COOLING COOLING HEATING
Area U-Value Shade TRANS SOLAR TRANS
(m²) (W/(m²·K)) Coeff. (W) (W) (W)
NE EXPOSURE
WALL 10 1.663 - 607 - 241
H EXPOSURE
ROOF 36 0.363 - 106 - 190

Hourly Analysis Program 5.11 Page 11 of 15


Space Design Load Summary for CONTROL BUILDING DX SYSTEM
Project Name: 3291-CONTROL BUILDING 09/18/2023
05:42PM

TABLE 3.1.A. Component Loads For Space "G04&G09-CORIDDOR" In Zone "Zone 3"
DESIGN COOLING DESIGN HEATING
COOLING DATA AT Jul 1500 HEATING DATA AT DES HTG
COOLING OA DB / WB 44.5 °C / 29.3 °C HEATING OA DB / WB 5.5 °C / 3.2 °C
OCCUPIED T-STAT 22.0 °C OCCUPIED T-STAT 21.1 °C
Sensible Latent Sensible Latent
SPACE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 0 m² 0 - 0 m² 0 -
Roof Transmission 25 m² 67 - 25 m² 142 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 25 m² 0 - 25 m² 0 -
Partitions 50 m² 2233 - 50 m² 1506 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 375 W 262 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 0W 0 - 0 0 -
People 0 0 0 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 10% / 10% 256 0 5% 82 0
>> Total Zone Loads - 2818 0 - 1731 0

TABLE 3.1.B. Envelope Loads For Space "G04&G09-CORIDDOR" In Zone "Zone 3"
COOLING COOLING HEATING
Area U-Value Shade TRANS SOLAR TRANS
(m²) (W/(m²·K)) Coeff. (W) (W) (W)
H EXPOSURE
ROOF 25 0.363 - 67 - 142

Hourly Analysis Program 5.11 Page 12 of 15


Space Design Load Summary for CONTROL BUILDING DX SYSTEM
Project Name: 3291-CONTROL BUILDING 09/18/2023
05:42PM

TABLE 4.1.A. Component Loads For Space "G06-LABORATORY" In Zone "Zone 4"
DESIGN COOLING DESIGN HEATING
COOLING DATA AT Jul 1500 HEATING DATA AT DES HTG
COOLING OA DB / WB 44.5 °C / 29.3 °C HEATING OA DB / WB 5.5 °C / 3.2 °C
OCCUPIED T-STAT 22.0 °C OCCUPIED T-STAT 21.1 °C
Sensible Latent Sensible Latent
SPACE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 5 m² 277 - 5 m² 130 -
Roof Transmission 12 m² 32 - 12 m² 68 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 12 m² 0 - 12 m² 0 -
Partitions 14 m² 625 - 14 m² 422 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 248 W 173 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 0W 0 - 0 0 -
People 3 215 180 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 10% / 10% 132 18 5% 31 0
>> Total Zone Loads - 1456 198 - 651 0

TABLE 4.1.B. Envelope Loads For Space "G06-LABORATORY" In Zone "Zone 4"
COOLING COOLING HEATING
Area U-Value Shade TRANS SOLAR TRANS
(m²) (W/(m²·K)) Coeff. (W) (W) (W)
NE EXPOSURE
WALL 5 1.663 - 277 - 130
H EXPOSURE
ROOF 12 0.363 - 32 - 68

Hourly Analysis Program 5.11 Page 13 of 15


Space Design Load Summary for CONTROL BUILDING DX SYSTEM
Project Name: 3291-CONTROL BUILDING 09/18/2023
05:42PM

TABLE 5.1.A. Component Loads For Space "G08-OFFICE" In Zone "Zone 5"
DESIGN COOLING DESIGN HEATING
COOLING DATA AT Jul 1600 HEATING DATA AT DES HTG
COOLING OA DB / WB 44.1 °C / 29.2 °C HEATING OA DB / WB 5.5 °C / 3.2 °C
OCCUPIED T-STAT 22.0 °C OCCUPIED T-STAT 21.1 °C
Sensible Latent Sensible Latent
SPACE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 7 m² 393 - 7 m² 182 -
Roof Transmission 25 m² 67 - 25 m² 142 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 25 m² 0 - 25 m² 0 -
Partitions 15 m² 666 - 15 m² 452 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 375 W 262 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 500 W 500 - 0 0 -
People 2 144 120 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 10% / 10% 203 12 5% 39 0
>> Total Zone Loads - 2236 132 - 814 0

TABLE 5.1.B. Envelope Loads For Space "G08-OFFICE" In Zone "Zone 5"
COOLING COOLING HEATING
Area U-Value Shade TRANS SOLAR TRANS
(m²) (W/(m²·K)) Coeff. (W) (W) (W)
NE EXPOSURE
WALL 7 1.663 - 393 - 182
H EXPOSURE
ROOF 25 0.363 - 67 - 142

Hourly Analysis Program 5.11 Page 14 of 15


Space Design Load Summary for CONTROL BUILDING DX SYSTEM
Project Name: 3291-CONTROL BUILDING 09/18/2023
05:42PM

TABLE 6.1.A. Component Loads For Space "G03-ELECTRICAL ROOM" In Zone "Zone 6"
DESIGN COOLING DESIGN HEATING
COOLING DATA AT Jun 2200 HEATING DATA AT DES HTG
COOLING OA DB / WB 34.9 °C / 27.3 °C HEATING OA DB / WB 5.5 °C / 3.2 °C
OCCUPIED T-STAT 21.0 °C OCCUPIED T-STAT 20.1 °C
Sensible Latent Sensible Latent
SPACE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 8 m² 486 - 8 m² 194 -
Roof Transmission 19 m² 56 - 19 m² 101 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 19 m² 0 - 19 m² 0 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 238 W 166 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 5300 W 5300 - 0 0 -
People 0 0 0 0 0 0
Infiltration - 0 0 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 10% / 10% 601 0 5% 15 0
>> Total Zone Loads - 6608 0 - 310 0

TABLE 6.1.B. Envelope Loads For Space "G03-ELECTRICAL ROOM" In Zone "Zone 6"
COOLING COOLING HEATING
Area U-Value Shade TRANS SOLAR TRANS
(m²) (W/(m²·K)) Coeff. (W) (W) (W)
NE EXPOSURE
WALL 8 1.663 - 486 - 194
H EXPOSURE
ROOF 19 0.363 - 56 - 101

Hourly Analysis Program 5.11 Page 15 of 15