Certificate of Final Electrical inspection
Certificate of Final Electrical inspection
Certificate of Final Electrical inspection
Province of Albay
City of Tabaco
OFFICE OF THE LOCAL BUILDING OFFICIAL
THIS IS TO CERTIFY THAT FINAL INSPECTION OF THE ELECTRICAL INSTALLATION HAD BEEN CONDUCTED ON THE
BUILDING AND/OR PREMISES COVERED BY BUILDING PERMIT NO.________________ISSUED ON_________________AND
THE SAME WERE FOUND COMPLETED IN ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS ON FILE WITH
THE OFFICE OF THE BUILDING OFFICIAL AND IN ACCORDANCE WITH PHILIPPINE ELECTRICAL CODE PROVISIONS.
OUTLET/DEVICES/EQUIPMENT
NUMBER OF OUTLETS: NUMBER OF EQUIPMENT/WIRING/DEVICES
___LIGHT ___SPO, COOKING UNIT ___TOGGLE SWITCH ___FA DETECTORS
___CONVENIENCE/RECEPTACLE ___SPO, WATER HEATER ___BELLS/BUZZERS ___OTHERS (See attached list)
___SPO/AIRCON ___SPO, WATER PUMP ___PUSH BUTTONS ________________________
PERSON IN-CHARGED OF INSTALLATION
PROFESSIONAL ELECTRICAL REGISTERED ELECTRICAL REGISTERED MASTER ELECTRICIAN
ENGINEER ENGINEER (Not exceeding 600 volts & 500 KVA)
NAME
PRC REG. NO.________________________
SIGNATURE VALIDITY____________________________
ADDRESS
PTR NO. DATE ISSUED PLACE ISSUED
CTC NO. DATE ISSUED TIN
ELECTRICAL CONTRACTOR (200 AMPERE MAIN AND ABOVE)
NAME PCAB LIC. NO. (SPECIFY ELECTRICAL)
VALIDITY
SIGNATURE TEL/FAX NO.
TYPE OF INSTALLATION:
TEMPORARY NEW REMODEL/ALTERATION
TYPES OF WIRING:
OPEN WIRING CONDUITS CABLE ARMORED CABLE RACEWAYS
OTHERS ________________________________
ESTIMATED COST________________________________________________________________________________________
ACTUAL COST
a) Materials (Total Cost) P
1. Electrical Wires_____________________________________________________________________
2. Lighting Outlets_____________________________________________________________________
3. Convenience Outlets_________________________________________________________________
4. Switches___________________________________________________________________________
Others (Specify)____________________________________________________________________
b) Other Costs_________________________________________________________________________________
This includes professional fees, permits and other fees.
1. Lights to be connected:
_____LIGHT ____SPO, COOKING UNIT ____TOGGLE SWITCH ____FA DETECTORS
______CONVINIENCE/RECEPTACLE ____SPO, WATER HEATER ____BELLS/BUZZERS ____OTHERS (See attached list)
_____SPO/AIRCON ____SPO, WATER PUMP ____PUSH BUTTONS
2. Nature of Works_______________________________________________________________________________________
3. Remarks:_____________________________________________________________________________________________
_____________________________________________________________________________________________
I hereby certify that the above data and information are true and correct to the best of my knowledge and belief.
ELECTRICAL FEES PEE/REE/RME
Fee ________________________________________ ADDRESS
Surcharge ________________________________________ PRC REG. NO. VALIDITY
Total ________________________________________ PTR NO. TIN
CTC NO.
Computed by:_____________________________________ DATE ISSUED
Signature Over Printed Name PLACE ISSUED
LOAD
Nature of Works:
Inspector_________________________________________
Fee:______________________________________________ Contractor_________________________________________
Paid Under OR No._________________________________
Date:_____________________________________________ Owner/Occupant:___________________________________
21754
PRC REG. NO. & VALIDITY
NOTE: Renewals or extensions of this permit and/or final certification of the electrical installation are subject to inspection and
payment of corresponding fees in conformity Code" (PD 1096) and its implementing rules and regulations.with pertinent
provisions of the "National Building