Form H Lot 4 Siavonga and Chirundu
Form H Lot 4 Siavonga and Chirundu
Form H Lot 4 Siavonga and Chirundu
NOTE: The value of preliminaries and general items shall not exceed 5% of the value
of measured works of the project
The contractor shall fabricate and errect a project billboard, site hoarding during the
construction of the water tank stand, and shall allow for all expenses associated with
convening and attending site progress meetings with client's staff and stage
inspection of works quality and progress .
The contractor shall upon completion of the works remove all equipment, tools and
remaining materials and clean the site as may be approved by the Project Engineer
Site Preparation
B CONCRETE WORKS
Preamble
2 Column bases m3 6
3 Stub Columns m3 1
4 Ground beam m3 2
Supplying, bending and fixing in position as per approved design; steel reinforcement
cut to length, bent to shape required, cranking, hooking ends etc., including binding
with 0.90mm dia (soft drawn) MS black binding wire etc., all complete as directed by
Engineer-in-Charge.
1 8mm bars Kg 81
High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and space
blocks and fixing.
To Collection
D FORMWORK
E STRUCTURAL STEELWORK
Preamble
All structural steel shall be Grade S275, in accordance with with B.S 5950, all welds
to be 6mm continous weld or as described; in accordance with BS 1856 and 2642,
and shall be given a coat of SF Utra - Thin Fire Retardant.
All rates shall include the cost of fabrication, installation, assemby,errection and
where necessary testing; and all other associated costs to render the design
functional as described
Touch up approved anti corrosion paint primer, and two more coats on all steelworks;
17 General surfaces of steelwork in green colour (Provisional Sum) item 1
To Collection
F WATER TANK
COLLECTION
Page 1
Page 2
Page 2
Site Preparation
B CONCRETE WORKS
Preamble
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
2 Column bases m3 6
3 Stub Columns m3 1
4 Ground beam m3 2
Supplying, bending and fixing in position as per approved design; steel reinforcement
cut to length, bent to shape required, cranking, hooking ends etc., including binding
with 0.90mm dia (soft drawn) MS black binding wire etc., all complete as directed by
Engineer-in-Charge.
1 8mm bars Kg 39
High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and space
blocks and fixing.
To Collection
D FORMWORK
E STRUCTURAL STEELWORK
Preamble
All structural steel shall be Grade S275, in accordance with with B.S 5950, all welds
to be 6mm continous weld or as described; in accordance with BS 1856 and 2642,
and shall be given a coat of SF Utra - Thin Fire Retardant.
All rates shall include the cost of fabrication, installation, assemby,errection and
where necessary testing; and all other associated costs to render the design
functional as described
Touch up approved anti corrosion paint primer, and two more coats on all steelworks;
17 General surfaces of steelwork in green colour (Provisional Sum) item 1
To Collection
F WATER TANK
COLLECTION
Page 1
Page 2
Page 3
Site Preparation
B CONCRETE WORKS
Preamble
2 Column bases m3 6
3 Stub Columns m3 1
4 Ground beam m3 2
Supplying, bending and fixing in position as per approved design; steel reinforcement
cut to length, bent to shape required, cranking, hooking ends etc., including binding
with 0.90mm dia (soft drawn) MS black binding wire etc., all complete as directed by
Engineer-in-Charge.
1 8mm bars Kg 39
High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and space
blocks and fixing.
To Collection
D FORMWORK
E STRUCTURAL STEELWORK
Preamble
All structural steel shall be Grade S275, in accordance with with B.S 5950, all welds
to be 6mm continous weld or as described; in accordance with BS 1856 and 2642,
and shall be given a coat of SF Utra - Thin Fire Retardant.
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
Touch up approved anti corrosion paint primer, and two more coats on all steelworks;
17 General surfaces of steelwork in green colour (Provisional Sum) item 1
To Collection
F WATER TANK
COLLECTION
Page 1
Page 2
Page 3
BBAKASA SITE
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS
Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 140
cutting down trees not exceeding 600mm girth and grub
up roots
Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Kiosk apron, pipe trenches and soak pit m3 26
Supplying, bending and fixing in position as per approved design; steel reinforcement
cut to length, bent to shape required, cranking, hooking ends etc., including binding
with 0.90mm dia (soft drawn) MS black binding wire etc., all complete as directed by
Engineer-in-Charge.
High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and space
i)
blocks and fixing.
For Substructure works:
3 i) 12mm dia. As Y12 in apron Kg 355
All lean and blinding concrete shall be mixed on site as C15 concrete using 42.5R
cement, 20mm graded granite aggregated and quarry dust; thickness as required
including compacting, curing, formwork etc., complete as directed by the Resident
Engineer
i) Below Kiosk apron m3 2.00
Formwork
Sawn formwork; to:
iii) Sides of apron concrete m2 4
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
Two strand 3.25 mm diameter high tensile steel wire wall reinforcement; 100 mm laps
(measured net: no allowance made for laps); every course; in
Kiosk blockwork:
iii) 200 mm block wall. m 20
iv) 200 mm Kiosk Soak Pit honeycomb m2 38
Cement mortar (1:4) plastering 10mm thick over concrete and blockwork surface and
concrete apron to be finished even and smooth with steel float trowel; all complete as
directed by the Resident Engineer.
i) Apron Flooring m2 23
Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256 (Medium
gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all jointing
fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 19 mm Diameter pipe to walls and slab underside m 2
ii) 25 mm Diameter pipe to walls and slab underside m 15
iii) Allow for Extra for all fittings in diameter 19 mm No. 12
iv) Allow for Extra for all fittings in pipe diameter 25 mm No. 5
Equipment
Include for making chases and holes in walls, existing slab and breaking existing slab
v) Item 1
where necessary and making good walls, slab and finishings.
SUMMARY
Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
D BRICKWORK AND MASONRY
E PLASTERING AND FLOORING
F PLUMBING INSTALLATION
TO COLLECTIONS
Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 140
cutting down trees not exceeding 600mm girth and grub
up roots
Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Kiosk apron, pipe trenches and soak pit m3 26
Supplying, bending and fixing in position as per approved design; steel reinforcement
cut to length, bent to shape required, cranking, hooking ends etc., including binding
with 0.90mm dia (soft drawn) MS black binding wire etc., all complete as directed by
Engineer-in-Charge.
High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and space
i)
blocks and fixing.
For Substructure works:
3 i) 12mm dia. As Y12 in apron Kg 355
All lean and blinding concrete shall be mixed on site as C15 concrete using 42.5R
cement, 20mm graded granite aggregated and quarry dust; thickness as required
including compacting, curing, formwork etc., complete as directed by the Resident
Engineer
i) Below Kiosk apron m3 2.00
Formwork
Sawn formwork; to:
iii) Sides of apron concrete m2 4
Two strand 3.25 mm diameter high tensile steel wire wall reinforcement; 100 mm laps
(measured net: no allowance made for laps); every course; in
Kiosk blockwork:
iii) 200 mm block wall. m 20
iv) 200 mm Kiosk Soak Pit honeycomb m2 38
Cement mortar (1:4) plastering 10mm thick over concrete and blockwork surface and
concrete apron to be finished even and smooth with steel float trowel; all complete as
directed by the Resident Engineer.
i) Apron Flooring m2 23
Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256 (Medium
gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all jointing
fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 19 mm Diameter pipe to walls and slab underside m 2
ii) 25 mm Diameter pipe to walls and slab underside m 15
iii) Allow for Extra for all fittings in diameter 19 mm No. 12
iv) Allow for Extra for all fittings in pipe diameter 25 mm No. 5
Equipment
Include for making chases and holes in walls, existing slab and breaking existing slab
v) Item 1
where necessary and making good walls, slab and finishings.
SUMMARY
Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
D BRICKWORK AND MASONRY
E PLASTERING AND FLOORING
F PLUMBING INSTALLATION
TO COLLECTIONS
Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 140
cutting down trees not exceeding 600mm girth and grub
up roots
Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Kiosk apron, pipe trenches and soak pit m3 26
Supplying, bending and fixing in position as per approved design; steel reinforcement
cut to length, bent to shape required, cranking, hooking ends etc., including binding
with 0.90mm dia (soft drawn) MS black binding wire etc., all complete as directed by
Engineer-in-Charge.
High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and space
i)
blocks and fixing.
For Substructure works:
3 i) 12mm dia. As Y12 in apron Kg 355
All lean and blinding concrete shall be mixed on site as C15 concrete using 42.5R
cement, 20mm graded granite aggregated and quarry dust; thickness as required
including compacting, curing, formwork etc., complete as directed by the Resident
Engineer
i) Below Kiosk apron m3 2.00
Formwork
Sawn formwork; to:
iii) Sides of apron concrete m2 4
Two strand 3.25 mm diameter high tensile steel wire wall reinforcement; 100 mm laps
(measured net: no allowance made for laps); every course; in
Kiosk blockwork:
iii) 200 mm block wall. m 20
iv) 200 mm Kiosk Soak Pit honeycomb m2 38
Cement mortar (1:4) plastering 10mm thick over concrete and blockwork surface and
concrete apron to be finished even and smooth with steel float trowel; all complete as
directed by the Resident Engineer.
i) Apron Flooring m2 23
Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256 (Medium
gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all jointing
fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 19 mm Diameter pipe to walls and slab underside m 2
ii) 25 mm Diameter pipe to walls and slab underside m 15
iii) Allow for Extra for all fittings in diameter 19 mm No. 12
iv) Allow for Extra for all fittings in pipe diameter 25 mm No. 5
Equipment
Include for making chases and holes in walls, existing slab and breaking existing slab
v) Item 1
where necessary and making good walls, slab and finishings.
SUMMARY
Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
D BRICKWORK AND MASONRY
E PLASTERING AND FLOORING
F PLUMBING INSTALLATION
TO COLLECTIONS
BBAKASA SITE
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 384
cutting down trees not exceeding 600mm girth and grub
up roots
Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Cattle Water Trough apron and pipe trenches m3 40
Supplying, bending and fixing in position as per approved design; steel reinforcement
cut to length, bent to shape required, cranking, hooking ends etc., including binding
with 0.90mm dia (soft drawn) MS black binding wire etc., all complete as directed by
Engineer-in-Charge.
i) 3.2mm dia , 150 BRC heavy duty conforce wire in apron slab m2 120
High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and space
ii)
blocks and fixing.
All lean and blinding concrete shall be mixed on site as C15 concrete using 42.5R
cement, 20mm graded granite aggregated and quarry dust; thickness as required
including compacting, curing, formwork etc., complete as directed by the Resident
Engineer
i) Below Cattle Water Trough apron m3 7.00
Formwork
Sawn formwork; to:
iii) Sides of trough stem concrete m2 64
10mm thick Cement grouting mortar (1:2) to be rendered to the interior of the water
trough over concrete surface; smooth with steel float trowel; all complete as directed
by the Resident Engineer.
F PLUMBING INSTALLATIONS
Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256 (Medium
gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all jointing
fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 25 mm Diameter pipe to walls and slab underside m 20
ii) Allow for Extra for all fittings in pipe diameter 25 mm No. 5
Equipment
Include for making chases and holes in walls, existing slab and breaking slab where
iv) Item 1
necessary and making good walls, slab and finishings.
Supply and install, 50mm dia. uPVC pipes including all fittings to render the
v) installation functional as described; in accordance with ASMD - 1785 or equal and m 180
approved standard
SUMMARY
Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 384
cutting down trees not exceeding 600mm girth and grub
up roots
Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Cattle Water Trough apron and pipe trenches m3 40
Supplying, bending and fixing in position as per approved design; steel reinforcement
cut to length, bent to shape required, cranking, hooking ends etc., including binding
with 0.90mm dia (soft drawn) MS black binding wire etc., all complete as directed by
Engineer-in-Charge.
i) 3.2mm dia , 150 BRC heavy duty conforce wire in apron slab m2 120
High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and space
ii)
blocks and fixing.
All lean and blinding concrete shall be mixed on site as C15 concrete using 42.5R
cement, 20mm graded granite aggregated and quarry dust; thickness as required
including compacting, curing, formwork etc., complete as directed by the Resident
Engineer
i) Below Cattle Water Trough apron m3 7.00
Formwork
Sawn formwork; to:
iii) Sides of trough stem concrete m2 64
10mm thick Cement grouting mortar (1:2) to be rendered to the interior of the water
trough over concrete surface; smooth with steel float trowel; all complete as directed
by the Resident Engineer.
Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256 (Medium
gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all jointing
fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
Equipment
Include for making chases and holes in walls, existing slab and breaking slab where
iv) Item 1
necessary and making good walls, slab and finishings.
Supply and install, 50mm dia. uPVC pipes including all fittings to render the
v) installation functional as described; in accordance with ASMD - 1785 or equal and m 180
approved standard
SUMMARY
Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
E TROUGH GROUTING AND SEALING
F PLUMBING INSTALLATIONS
To collections
Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 384
cutting down trees not exceeding 600mm girth and grub
up roots
Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Cattle Water Trough apron and pipe trenches m3 40
Supplying, bending and fixing in position as per approved design; steel reinforcement
cut to length, bent to shape required, cranking, hooking ends etc., including binding
with 0.90mm dia (soft drawn) MS black binding wire etc., all complete as directed by
Engineer-in-Charge.
i) 3.2mm dia , 150 BRC heavy duty conforce wire in apron slab m2 120
High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and space
ii)
blocks and fixing.
All lean and blinding concrete shall be mixed on site as C15 concrete using 42.5R
cement, 20mm graded granite aggregated and quarry dust; thickness as required
including compacting, curing, formwork etc., complete as directed by the Resident
Engineer
i) Below Cattle Water Trough apron m3 7.00
Formwork
Sawn formwork; to:
iii) Sides of trough stem concrete m2 64
10mm thick Cement grouting mortar (1:2) to be rendered to the interior of the water
trough over concrete surface; smooth with steel float trowel; all complete as directed
by the Resident Engineer.
Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256 (Medium
gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all jointing
fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 25 mm Diameter pipe to walls and slab underside m 20
ii) Allow for Extra for all fittings in pipe diameter 25 mm No. 5
Equipment
Include for making chases and holes in walls, existing slab and breaking slab where
iv) Item 1
necessary and making good walls, slab and finishings.
Supply and install, 50mm dia. uPVC pipes including all fittings to render the
v) installation functional as described; in accordance with ASMD - 1785 or equal and m 180
approved standard
SUMMARY
Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
E TROUGH GROUTING AND SEALING
F PLUMBING INSTALLATIONS
To collections
Game wire fencing shall be 1.88m x 300mm 14W Wire VELDSPAN brand or equal
and approved, with all posts, steys and Y sections well anchored in to the ground by
concreting with C20 concrete to resident Engineer's approval, all complete with fence
posts round 3.0m x 76mm MD, Fence Stey Round 3.0 x 38mm MD, all bolts, washers
and nuts to render installation functional, fence standards Y sections 3.05m at not
more than 4.5m centres, Double 1.8 x 4.2m Fence Gate all complete with required
Wire plains to Engineers satisfaction
Supply and install 'game wire fencing' as described around the water tank and water
kiosk facility around 5 hactare plot with solar powered electric wires
i) m 1000
Supply and install double gate as described to allow for controlled access around the
ii) water tank and water kiosk facility around 5 hactare plot No. 1
FILTER
1 DISC FILTER 130 MICRONS, 3" EA 2
2 ACCESSORIES incl valves, fittings, risers etc EA 1
SITE:
MANYEPA 4 BOREHOLES
SIAVONGA
No. ITEM UNIT QTY
DISTRICT
SOLAR PUMP STRUCTURE
Excavation(Provisional)
Excavation(Provisional)
Excavation including maintaining and supporting sides and keeping free from water,
mud and fallen materials by bailing, pumping or otherwise
A1 Prepare site by stripping top 200 mm of soil to remove all debris including sand (if
m2 70
any) from site and carting away spoil
A2 Pit excavation commencing at reduced levels depth not exceeding 1.50m deep
m3 2
Concrete work
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
Reinforcement
Sawn formwork
A7 Formwork to sides m 2
Structural steelwork
A8 Supply, fabricate and erect the following framed structural steelwork; complete with
and including all welded and bolted connections; and including one shop coat red
oxide, zinc chromate or similar and approved primer and 2 finishing coats of gloss oil 1
paint after erection: refer to DWG #1 attached
A9 Solar panels support structure constructed according to design including anti theft U-
channels 50mm x 50mm, including Aluminium U 3mm channel, 7mm angle lines, sum 1
Warranty (months): 12
A14 345W solar modules, voc 46.4v +/-3% OR alternative module combination
ea 48
A18 2" well seal complete (union, tee and Elbow etc) ea 4
SITE:
NAMBWELE 2 BOREHOLES
SIAVONGA
No. ITEM UNIT QTY
DISTRICT
SOLAR PUMP STRUCTURE
Excavation(Provisional)
Excavation(Provisional)
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
A1 Prepare site by stripping top 200 mm of soil to remove all debris including sand (if
m2 60
any) from site and carting away spoil
A2 Pit excavation commencing at reduced levels depth not exceeding 1.50m deep
m3 2
Concrete work
Reinforcement
Sawn formwork
A7 Formwork to sides m 2
Structural steelwork
A8 Supply, fabricate and erect the following framed structural steelwork; complete with
and including all welded and bolted connections; and including one shop coat red
oxide, zinc chromate or similar and approved primer and 2 finishing coats of gloss oil 1
paint after erection: refer to DWG #1 attached
A9 Solar panels support structure constructed according to design including anti theft U-
channels 50mm x 50mm, including Aluminium U 3mm channel, 7mm angle lines, sum 1
Warranty (months): 12
C Joint kit ea 2
M Installation ea 1
N Borehole flushing ea 2
SITE:
CHILUNDU 4 BOREHOLES
CIHUWA
No. ITEM UNIT QTY
SIAVONGA
SOLAR PUMP STRUCTURE
Excavation(Provisional)
Excavation(Provisional)
Excavation including maintaining and supporting sides and keeping free from water,
mud and fallen materials by bailing, pumping or otherwise
A1 Prepare site by stripping top 200 mm of soil to remove all debris including sand (if
m2 40
any) from site and carting away spoil
A2 Pit excavation commencing at reduced levels depth not exceeding 1.50m deep
m3 2
Concrete work
Reinforcement
Sawn formwork
A7 Formwork to sides m 4
Structural steelwork
A8 Supply, fabricate and erect the following framed structural steelwork; complete with
and including all welded and bolted connections; and including one shop coat red
oxide, zinc chromate or similar and approved primer and 2 finishing coats of gloss oil 4
paint after erection: refer to DWG #1 attached
A9 Solar panels support structure constructed according to design including anti theft U-
channels 50mm x 50mm, including Aluminium U 3mm channel, 7mm angle lines, sum 4
Warranty (months): 12
C Joint kit ea 4
M Installation ea 1
N Borehole flushing ea 4
Sl.No. ITEM
4 WATER TROUGHS
5 FENCING
6 DRIP IRRIGATION
8 PRIME COSTS
9 TOTAL
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
TOTAL PRICE
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
TOTAL PRICE
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
TOTAL PRICE
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
TOTAL PRICE
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
TOTAL PRICE
0
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
TOTAL PRICE
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
TOTAL PRICE
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
TOTAL PRICE
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
TOTAL PRICE
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
TOTAL PRICE
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
TOTAL PRICE
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
TOTAL PRICE
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
TOTAL PRICE
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
TOTAL PRICE
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
TOTAL PRICE
0
0
0
0
0
0
0
0
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
TOTAL PRICE
0
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
TOTAL PRICE
0
0
0
0
0
0
0
0
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
TOTAL PRICE
0
0
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
TOTAL PRICE
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
TOTAL PRICE
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
TOTAL PRICE
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
TOTAL PRICE
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
TOTAL PRICE
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
TOTAL PRICE
0
AMOUNT
AMOUNT
-
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT
TOTAL PRICE
-
APPENDIX H LOT 5 SIAVONGA AND CHIRUNDU
ITEM DESCRIPTION UNIT QTY
NOTE: The value of preliminaries and general items shall not exceed 5% of the
value of measured works of the project
Site Preparation
B CONCRETE WORKS
Preamble
2 Column bases m3 6
3 Stub Columns m3 1
4 Ground beam m3 2
1 8mm bars Kg 39
High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
D FORMWORK
E STRUCTURAL STEELWORK
Preamble
All structural steel shall be Grade S275, in accordance with with B.S 5950, all
welds to be 6mm continous weld or as described; in accordance with BS 1856
and 2642, and shall be given a coat of SF Utra - Thin Fire Retardant.
Touch up approved anti corrosion paint primer, and two more coats on all
steelworks;
17 General surfaces of steelwork in green colour (Provisional Sum) item 1
F WATER TANK
Site Preparation
B CONCRETE WORKS
Preamble
2 Column bases m3 6
3 Stub Columns m3 1
4 Ground beam m3 2
1 8mm bars Kg 39
High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
D FORMWORK
Preamble
All structural steel shall be Grade S275, in accordance with with B.S
5950, all welds to be 6mm continous weld or as described; in accordance
with BS 1856 and 2642, and shall be given a coat of SF Utra - Thin Fire
Retardant.
Touch up approved anti corrosion paint primer, and two more coats on all
steelworks;
17 General surfaces of steelwork in green colour (Provisional Sum) item 1
F WATER TANK
Site Preparation
B CONCRETE WORKS
Preamble
All structral concrete shall vibrated reinforced concrete (reinforcement
measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control.
2 Column bases m3 6
3 Stub Columns m3 1
4 Ground beam m3 2
1 8mm bars Kg 39
High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
D FORMWORK
E STRUCTURAL STEELWORK
Preamble
All structural steel shall be Grade S275, in accordance with with B.S
5950, all welds to be 6mm continous weld or as described; in accordance
with BS 1856 and 2642, and shall be given a coat of SF Utra - Thin Fire
Retardant.
Touch up approved anti corrosion paint primer, and two more coats on all
steelworks;
17 General surfaces of steelwork in green colour (Provisional Sum) item 1
F WATER TANK
Site Preparation
B CONCRETE WORKS
Preamble
2 Column bases m3 6
3 Stub Columns m3 1
4 Ground beam m3 2
1 8mm bars Kg 39
High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
D FORMWORK
E STRUCTURAL STEELWORK
Preamble
All structural steel shall be Grade S275, in accordance with with B.S
5950, all welds to be 6mm continous weld or as described; in accordance
with BS 1856 and 2642, and shall be given a coat of SF Utra - Thin Fire
Retardant.
All rates shall include the cost of fabrication, installation, assemby,errection
and where necessary testing; and all other associated costs to render the
design functional as described
Touch up approved anti corrosion paint primer, and two more coats on all
steelworks;
17 General surfaces of steelwork in green colour (Provisional Sum) item 1
F WATER TANK
Site Preparation
B CONCRETE WORKS
Preamble
2 Column bases m3 6
3 Stub Columns m3 1
4 Ground beam m3 2
1 8mm bars Kg 39
High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
D FORMWORK
E STRUCTURAL STEELWORK
Preamble
All structural steel shall be Grade S275, in accordance with with B.S
5950, all welds to be 6mm continous weld or as described; in accordance
with BS 1856 and 2642, and shall be given a coat of SF Utra - Thin Fire
Retardant.
Touch up approved anti corrosion paint primer, and two more coats on all
steelworks;
17 General surfaces of steelwork in green colour (Provisional Sum) item 1
F WATER TANK
Site Preparation
B CONCRETE WORKS
Preamble
2 Column bases m3 6
3 Stub Columns m3 1
4 Ground beam m3 2
1 8mm bars Kg 39
High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
D FORMWORK
E STRUCTURAL STEELWORK
Preamble
All structural steel shall be Grade S275, in accordance with with B.S
5950, all welds to be 6mm continous weld or as described; in accordance
with BS 1856 and 2642, and shall be given a coat of SF Utra - Thin Fire
Retardant.
Touch up approved anti corrosion paint primer, and two more coats on all
steelworks;
17 General surfaces of steelwork in green colour (Provisional Sum) item 1
F WATER TANK
Site Preparation
B CONCRETE WORKS
Preamble
2 Column bases m3 6
3 Stub Columns m3 1
4 Ground beam m3 2
1 8mm bars Kg 39
High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
D FORMWORK
E STRUCTURAL STEELWORK
Preamble
All structural steel shall be Grade S275, in accordance with with B.S
5950, all welds to be 6mm continous weld or as described; in accordance
with BS 1856 and 2642, and shall be given a coat of SF Utra - Thin Fire
Retardant.
Touch up approved anti corrosion paint primer, and two more coats on all
steelworks;
17 General surfaces of steelwork in green colour (Provisional Sum) item 1
F WATER TANK
Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like
including cutting down trees not exceeding 600mm
girth and grub up roots m2 100
B CONCRETE WORKS
Preamble
2 Column bases m3 6
3 Stub Columns m3 1
4 Ground beam m3 2
1 8mm bars Kg 39
High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
D FORMWORK
E STRUCTURAL STEELWORK
Preamble
All structural steel shall be Grade S275, in accordance with with B.S
5950, all welds to be 6mm continous weld or as described; in accordance
with BS 1856 and 2642, and shall be given a coat of SF Utra - Thin Fire
Retardant.
Touch up approved anti corrosion paint primer, and two more coats on all
steelworks;
17 General surfaces of steelwork in green colour (Provisional Sum) item 1
F WATER TANK
Site Preparation
B CONCRETE WORKS
Preamble
2 Column bases m3 6
3 Stub Columns m3 1
4 Ground beam m3 2
1 8mm bars Kg 39
High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
E STRUCTURAL STEELWORK
Preamble
All structural steel shall be Grade S275, in accordance with with B.S
5950, all welds to be 6mm continous weld or as described; in accordance
with BS 1856 and 2642, and shall be given a coat of SF Utra - Thin Fire
Retardant.
Touch up approved anti corrosion paint primer, and two more coats on all
steelworks;
17 General surfaces of steelwork in green colour (Provisional Sum) item 1
F WATER TANK
SIKONGO CHIRUNDU
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS
i) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
For Substructure works:
3 i) 12mm dia. As Y12 in apron Kg 355
Formwork
Sawn formwork; to:
iii) Sides of apron concrete m2 4
CONCRETE WORKS - TOTAL CARRIED TO SUMMARY
Two strand 3.25 mm diameter high tensile steel wire wall reinforcement; 100
mm laps (measured net: no allowance made for laps); every course; in
Kiosk blockwork:
iii) 200 mm block wall. m 20
iv) 200 mm Kiosk Soak Pit honeycomb m2 38
BRICKWORK AND MASONRY - TOTAL CARRIED TO SUMMARY
i) Apron Flooring m2 23
Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 19 mm Diameter pipe to walls and slab underside m 2
ii) 25 mm Diameter pipe to walls and slab underside m 15
iii) Allow for Extra for all fittings in diameter 19 mm No. 12
iv) Allow for Extra for all fittings in pipe diameter 25 mm No. 5
Equipment
v) Include for making chases and holes in walls, existing slab and breaking Item 1
existing slab where necessary and making good walls, slab and finishings.
SUMMARY
Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
D BRICKWORK AND MASONRY
E PLASTERING AND FLOORING
F PLUMBING INSTALLATION
TO COLLECTIONS
HACHIPILIKA
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS
i) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
For Substructure works:
3 i) 12mm dia. As Y12 in apron Kg 355
Formwork
Sawn formwork; to:
iii) Sides of apron concrete m2 4
Two strand 3.25 mm diameter high tensile steel wire wall reinforcement; 100
mm laps (measured net: no allowance made for laps); every course; in
Kiosk blockwork:
iii) 200 mm block wall. m 20
iv) 200 mm Kiosk Soak Pit honeycomb m2 38
BRICKWORK AND MASONRY - TOTAL CARRIED TO SUMMARY
i) Apron Flooring m2 23
Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 19 mm Diameter pipe to walls and slab underside m 2
ii) 25 mm Diameter pipe to walls and slab underside m 15
iii) Allow for Extra for all fittings in diameter 19 mm No. 12
iv) Allow for Extra for all fittings in pipe diameter 25 mm No. 5
Equipment
v) Include for making chases and holes in walls, existing slab and breaking Item 1
existing slab where necessary and making good walls, slab and finishings.
SUMMARY
Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
D BRICKWORK AND MASONRY
E PLASTERING AND FLOORING
F PLUMBING INSTALLATION
TO COLLECTIONS
CHIWENA
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS
i) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
For Substructure works:
3 i) 12mm dia. As Y12 in apron Kg 355
Formwork
Sawn formwork; to:
iii) Sides of apron concrete m2 4
Two strand 3.25 mm diameter high tensile steel wire wall reinforcement; 100
mm laps (measured net: no allowance made for laps); every course; in
Kiosk blockwork:
iii) 200 mm block wall. m 20
iv) 200 mm Kiosk Soak Pit honeycomb m2 38
BRICKWORK AND MASONRY - TOTAL CARRIED TO SUMMARY
i) Apron Flooring m2 23
Equipment
v) Include for making chases and holes in walls, existing slab and breaking Item 1
existing slab where necessary and making good walls, slab and finishings.
SUMMARY
Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
D BRICKWORK AND MASONRY
E PLASTERING AND FLOORING
F PLUMBING INSTALLATION
TO COLLECTIONS
IBBWEMUNYAMA
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS
i) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
For Substructure works:
3 i) 12mm dia. As Y12 in apron Kg 355
Formwork
Sawn formwork; to:
iii) Sides of apron concrete m2 4
Two strand 3.25 mm diameter high tensile steel wire wall reinforcement; 100
mm laps (measured net: no allowance made for laps); every course; in
Kiosk blockwork:
iii) 200 mm block wall. m 20
iv) 200 mm Kiosk Soak Pit honeycomb m2 38
BRICKWORK AND MASONRY - TOTAL CARRIED TO SUMMARY
i) Apron Flooring m2 23
Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 19 mm Diameter pipe to walls and slab underside m 2
ii) 25 mm Diameter pipe to walls and slab underside m 15
iii) Allow for Extra for all fittings in diameter 19 mm No. 12
iv) Allow for Extra for all fittings in pipe diameter 25 mm No. 5
Equipment
v) Include for making chases and holes in walls, existing slab and breaking Item 1
existing slab where necessary and making good walls, slab and finishings.
PLUMBING INSTALLATION - TOTAL CARRIED TO SUMMARY
SUMMARY
Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
D BRICKWORK AND MASONRY
E PLASTERING AND FLOORING
F PLUMBING INSTALLATION
TO COLLECTIONS
CHULAULA
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS
i) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
For Substructure works:
3 i) 12mm dia. As Y12 in apron Kg 355
Formwork
Sawn formwork; to:
iii) Sides of apron concrete m2 4
Two strand 3.25 mm diameter high tensile steel wire wall reinforcement; 100
mm laps (measured net: no allowance made for laps); every course; in
Kiosk blockwork:
iii) 200 mm block wall. m 20
iv) 200 mm Kiosk Soak Pit honeycomb m2 38
BRICKWORK AND MASONRY - TOTAL CARRIED TO SUMMARY
i) Apron Flooring m2 23
Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 19 mm Diameter pipe to walls and slab underside m 2
ii) 25 mm Diameter pipe to walls and slab underside m 15
iii) Allow for Extra for all fittings in diameter 19 mm No. 12
iv) Allow for Extra for all fittings in pipe diameter 25 mm No. 5
Equipment
v) Include for making chases and holes in walls, existing slab and breaking Item 1
existing slab where necessary and making good walls, slab and finishings.
SUMMARY
Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
D BRICKWORK AND MASONRY
E PLASTERING AND FLOORING
F PLUMBING INSTALLATION
TO COLLECTIONS
JAMBA
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS
i) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
For Substructure works:
3 i) 12mm dia. As Y12 in apron Kg 355
Formwork
Sawn formwork; to:
iii) Sides of apron concrete m2 4
Two strand 3.25 mm diameter high tensile steel wire wall reinforcement; 100
mm laps (measured net: no allowance made for laps); every course; in
Kiosk blockwork:
iii) 200 mm block wall. m 20
iv) 200 mm Kiosk Soak Pit honeycomb m2 38
BRICKWORK AND MASONRY - TOTAL CARRIED TO SUMMARY
i) Apron Flooring m2 23
Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 19 mm Diameter pipe to walls and slab underside m 2
ii) 25 mm Diameter pipe to walls and slab underside m 15
iii) Allow for Extra for all fittings in diameter 19 mm No. 12
iv) Allow for Extra for all fittings in pipe diameter 25 mm No. 5
Equipment
v) Include for making chases and holes in walls, existing slab and breaking Item 1
existing slab where necessary and making good walls, slab and finishings.
SUMMARY
Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
D BRICKWORK AND MASONRY
E PLASTERING AND FLOORING
F PLUMBING INSTALLATION
TO COLLECTIONS
MWEEMBA
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS
i) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
For Substructure works:
3 i) 12mm dia. As Y12 in apron Kg 355
Formwork
Sawn formwork; to:
iii) Sides of apron concrete m2 4
Two strand 3.25 mm diameter high tensile steel wire wall reinforcement; 100
mm laps (measured net: no allowance made for laps); every course; in
Kiosk blockwork:
iii) 200 mm block wall. m 20
iv) 200 mm Kiosk Soak Pit honeycomb m2 38
BRICKWORK AND MASONRY - TOTAL CARRIED TO SUMMARY
i) Apron Flooring m2 23
Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 19 mm Diameter pipe to walls and slab underside m 2
ii) 25 mm Diameter pipe to walls and slab underside m 15
iii) Allow for Extra for all fittings in diameter 19 mm No. 12
iv) Allow for Extra for all fittings in pipe diameter 25 mm No. 5
Equipment
v) Include for making chases and holes in walls, existing slab and breaking Item 1
existing slab where necessary and making good walls, slab and finishings.
SUMMARY
Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
D BRICKWORK AND MASONRY
E PLASTERING AND FLOORING
F PLUMBING INSTALLATION
TO COLLECTIONS
CHIKANZAYA
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS
i) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
For Substructure works:
3 i) 12mm dia. As Y12 in apron Kg 355
Formwork
Sawn formwork; to:
iii) Sides of apron concrete m2 4
Two strand 3.25 mm diameter high tensile steel wire wall reinforcement; 100
mm laps (measured net: no allowance made for laps); every course; in
Kiosk blockwork:
iii) 200 mm block wall. m 20
iv) 200 mm Kiosk Soak Pit honeycomb m2 38
BRICKWORK AND MASONRY - TOTAL CARRIED TO SUMMARY
i) Apron Flooring m2 23
Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 19 mm Diameter pipe to walls and slab underside m 2
ii) 25 mm Diameter pipe to walls and slab underside m 15
iii) Allow for Extra for all fittings in diameter 19 mm No. 12
iv) Allow for Extra for all fittings in pipe diameter 25 mm No. 5
Equipment
v) Include for making chases and holes in walls, existing slab and breaking Item 1
existing slab where necessary and making good walls, slab and finishings.
SUMMARY
Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
D BRICKWORK AND MASONRY
E PLASTERING AND FLOORING
F PLUMBING INSTALLATION
TO COLLECTIONS
NABBANDA
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS
i) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
For Substructure works:
3 i) 12mm dia. As Y12 in apron Kg 355
Formwork
Sawn formwork; to:
iii) Sides of apron concrete m2 4
Two strand 3.25 mm diameter high tensile steel wire wall reinforcement; 100
mm laps (measured net: no allowance made for laps); every course; in
Kiosk blockwork:
iii) 200 mm block wall. m 20
iv) 200 mm Kiosk Soak Pit honeycomb m2 38
BRICKWORK AND MASONRY - TOTAL CARRIED TO SUMMARY
i) Apron Flooring m2 23
Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 19 mm Diameter pipe to walls and slab underside m 2
ii) 25 mm Diameter pipe to walls and slab underside m 15
iii) Allow for Extra for all fittings in diameter 19 mm No. 12
iv) Allow for Extra for all fittings in pipe diameter 25 mm No. 5
Equipment
v) Include for making chases and holes in walls, existing slab and breaking Item 1
existing slab where necessary and making good walls, slab and finishings.
SUMMARY
Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
D BRICKWORK AND MASONRY
E PLASTERING AND FLOORING
F PLUMBING INSTALLATION
TO COLLECTIONS
Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 384
cutting down trees not exceeding 600mm girth and grub
up roots
Unless otherwise stated excavations shall be in 'pickable' material.
Excavations and Earthworks
Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Cattle Water Trough apron and pipe trenches m3 40
ii) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer
i) Below Cattle Water Trough apron m3 7.00
All structral concrete shall vibrated reinforced concrete (reinforcement
measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control. Formwork rates to include all supports and jointing to required to
assemble sound formwork necessary to achieve and form described concrete
geometry
For Substructure works:
ii) in Cattle Water Trough Apron m3 23.00
Formwork
Sawn formwork; to:
iii) Sides of trough stem concrete m2 64
10mm thick Cement grouting mortar (1:2) to be rendered to the interior of the
water trough over concrete surface; smooth with steel float trowel; all complete
as directed by the Resident Engineer.
F PLUMBING INSTALLATIONS
Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 25 mm Diameter pipe to walls and slab underside m 20
ii) Allow for Extra for all fittings in pipe diameter 25 mm No. 5
Equipment
Include for making chases and holes in walls, existing slab and breaking slab
iv) Item
where necessary and making good walls, slab and finishings.
1
Supply and install, 50mm dia. uPVC pipes including all fittings to render the
v) installation functional as described; in accordance with ASMD - 1785 or equal m 180
and approved standard
SUMMARY
Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 384
cutting down trees not exceeding 600mm girth and grub
up roots
Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Cattle Water Trough apron and pipe trenches m3 40
ii) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer
i) Below Cattle Water Trough apron m3 7.00
Formwork
Sawn formwork; to:
iii) Sides of trough stem concrete m2 64
10mm thick Cement grouting mortar (1:2) to be rendered to the interior of the
water trough over concrete surface; smooth with steel float trowel; all complete
as directed by the Resident Engineer.
F PLUMBING INSTALLATIONS
Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 25 mm Diameter pipe to walls and slab underside m 20
ii) Allow for Extra for all fittings in pipe diameter 25 mm No. 5
Equipment
Include for making chases and holes in walls, existing slab and breaking slab
iv) Item
where necessary and making good walls, slab and finishings.
1
Supply and install, 50mm dia. uPVC pipes including all fittings to render the
v) installation functional as described; in accordance with ASMD - 1785 or equal m 180
and approved standard
SUMMARY
Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Cattle Water Trough apron and pipe trenches m3 40
ii) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer
i) Below Cattle Water Trough apron m3 7.00
All structral concrete shall vibrated reinforced concrete (reinforcement
measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control. Formwork rates to include all supports and jointing to required to
assemble sound formwork necessary to achieve and form described concrete
geometry
For Substructure works:
ii) in Cattle Water Trough Apron m3 23.00
Formwork
Sawn formwork; to:
iii) Sides of trough stem concrete m2 64
10mm thick Cement grouting mortar (1:2) to be rendered to the interior of the
water trough over concrete surface; smooth with steel float trowel; all complete
as directed by the Resident Engineer.
F PLUMBING INSTALLATIONS
Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 25 mm Diameter pipe to walls and slab underside m 20
ii) Allow for Extra for all fittings in pipe diameter 25 mm No. 5
Equipment
Include for making chases and holes in walls, existing slab and breaking slab
iv) Item
where necessary and making good walls, slab and finishings.
1
Supply and install, 50mm dia. uPVC pipes including all fittings to render the
v) installation functional as described; in accordance with ASMD - 1785 or equal m 180
and approved standard
SUMMARY
JAMBA
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS
Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 384
cutting down trees not exceeding 600mm girth and grub
up roots
Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Cattle Water Trough apron and pipe trenches m3 40
ii) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer
i) Below Cattle Water Trough apron m3 7.00
Formwork
Sawn formwork; to:
iii) Sides of trough stem concrete m2 64
10mm thick Cement grouting mortar (1:2) to be rendered to the interior of the
water trough over concrete surface; smooth with steel float trowel; all complete
as directed by the Resident Engineer.
F PLUMBING INSTALLATIONS
Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 25 mm Diameter pipe to walls and slab underside m 20
ii) Allow for Extra for all fittings in pipe diameter 25 mm No. 5
Equipment
Include for making chases and holes in walls, existing slab and breaking slab
iv) Item
where necessary and making good walls, slab and finishings.
1
Supply and install, 50mm dia. uPVC pipes including all fittings to render the
v) installation functional as described; in accordance with ASMD - 1785 or equal m 180
and approved standard
SUMMARY
CHIWENA
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS
Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 384
cutting down trees not exceeding 600mm girth and grub
up roots
Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Cattle Water Trough apron and pipe trenches m3 40
ii) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer
i) Below Cattle Water Trough apron m3 7.00
All structral concrete shall vibrated reinforced concrete (reinforcement
measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control. Formwork rates to include all supports and jointing to required to
assemble sound formwork necessary to achieve and form described concrete
geometry
For Substructure works:
ii) in Cattle Water Trough Apron m3 23.00
Formwork
Sawn formwork; to:
iii) Sides of trough stem concrete m2 64
10mm thick Cement grouting mortar (1:2) to be rendered to the interior of the
water trough over concrete surface; smooth with steel float trowel; all complete
as directed by the Resident Engineer.
F PLUMBING INSTALLATIONS
Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 25 mm Diameter pipe to walls and slab underside m 20
ii) Allow for Extra for all fittings in pipe diameter 25 mm No. 5
Equipment
Include for making chases and holes in walls, existing slab and breaking slab
iv) Item
where necessary and making good walls, slab and finishings.
1
Supply and install, 50mm dia. uPVC pipes including all fittings to render the
v) installation functional as described; in accordance with ASMD - 1785 or equal m 180
and approved standard
SUMMARY
Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 384
cutting down trees not exceeding 600mm girth and grub
up roots
Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Cattle Water Trough apron and pipe trenches m3 40
ii) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer
i) Below Cattle Water Trough apron m3 7.00
Formwork
Sawn formwork; to:
iii) Sides of trough stem concrete m2 64
10mm thick Cement grouting mortar (1:2) to be rendered to the interior of the
water trough over concrete surface; smooth with steel float trowel; all complete
as directed by the Resident Engineer.
F PLUMBING INSTALLATIONS
Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 25 mm Diameter pipe to walls and slab underside m 20
ii) Allow for Extra for all fittings in pipe diameter 25 mm No. 5
Equipment
Include for making chases and holes in walls, existing slab and breaking slab
iv) Item
where necessary and making good walls, slab and finishings.
1
Supply and install, 50mm dia. uPVC pipes including all fittings to render the
v) installation functional as described; in accordance with ASMD - 1785 or equal m 180
and approved standard
SUMMARY
Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Cattle Water Trough apron and pipe trenches m3 40
ii) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer
i) Below Cattle Water Trough apron m3 7.00
All structral concrete shall vibrated reinforced concrete (reinforcement
measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control. Formwork rates to include all supports and jointing to required to
assemble sound formwork necessary to achieve and form described concrete
geometry
For Substructure works:
ii) in Cattle Water Trough Apron m3 23.00
Formwork
Sawn formwork; to:
iii) Sides of trough stem concrete m2 64
10mm thick Cement grouting mortar (1:2) to be rendered to the interior of the
water trough over concrete surface; smooth with steel float trowel; all complete
as directed by the Resident Engineer.
F PLUMBING INSTALLATIONS
Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 25 mm Diameter pipe to walls and slab underside m 20
ii) Allow for Extra for all fittings in pipe diameter 25 mm No. 5
Equipment
Include for making chases and holes in walls, existing slab and breaking slab
iv) Item
where necessary and making good walls, slab and finishings.
1
Supply and install, 50mm dia. uPVC pipes including all fittings to render the
v) installation functional as described; in accordance with ASMD - 1785 or equal m 180
and approved standard
SUMMARY
Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 384
cutting down trees not exceeding 600mm girth and grub
up roots
Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Cattle Water Trough apron and pipe trenches m3 40
ii) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer
i) Below Cattle Water Trough apron m3 7.00
Formwork
Sawn formwork; to:
iii) Sides of trough stem concrete m2 64
10mm thick Cement grouting mortar (1:2) to be rendered to the interior of the
water trough over concrete surface; smooth with steel float trowel; all complete
as directed by the Resident Engineer.
F PLUMBING INSTALLATIONS
Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 25 mm Diameter pipe to walls and slab underside m 20
ii) Allow for Extra for all fittings in pipe diameter 25 mm No. 5
Equipment
Include for making chases and holes in walls, existing slab and breaking slab
iv) Item
where necessary and making good walls, slab and finishings.
1
Supply and install, 50mm dia. uPVC pipes including all fittings to render the
v) installation functional as described; in accordance with ASMD - 1785 or equal m 180
and approved standard
SUMMARY
Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Cattle Water Trough apron and pipe trenches m3 40
ii) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer
i) Below Cattle Water Trough apron m3 7.00
All structral concrete shall vibrated reinforced concrete (reinforcement
measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control. Formwork rates to include all supports and jointing to required to
assemble sound formwork necessary to achieve and form described concrete
geometry
For Substructure works:
ii) in Cattle Water Trough Apron m3 23.00
Formwork
Sawn formwork; to:
iii) Sides of trough stem concrete m2 64
10mm thick Cement grouting mortar (1:2) to be rendered to the interior of the
water trough over concrete surface; smooth with steel float trowel; all complete
as directed by the Resident Engineer.
F PLUMBING INSTALLATIONS
Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 25 mm Diameter pipe to walls and slab underside m 20
ii) Allow for Extra for all fittings in pipe diameter 25 mm No. 5
Equipment
Include for making chases and holes in walls, existing slab and breaking slab
iv) Item
where necessary and making good walls, slab and finishings.
1
Supply and install, 50mm dia. uPVC pipes including all fittings to render the
v) installation functional as described; in accordance with ASMD - 1785 or equal m 180
and approved standard
SUMMARY
FENCING
Site: SIKONGO CHIRUNDU DISTRICT
Sl.No. ITEM UNIT QTY
G FENCING INSTALLATION
Game wire fencing shall be 1.88m x 300mm 14W Wire VELDSPAN brand or
equal and approved, with all posts, steys and Y sections well anchored in to
the ground by concreting with C20 concrete to resident Engineer's approval, all
complete with fence posts round 3.0m x 76mm MD, Fence Stey Round 3.0 x
38mm MD, all bolts, washers and nuts to render installation functional, fence
standards Y sections 3.05m at not more than 4.5m centres, Double 1.8 x 4.2m
Fence Gate all complete with required Wire plains to Engineers satisfaction
Supply and install 'game wire fencing' as described around the water tank and
i) water kiosk facility around 1/4 hactare plot m 250
Supply and install double gate as described to allow for controlled access
ii) around the water tank and water kiosk facility around 1/4 hactare plot No. 1
Supply and install double gate as described to allow for controlled access
ii) around the water tank and water kiosk facility around 1/4 hactare plot No. 1
SITE: JAMBA
CHIRUNDU
Sl.No. ITEM UNIT QTY
DISTRICT
G FENCING INSTALLATION
Game wire fencing shall be 1.88m x 300mm 14W Wire VELDSPAN brand or
equal and approved, with all posts, steys and Y sections well anchored in to
the ground by concreting with C20 concrete to resident Engineer's approval, all
complete with fence posts round 3.0m x 76mm MD, Fence Stey Round 3.0 x
38mm MD, all bolts, washers and nuts to render installation functional, fence
standards Y sections 3.05m at not more than 4.5m centres, Double 1.8 x 4.2m
Fence Gate all complete with required Wire plains to Engineers satisfaction
Supply and install 'game wire fencing' as described around the water tank and
i) water kiosk facility around 1/4 hactare plot m 250
Supply and install double gate as described to allow for controlled access
ii) around the water tank and water kiosk facility around 1/4 hactare plot No. 1
Game wire fencing shall be 1.88m x 300mm 14W Wire VELDSPAN brand or
equal and approved, with all posts, steys and Y sections well anchored in to
the ground by concreting with C20 concrete to resident Engineer's approval, all
complete with fence posts round 3.0m x 76mm MD, Fence Stey Round 3.0 x
38mm MD, all bolts, washers and nuts to render installation functional, fence
standards Y sections 3.05m at not more than 4.5m centres, Double 1.8 x 4.2m
Fence Gate all complete with required Wire plains to Engineers satisfaction
Supply and install 'game wire fencing' as described around the water tank and
i) water kiosk facility around 1/4 hactare plot m 250
Supply and install double gate as described to allow for controlled access
ii) around the water tank and water kiosk facility around 1/4 hactare plot No. 1
Game wire fencing shall be 1.88m x 300mm 14W Wire VELDSPAN brand or
equal and approved, with all posts, steys and Y sections well anchored in to
the ground by concreting with C20 concrete to resident Engineer's approval, all
complete with fence posts round 3.0m x 76mm MD, Fence Stey Round 3.0 x
38mm MD, all bolts, washers and nuts to render installation functional, fence
standards Y sections 3.05m at not more than 4.5m centres, Double 1.8 x 4.2m
Fence Gate all complete with required Wire plains to Engineers satisfaction
Supply and install 'game wire fencing' as described around the water tank and
i) water kiosk facility around 1/4 hactare plot m 250
Supply and install double gate as described to allow for controlled access
ii) around the water tank and water kiosk facility around 1/4 hactare plot No. 1
SITE:
HACHIPILIKA
Sl.No. ITEM UNIT QTY
CHIRUNDU
DISTRICT
G FENCING INSTALLATION
Game wire fencing shall be 2.11m x 300mm 14W Wire VELDSPAN brand or
equal and approved, with all posts, steys and Y sections well anchored in to
the ground by concreting with C20 concrete to resident Engineer's approval, all
complete with fence posts round 3.0m x 76mm MD, Fence Stey Round 3.0 x
38mm MD, all bolts, washers and nuts to render installation functional, fence
standards Y sections 3.05m at not more than 4.5m centres, Double 1.8 x 4.2m
Fence Gate all complete with required Wire plains to Engineers satisfaction
Supply and install 'game wire fencing' as described around the water tank and
i) water kiosk facility around 1 hactare plot m 500
Supply and install double gate as described to allow for controlled access
ii) around the water tank and water kiosk facility around 1 hactare plot No. 1
Game wire fencing shall be 1.88m x 300mm 14W Wire VELDSPAN brand or
equal and approved, with all posts, steys and Y sections well anchored in to
the ground by concreting with C20 concrete to resident Engineer's approval, all
complete with fence posts round 3.0m x 76mm MD, Fence Stey Round 3.0 x
38mm MD, all bolts, washers and nuts to render installation functional, fence
standards Y sections 3.05m at not more than 4.5m centres, Double 1.8 x 4.2m
Fence Gate all complete with required Wire plains to Engineers satisfaction
Supply and install 'game wire fencing' as described around the water tank and
i) water kiosk facility around 1/4 hactare plot m 250
Supply and install double gate as described to allow for controlled access
ii) around the water tank and water kiosk facility around 1/4 hactare plot No. 1
Game wire fencing shall be 1.88m x 300mm 14W Wire VELDSPAN brand or
equal and approved, with all posts, steys and Y sections well anchored in to
the ground by concreting with C20 concrete to resident Engineer's approval, all
complete with fence posts round 3.0m x 76mm MD, Fence Stey Round 3.0 x
38mm MD, all bolts, washers and nuts to render installation functional, fence
standards Y sections 3.05m at not more than 4.5m centres, Double 1.8 x 4.2m
Fence Gate all complete with required Wire plains to Engineers satisfaction
Supply and install 'game wire fencing' as described around the water tank and
i) water kiosk facility around 1/4 hactare plot m 250
Supply and install double gate as described to allow for controlled access
ii) around the water tank and water kiosk facility around 1/4 hactare plot No. 1
Supply and install double gate as described to allow for controlled access
ii) around the water tank and water kiosk facility around 1 hactare plot No. 1
FILTER
1 DISC FILTER 130 MICRONS, 3" EA 1
2 ACCESSORIES incl valves, fittings, risers etc EA 1
3
DRIP SYSTEM
DRIP PIPE 1.0L/H @ 0.3CM SP, 0.60MM MIN WALL THICKNESS, VIRGIN
1 MATERIAL, 4 YR WARRANTY MTR 10000
2 PE IRRIGATION PIPE 16/4 100M MTR 200
3 START CONN-PVC BARB 16 W/SEAL- MT EA 200
4 END LINE (DOUBLE O) 16/17 EA 200
5 BARB 16 COUPLING CONN. 1UNIT EA 200
6 BARB 16 W/FLARE COUPLING EA 200
FILTER
1 DISC FILTER 130 MICRONS, 3" EA 1
2 ACCESSORIES incl valves, fittings, risers etc EA 1
3
DRIP SYSTEM
DRIP PIPE 1.0L/H @ 0.3CM SP, 0.60MM MIN WALL THICKNESS, VIRGIN
1 MATERIAL, 4 YR WARRANTY MTR 10000
2 PE IRRIGATION PIPE 16/4 100M MTR 200
3 START CONN-PVC BARB 16 W/SEAL- MT EA 200
4 END LINE (DOUBLE O) 16/17 EA 200
5 BARB 16 COUPLING CONN. 1UNIT EA 200
6 BARB 16 W/FLARE COUPLING EA 200
COLLECTION
DRIP IRRIGATION TO MAIN SUMMARY
Excavation(Provisional)
Excavation including maintaining and supporting sides and keeping free from
water, mud and fallen materials by bailing, pumping or otherwise
A1 Prepare site by stripping top 200 mm of soil to remove all debris including sand
(if any) from site and carting away spoil m2 50
A2 Pit excavation commencing at reduced levels depth not exceeding 1.50m deep
m3 2
Concrete work
Reinforcement
Sawn formwork
A7 Formwork to sides m 2
Structural steelwork
A8 Supply, fabricate and erect the following framed structural steelwork; complete 1
with and including all welded and bolted connections; and including one shop
coat red oxide, zinc chromate or similar and approved primer and 2 finishing
coats of gloss oil paint after erection: refer to DWG #1 attached
A9 Solar panels support structure constructed according to design including anti
theft U-channels 50mm x 50mm, including Aluminium U 3mm channel, 7mm sum 1
angle lines,
Warranty (months): 12
C Joint kit ea 1
M Installation ea 1
N Borehole flushing ea 1
Sub-Total
Excavation(Provisional)
Excavation including maintaining and supporting sides and keeping free from
water, mud and fallen materials by bailing, pumping or otherwise
A1 Prepare site by stripping top 200 mm of soil to remove all debris including sand
(if any) from site and carting away spoil m2 100
A2 Pit excavation commencing at reduced levels depth not exceeding 1.50m deep
m3 2
Concrete work
Reinforcement
Sawn formwork
A7 Formwork to sides m 2
Structural steelwork
A8 Supply, fabricate and erect the following framed structural steelwork; complete 1
with and including all welded and bolted connections; and including one shop
coat red oxide, zinc chromate or similar and approved primer and 2 finishing
coats of gloss oil paint after erection: refer to DWG #1 attached
Warranty (months): 12
6 Supply and Installation of Solar Powered Pump
C Joint kit ea 1
M Installation ea 1
N Borehole flushing ea 1
Sub-Total
Excavation(Provisional)
Excavation including maintaining and supporting sides and keeping free from
water, mud and fallen materials by bailing, pumping or otherwise
A1 Prepare site by stripping top 200 mm of soil to remove all debris including sand
(if any) from site and carting away spoil m2 100
A2 Pit excavation commencing at reduced levels depth not exceeding 1.50m deep
m3 2
Concrete work
Reinforcement
Sawn formwork
A7 Formwork to sides m 2
Structural steelwork
A8 Supply, fabricate and erect the following framed structural steelwork; complete 1
with and including all welded and bolted connections; and including one shop
coat red oxide, zinc chromate or similar and approved primer and 2 finishing
coats of gloss oil paint after erection: refer to DWG #1 attached
Warranty (months): 12
M Installation ea 1
N Borehole flushing ea 1
Sub-Total
Excavation(Provisional)
Excavation including maintaining and supporting sides and keeping free from
water, mud and fallen materials by bailing, pumping or otherwise
A1 Prepare site by stripping top 200 mm of soil to remove all debris including sand
(if any) from site and carting away spoil m2 100
A2 Pit excavation commencing at reduced levels depth not exceeding 1.50m deep
m3 2
Concrete work
Reinforcement
Sawn formwork
A7 Formwork to sides m 2
Structural steelwork
A8 Supply, fabricate and erect the following framed structural steelwork; complete 1
with and including all welded and bolted connections; and including one shop
coat red oxide, zinc chromate or similar and approved primer and 2 finishing
coats of gloss oil paint after erection: refer to DWG #1 attached
Warranty (months): 12
C Joint kit ea 1
M Installation ea 1
N Borehole flushing ea 1
Sub-Total
Excavation(Provisional)
Excavation including maintaining and supporting sides and keeping free from
water, mud and fallen materials by bailing, pumping or otherwise
A1 Prepare site by stripping top 200 mm of soil to remove all debris including sand
(if any) from site and carting away spoil m2 100
A2 Pit excavation commencing at reduced levels depth not exceeding 1.50m deep
m3 2
Reinforcement
Sawn formwork
A7 Formwork to sides m 2
Structural steelwork
A8 Supply, fabricate and erect the following framed structural steelwork; complete 1
with and including all welded and bolted connections; and including one shop
coat red oxide, zinc chromate or similar and approved primer and 2 finishing
coats of gloss oil paint after erection: refer to DWG #1 attached
Warranty (months): 12
C Joint kit ea 1
M Installation ea 1
N Borehole flushing ea 1
Sub-Total
SITE:
HACHIPILIKA 1 BOREHOLES
CHIRUNDU
No.
DISTRICT ITEM UNIT QTY
Excavation(Provisional)
Excavation including maintaining and supporting sides and keeping free from
water, mud and fallen materials by bailing, pumping or otherwise
A1 Prepare site by stripping top 200 mm of soil to remove all debris including sand
(if any) from site and carting away spoil m2 100
A2 Pit excavation commencing at reduced levels depth not exceeding 1.50m deep
m3 2
Concrete work
Sawn formwork
A7 Formwork to sides m 2
Structural steelwork
A8 Supply, fabricate and erect the following framed structural steelwork; complete 1
with and including all welded and bolted connections; and including one shop
coat red oxide, zinc chromate or similar and approved primer and 2 finishing
coats of gloss oil paint after erection: refer to DWG #1 attached
Warranty (months): 12
A14 345W solar modules, voc 46.4v +/-3% OR alternative module combination
ea 16
A18 2" well seal complete (union, tee and Elbow etc) ea 1
Sub-Total
Excavation(Provisional)
Excavation including maintaining and supporting sides and keeping free from
water, mud and fallen materials by bailing, pumping or otherwise
A1 Prepare site by stripping top 200 mm of soil to remove all debris including sand
(if any) from site and carting away spoil m2 100
A2 Pit excavation commencing at reduced levels depth not exceeding 1.50m deep
m3 2
Concrete work
Reinforcement
Sawn formwork
A7 Formwork to sides m 2
Structural steelwork
A8 Supply, fabricate and erect the following framed structural steelwork; complete 1
with and including all welded and bolted connections; and including one shop
coat red oxide, zinc chromate or similar and approved primer and 2 finishing
coats of gloss oil paint after erection: refer to DWG #1 attached
Warranty (months): 12
C Joint kit ea 1
M Installation ea 1
N Borehole flushing ea 1
Excavation(Provisional)
Excavation including maintaining and supporting sides and keeping free from
water, mud and fallen materials by bailing, pumping or otherwise
A1 Prepare site by stripping top 200 mm of soil to remove all debris including sand
(if any) from site and carting away spoil m2 100
A2 Pit excavation commencing at reduced levels depth not exceeding 1.50m deep
m3 2
Concrete work
Reinforcement
Sawn formwork
A7 Formwork to sides m 2
Structural steelwork
A8 Supply, fabricate and erect the following framed structural steelwork; complete 1
with and including all welded and bolted connections; and including one shop
coat red oxide, zinc chromate or similar and approved primer and 2 finishing
coats of gloss oil paint after erection: refer to DWG #1 attached
Warranty (months): 12
C Joint kit ea 1
M Installation ea 1
N Borehole flushing ea 1
Sub-Total
Excavation(Provisional)
Excavation including maintaining and supporting sides and keeping free from
water, mud and fallen materials by bailing, pumping or otherwise
A1 Prepare site by stripping top 200 mm of soil to remove all debris including sand
(if any) from site and carting away spoil m2 100
A2 Pit excavation commencing at reduced levels depth not exceeding 1.50m deep
m3 2
Concrete work
Reinforcement
Sawn formwork
A7 Formwork to sides m 2
Structural steelwork
A8 Supply, fabricate and erect the following framed structural steelwork; complete 1
with and including all welded and bolted connections; and including one shop
coat red oxide, zinc chromate or similar and approved primer and 2 finishing
coats of gloss oil paint after erection: refer to DWG #1 attached
A9 Solar panels support structure constructed according to design including anti
theft U-channels 50mm x 50mm, including Aluminium U 3mm channel, 7mm sum 1
angle lines,
Warranty (months): 12
A14 345W solar modules, voc 46.4v +/-3% OR alternative module combination
ea 16
A18 2" well seal complete (union, tee and Elbow etc) ea 1
Sub-Total
PRIME COSTS
SUMMARY
Sl.No. ITEM
4 WATER TROUGHS
5 FENCING
6 DRIP IRRIGATION
8 PRIME COSTS
9 TOTAL
UNIT PRICE TOTAL PRICE
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
-
0
0
-
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
RATE AMOUNT
-
AMOUNT