BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA

UNDER THE SCRALA PROJECT

ITEM DESCRIPTION UNIT QTY UNIT PRICE

1.00 PRELIMINARIES AND GENERAL ITEMS

NOTE: The value of preliminaries and general items shall not exceed 5% of the value
of measured works of the project

i) Site Mobilization Item 1


The contractor shall set up the site working areas and storage facilities as may be
deemed necessary including all required site mobilization activities not mentioned
below

ii) Site Billboard, Site hoarding and Site Meetings Item 1

The contractor shall fabricate and errect a project billboard, site hoarding during the
construction of the water tank stand, and shall allow for all expenses associated with
convening and attending site progress meetings with client's staff and stage
inspection of works quality and progress .

iv) Contractor's Demobilization and handover Item 1

The contractor shall upon completion of the works remove all equipment, tools and
remaining materials and clean the site as may be approved by the Project Engineer

TOTAL P&Gs CARRIED TO GENERAL SUMMARY

CONSTRUCTION OF A STEEL WATER TANK STAND TO HOIST 2 X 10,000


2.00
LITRES POLY WATER TANK

No. ITEM UNIT QTY


BBAKASA SIAVONGA DISTRICT

A FOUNDATION AND EARTHWORKS

Site Preparation

1 Clear site of bushes, shrubs undergrowth and the like


including cutting down trees not exceeding 600mm
girth and grub up roots m2 200

2 Excavating Base Pit commencing at reduced level depth


not exceeding 1.5m starting from formation level m3 20

3 Extra over excavating in hard rock m3 3

Backfilling and Disposal

4 Backfilling around foundations and compacting loose


soils in 150mm layers upto 1.5m height on reduced level m3 9

5 Redig from spoil heap and remove off site m3 11

B CONCRETE WORKS

Preamble

All structral concrete shall vibrated reinforced concrete (reinforcement measured


separately); to specified classes for different member categories; 30MPa for
foundation members, (30MPa for stub columns; 20 mm maximum aggregate). Slump
and cube samples shall be taken for each batch for quality control.

Plain in-situ concrete Grade 15

1 50mm thick Blinding below column bases m2 12

Reinforced concrete C30 in


BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

ITEM DESCRIPTION UNIT QTY UNIT PRICE

2 Column bases m3 6

3 Stub Columns m3 1

4 Ground beam m3 2

C STEEL REINFORCEMENT FOR CONCRETE

Supplying, bending and fixing in position as per approved design; steel reinforcement
cut to length, bent to shape required, cranking, hooking ends etc., including binding
with 0.90mm dia (soft drawn) MS black binding wire etc., all complete as directed by
Engineer-in-Charge.

1 8mm bars Kg 81

High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and space
blocks and fixing.

2 16mm diameter bars Kg 793

To Collection

D FORMWORK

Smooth off shutter concrete formwork including


making good exposed surfaces after removal as described
to:

1 Sides of stub column m2 13

2 Sides and soffits of ground beams m2 17

E STRUCTURAL STEELWORK

Preamble

All structural steel shall be Grade S275, in accordance with with B.S 5950, all welds
to be 6mm continous weld or as described; in accordance with BS 1856 and 2642,
and shall be given a coat of SF Utra - Thin Fire Retardant.

All rates shall include the cost of fabrication, installation, assemby,errection and
where necessary testing; and all other associated costs to render the design
functional as described

1 IPE 160 Stanchions Kg 758

2 UB 254 x 146 x 31 Primary Beams Kg 434

3 IPE 200 x 22.4 for Secondary Beams Kg 1047

4 80 x 80 x 6 for Ties Kg 299

5 70 x 70 x6 for Bracing Kg 1213

6 70 x 70 x 6 RSA for railing support Kg 295

33.7mm dia. x 2.6mm CHS hand rails (2.4 Kg/m)


7 Kg 108

8 20mm base plate Kg 151

9 16mm base plates Kg 86

10 8mm MS Plates Kg 784

11 M20 x 60mm Gr. 8.8 Bolts & Nuts No. 36


BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

ITEM DESCRIPTION UNIT QTY UNIT PRICE

12 M16 x 50mm Gr. 8.8 Bolts & Nuts No. 420

13 M20 x 1m Gr. 8.8 HD Bolts No. 24

14 150x75mm Tank decking HW timber m 37

15 Fabricate ladder and install as described (Provisional sum) m 1

16 484 Expanded diamond mesh for catwalk m2 18

Touch up approved anti corrosion paint primer, and two more coats on all steelworks;
17 General surfaces of steelwork in green colour (Provisional Sum) item 1

To Collection

Sl.No. ITEM UNIT QTY

F WATER TANK

1 Supply and fix 10,000 litres capacity polycon water


tank hoisted on tank stand ( measured seperately)
complete with automatic float switch, ball valves, filters
and connecting pipes inlet and outlet and overflow No. 2

COLLECTION

Page 1

Page 2

Page 2

CONSTRUCTION OF TANK STAND AND 2NO POLY


TANKS- TOTAL CARRIED TO SUMMARY

NAMBWELE SIAVONGA DISTRICT

A FOUNDATION AND EARTHWORKS

Site Preparation

1 Clear site of bushes, shrubs undergrowth and the like


including cutting down trees not exceeding 600mm
girth and grub up roots m2 100

2 Excavating Base Pit commencing at reduced level depth


not exceeding 1.5m starting from formation level m3 10

3 Extra over excavating in hard rock m3 3

Backfilling and Disposal

4 Backfilling around foundations and compacting loose


soils in 150mm layers upto 1.5m height on reduced level m3 9

5 Redig from spoil heap and remove off site m3 11

B CONCRETE WORKS

Preamble
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

ITEM DESCRIPTION UNIT QTY UNIT PRICE

All structral concrete shall vibrated reinforced concrete (reinforcement measured


separately); to specified classes for different member categories; 30MPa for
foundation members, (30MPa for stub columns; 20 mm maximum aggregate). Slump
and cube samples shall be taken for each batch for quality control.

Plain in-situ concrete Grade 15

1 50mm thick Blinding below column bases m2 12

Reinforced concrete C30 in

2 Column bases m3 6

3 Stub Columns m3 1

4 Ground beam m3 2

C STEEL REINFORCEMENT FOR CONCRETE

Supplying, bending and fixing in position as per approved design; steel reinforcement
cut to length, bent to shape required, cranking, hooking ends etc., including binding
with 0.90mm dia (soft drawn) MS black binding wire etc., all complete as directed by
Engineer-in-Charge.

1 8mm bars Kg 39

High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and space
blocks and fixing.

2 16mm diameter bars Kg 452

To Collection

D FORMWORK

Smooth off shutter concrete formwork including


making good exposed surfaces after removal as described
to:

1 Sides of stub column m2 8

2 Sides and soffits of ground beams m2 9

E STRUCTURAL STEELWORK

Preamble

All structural steel shall be Grade S275, in accordance with with B.S 5950, all welds
to be 6mm continous weld or as described; in accordance with BS 1856 and 2642,
and shall be given a coat of SF Utra - Thin Fire Retardant.

All rates shall include the cost of fabrication, installation, assemby,errection and
where necessary testing; and all other associated costs to render the design
functional as described

1 IPE 160 Stanchions Kg 506

2 UB 254 x 146 x 31 Primary Beams Kg 273

3 IPE 200 x 22.4 for Secondary Beams Kg 667

4 80 x 80 x 6 for Ties Kg 245.00

5 70 x 70 x6 for Bracing Kg 864


BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

ITEM DESCRIPTION UNIT QTY UNIT PRICE


6 70 x 70 x 6 RSA for railing support Kg 211

33.7mm dia. x 2.6mm CHS hand rails (2.4 Kg/m)


7 Kg
41

8 20mm base plate Kg 101

9 16mm base plates Kg 58

10 8mm MS Plates Kg 452

11 M20 x 60mm Gr. 8.8 Bolts & Nuts No. 24

12 M16 x 50mm Gr. 8.8 Bolts & Nuts No. 360

13 M20 x 1m Gr. 8.8 HD Bolts No. 16

14 150x75mm Tank decking HW timber m 19

15 Fabricate ladder and install as described (Provisional sum) m 1

16 484 Expanded diamond mesh for catwalk m2 13

Touch up approved anti corrosion paint primer, and two more coats on all steelworks;
17 General surfaces of steelwork in green colour (Provisional Sum) item 1

To Collection

F WATER TANK

1 Supply and fix 10,000 litres capacity polycon water


tank hoisted on tank stand ( measured seperately)
complete with automatic float switch, ball valves, filters
and connecting pipes inlet and outlet and overflow No. 1

COLLECTION

Page 1

Page 2

Page 3

CONSTRUCTION OF TANK STAND AND 1NO POLY


TANKS- TOTAL CARRIED TO SUMMARY

CHIRUNDU CIHUWA SIAVONGA DISTRICT

A FOUNDATION AND EARTHWORKS

Site Preparation

1 Clear site of bushes, shrubs undergrowth and the like


including cutting down trees not exceeding 600mm
girth and grub up roots m2 100

2 Excavating Base Pit commencing at reduced level depth


not exceeding 1.5m starting from formation level m3 10

3 Extra over excavating in hard rock m3 3


BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

ITEM DESCRIPTION UNIT QTY UNIT PRICE

Backfilling and Disposal

4 Backfilling around foundations and compacting loose


soils in 150mm layers upto 1.5m height on reduced level m3 9

5 Redig from spoil heap and remove off site m3 11

B CONCRETE WORKS

Preamble

All structral concrete shall vibrated reinforced concrete (reinforcement measured


separately); to specified classes for different member categories; 30MPa for
foundation members, (30MPa for stub columns; 20 mm maximum aggregate). Slump
and cube samples shall be taken for each batch for quality control.

Plain in-situ concrete Grade 15

1 50mm thick Blinding below column bases m2 12

Reinforced concrete C30 in

2 Column bases m3 6

3 Stub Columns m3 1

4 Ground beam m3 2

C STEEL REINFORCEMENT FOR CONCRETE

Supplying, bending and fixing in position as per approved design; steel reinforcement
cut to length, bent to shape required, cranking, hooking ends etc., including binding
with 0.90mm dia (soft drawn) MS black binding wire etc., all complete as directed by
Engineer-in-Charge.

1 8mm bars Kg 39

High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and space
blocks and fixing.

2 16mm diameter bars Kg 452

To Collection

D FORMWORK

Smooth off shutter concrete formwork including


making good exposed surfaces after removal as described
to:

1 Sides of stub column m2 8

2 Sides and soffits of ground beams m2 9

E STRUCTURAL STEELWORK

Preamble

All structural steel shall be Grade S275, in accordance with with B.S 5950, all welds
to be 6mm continous weld or as described; in accordance with BS 1856 and 2642,
and shall be given a coat of SF Utra - Thin Fire Retardant.
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

ITEM DESCRIPTION UNIT QTY UNIT PRICE


All rates shall include the cost of fabrication, installation, assemby,errection and
where necessary testing; and all other associated costs to render the design
functional as described

1 IPE 160 Stanchions Kg 506

2 UB 254 x 146 x 31 Primary Beams Kg 273

3 IPE 200 x 22.4 for Secondary Beams Kg 667

4 80 x 80 x 6 for Ties Kg 245.00

5 70 x 70 x6 for Bracing Kg 864

6 70 x 70 x 6 RSA for railing support Kg 211

33.7mm dia. x 2.6mm CHS hand rails (2.4 Kg/m)


7 Kg
41

8 20mm base plate Kg 101

9 16mm base plates Kg 58

10 8mm MS Plates Kg 452

11 M20 x 60mm Gr. 8.8 Bolts & Nuts No. 24

12 M16 x 50mm Gr. 8.8 Bolts & Nuts No. 360

13 M20 x 1m Gr. 8.8 HD Bolts No. 16

14 150x75mm Tank decking HW timber m 19

15 Fabricate ladder and install as described (Provisional sum) m 1

16 484 Expanded diamond mesh for catwalk m2 13

Touch up approved anti corrosion paint primer, and two more coats on all steelworks;
17 General surfaces of steelwork in green colour (Provisional Sum) item 1

To Collection

F WATER TANK

1 Supply and fix 10,000 litres capacity polycon water


tank hoisted on tank stand ( measured seperately)
complete with automatic float switch, ball valves, filters
and connecting pipes inlet and outlet and overflow No. 1

COLLECTION

Page 1

Page 2

Page 3

CONSTRUCTION OF TANK STAND AND 1NO POLY


TANKS- TOTAL CARRIED TO SUMMARY

CONSTRUCTION OF TANK STAND AND POLYTANKS TO MAIN SUMMARY


BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

ITEM DESCRIPTION UNIT QTY UNIT PRICE

3 CONSTRUCTION OF WATER KIOSKS

BBAKASA SITE
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS

Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 140
cutting down trees not exceeding 600mm girth and grub
up roots

Unless otherwise stated excavations shall be in 'pickable' material.


Excavations and Earthworks

Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Kiosk apron, pipe trenches and soak pit m3 26

Refilling of foundation hardcore base with approved laterite in layers of 150mm


thick including compaction and consolidation etc., all complete as directed by
the Engineer-in-Charge.

3 i) Below Kiosk apron m3 15.0

FOUNDATION AND EARTHWORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


B STEEL REINFORCEMENT FOR CONCRETE

Supplying, bending and fixing in position as per approved design; steel reinforcement
cut to length, bent to shape required, cranking, hooking ends etc., including binding
with 0.90mm dia (soft drawn) MS black binding wire etc., all complete as directed by
Engineer-in-Charge.
High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and space
i)
blocks and fixing.
For Substructure works:
3 i) 12mm dia. As Y12 in apron Kg 355

STEEL REINFORCEMENT FOR CONCRETE- TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


C CONCRETE WORKS

All lean and blinding concrete shall be mixed on site as C15 concrete using 42.5R
cement, 20mm graded granite aggregated and quarry dust; thickness as required
including compacting, curing, formwork etc., complete as directed by the Resident
Engineer
i) Below Kiosk apron m3 2.00

All structral concrete shall vibrated reinforced concrete (reinforcement measured


separately); to specified classes for different member categories; 30MPa for
foundation members, (30MPa for stub columns; 20 mm maximum aggregate). Slump
and cube samples shall be taken for each batch for quality control. Rate should
include all formwork
For Substructure works:
ii) in Apron and ramps m3 4.00

Formwork
Sawn formwork; to:
iii) Sides of apron concrete m2 4
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

ITEM DESCRIPTION UNIT QTY UNIT PRICE


CONCRETE WORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


D BRICKWORK AND MASONRY
Blockwork in concrete blocks not less than 10N/mm2 in crushing strength cement
mortar (1:3); and filled with C15 concrete in:
For Substructure works:
i) 200 mm Kiosk blockwork m2 6
ii) 200 mm Kiosk Soak Pit honeycomb m2 10

Two strand 3.25 mm diameter high tensile steel wire wall reinforcement; 100 mm laps
(measured net: no allowance made for laps); every course; in
Kiosk blockwork:
iii) 200 mm block wall. m 20
iv) 200 mm Kiosk Soak Pit honeycomb m2 38

BRICKWORK AND MASONRY - TOTAL CARRIED TO SUMMARY

E PLASTERING AND FLOORING

Cement mortar (1:4) plastering 10mm thick over concrete and blockwork surface and
concrete apron to be finished even and smooth with steel float trowel; all complete as
directed by the Resident Engineer.

i) Apron Flooring m2 23

ii) Kiosk Blockwork m2 9

iii) Kiosk Soak Pit honeycomb m2 45

PLASTERING AND FLOORING - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


1.1 PLUMBING INSTALLATION

Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256 (Medium
gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all jointing
fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 19 mm Diameter pipe to walls and slab underside m 2
ii) 25 mm Diameter pipe to walls and slab underside m 15
iii) Allow for Extra for all fittings in diameter 19 mm No. 12
iv) Allow for Extra for all fittings in pipe diameter 25 mm No. 5

Equipment
Include for making chases and holes in walls, existing slab and breaking existing slab
v) Item 1
where necessary and making good walls, slab and finishings.

PLUMBING INSTALLATION - TOTAL CARRIED TO SUMMARY

SUMMARY

Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
D BRICKWORK AND MASONRY
E PLASTERING AND FLOORING
F PLUMBING INSTALLATION
TO COLLECTIONS

NAMBWELE SIAVONGA DISTRICT


BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

ITEM DESCRIPTION UNIT QTY UNIT PRICE


No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS

Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 140
cutting down trees not exceeding 600mm girth and grub
up roots

Unless otherwise stated excavations shall be in 'pickable' material.


Excavations and Earthworks

Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Kiosk apron, pipe trenches and soak pit m3 26

Refilling of foundation hardcore base with approved laterite in layers of 150mm


thick including compaction and consolidation etc., all complete as directed by
the Engineer-in-Charge.

3 i) Below Kiosk apron m3 15.0

FOUNDATION AND EARTHWORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


B STEEL REINFORCEMENT FOR CONCRETE

Supplying, bending and fixing in position as per approved design; steel reinforcement
cut to length, bent to shape required, cranking, hooking ends etc., including binding
with 0.90mm dia (soft drawn) MS black binding wire etc., all complete as directed by
Engineer-in-Charge.
High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and space
i)
blocks and fixing.
For Substructure works:
3 i) 12mm dia. As Y12 in apron Kg 355

STEEL REINFORCEMENT FOR CONCRETE- TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


C CONCRETE WORKS

All lean and blinding concrete shall be mixed on site as C15 concrete using 42.5R
cement, 20mm graded granite aggregated and quarry dust; thickness as required
including compacting, curing, formwork etc., complete as directed by the Resident
Engineer
i) Below Kiosk apron m3 2.00

All structral concrete shall vibrated reinforced concrete (reinforcement measured


separately); to specified classes for different member categories; 30MPa for
foundation members, (30MPa for stub columns; 20 mm maximum aggregate). Slump
and cube samples shall be taken for each batch for quality control. Rate should
include all formwork
For Substructure works:
ii) in Apron and ramps m3 4.00

Formwork
Sawn formwork; to:
iii) Sides of apron concrete m2 4

CONCRETE WORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


D BRICKWORK AND MASONRY
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

ITEM DESCRIPTION UNIT QTY UNIT PRICE


Blockwork in concrete blocks not less than 10N/mm2 in crushing strength cement
mortar (1:3); and filled with C15 concrete in:
For Substructure works:
i) 200 mm Kiosk blockwork m2 6
ii) 200 mm Kiosk Soak Pit honeycomb m2 10

Two strand 3.25 mm diameter high tensile steel wire wall reinforcement; 100 mm laps
(measured net: no allowance made for laps); every course; in
Kiosk blockwork:
iii) 200 mm block wall. m 20
iv) 200 mm Kiosk Soak Pit honeycomb m2 38

BRICKWORK AND MASONRY - TOTAL CARRIED TO SUMMARY

E PLASTERING AND FLOORING

Cement mortar (1:4) plastering 10mm thick over concrete and blockwork surface and
concrete apron to be finished even and smooth with steel float trowel; all complete as
directed by the Resident Engineer.

i) Apron Flooring m2 23

ii) Kiosk Blockwork m2 9

iii) Kiosk Soak Pit honeycomb m2 45

PLASTERING AND FLOORING - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


1.1 PLUMBING INSTALLATION

Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256 (Medium
gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all jointing
fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 19 mm Diameter pipe to walls and slab underside m 2
ii) 25 mm Diameter pipe to walls and slab underside m 15
iii) Allow for Extra for all fittings in diameter 19 mm No. 12
iv) Allow for Extra for all fittings in pipe diameter 25 mm No. 5

Equipment
Include for making chases and holes in walls, existing slab and breaking existing slab
v) Item 1
where necessary and making good walls, slab and finishings.

PLUMBING INSTALLATION - TOTAL CARRIED TO SUMMARY

SUMMARY
Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
D BRICKWORK AND MASONRY
E PLASTERING AND FLOORING
F PLUMBING INSTALLATION
TO COLLECTIONS

CHIRUNDU CIHUWA SITE


No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

ITEM DESCRIPTION UNIT QTY UNIT PRICE

Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 140
cutting down trees not exceeding 600mm girth and grub
up roots

Unless otherwise stated excavations shall be in 'pickable' material.


Excavations and Earthworks

Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Kiosk apron, pipe trenches and soak pit m3 26

Refilling of foundation hardcore base with approved laterite in layers of 150mm


thick including compaction and consolidation etc., all complete as directed by
the Engineer-in-Charge.

3 i) Below Kiosk apron m3 15.0

FOUNDATION AND EARTHWORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


B STEEL REINFORCEMENT FOR CONCRETE

Supplying, bending and fixing in position as per approved design; steel reinforcement
cut to length, bent to shape required, cranking, hooking ends etc., including binding
with 0.90mm dia (soft drawn) MS black binding wire etc., all complete as directed by
Engineer-in-Charge.
High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and space
i)
blocks and fixing.
For Substructure works:
3 i) 12mm dia. As Y12 in apron Kg 355

STEEL REINFORCEMENT FOR CONCRETE- TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


C CONCRETE WORKS

All lean and blinding concrete shall be mixed on site as C15 concrete using 42.5R
cement, 20mm graded granite aggregated and quarry dust; thickness as required
including compacting, curing, formwork etc., complete as directed by the Resident
Engineer
i) Below Kiosk apron m3 2.00

All structral concrete shall vibrated reinforced concrete (reinforcement measured


separately); to specified classes for different member categories; 30MPa for
foundation members, (30MPa for stub columns; 20 mm maximum aggregate). Slump
and cube samples shall be taken for each batch for quality control. Rate should
include all formwork
For Substructure works:
ii) in Apron and ramps m3 4.00

Formwork
Sawn formwork; to:
iii) Sides of apron concrete m2 4

CONCRETE WORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


D BRICKWORK AND MASONRY
Blockwork in concrete blocks not less than 10N/mm2 in crushing strength cement
mortar (1:3); and filled with C15 concrete in:
For Substructure works:
i) 200 mm Kiosk blockwork m2 6
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

ITEM DESCRIPTION UNIT QTY UNIT PRICE


ii) 200 mm Kiosk Soak Pit honeycomb m2 10

Two strand 3.25 mm diameter high tensile steel wire wall reinforcement; 100 mm laps
(measured net: no allowance made for laps); every course; in
Kiosk blockwork:
iii) 200 mm block wall. m 20
iv) 200 mm Kiosk Soak Pit honeycomb m2 38

BRICKWORK AND MASONRY - TOTAL CARRIED TO SUMMARY

E PLASTERING AND FLOORING

Cement mortar (1:4) plastering 10mm thick over concrete and blockwork surface and
concrete apron to be finished even and smooth with steel float trowel; all complete as
directed by the Resident Engineer.

i) Apron Flooring m2 23

ii) Kiosk Blockwork m2 9

iii) Kiosk Soak Pit honeycomb m2 45

PLASTERING AND FLOORING - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


1.1 PLUMBING INSTALLATION

Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256 (Medium
gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all jointing
fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 19 mm Diameter pipe to walls and slab underside m 2
ii) 25 mm Diameter pipe to walls and slab underside m 15
iii) Allow for Extra for all fittings in diameter 19 mm No. 12
iv) Allow for Extra for all fittings in pipe diameter 25 mm No. 5

Equipment
Include for making chases and holes in walls, existing slab and breaking existing slab
v) Item 1
where necessary and making good walls, slab and finishings.

PLUMBING INSTALLATION - TOTAL CARRIED TO SUMMARY

SUMMARY

Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
D BRICKWORK AND MASONRY
E PLASTERING AND FLOORING
F PLUMBING INSTALLATION
TO COLLECTIONS

CATTLE WATER KIOSKS- TOTAL CARRIED TO MAIN SUMMARY

4 CONSTRUCTION OF WATER TROUGHS

BBAKASA SITE
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

ITEM DESCRIPTION UNIT QTY UNIT PRICE

Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 384
cutting down trees not exceeding 600mm girth and grub
up roots

Unless otherwise stated excavations shall be in 'pickable' material.


Excavations and Earthworks

Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Cattle Water Trough apron and pipe trenches m3 40

Refilling of foundation hardcore base with approved laterite in layers of 150mm


thick including compaction and consolidation etc., all complete as directed by
the Engineer-in-Charge.

3 i) Below Cattle Water Trough apron m3 40.0

FOUNDATION AND EARTHWORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


B STEEL REINFORCEMENT FOR CONCRETE

Supplying, bending and fixing in position as per approved design; steel reinforcement
cut to length, bent to shape required, cranking, hooking ends etc., including binding
with 0.90mm dia (soft drawn) MS black binding wire etc., all complete as directed by
Engineer-in-Charge.
i) 3.2mm dia , 150 BRC heavy duty conforce wire in apron slab m2 120
High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and space
ii)
blocks and fixing.

3 i) 10mm dia. As Y10 in trough stem concrete Kg 586

STEEL REINFORCEMENT FOR CONCRETE- TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


C CONCRETE WORKS

All lean and blinding concrete shall be mixed on site as C15 concrete using 42.5R
cement, 20mm graded granite aggregated and quarry dust; thickness as required
including compacting, curing, formwork etc., complete as directed by the Resident
Engineer
i) Below Cattle Water Trough apron m3 7.00

All structral concrete shall vibrated reinforced concrete (reinforcement measured


separately); to specified classes for different member categories; 30MPa for
foundation members, (30MPa for stub columns; 20 mm maximum aggregate). Slump
and cube samples shall be taken for each batch for quality control. Formwork rates to
include all supports and jointing to required to assemble sound formwork necessary
to achieve and form described concrete geometry
For Substructure works:
ii) in Cattle Water Trough Apron m3 23.00

Formwork
Sawn formwork; to:
iii) Sides of trough stem concrete m2 64

CONCRETE WORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


E TROUGH GROUTING AND SEALING
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

ITEM DESCRIPTION UNIT QTY UNIT PRICE

10mm thick Cement grouting mortar (1:2) to be rendered to the interior of the water
trough over concrete surface; smooth with steel float trowel; all complete as directed
by the Resident Engineer.

i) Grout to interior surfaces of water troughs m2 116

TROUGH GROUTING AND SEALING- TOTAL CARRIED TO SUMMARY

F PLUMBING INSTALLATIONS

Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256 (Medium
gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all jointing
fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 25 mm Diameter pipe to walls and slab underside m 20
ii) Allow for Extra for all fittings in pipe diameter 25 mm No. 5

Supply and installation of ball-floater automated water opening and closing


iii) mechanism, including all associated fixture to render installation functional L.S. 1
(Provisional Sum only)

Equipment
Include for making chases and holes in walls, existing slab and breaking slab where
iv) Item 1
necessary and making good walls, slab and finishings.

Supply and install, 50mm dia. uPVC pipes including all fittings to render the
v) installation functional as described; in accordance with ASMD - 1785 or equal and m 180
approved standard

PLUMBING INSTALLATIONS - TOTAL CARRIED TO SUMMARY

SUMMARY

A FOUNDATION AND EARTHWORKS


B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
E TROUGH GROUTING AND SEALING
F PLUMBING INSTALLATIONS
To collections

NAMBWELE SIAVONGA DISTRICT


No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS

Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 384
cutting down trees not exceeding 600mm girth and grub
up roots

Unless otherwise stated excavations shall be in 'pickable' material.


Excavations and Earthworks

Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Cattle Water Trough apron and pipe trenches m3 40

Refilling of foundation hardcore base with approved laterite in layers of 150mm


thick including compaction and consolidation etc., all complete as directed by
the Engineer-in-Charge.
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

ITEM DESCRIPTION UNIT QTY UNIT PRICE


3 i) Below Cattle Water Trough apron m3 40.0

FOUNDATION AND EARTHWORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


B STEEL REINFORCEMENT FOR CONCRETE

Supplying, bending and fixing in position as per approved design; steel reinforcement
cut to length, bent to shape required, cranking, hooking ends etc., including binding
with 0.90mm dia (soft drawn) MS black binding wire etc., all complete as directed by
Engineer-in-Charge.
i) 3.2mm dia , 150 BRC heavy duty conforce wire in apron slab m2 120
High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and space
ii)
blocks and fixing.

3 i) 10mm dia. As Y10 in trough stem concrete Kg 586

STEEL REINFORCEMENT FOR CONCRETE- TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


C CONCRETE WORKS

All lean and blinding concrete shall be mixed on site as C15 concrete using 42.5R
cement, 20mm graded granite aggregated and quarry dust; thickness as required
including compacting, curing, formwork etc., complete as directed by the Resident
Engineer
i) Below Cattle Water Trough apron m3 7.00

All structral concrete shall vibrated reinforced concrete (reinforcement measured


separately); to specified classes for different member categories; 30MPa for
foundation members, (30MPa for stub columns; 20 mm maximum aggregate). Slump
and cube samples shall be taken for each batch for quality control. Formwork rates to
include all supports and jointing to required to assemble sound formwork necessary
to achieve and form described concrete geometry
For Substructure works:
ii) in Cattle Water Trough Apron m3 23.00

Formwork
Sawn formwork; to:
iii) Sides of trough stem concrete m2 64

CONCRETE WORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


E TROUGH GROUTING AND SEALING

10mm thick Cement grouting mortar (1:2) to be rendered to the interior of the water
trough over concrete surface; smooth with steel float trowel; all complete as directed
by the Resident Engineer.

i) Grout to interior surfaces of water troughs m2 116

TROUGH GROUTING AND SEALING- TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


F PLUMBING INSTALLATIONS

Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256 (Medium
gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all jointing
fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

ITEM DESCRIPTION UNIT QTY UNIT PRICE


i) 25 mm Diameter pipe to walls and slab underside m 20
ii) Allow for Extra for all fittings in pipe diameter 25 mm No. 5

Supply and installation of ball-floater automated water opening and closing


iii) mechanism, including all associated fixture to render installation functional L.S. 1
(Provisional Sum only)

Equipment
Include for making chases and holes in walls, existing slab and breaking slab where
iv) Item 1
necessary and making good walls, slab and finishings.

Supply and install, 50mm dia. uPVC pipes including all fittings to render the
v) installation functional as described; in accordance with ASMD - 1785 or equal and m 180
approved standard

PLUMBING INSTALLATIONS - TOTAL CARRIED TO SUMMARY

SUMMARY

Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
E TROUGH GROUTING AND SEALING
F PLUMBING INSTALLATIONS
To collections

CHIRUNDU CHIHUWA SITE


No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS

Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 384
cutting down trees not exceeding 600mm girth and grub
up roots

Unless otherwise stated excavations shall be in 'pickable' material.


Excavations and Earthworks

Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Cattle Water Trough apron and pipe trenches m3 40

Refilling of foundation hardcore base with approved laterite in layers of 150mm


thick including compaction and consolidation etc., all complete as directed by
the Engineer-in-Charge.

3 i) Below Cattle Water Trough apron m3 40.0

FOUNDATION AND EARTHWORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


B STEEL REINFORCEMENT FOR CONCRETE

Supplying, bending and fixing in position as per approved design; steel reinforcement
cut to length, bent to shape required, cranking, hooking ends etc., including binding
with 0.90mm dia (soft drawn) MS black binding wire etc., all complete as directed by
Engineer-in-Charge.
i) 3.2mm dia , 150 BRC heavy duty conforce wire in apron slab m2 120
High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and space
ii)
blocks and fixing.

3 i) 10mm dia. As Y10 in trough stem concrete Kg 586


BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

ITEM DESCRIPTION UNIT QTY UNIT PRICE

STEEL REINFORCEMENT FOR CONCRETE- TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


C CONCRETE WORKS

All lean and blinding concrete shall be mixed on site as C15 concrete using 42.5R
cement, 20mm graded granite aggregated and quarry dust; thickness as required
including compacting, curing, formwork etc., complete as directed by the Resident
Engineer
i) Below Cattle Water Trough apron m3 7.00

All structral concrete shall vibrated reinforced concrete (reinforcement measured


separately); to specified classes for different member categories; 30MPa for
foundation members, (30MPa for stub columns; 20 mm maximum aggregate). Slump
and cube samples shall be taken for each batch for quality control. Formwork rates to
include all supports and jointing to required to assemble sound formwork necessary
to achieve and form described concrete geometry
For Substructure works:
ii) in Cattle Water Trough Apron m3 23.00

Formwork
Sawn formwork; to:
iii) Sides of trough stem concrete m2 64

CONCRETE WORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


E TROUGH GROUTING AND SEALING

10mm thick Cement grouting mortar (1:2) to be rendered to the interior of the water
trough over concrete surface; smooth with steel float trowel; all complete as directed
by the Resident Engineer.

i) Grout to interior surfaces of water troughs m2 116

TROUGH GROUTING AND SEALING- TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


F PLUMBING INSTALLATIONS

Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256 (Medium
gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all jointing
fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 25 mm Diameter pipe to walls and slab underside m 20
ii) Allow for Extra for all fittings in pipe diameter 25 mm No. 5

Supply and installation of ball-floater automated water opening and closing


iii) mechanism, including all associated fixture to render installation functional L.S. 1
(Provisional Sum only)

Equipment
Include for making chases and holes in walls, existing slab and breaking slab where
iv) Item 1
necessary and making good walls, slab and finishings.

Supply and install, 50mm dia. uPVC pipes including all fittings to render the
v) installation functional as described; in accordance with ASMD - 1785 or equal and m 180
approved standard

PLUMBING INSTALLATIONS - TOTAL CARRIED TO SUMMARY


BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

ITEM DESCRIPTION UNIT QTY UNIT PRICE

SUMMARY

Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
E TROUGH GROUTING AND SEALING
F PLUMBING INSTALLATIONS
To collections

MAIN SUMMARY TROUGHS

5.0 CONSTRUCTION OF FENCING


SITE:BBAKASA/ MANYEPA SIAVONGA
Sl.No. ITEM UNIT QTY
G FENCING INSTALLATION

Game wire fencing shall be 1.88m x 300mm 14W Wire VELDSPAN brand or equal
and approved, with all posts, steys and Y sections well anchored in to the ground by
concreting with C20 concrete to resident Engineer's approval, all complete with fence
posts round 3.0m x 76mm MD, Fence Stey Round 3.0 x 38mm MD, all bolts, washers
and nuts to render installation functional, fence standards Y sections 3.05m at not
more than 4.5m centres, Double 1.8 x 4.2m Fence Gate all complete with required
Wire plains to Engineers satisfaction
Supply and install 'game wire fencing' as described around the water tank and water
kiosk facility around 5 hactare plot with solar powered electric wires
i) m 1000

Supply and install double gate as described to allow for controlled access around the
ii) water tank and water kiosk facility around 5 hactare plot No. 1

FENCING INSTALLATION - TOTAL CARRIED TO SUMMARY

SITE: 6.0 CONSTRUCTION OF DRIP IRRIGATION SCHEME


MANYEPA
SIAVONGA
DISTRICT

ITEM DESCRIPTION UNIT QTY

1 DRIP IRRIGATION SYSTEM 4ha


The contractor is expected to supply, construct, commission the 4ha drip irrigation
system
A Excavating trenches not exceeding 0.80m deep and
average depth 600mm starting from existing ground level
to receive service pipes, including grading bottoms,
earthwork supports, backfilling with excavated material,
disposing of surplus excavated material off site m 800

B Extra over excavating in hard rock m³ 100

Polyvinyl Chloride class 6, PVC pipes, fittings


and jointing as described

FILTER
1 DISC FILTER 130 MICRONS, 3" EA 2
2 ACCESSORIES incl valves, fittings, risers etc EA 1

MAINLINE & SUBMAIN FITTINGS


1 PIPE PVC 63 W/SEAL CLASS 6 MTR 300
2 GALVANISED UNION WITH O-RING, HD 50MM EA 16
3 GALVANISED VALVE 50MM COBRA OR EQUIVALENT EA 16
4 PVC 90 DEG TEE GLUE 63 EA 6
5 PVC ADAPTOR GLUE 50*63*2", PN16 EA 16
6 PVC END CAP PN16 EA 16
7 PVC 63MM SOCKET PN16 EA 12
8 NAVC 10 2" COMBINATION AV PN10 BSP EA 4
9 GALVANISED RISER 2" X 75MM, HD EA 48
10 GALVANISED EQUAL TEE, HD, 50MM EA 16
11 GALVANISED ELBOW, HD, 50MM EA 64
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

ITEM DESCRIPTION UNIT QTY UNIT PRICE


12 GALVANISED NIPPLE, HD, 50MM EA 96
13 PVC ADAPTOR-GLUE 63*75*2, PN16 EA 4
14 PVC ADAPTOR TEE-GLUE 63* 2", PN16 EA 4
15 ACCESSORIES EA 2

SUBMAIN PVC PIPES


1 PIPE UPVC 50 CLASS 6 MTR 828
2 ACCESSORIES fittings LS 1

DRIP SYSTEM INFIELD NETWORK


DRIP PIPE 1.0L/H @ 0.3CM SP, 0.60MM MIN WALL THICKNESS, VIRGIN
1 MATERIAL, 4 YR WARRANTY MTR 40,000
2 PE IRRIGATION PIPE 16/4 100M EA 10
3 START CONN-PVC BARB 16 W/SEAL- MT EA 1,100
4 END LINE (DOUBLE O) 16/17 EA 1,100
5 BARB 16 COUPLING CONN. 1UNIT EA 1,000
6 BARB 16 W/FLARE COUPLING EA 1,100

TAUYA SITE CHIRUNDU DISTRICT


1 100mm FLEXIBLE REINFORCED HOSE PN 16 X 6M EA 12
SUPPLY AND INSTALLATION OF AN AUTOMATED DISC FILTER, 120 MICRONS,
SPIN KLIN RUBY PP 3 FILTER BANK OR EQUIVALENT AS APPROVED BY
2 ENGINEER, Q= 72M3/HR EA 1

3 SUPPLY AND INSTALLATION OF WATER METER, SYSTEM CAPACITY 80M3/HR EA 1


SUPPLY AND INSTALLATION OF BOOSTER PUMP Q =40M3/HR, H=40M,
DELIVERY AND SUCTION FITTINGS ON A FLOATING PLATFORM SECURED TO
4 THE GROUND EA 1
5 AMOURED CABLE 16MM X 4C M 70

DRIP SYSTEM INFIELD NETWORK


DRIP PIPE 1.0L/H @ 0.3CM SP, 0.60MM MIN WALL THICKNESS, VIRGIN
1 MATERIAL, 4 YR WARRANTY MTR 60,000
2 PE IRRIGATION PIPE 16/4 100M EA 20
3 START CONN-PVC BARB 16 W/SEAL- MT EA 2,000
4 END LINE (DOUBLE O) 16/17 EA 2,000
5 BARB 16 COUPLING CONN. 1UNIT EA 2,000
6 BARB 16 W/FLARE COUPLING EA 2,000

SUMMARY COLLECTIONS TO MAIN SUMMARY

7.0 CONSTRUCTION OF SOLAR SYSTEM

SITE:
MANYEPA 4 BOREHOLES
SIAVONGA
No. ITEM UNIT QTY
DISTRICT
SOLAR PUMP STRUCTURE
Excavation(Provisional)

A SOLAR PUMP AND STRUCTURE

Excavation(Provisional)

Excavation including maintaining and supporting sides and keeping free from water,
mud and fallen materials by bailing, pumping or otherwise

A1 Prepare site by stripping top 200 mm of soil to remove all debris including sand (if
m2 70
any) from site and carting away spoil

A2 Pit excavation commencing at reduced levels depth not exceeding 1.50m deep
m3 2

A3 Remove surplus excavated material from site m3 0.50

A4 Backfill around foundation m3 2

Concrete work
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

ITEM DESCRIPTION UNIT QTY UNIT PRICE


Reinforced Concrete class 25

A5 Concrete pad with surface steel trowelled smooth m3 0.13

Reinforcement

A6 Reinforcement bars (all sizes) kg 35

Sawn formwork

A7 Formwork to sides m 2

Structural steelwork

A8 Supply, fabricate and erect the following framed structural steelwork; complete with
and including all welded and bolted connections; and including one shop coat red
oxide, zinc chromate or similar and approved primer and 2 finishing coats of gloss oil 1
paint after erection: refer to DWG #1 attached

A9 Solar panels support structure constructed according to design including anti theft U-
channels 50mm x 50mm, including Aluminium U 3mm channel, 7mm angle lines, sum 1

Warranty (months): 12

Supply and Installation of Solar Powered Pump


A10 2.2Kw Submersible, average yield 4l/s ea 4

A11 4.0 mm submersible cable 3-core m 400

A12 Joint kit ea 4

A13 INVT prewired DC/AC controller w/protection ea 4

A14 345W solar modules, voc 46.4v +/-3% OR alternative module combination
ea 48

A15 50mm HDPE poly pipe class 9 x 100m ea 4

A16 50mm HDPE poly pipe class 6 x 100m ea 8

A17 50mm x 2" poly adapter ea 12

A18 2" well seal complete (union, tee and Elbow etc) ea 4

A19 Cable ties packets ea 4

A20 6mm earth wire m 40

A21 50mm compression couplers ea 16

A22 Miscelleaneous ( bolts, thread tape etc) items 4

A23 Installation of solar kit and pipework from borehole to tanks ea 4

A24 Borehole flushing and testing ea 4

TOTAL CARRIED TO SUMMARY

SITE:
NAMBWELE 2 BOREHOLES
SIAVONGA
No. ITEM UNIT QTY
DISTRICT
SOLAR PUMP STRUCTURE
Excavation(Provisional)

A SOLAR PUMP AND STRUCTURE

Excavation(Provisional)
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

ITEM DESCRIPTION UNIT QTY UNIT PRICE


Excavation including maintaining and supporting sides and keeping free from water,
mud and fallen materials by bailing, pumping or otherwise

A1 Prepare site by stripping top 200 mm of soil to remove all debris including sand (if
m2 60
any) from site and carting away spoil

A2 Pit excavation commencing at reduced levels depth not exceeding 1.50m deep
m3 2

A3 Remove surplus excavated material from site m3 0.50

A4 Backfill around foundation m3 2

Concrete work

Reinforced Concrete class 25

A5 Concrete pad with surface steel trowelled smooth m3 0.13

Reinforcement

A6 Reinforcement bars (all sizes) kg 35

Sawn formwork

A7 Formwork to sides m 2

Structural steelwork

A8 Supply, fabricate and erect the following framed structural steelwork; complete with
and including all welded and bolted connections; and including one shop coat red
oxide, zinc chromate or similar and approved primer and 2 finishing coats of gloss oil 1
paint after erection: refer to DWG #1 attached

A9 Solar panels support structure constructed according to design including anti theft U-
channels 50mm x 50mm, including Aluminium U 3mm channel, 7mm angle lines, sum 1

Warranty (months): 12

Supply and Installation of Solar Powered Pump


A 1HP DC Solar Submersible Pump CW Control Panel ea 2

B 4.0mm submersible cable 3-core m 200

C Joint kit ea 2

D 550W solar modules, Monocrystalline, 49.9 VoC DC OR alternative module ea


8
combination

E 32mm HDPE poly pipe class 9 x 100m ea 2

F 32mm HDPE poly pipe class 6 x 100m ea 4

G 32mm x 1 1/4" poly adapter ea 2

H 1 1/4" well seal complete (union, tee and Elbow etc) ea 2

I Cable ties packets ea 2

J 6mm earth wire m 30

K 32mm compression couplers ea 12

L Miscelleaneous ( i.e sundries, bolts, thread tape etc) items 2

M Installation ea 1

N Borehole flushing ea 2

O Borehole Drilling min water 1 l/s accepted ea 1


BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

ITEM DESCRIPTION UNIT QTY UNIT PRICE

TOTAL CARRIED TO SUMMARY

SITE:
CHILUNDU 4 BOREHOLES
CIHUWA
No. ITEM UNIT QTY
SIAVONGA
SOLAR PUMP STRUCTURE
Excavation(Provisional)

A SOLAR PUMP AND STRUCTURE

Excavation(Provisional)

Excavation including maintaining and supporting sides and keeping free from water,
mud and fallen materials by bailing, pumping or otherwise

A1 Prepare site by stripping top 200 mm of soil to remove all debris including sand (if
m2 40
any) from site and carting away spoil

A2 Pit excavation commencing at reduced levels depth not exceeding 1.50m deep
m3 2

A3 Remove surplus excavated material from site m3 2.00

A4 Backfill around foundation m3 4

Concrete work

Reinforced Concrete class 25

A5 Concrete pad with surface steel trowelled smooth m3 0.26

Reinforcement

A6 Reinforcement bars (all sizes) kg 70

Sawn formwork

A7 Formwork to sides m 4

Structural steelwork

A8 Supply, fabricate and erect the following framed structural steelwork; complete with
and including all welded and bolted connections; and including one shop coat red
oxide, zinc chromate or similar and approved primer and 2 finishing coats of gloss oil 4
paint after erection: refer to DWG #1 attached

A9 Solar panels support structure constructed according to design including anti theft U-
channels 50mm x 50mm, including Aluminium U 3mm channel, 7mm angle lines, sum 4

Warranty (months): 12

Supply and Installation of Solar Powered Pump


A 1HP DC Solar Submersible Pump CW Control Panel ea 4

B 4.0mm submersible cable 3-core m 400

C Joint kit ea 4

D 550W solar modules, Monocrystalline, 49.9 VoC DC OR alternative module ea


16
combination

E 32mm HDPE poly pipe class 9 x 100m ea 4

F 32mm HDPE poly pipe class 6 x 100m ea 8


BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

ITEM DESCRIPTION UNIT QTY UNIT PRICE


G 32mm x 1 1/4" poly adapter ea 4

H 1 1/4" well seal complete (union, tee and Elbow etc) ea 4

I Cable ties packets ea 2

J 6mm earth wire m 40

K 32mm compression couplers ea 12

L Miscelleaneous ( i.e sundries, bolts, thread tape etc) items 2

M Installation ea 1

N Borehole flushing ea 4

O Borehole pump test ea 4

TOTAL CARRIED TO SUMMARY

SOLAR SYSTEM - TOTAL CARRIED TO MAIN SUMMARY

8.0 PRIME COSTS

DESCRIPTION UNIT QTY RATE

Include the following NET Provisional Sums


to be expended by Ministry of Agriculture
or omitted if not expended without any claim for loss
of profit

1 ALLOW the provisional sum K300,000 to cover incidentals, complete ea 1


cost of incorporating materials into the
works including delivery of materials to site,
off-loading, storing, checking replacing defective
items, establishment charges all transport and
for installation of materials on site and all
contractor's overheads and profit

2 Add Contigency sum at 10% of total ea 1

PROVISIONAL AND PRIME COST SUMS


TOTAL CARRIED TO SUMMARY

APPENDIX H: BILL OF QUANTITIES LOT 5 SIAVONGA AND CHIRUNDU

Sl.No. ITEM

1 PRELIMINARIES AND GENERAL ITEMS

CONSTRUCTION OF A STEEL WATER TANK TO HOIST LITRE POLY WATER


2
TANK

3 4 POINT WATER KIOSK

4 WATER TROUGHS

5 FENCING

6 DRIP IRRIGATION

7 SOLAR SYSTEM & STRUCTURE


BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

ITEM DESCRIPTION UNIT QTY UNIT PRICE

8 PRIME COSTS

9 TOTAL
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

TOTAL PRICE

0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

TOTAL PRICE

0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

TOTAL PRICE

0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

TOTAL PRICE

0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

TOTAL PRICE
0

0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

TOTAL PRICE

0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

TOTAL PRICE

0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

TOTAL PRICE

0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

TOTAL PRICE
0

0
0

0
0

0
0
0
0

0
0
0
0
0
0
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

TOTAL PRICE

0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

TOTAL PRICE

0
0

0
0

0
0
0
0

0
0
0
0
0
0
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

TOTAL PRICE

0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

TOTAL PRICE
0

0
0

0
0
0
0

0
0
0
0
0
0
0

0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

TOTAL PRICE

0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

TOTAL PRICE

0
0

0
0
0
0
0
0

0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

TOTAL PRICE
0

0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

TOTAL PRICE
0
0

0
0
0
0
0
0

0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

TOTAL PRICE

0
0

0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

TOTAL PRICE

0
0
0
0
0
0

0
0

0
0
0
0
0
0
0
0
0
0
0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

TOTAL PRICE
0
0
0
0

0
0

0
0
0
0
0
0

0
0

0
0
0
0
0
0

0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

TOTAL PRICE

0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

TOTAL PRICE

0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

TOTAL PRICE

0
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

TOTAL PRICE
0

AMOUNT

AMOUNT

-
BILL OF QUANTITIES FOR THE PROPOSED CONSTRUCTION OF AN IRRIGATION SCHEME IN SIAVONGA
UNDER THE SCRALA PROJECT

TOTAL PRICE

-
APPENDIX H LOT 5 SIAVONGA AND CHIRUNDU
ITEM DESCRIPTION UNIT QTY

1.00 PRELIMINARIES AND GENERAL ITEMS

NOTE: The value of preliminaries and general items shall not exceed 5% of the
value of measured works of the project

i) Site Mobilization Item 1


The contractor shall set up the site working areas and storage facilities as may
be deemed necessary including all required site mobilization activities not
mentioned below

ii) Site Billboard, Site hoarding and Site Meetings Item 1


The contractor shall fabricate and errect a project billboard, site hoarding
during the construction of the water tank stand, and shall allow for all expenses
associated with convening and attending site progress meetings with client's
staff and stage inspection of works quality and progress .

iv) Contractor's Demobilization and handover Item 1


The contractor shall upon completion of the works remove all equipment, tools
and remaining materials and clean the site as may be approved by the Project
Engineer

TOTAL P&Gs CARRIED TO GENERAL SUMMARY

2.0 CONSTRUCTION OF WATER TANK STAND

Site: SIKONGO CHIRUNDU DISTRICT

A FOUNDATION AND EARTHWORKS

Site Preparation

1 Clear site of bushes, shrubs undergrowth and the like


including cutting down trees not exceeding 600mm
girth and grub up roots m2 100

2 Excavating Base Pit commencing at reduced level depth


not exceeding 1.5m starting from formation level m3 10

3 Extra over excavating in hard rock m3 3

Backfilling and Disposal

4 Backfilling around foundations and compacting loose


soils in 150mm layers upto 1.5m height on reduced level m3 9

5 Redig from spoil heap and remove off site m3 11

B CONCRETE WORKS

Preamble

All structral concrete shall vibrated reinforced concrete (reinforcement


measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control.

Plain in-situ concrete Grade 15

1 50mm thick Blinding below column bases m2 12

Reinforced concrete C30 in

2 Column bases m3 6

3 Stub Columns m3 1

4 Ground beam m3 2

C STEEL REINFORCEMENT FOR CONCRETE

Supplying, bending and fixing in position as per approved design; steel


reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.

1 8mm bars Kg 39

High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.

2 16mm diameter bars Kg 452

D FORMWORK

Smooth off shutter concrete formwork including


making good exposed surfaces after removal as described
to:

1 Sides of stub column m2 8

2 Sides and soffits of ground beams m2 9

E STRUCTURAL STEELWORK

Preamble

All structural steel shall be Grade S275, in accordance with with B.S 5950, all
welds to be 6mm continous weld or as described; in accordance with BS 1856
and 2642, and shall be given a coat of SF Utra - Thin Fire Retardant.

All rates shall include the cost of fabrication, installation, assemby,errection


and where necessary testing; and all other associated costs to render the
design functional as described

1 IPE 160 Stanchions Kg 506

2 UB 254 x 146 x 31 Primary Beams Kg 273

3 IPE 200 x 22.4 for Secondary Beams Kg 667

4 80 x 80 x 6 for Ties Kg 245.00

5 70 x 70 x6 for Bracing Kg 864

6 70 x 70 x 6 RSA for railing support Kg 211

7 33.7mm dia. x 2.6mm CHS hand rails (2.4 Kg/m) Kg 41

8 20mm base plate Kg 101

9 16mm base plates Kg 58

10 8mm MS Plates Kg 452

11 M20 x 60mm Gr. 8.8 Bolts & Nuts No. 24

12 M16 x 50mm Gr. 8.8 Bolts & Nuts No. 360

13 M20 x 1m Gr. 8.8 HD Bolts No. 16

14 150x75mm Tank decking HW timber m 19

15 Fabricate ladder and install as described (Provisional sum) m 1


16 484 Expanded diamond mesh for catwalk m2 13

Touch up approved anti corrosion paint primer, and two more coats on all
steelworks;
17 General surfaces of steelwork in green colour (Provisional Sum) item 1

F WATER TANK

1 Supply and fix 10,000 litres capacity polycon water


tank hoisted on tank stand ( measured seperately)
complete with automatic float switch, ball valves, filters
and connecting pipes inlet and outlet and overflow No. 1

CONSTRUCTION OF TANK STAND AND 1NO POLY


TANKS- TOTAL CARRIED TO SUMMARY

Site: NABBANDA CHIRUNDU DISTRICT

A FOUNDATION AND EARTHWORKS

Site Preparation

1 Clear site of bushes, shrubs undergrowth and the like


including cutting down trees not exceeding 600mm
girth and grub up roots m2 100

2 Excavating Base Pit commencing at reduced level depth


not exceeding 1.5m starting from formation level m3 10

3 Extra over excavating in hard rock m3 3

Backfilling and Disposal

4 Backfilling around foundations and compacting loose


soils in 150mm layers upto 1.5m height on reduced level m3 9

5 Redig from spoil heap and remove off site m3 11

B CONCRETE WORKS
Preamble

All structral concrete shall vibrated reinforced concrete (reinforcement


measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control.

Plain in-situ concrete Grade 15

1 50mm thick Blinding below column bases m2 12

Reinforced concrete C30 in

2 Column bases m3 6

3 Stub Columns m3 1

4 Ground beam m3 2

C STEEL REINFORCEMENT FOR CONCRETE

Supplying, bending and fixing in position as per approved design; steel


reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.

1 8mm bars Kg 39

High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.

2 16mm diameter bars Kg 452

D FORMWORK

Smooth off shutter concrete formwork including


making good exposed surfaces after removal as described
to:

1 Sides of stub column m2 8

2 Sides and soffits of ground beams m2 9


E STRUCTURAL STEELWORK

Preamble

All structural steel shall be Grade S275, in accordance with with B.S
5950, all welds to be 6mm continous weld or as described; in accordance
with BS 1856 and 2642, and shall be given a coat of SF Utra - Thin Fire
Retardant.

All rates shall include the cost of fabrication, installation, assemby,errection


and where necessary testing; and all other associated costs to render the
design functional as described

1 IPE 160 Stanchions Kg 506

2 UB 254 x 146 x 31 Primary Beams Kg 273

3 IPE 200 x 22.4 for Secondary Beams Kg 667

4 80 x 80 x 6 for Ties Kg 245

5 70 x 70 x6 for Bracing Kg 864.00

6 70 x 70 x 6 RSA for railing support Kg 211

7 33.7mm dia. x 2.6mm CHS hand rails (2.4 Kg/m) Kg 41

8 20mm base plate Kg 101

9 16mm base plates Kg 58

10 8mm MS Plates Kg 452

11 M20 x 60mm Gr. 8.8 Bolts & Nuts No. 24

12 M16 x 50mm Gr. 8.8 Bolts & Nuts No. 360

13 M20 x 1m Gr. 8.8 HD Bolts No. 16

14 150x75mm Tank decking HW timber m 19

15 Fabricate ladder and install as described (Provisional sum) m 1

16 484 Expanded diamond mesh for catwalk m2 13

Touch up approved anti corrosion paint primer, and two more coats on all
steelworks;
17 General surfaces of steelwork in green colour (Provisional Sum) item 1

F WATER TANK

1 Supply and fix 10,000 litres capacity polycon water


tank hoisted on tank stand ( measured seperately)
complete with automatic float switch, ball valves, filters
and connecting pipes inlet and outlet and overflow No. 1

CONSTRUCTION OF TANK STAND AND 1NO POLY


TANKS- TOTAL CARRIED TO SUMMARY

SITE: JAMBA CHIRUNDU DISTRICT

A FOUNDATION AND EARTHWORKS

Site Preparation

1 Clear site of bushes, shrubs undergrowth and the like


including cutting down trees not exceeding 600mm
girth and grub up roots m2 100

2 Excavating Base Pit commencing at reduced level depth


not exceeding 1.5m starting from formation level m3 10

3 Extra over excavating in hard rock m3 3

Backfilling and Disposal

4 Backfilling around foundations and compacting loose


soils in 150mm layers upto 1.5m height on reduced level m3 9

5 Redig from spoil heap and remove off site m3 11

B CONCRETE WORKS

Preamble
All structral concrete shall vibrated reinforced concrete (reinforcement
measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control.

Plain in-situ concrete Grade 15

1 50mm thick Blinding below column bases m2 12

Reinforced concrete C30 in

2 Column bases m3 6

3 Stub Columns m3 1

4 Ground beam m3 2

C STEEL REINFORCEMENT FOR CONCRETE

Supplying, bending and fixing in position as per approved design; steel


reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.

1 8mm bars Kg 39

High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.

2 16mm diameter bars Kg 452

D FORMWORK

Smooth off shutter concrete formwork including


making good exposed surfaces after removal as described
to:

1 Sides of stub column m2 8

2 Sides and soffits of ground beams m2 9

E STRUCTURAL STEELWORK
Preamble

All structural steel shall be Grade S275, in accordance with with B.S
5950, all welds to be 6mm continous weld or as described; in accordance
with BS 1856 and 2642, and shall be given a coat of SF Utra - Thin Fire
Retardant.

All rates shall include the cost of fabrication, installation, assemby,errection


and where necessary testing; and all other associated costs to render the
design functional as described

1 IPE 160 Stanchions Kg 506

2 UB 254 x 146 x 31 Primary Beams Kg 273

3 IPE 200 x 22.4 for Secondary Beams Kg 667

4 80 x 80 x 6 for Ties Kg 245

5 70 x 70 x6 for Bracing Kg 864.00

6 70 x 70 x 6 RSA for railing support Kg 211

7 33.7mm dia. x 2.6mm CHS hand rails (2.4 Kg/m) Kg 41

8 20mm base plate Kg 101

9 16mm base plates Kg 58

10 8mm MS Plates Kg 452

11 M20 x 60mm Gr. 8.8 Bolts & Nuts No. 24

12 M16 x 50mm Gr. 8.8 Bolts & Nuts No. 360

13 M20 x 1m Gr. 8.8 HD Bolts No. 16

14 150x75mm Tank decking HW timber m 19

15 Fabricate ladder and install as described (Provisional sum) m 1

16 484 Expanded diamond mesh for catwalk m2 13

Touch up approved anti corrosion paint primer, and two more coats on all
steelworks;
17 General surfaces of steelwork in green colour (Provisional Sum) item 1
F WATER TANK

1 Supply and fix 10,000 litres capacity polycon water


tank hoisted on tank stand ( measured seperately)
complete with automatic float switch, ball valves, filters
and connecting pipes inlet and outlet and overflow No. 1

CONSTRUCTION OF TANK STAND AND 1NO POLY


TANKS- TOTAL CARRIED TO SUMMARY

Site: MWEEMBA CHIRUNDU DISTRICT

A FOUNDATION AND EARTHWORKS

Site Preparation

1 Clear site of bushes, shrubs undergrowth and the like


including cutting down trees not exceeding 600mm
girth and grub up roots m2 100

2 Excavating Base Pit commencing at reduced level depth


not exceeding 1.5m starting from formation level m3 10

3 Extra over excavating in hard rock m3 3

Backfilling and Disposal

4 Backfilling around foundations and compacting loose


soils in 150mm layers upto 1.5m height on reduced level m3 9

5 Redig from spoil heap and remove off site m3 11

B CONCRETE WORKS

Preamble

All structral concrete shall vibrated reinforced concrete (reinforcement


measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control.
Plain in-situ concrete Grade 15

1 50mm thick Blinding below column bases m2 12

Reinforced concrete C30 in

2 Column bases m3 6

3 Stub Columns m3 1

4 Ground beam m3 2

C STEEL REINFORCEMENT FOR CONCRETE

Supplying, bending and fixing in position as per approved design; steel


reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.

1 8mm bars Kg 39

High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.

2 16mm diameter bars Kg 452

D FORMWORK

Smooth off shutter concrete formwork including


making good exposed surfaces after removal as described
to:

1 Sides of stub column m2 8

2 Sides and soffits of ground beams m2 9

E STRUCTURAL STEELWORK

Preamble

All structural steel shall be Grade S275, in accordance with with B.S
5950, all welds to be 6mm continous weld or as described; in accordance
with BS 1856 and 2642, and shall be given a coat of SF Utra - Thin Fire
Retardant.
All rates shall include the cost of fabrication, installation, assemby,errection
and where necessary testing; and all other associated costs to render the
design functional as described

1 IPE 160 Stanchions Kg 506

2 UB 254 x 146 x 31 Primary Beams Kg 273

3 IPE 200 x 22.4 for Secondary Beams Kg 667

4 80 x 80 x 6 for Ties Kg 245

5 70 x 70 x6 for Bracing Kg 864.00

6 70 x 70 x 6 RSA for railing support Kg 211

7 33.7mm dia. x 2.6mm CHS hand rails (2.4 Kg/m) Kg 41

8 20mm base plate Kg 101

9 16mm base plates Kg 58

10 8mm MS Plates Kg 452

11 M20 x 60mm Gr. 8.8 Bolts & Nuts No. 24

12 M16 x 50mm Gr. 8.8 Bolts & Nuts No. 360

13 M20 x 1m Gr. 8.8 HD Bolts No. 16

14 150x75mm Tank decking HW timber m 19

15 Fabricate ladder and install as described (Provisional sum) m 1

16 484 Expanded diamond mesh for catwalk m2 13

Touch up approved anti corrosion paint primer, and two more coats on all
steelworks;
17 General surfaces of steelwork in green colour (Provisional Sum) item 1

F WATER TANK

1 Supply and fix 10,000 litres capacity polycon water


tank hoisted on tank stand ( measured seperately)
complete with automatic float switch, ball valves, filters
and connecting pipes inlet and outlet and overflow No. 1

CONSTRUCTION OF TANK STAND AND 1NO POLY


TANKS- TOTAL CARRIED TO SUMMARY

Site: CHIKANZAYA CHIRUNDU DISTRICT

A FOUNDATION AND EARTHWORKS

Site Preparation

1 Clear site of bushes, shrubs undergrowth and the like


including cutting down trees not exceeding 600mm
girth and grub up roots m2 100

2 Excavating Base Pit commencing at reduced level depth


not exceeding 1.5m starting from formation level m3 10

3 Extra over excavating in hard rock m3 3

Backfilling and Disposal

4 Backfilling around foundations and compacting loose


soils in 150mm layers upto 1.5m height on reduced level m3 9

5 Redig from spoil heap and remove off site m3 11

B CONCRETE WORKS

Preamble

All structral concrete shall vibrated reinforced concrete (reinforcement


measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control.

Plain in-situ concrete Grade 15

1 50mm thick Blinding below column bases m2 12

Reinforced concrete C30 in

2 Column bases m3 6
3 Stub Columns m3 1

4 Ground beam m3 2

C STEEL REINFORCEMENT FOR CONCRETE

Supplying, bending and fixing in position as per approved design; steel


reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.

1 8mm bars Kg 39

High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.

2 16mm diameter bars Kg 452

D FORMWORK

Smooth off shutter concrete formwork including


making good exposed surfaces after removal as described
to:

1 Sides of stub column m2 8

2 Sides and soffits of ground beams m2 9

E STRUCTURAL STEELWORK

Preamble

All structural steel shall be Grade S275, in accordance with with B.S
5950, all welds to be 6mm continous weld or as described; in accordance
with BS 1856 and 2642, and shall be given a coat of SF Utra - Thin Fire
Retardant.

All rates shall include the cost of fabrication, installation, assemby,errection


and where necessary testing; and all other associated costs to render the
design functional as described

1 IPE 160 Stanchions Kg 506


2 UB 254 x 146 x 31 Primary Beams Kg 273

3 IPE 200 x 22.4 for Secondary Beams Kg 667

4 80 x 80 x 6 for Ties Kg 245

5 70 x 70 x6 for Bracing Kg 864.00

6 70 x 70 x 6 RSA for railing support Kg 211

7 33.7mm dia. x 2.6mm CHS hand rails (2.4 Kg/m) Kg 41

8 20mm base plate Kg 101

9 16mm base plates Kg 58

10 8mm MS Plates Kg 452

11 M20 x 60mm Gr. 8.8 Bolts & Nuts No. 24

12 M16 x 50mm Gr. 8.8 Bolts & Nuts No. 360

13 M20 x 1m Gr. 8.8 HD Bolts No. 16

14 150x75mm Tank decking HW timber m 19

15 Fabricate ladder and install as described (Provisional sum) m 1

16 484 Expanded diamond mesh for catwalk m2 13

Touch up approved anti corrosion paint primer, and two more coats on all
steelworks;
17 General surfaces of steelwork in green colour (Provisional Sum) item 1

F WATER TANK

1 Supply and fix 10,000 litres capacity polycon water


tank hoisted on tank stand ( measured seperately)
complete with automatic float switch, ball valves, filters
and connecting pipes inlet and outlet and overflow No. 1

CONSTRUCTION OF TANK STAND AND 1NO POLY


TANKS- TOTAL CARRIED TO SUMMARY
CONSTRUCTION OF TANK STAND AND 1NO POLY
TANKS- TOTAL CARRIED TO SUMMARY

SITE: HACHIPILIKA CHIRUNDU DISTRICT

A FOUNDATION AND EARTHWORKS

Site Preparation

1 Clear site of bushes, shrubs undergrowth and the like


including cutting down trees not exceeding 600mm
girth and grub up roots m2 100

2 Excavating Base Pit commencing at reduced level depth


not exceeding 1.5m starting from formation level m3 10

3 Extra over excavating in hard rock m3 3

Backfilling and Disposal

4 Backfilling around foundations and compacting loose


soils in 150mm layers upto 1.5m height on reduced level m3 9

5 Redig from spoil heap and remove off site m3 11

B CONCRETE WORKS

Preamble

All structral concrete shall vibrated reinforced concrete (reinforcement


measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control.

Plain in-situ concrete Grade 15

1 50mm thick Blinding below column bases m2 12

Reinforced concrete C30 in

2 Column bases m3 6

3 Stub Columns m3 1
4 Ground beam m3 2

C STEEL REINFORCEMENT FOR CONCRETE

Supplying, bending and fixing in position as per approved design; steel


reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.

1 8mm bars Kg 39

High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.

2 16mm diameter bars Kg 452

D FORMWORK

Smooth off shutter concrete formwork including


making good exposed surfaces after removal as described
to:

1 Sides of stub column m2 8

2 Sides and soffits of ground beams m2 9

E STRUCTURAL STEELWORK

Preamble

All structural steel shall be Grade S275, in accordance with with B.S
5950, all welds to be 6mm continous weld or as described; in accordance
with BS 1856 and 2642, and shall be given a coat of SF Utra - Thin Fire
Retardant.

All rates shall include the cost of fabrication, installation, assemby,errection


and where necessary testing; and all other associated costs to render the
design functional as described

1 IPE 160 Stanchions Kg 506

2 UB 254 x 146 x 31 Primary Beams Kg 273

3 IPE 200 x 22.4 for Secondary Beams Kg 667


4 80 x 80 x 6 for Ties Kg 245

5 70 x 70 x6 for Bracing Kg 864.00

6 70 x 70 x 6 RSA for railing support Kg 211

7 33.7mm dia. x 2.6mm CHS hand rails (2.4 Kg/m) Kg 41

8 20mm base plate Kg 101

9 16mm base plates Kg 58

10 8mm MS Plates Kg 452

11 M20 x 60mm Gr. 8.8 Bolts & Nuts No. 24

12 M16 x 50mm Gr. 8.8 Bolts & Nuts No. 360

13 M20 x 1m Gr. 8.8 HD Bolts No. 16

14 150x75mm Tank decking HW timber m 19

15 Fabricate ladder and install as described (Provisional sum) m 1

16 484 Expanded diamond mesh for catwalk m2 13

Touch up approved anti corrosion paint primer, and two more coats on all
steelworks;
17 General surfaces of steelwork in green colour (Provisional Sum) item 1

F WATER TANK

1 Supply and fix 10,000 litres capacity polycon water


tank hoisted on tank stand ( measured seperately)
complete with automatic float switch, ball valves, filters
and connecting pipes inlet and outlet and overflow No. 1

CONSTRUCTION OF TANK STAND AND 1NO POLY


TANKS- TOTAL CARRIED TO SUMMARY
Site: IBBWEMUNYAMA CHIRUNDU DISTRICT

A FOUNDATION AND EARTHWORKS

Site Preparation

1 Clear site of bushes, shrubs undergrowth and the like


including cutting down trees not exceeding 600mm
girth and grub up roots m2 100

2 Excavating Base Pit commencing at reduced level depth


not exceeding 1.5m starting from formation level m3 10

3 Extra over excavating in hard rock m3 3

Backfilling and Disposal

4 Backfilling around foundations and compacting loose


soils in 150mm layers upto 1.5m height on reduced level m3 9

5 Redig from spoil heap and remove off site m3 11

B CONCRETE WORKS

Preamble

All structral concrete shall vibrated reinforced concrete (reinforcement


measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control.

Plain in-situ concrete Grade 15

1 50mm thick Blinding below column bases m2 12

Reinforced concrete C30 in

2 Column bases m3 6

3 Stub Columns m3 1

4 Ground beam m3 2

C STEEL REINFORCEMENT FOR CONCRETE


Supplying, bending and fixing in position as per approved design; steel
reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.

1 8mm bars Kg 39

High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.

2 16mm diameter bars Kg 452

D FORMWORK

Smooth off shutter concrete formwork including


making good exposed surfaces after removal as described
to:

1 Sides of stub column m2 8

2 Sides and soffits of ground beams m2 9

E STRUCTURAL STEELWORK

Preamble

All structural steel shall be Grade S275, in accordance with with B.S
5950, all welds to be 6mm continous weld or as described; in accordance
with BS 1856 and 2642, and shall be given a coat of SF Utra - Thin Fire
Retardant.

All rates shall include the cost of fabrication, installation, assemby,errection


and where necessary testing; and all other associated costs to render the
design functional as described

1 IPE 160 Stanchions Kg 506

2 UB 254 x 146 x 31 Primary Beams Kg 273

3 IPE 200 x 22.4 for Secondary Beams Kg 667

4 80 x 80 x 6 for Ties Kg 245

5 70 x 70 x6 for Bracing Kg 864.00


6 70 x 70 x 6 RSA for railing support Kg 211

7 33.7mm dia. x 2.6mm CHS hand rails (2.4 Kg/m) Kg 41

8 20mm base plate Kg 101

9 16mm base plates Kg 58

10 8mm MS Plates Kg 452

11 M20 x 60mm Gr. 8.8 Bolts & Nuts No. 24

12 M16 x 50mm Gr. 8.8 Bolts & Nuts No. 360

13 M20 x 1m Gr. 8.8 HD Bolts No. 16

14 150x75mm Tank decking HW timber m 19

15 Fabricate ladder and install as described (Provisional sum) m 1

16 484 Expanded diamond mesh for catwalk m2 13

Touch up approved anti corrosion paint primer, and two more coats on all
steelworks;
17 General surfaces of steelwork in green colour (Provisional Sum) item 1

F WATER TANK

1 Supply and fix 10,000 litres capacity polycon water


tank hoisted on tank stand ( measured seperately)
complete with automatic float switch, ball valves, filters
and connecting pipes inlet and outlet and overflow No. 1

CONSTRUCTION OF TANK STAND AND 1NO POLY


TANKS- TOTAL CARRIED TO SUMMARY

Site: CHULAULA CHIRUNDU DISTRICT

A FOUNDATION AND EARTHWORKS

Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like
including cutting down trees not exceeding 600mm
girth and grub up roots m2 100

2 Excavating Base Pit commencing at reduced level depth


not exceeding 1.5m starting from formation level m3 10

3 Extra over excavating in hard rock m3 3

Backfilling and Disposal

4 Backfilling around foundations and compacting loose


soils in 150mm layers upto 1.5m height on reduced level m3 9

5 Redig from spoil heap and remove off site m3 11

B CONCRETE WORKS

Preamble

All structral concrete shall vibrated reinforced concrete (reinforcement


measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control.

Plain in-situ concrete Grade 15

1 50mm thick Blinding below column bases m2 12

Reinforced concrete C30 in

2 Column bases m3 6

3 Stub Columns m3 1

4 Ground beam m3 2

C STEEL REINFORCEMENT FOR CONCRETE

Supplying, bending and fixing in position as per approved design; steel


reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.

1 8mm bars Kg 39
High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.

2 16mm diameter bars Kg 452

D FORMWORK

Smooth off shutter concrete formwork including


making good exposed surfaces after removal as described
to:

1 Sides of stub column m2 8

2 Sides and soffits of ground beams m2 9

E STRUCTURAL STEELWORK

Preamble

All structural steel shall be Grade S275, in accordance with with B.S
5950, all welds to be 6mm continous weld or as described; in accordance
with BS 1856 and 2642, and shall be given a coat of SF Utra - Thin Fire
Retardant.

All rates shall include the cost of fabrication, installation, assemby,errection


and where necessary testing; and all other associated costs to render the
design functional as described

1 IPE 160 Stanchions Kg 506

2 UB 254 x 146 x 31 Primary Beams Kg 273

3 IPE 200 x 22.4 for Secondary Beams Kg 667

4 80 x 80 x 6 for Ties Kg 245

5 70 x 70 x6 for Bracing Kg 864.00

6 70 x 70 x 6 RSA for railing support Kg 211

7 33.7mm dia. x 2.6mm CHS hand rails (2.4 Kg/m) Kg 41

8 20mm base plate Kg 101


9 16mm base plates Kg 58

10 8mm MS Plates Kg 452

11 M20 x 60mm Gr. 8.8 Bolts & Nuts No. 24

12 M16 x 50mm Gr. 8.8 Bolts & Nuts No. 360

13 M20 x 1m Gr. 8.8 HD Bolts No. 16

14 150x75mm Tank decking HW timber m 19

15 Fabricate ladder and install as described (Provisional sum) m 1

16 484 Expanded diamond mesh for catwalk m2 13

Touch up approved anti corrosion paint primer, and two more coats on all
steelworks;
17 General surfaces of steelwork in green colour (Provisional Sum) item 1

F WATER TANK

1 Supply and fix 10,000 litres capacity polycon water


tank hoisted on tank stand ( measured seperately)
complete with automatic float switch, ball valves, filters
and connecting pipes inlet and outlet and overflow No. 1

CONSTRUCTION OF TANK STAND AND 1NO POLY


TANKS- TOTAL CARRIED TO SUMMARY

Site: CHIWENA CHIRUNDU DISTRICT

A FOUNDATION AND EARTHWORKS

Site Preparation

1 Clear site of bushes, shrubs undergrowth and the like


including cutting down trees not exceeding 600mm
girth and grub up roots m2 100

2 Excavating Base Pit commencing at reduced level depth


not exceeding 1.5m starting from formation level m3 10

3 Extra over excavating in hard rock m3 3

Backfilling and Disposal

4 Backfilling around foundations and compacting loose


soils in 150mm layers upto 1.5m height on reduced level m3 9

5 Redig from spoil heap and remove off site m3 11

B CONCRETE WORKS

Preamble

All structral concrete shall vibrated reinforced concrete (reinforcement


measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control.

Plain in-situ concrete Grade 15

1 50mm thick Blinding below column bases m2 12

Reinforced concrete C30 in

2 Column bases m3 6

3 Stub Columns m3 1

4 Ground beam m3 2

C STEEL REINFORCEMENT FOR CONCRETE

Supplying, bending and fixing in position as per approved design; steel


reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.

1 8mm bars Kg 39

High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.

2 16mm diameter bars Kg 452


D FORMWORK

Smooth off shutter concrete formwork including


making good exposed surfaces after removal as described
to:

1 Sides of stub column m2 8

2 Sides and soffits of ground beams m2 9

E STRUCTURAL STEELWORK

Preamble

All structural steel shall be Grade S275, in accordance with with B.S
5950, all welds to be 6mm continous weld or as described; in accordance
with BS 1856 and 2642, and shall be given a coat of SF Utra - Thin Fire
Retardant.

All rates shall include the cost of fabrication, installation, assemby,errection


and where necessary testing; and all other associated costs to render the
design functional as described

1 IPE 160 Stanchions Kg 506

2 UB 254 x 146 x 31 Primary Beams Kg 273

3 IPE 200 x 22.4 for Secondary Beams Kg 667

4 80 x 80 x 6 for Ties Kg 245

5 70 x 70 x6 for Bracing Kg 864.00

6 70 x 70 x 6 RSA for railing support Kg 211

7 33.7mm dia. x 2.6mm CHS hand rails (2.4 Kg/m) Kg 41

8 20mm base plate Kg 101

9 16mm base plates Kg 58

10 8mm MS Plates Kg 452

11 M20 x 60mm Gr. 8.8 Bolts & Nuts No. 24


12 M16 x 50mm Gr. 8.8 Bolts & Nuts No. 360

13 M20 x 1m Gr. 8.8 HD Bolts No. 16

14 150x75mm Tank decking HW timber m 19

15 Fabricate ladder and install as described (Provisional sum) m 1

16 484 Expanded diamond mesh for catwalk m2 13

Touch up approved anti corrosion paint primer, and two more coats on all
steelworks;
17 General surfaces of steelwork in green colour (Provisional Sum) item 1

F WATER TANK

1 Supply and fix 10,000 litres capacity polycon water


tank hoisted on tank stand ( measured seperately)
complete with automatic float switch, ball valves, filters
and connecting pipes inlet and outlet and overflow No. 1

CONSTRUCTION OF TANK STAND AND 1NO POLY


TANKS- TOTAL CARRIED TO SUMMARY

CONSTRUCTION OF TANK STAND AND 1NO POLY


TANKS- TOTAL CARRIED TO MAIN SUMMARY

3.0 CONSTRUCTION OF WATER KIOSKS

SIKONGO CHIRUNDU
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS

1 Site Preparation m2 140


Clear site of bushes, shrubs undergrowth and the like including
cutting down trees not exceeding 600mm girth and grub
up roots

Unless otherwise stated excavations shall be in 'pickable' material.


Excavations and Earthworks
Excavate not exceeding 1500 mm deep starting from stripped level for;

2 Below Kiosk apron, pipe trenches and soak pit m3 26

Refilling of foundation hardcore base with approved laterite in layers of


150mm thick including compaction and consolidation etc., all complete
as directed by the Engineer-in-Charge.

3 i) Below Kiosk apron m3 15.0

FOUNDATION AND EARTHWORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


B STEEL REINFORCEMENT FOR CONCRETE
Supplying, bending and fixing in position as per approved design; steel
reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.

i) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
For Substructure works:
3 i) 12mm dia. As Y12 in apron Kg 355

STEEL REINFORCEMENT FOR CONCRETE- TOTAL CARRIED TO


SUMMARY

Sl.No. ITEM UNIT QTY


C CONCRETE WORKS
All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer

i) Below Kiosk apron m3 2.00


All structral concrete shall vibrated reinforced concrete (reinforcement
measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control. Rate should include all formwork

For Substructure works:


ii) in Apron and ramps m3 4.00

Formwork
Sawn formwork; to:
iii) Sides of apron concrete m2 4
CONCRETE WORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


D BRICKWORK AND MASONRY
Blockwork in concrete blocks not less than 10N/mm2 in crushing strength
cement mortar (1:3); and filled with C15 concrete in:

For Substructure works:


i) 200 mm Kiosk blockwork m2 6
ii) 200 mm Kiosk Soak Pit honeycomb m2 10

Two strand 3.25 mm diameter high tensile steel wire wall reinforcement; 100
mm laps (measured net: no allowance made for laps); every course; in

Kiosk blockwork:
iii) 200 mm block wall. m 20
iv) 200 mm Kiosk Soak Pit honeycomb m2 38
BRICKWORK AND MASONRY - TOTAL CARRIED TO SUMMARY

E PLASTERING AND FLOORING


Cement mortar (1:4) plastering 10mm thick over concrete and blockwork
surface and concrete apron to be finished even and smooth with steel float
trowel; all complete as directed by the Resident Engineer.

i) Apron Flooring m2 23

ii) Kiosk Blockwork m2 9

iii) Kiosk Soak Pit honeycomb m2 45

PLASTERING AND FLOORING - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


1.1 PLUMBING INSTALLATION

Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 19 mm Diameter pipe to walls and slab underside m 2
ii) 25 mm Diameter pipe to walls and slab underside m 15
iii) Allow for Extra for all fittings in diameter 19 mm No. 12
iv) Allow for Extra for all fittings in pipe diameter 25 mm No. 5

Equipment
v) Include for making chases and holes in walls, existing slab and breaking Item 1
existing slab where necessary and making good walls, slab and finishings.

PLUMBING INSTALLATION - TOTAL CARRIED TO SUMMARY

SUMMARY

Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
D BRICKWORK AND MASONRY
E PLASTERING AND FLOORING
F PLUMBING INSTALLATION
TO COLLECTIONS

HACHIPILIKA
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS

1 Site Preparation m2 140


Clear site of bushes, shrubs undergrowth and the like including
cutting down trees not exceeding 600mm girth and grub
up roots

Unless otherwise stated excavations shall be in 'pickable' material.

Excavations and Earthworks


Excavate not exceeding 1500 mm deep starting from stripped level for;

2 Below Kiosk apron, pipe trenches and soak pit m3 26

Refilling of foundation hardcore base with approved laterite in layers of


150mm thick including compaction and consolidation etc., all complete
as directed by the Engineer-in-Charge.

3 i) Below Kiosk apron m3 15.0

FOUNDATION AND EARTHWORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


B STEEL REINFORCEMENT FOR CONCRETE
Supplying, bending and fixing in position as per approved design; steel
reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.

i) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
For Substructure works:
3 i) 12mm dia. As Y12 in apron Kg 355

STEEL REINFORCEMENT FOR CONCRETE- TOTAL CARRIED TO


SUMMARY

Sl.No. ITEM UNIT QTY


C CONCRETE WORKS
All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer

i) Below Kiosk apron m3 2.00


All structral concrete shall vibrated reinforced concrete (reinforcement
measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control. Rate should include all formwork

For Substructure works:


ii) in Apron and ramps m3 4.00

Formwork
Sawn formwork; to:
iii) Sides of apron concrete m2 4

CONCRETE WORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


D BRICKWORK AND MASONRY
Blockwork in concrete blocks not less than 10N/mm2 in crushing strength
cement mortar (1:3); and filled with C15 concrete in:

For Substructure works:


i) 200 mm Kiosk blockwork m2 6
ii) 200 mm Kiosk Soak Pit honeycomb m2 10

Two strand 3.25 mm diameter high tensile steel wire wall reinforcement; 100
mm laps (measured net: no allowance made for laps); every course; in

Kiosk blockwork:
iii) 200 mm block wall. m 20
iv) 200 mm Kiosk Soak Pit honeycomb m2 38
BRICKWORK AND MASONRY - TOTAL CARRIED TO SUMMARY

E PLASTERING AND FLOORING


Cement mortar (1:4) plastering 10mm thick over concrete and blockwork
surface and concrete apron to be finished even and smooth with steel float
trowel; all complete as directed by the Resident Engineer.

i) Apron Flooring m2 23

ii) Kiosk Blockwork m2 9

iii) Kiosk Soak Pit honeycomb m2 45

PLASTERING AND FLOORING - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


1.1 PLUMBING INSTALLATION

Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 19 mm Diameter pipe to walls and slab underside m 2
ii) 25 mm Diameter pipe to walls and slab underside m 15
iii) Allow for Extra for all fittings in diameter 19 mm No. 12
iv) Allow for Extra for all fittings in pipe diameter 25 mm No. 5

Equipment
v) Include for making chases and holes in walls, existing slab and breaking Item 1
existing slab where necessary and making good walls, slab and finishings.

PLUMBING INSTALLATION - TOTAL CARRIED TO SUMMARY

SUMMARY

Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
D BRICKWORK AND MASONRY
E PLASTERING AND FLOORING
F PLUMBING INSTALLATION
TO COLLECTIONS
CHIWENA
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS

1 Site Preparation m2 140


Clear site of bushes, shrubs undergrowth and the like including
cutting down trees not exceeding 600mm girth and grub
up roots

Unless otherwise stated excavations shall be in 'pickable' material.

Excavations and Earthworks


Excavate not exceeding 1500 mm deep starting from stripped level for;

2 Below Kiosk apron, pipe trenches and soak pit m3 26

Refilling of foundation hardcore base with approved laterite in layers of


150mm thick including compaction and consolidation etc., all complete
as directed by the Engineer-in-Charge.

3 i) Below Kiosk apron m3 15.0

FOUNDATION AND EARTHWORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


B STEEL REINFORCEMENT FOR CONCRETE
Supplying, bending and fixing in position as per approved design; steel
reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.

i) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
For Substructure works:
3 i) 12mm dia. As Y12 in apron Kg 355

STEEL REINFORCEMENT FOR CONCRETE- TOTAL CARRIED TO


SUMMARY

Sl.No. ITEM UNIT QTY


C CONCRETE WORKS
All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer

i) Below Kiosk apron m3 2.00


All structral concrete shall vibrated reinforced concrete (reinforcement
measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control. Rate should include all formwork

For Substructure works:


ii) in Apron and ramps m3 4.00

Formwork
Sawn formwork; to:
iii) Sides of apron concrete m2 4

CONCRETE WORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


D BRICKWORK AND MASONRY
Blockwork in concrete blocks not less than 10N/mm2 in crushing strength
cement mortar (1:3); and filled with C15 concrete in:

For Substructure works:


i) 200 mm Kiosk blockwork m2 6
ii) 200 mm Kiosk Soak Pit honeycomb m2 10

Two strand 3.25 mm diameter high tensile steel wire wall reinforcement; 100
mm laps (measured net: no allowance made for laps); every course; in

Kiosk blockwork:
iii) 200 mm block wall. m 20
iv) 200 mm Kiosk Soak Pit honeycomb m2 38
BRICKWORK AND MASONRY - TOTAL CARRIED TO SUMMARY

E PLASTERING AND FLOORING


Cement mortar (1:4) plastering 10mm thick over concrete and blockwork
surface and concrete apron to be finished even and smooth with steel float
trowel; all complete as directed by the Resident Engineer.

i) Apron Flooring m2 23

ii) Kiosk Blockwork m2 9

iii) Kiosk Soak Pit honeycomb m2 45

PLASTERING AND FLOORING - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


1.1 PLUMBING INSTALLATION
Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 19 mm Diameter pipe to walls and slab underside m 2
ii) 25 mm Diameter pipe to walls and slab underside m 15
iii) Allow for Extra for all fittings in diameter 19 mm No. 12
iv) Allow for Extra for all fittings in pipe diameter 25 mm No. 5

Equipment
v) Include for making chases and holes in walls, existing slab and breaking Item 1
existing slab where necessary and making good walls, slab and finishings.

PLUMBING INSTALLATION - TOTAL CARRIED TO SUMMARY

SUMMARY

Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
D BRICKWORK AND MASONRY
E PLASTERING AND FLOORING
F PLUMBING INSTALLATION
TO COLLECTIONS

IBBWEMUNYAMA
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS

1 Site Preparation m2 140


Clear site of bushes, shrubs undergrowth and the like including
cutting down trees not exceeding 600mm girth and grub
up roots

Unless otherwise stated excavations shall be in 'pickable' material.

Excavations and Earthworks


Excavate not exceeding 1500 mm deep starting from stripped level for;

2 Below Kiosk apron, pipe trenches and soak pit m3 26


Refilling of foundation hardcore base with approved laterite in layers of
150mm thick including compaction and consolidation etc., all complete
as directed by the Engineer-in-Charge.

3 i) Below Kiosk apron m3 15.0

FOUNDATION AND EARTHWORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


B STEEL REINFORCEMENT FOR CONCRETE
Supplying, bending and fixing in position as per approved design; steel
reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.

i) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
For Substructure works:
3 i) 12mm dia. As Y12 in apron Kg 355

STEEL REINFORCEMENT FOR CONCRETE- TOTAL CARRIED TO


SUMMARY

Sl.No. ITEM UNIT QTY


C CONCRETE WORKS
All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer

i) Below Kiosk apron m3 2.00


All structral concrete shall vibrated reinforced concrete (reinforcement
measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control. Rate should include all formwork

For Substructure works:


ii) in Apron and ramps m3 4.00

Formwork
Sawn formwork; to:
iii) Sides of apron concrete m2 4

CONCRETE WORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


D BRICKWORK AND MASONRY
Blockwork in concrete blocks not less than 10N/mm2 in crushing strength
cement mortar (1:3); and filled with C15 concrete in:

For Substructure works:


i) 200 mm Kiosk blockwork m2 6
ii) 200 mm Kiosk Soak Pit honeycomb m2 10

Two strand 3.25 mm diameter high tensile steel wire wall reinforcement; 100
mm laps (measured net: no allowance made for laps); every course; in

Kiosk blockwork:
iii) 200 mm block wall. m 20
iv) 200 mm Kiosk Soak Pit honeycomb m2 38
BRICKWORK AND MASONRY - TOTAL CARRIED TO SUMMARY

E PLASTERING AND FLOORING


Cement mortar (1:4) plastering 10mm thick over concrete and blockwork
surface and concrete apron to be finished even and smooth with steel float
trowel; all complete as directed by the Resident Engineer.

i) Apron Flooring m2 23

ii) Kiosk Blockwork m2 9

iii) Kiosk Soak Pit honeycomb m2 45

PLASTERING AND FLOORING - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


1.1 PLUMBING INSTALLATION

Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 19 mm Diameter pipe to walls and slab underside m 2
ii) 25 mm Diameter pipe to walls and slab underside m 15
iii) Allow for Extra for all fittings in diameter 19 mm No. 12
iv) Allow for Extra for all fittings in pipe diameter 25 mm No. 5

Equipment
v) Include for making chases and holes in walls, existing slab and breaking Item 1
existing slab where necessary and making good walls, slab and finishings.
PLUMBING INSTALLATION - TOTAL CARRIED TO SUMMARY

SUMMARY

Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
D BRICKWORK AND MASONRY
E PLASTERING AND FLOORING
F PLUMBING INSTALLATION
TO COLLECTIONS

CHULAULA
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS

1 Site Preparation m2 140


Clear site of bushes, shrubs undergrowth and the like including
cutting down trees not exceeding 600mm girth and grub
up roots

Unless otherwise stated excavations shall be in 'pickable' material.

Excavations and Earthworks


Excavate not exceeding 1500 mm deep starting from stripped level for;

2 Below Kiosk apron, pipe trenches and soak pit m3 26

Refilling of foundation hardcore base with approved laterite in layers of


150mm thick including compaction and consolidation etc., all complete
as directed by the Engineer-in-Charge.

3 i) Below Kiosk apron m3 15.0

FOUNDATION AND EARTHWORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


B STEEL REINFORCEMENT FOR CONCRETE
Supplying, bending and fixing in position as per approved design; steel
reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.

i) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
For Substructure works:
3 i) 12mm dia. As Y12 in apron Kg 355

STEEL REINFORCEMENT FOR CONCRETE- TOTAL CARRIED TO


SUMMARY

Sl.No. ITEM UNIT QTY


C CONCRETE WORKS
All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer

i) Below Kiosk apron m3 2.00


All structral concrete shall vibrated reinforced concrete (reinforcement
measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control. Rate should include all formwork

For Substructure works:


ii) in Apron and ramps m3 4.00

Formwork
Sawn formwork; to:
iii) Sides of apron concrete m2 4

CONCRETE WORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


D BRICKWORK AND MASONRY
Blockwork in concrete blocks not less than 10N/mm2 in crushing strength
cement mortar (1:3); and filled with C15 concrete in:

For Substructure works:


i) 200 mm Kiosk blockwork m2 6
ii) 200 mm Kiosk Soak Pit honeycomb m2 10

Two strand 3.25 mm diameter high tensile steel wire wall reinforcement; 100
mm laps (measured net: no allowance made for laps); every course; in

Kiosk blockwork:
iii) 200 mm block wall. m 20
iv) 200 mm Kiosk Soak Pit honeycomb m2 38
BRICKWORK AND MASONRY - TOTAL CARRIED TO SUMMARY

E PLASTERING AND FLOORING


Cement mortar (1:4) plastering 10mm thick over concrete and blockwork
surface and concrete apron to be finished even and smooth with steel float
trowel; all complete as directed by the Resident Engineer.

i) Apron Flooring m2 23

ii) Kiosk Blockwork m2 9

iii) Kiosk Soak Pit honeycomb m2 45

PLASTERING AND FLOORING - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


1.1 PLUMBING INSTALLATION

Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 19 mm Diameter pipe to walls and slab underside m 2
ii) 25 mm Diameter pipe to walls and slab underside m 15
iii) Allow for Extra for all fittings in diameter 19 mm No. 12
iv) Allow for Extra for all fittings in pipe diameter 25 mm No. 5

Equipment
v) Include for making chases and holes in walls, existing slab and breaking Item 1
existing slab where necessary and making good walls, slab and finishings.

PLUMBING INSTALLATION - TOTAL CARRIED TO SUMMARY

SUMMARY

Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
D BRICKWORK AND MASONRY
E PLASTERING AND FLOORING
F PLUMBING INSTALLATION
TO COLLECTIONS

JAMBA
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS

1 Site Preparation m2 140


Clear site of bushes, shrubs undergrowth and the like including
cutting down trees not exceeding 600mm girth and grub
up roots

Unless otherwise stated excavations shall be in 'pickable' material.

Excavations and Earthworks


Excavate not exceeding 1500 mm deep starting from stripped level for;

2 Below Kiosk apron, pipe trenches and soak pit m3 26

Refilling of foundation hardcore base with approved laterite in layers of


150mm thick including compaction and consolidation etc., all complete
as directed by the Engineer-in-Charge.

3 i) Below Kiosk apron m3 15.0

FOUNDATION AND EARTHWORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


B STEEL REINFORCEMENT FOR CONCRETE
Supplying, bending and fixing in position as per approved design; steel
reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.

i) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
For Substructure works:
3 i) 12mm dia. As Y12 in apron Kg 355

STEEL REINFORCEMENT FOR CONCRETE- TOTAL CARRIED TO


SUMMARY

Sl.No. ITEM UNIT QTY


C CONCRETE WORKS
All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer

i) Below Kiosk apron m3 2.00


All structral concrete shall vibrated reinforced concrete (reinforcement
measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control. Rate should include all formwork

For Substructure works:


ii) in Apron and ramps m3 4.00

Formwork
Sawn formwork; to:
iii) Sides of apron concrete m2 4

CONCRETE WORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


D BRICKWORK AND MASONRY
Blockwork in concrete blocks not less than 10N/mm2 in crushing strength
cement mortar (1:3); and filled with C15 concrete in:

For Substructure works:


i) 200 mm Kiosk blockwork m2 6
ii) 200 mm Kiosk Soak Pit honeycomb m2 10

Two strand 3.25 mm diameter high tensile steel wire wall reinforcement; 100
mm laps (measured net: no allowance made for laps); every course; in

Kiosk blockwork:
iii) 200 mm block wall. m 20
iv) 200 mm Kiosk Soak Pit honeycomb m2 38
BRICKWORK AND MASONRY - TOTAL CARRIED TO SUMMARY

E PLASTERING AND FLOORING


Cement mortar (1:4) plastering 10mm thick over concrete and blockwork
surface and concrete apron to be finished even and smooth with steel float
trowel; all complete as directed by the Resident Engineer.

i) Apron Flooring m2 23

ii) Kiosk Blockwork m2 9

iii) Kiosk Soak Pit honeycomb m2 45


PLASTERING AND FLOORING - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


1.1 PLUMBING INSTALLATION

Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 19 mm Diameter pipe to walls and slab underside m 2
ii) 25 mm Diameter pipe to walls and slab underside m 15
iii) Allow for Extra for all fittings in diameter 19 mm No. 12
iv) Allow for Extra for all fittings in pipe diameter 25 mm No. 5

Equipment
v) Include for making chases and holes in walls, existing slab and breaking Item 1
existing slab where necessary and making good walls, slab and finishings.

PLUMBING INSTALLATION - TOTAL CARRIED TO SUMMARY

SUMMARY

Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
D BRICKWORK AND MASONRY
E PLASTERING AND FLOORING
F PLUMBING INSTALLATION
TO COLLECTIONS

MWEEMBA
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS

1 Site Preparation m2 140


Clear site of bushes, shrubs undergrowth and the like including
cutting down trees not exceeding 600mm girth and grub
up roots
Unless otherwise stated excavations shall be in 'pickable' material.

Excavations and Earthworks


Excavate not exceeding 1500 mm deep starting from stripped level for;

2 Below Kiosk apron, pipe trenches and soak pit m3 26

Refilling of foundation hardcore base with approved laterite in layers of


150mm thick including compaction and consolidation etc., all complete
as directed by the Engineer-in-Charge.

3 i) Below Kiosk apron m3 15.0

FOUNDATION AND EARTHWORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


B STEEL REINFORCEMENT FOR CONCRETE
Supplying, bending and fixing in position as per approved design; steel
reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.

i) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
For Substructure works:
3 i) 12mm dia. As Y12 in apron Kg 355

STEEL REINFORCEMENT FOR CONCRETE- TOTAL CARRIED TO


SUMMARY

Sl.No. ITEM UNIT QTY


C CONCRETE WORKS
All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer

i) Below Kiosk apron m3 2.00


All structral concrete shall vibrated reinforced concrete (reinforcement
measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control. Rate should include all formwork

For Substructure works:


ii) in Apron and ramps m3 4.00

Formwork
Sawn formwork; to:
iii) Sides of apron concrete m2 4

CONCRETE WORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


D BRICKWORK AND MASONRY
Blockwork in concrete blocks not less than 10N/mm2 in crushing strength
cement mortar (1:3); and filled with C15 concrete in:

For Substructure works:


i) 200 mm Kiosk blockwork m2 6
ii) 200 mm Kiosk Soak Pit honeycomb m2 10

Two strand 3.25 mm diameter high tensile steel wire wall reinforcement; 100
mm laps (measured net: no allowance made for laps); every course; in

Kiosk blockwork:
iii) 200 mm block wall. m 20
iv) 200 mm Kiosk Soak Pit honeycomb m2 38
BRICKWORK AND MASONRY - TOTAL CARRIED TO SUMMARY

E PLASTERING AND FLOORING


Cement mortar (1:4) plastering 10mm thick over concrete and blockwork
surface and concrete apron to be finished even and smooth with steel float
trowel; all complete as directed by the Resident Engineer.

i) Apron Flooring m2 23

ii) Kiosk Blockwork m2 9

iii) Kiosk Soak Pit honeycomb m2 45

PLASTERING AND FLOORING - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


1.1 PLUMBING INSTALLATION

Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 19 mm Diameter pipe to walls and slab underside m 2
ii) 25 mm Diameter pipe to walls and slab underside m 15
iii) Allow for Extra for all fittings in diameter 19 mm No. 12
iv) Allow for Extra for all fittings in pipe diameter 25 mm No. 5
Equipment
v) Include for making chases and holes in walls, existing slab and breaking Item 1
existing slab where necessary and making good walls, slab and finishings.

PLUMBING INSTALLATION - TOTAL CARRIED TO SUMMARY

SUMMARY

Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
D BRICKWORK AND MASONRY
E PLASTERING AND FLOORING
F PLUMBING INSTALLATION
TO COLLECTIONS

CHIKANZAYA
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS

1 Site Preparation m2 140


Clear site of bushes, shrubs undergrowth and the like including
cutting down trees not exceeding 600mm girth and grub
up roots

Unless otherwise stated excavations shall be in 'pickable' material.

Excavations and Earthworks


Excavate not exceeding 1500 mm deep starting from stripped level for;

2 Below Kiosk apron, pipe trenches and soak pit m3 26

Refilling of foundation hardcore base with approved laterite in layers of


150mm thick including compaction and consolidation etc., all complete
as directed by the Engineer-in-Charge.

3 i) Below Kiosk apron m3 15.0

FOUNDATION AND EARTHWORKS - TOTAL CARRIED TO SUMMARY


Sl.No. ITEM UNIT QTY
B STEEL REINFORCEMENT FOR CONCRETE
Supplying, bending and fixing in position as per approved design; steel
reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.

i) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
For Substructure works:
3 i) 12mm dia. As Y12 in apron Kg 355

STEEL REINFORCEMENT FOR CONCRETE- TOTAL CARRIED TO


SUMMARY

Sl.No. ITEM UNIT QTY


C CONCRETE WORKS
All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer

i) Below Kiosk apron m3 2.00


All structral concrete shall vibrated reinforced concrete (reinforcement
measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control. Rate should include all formwork

For Substructure works:


ii) in Apron and ramps m3 4.00

Formwork
Sawn formwork; to:
iii) Sides of apron concrete m2 4

CONCRETE WORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


D BRICKWORK AND MASONRY
Blockwork in concrete blocks not less than 10N/mm2 in crushing strength
cement mortar (1:3); and filled with C15 concrete in:

For Substructure works:


i) 200 mm Kiosk blockwork m2 6
ii) 200 mm Kiosk Soak Pit honeycomb m2 10

Two strand 3.25 mm diameter high tensile steel wire wall reinforcement; 100
mm laps (measured net: no allowance made for laps); every course; in
Kiosk blockwork:
iii) 200 mm block wall. m 20
iv) 200 mm Kiosk Soak Pit honeycomb m2 38
BRICKWORK AND MASONRY - TOTAL CARRIED TO SUMMARY

E PLASTERING AND FLOORING


Cement mortar (1:4) plastering 10mm thick over concrete and blockwork
surface and concrete apron to be finished even and smooth with steel float
trowel; all complete as directed by the Resident Engineer.

i) Apron Flooring m2 23

ii) Kiosk Blockwork m2 9

iii) Kiosk Soak Pit honeycomb m2 45

PLASTERING AND FLOORING - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


1.1 PLUMBING INSTALLATION

Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 19 mm Diameter pipe to walls and slab underside m 2
ii) 25 mm Diameter pipe to walls and slab underside m 15
iii) Allow for Extra for all fittings in diameter 19 mm No. 12
iv) Allow for Extra for all fittings in pipe diameter 25 mm No. 5

Equipment
v) Include for making chases and holes in walls, existing slab and breaking Item 1
existing slab where necessary and making good walls, slab and finishings.

PLUMBING INSTALLATION - TOTAL CARRIED TO SUMMARY

SUMMARY

Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
D BRICKWORK AND MASONRY
E PLASTERING AND FLOORING
F PLUMBING INSTALLATION
TO COLLECTIONS

NABBANDA
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS

1 Site Preparation m2 140


Clear site of bushes, shrubs undergrowth and the like including
cutting down trees not exceeding 600mm girth and grub
up roots

Unless otherwise stated excavations shall be in 'pickable' material.

Excavations and Earthworks


Excavate not exceeding 1500 mm deep starting from stripped level for;

2 Below Kiosk apron, pipe trenches and soak pit m3 26

Refilling of foundation hardcore base with approved laterite in layers of


150mm thick including compaction and consolidation etc., all complete
as directed by the Engineer-in-Charge.

3 i) Below Kiosk apron m3 15.0

FOUNDATION AND EARTHWORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


B STEEL REINFORCEMENT FOR CONCRETE
Supplying, bending and fixing in position as per approved design; steel
reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.

i) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.
For Substructure works:
3 i) 12mm dia. As Y12 in apron Kg 355

STEEL REINFORCEMENT FOR CONCRETE- TOTAL CARRIED TO


SUMMARY

Sl.No. ITEM UNIT QTY


C CONCRETE WORKS
All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer

i) Below Kiosk apron m3 2.00


All structral concrete shall vibrated reinforced concrete (reinforcement
measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control. Rate should include all formwork

For Substructure works:


ii) in Apron and ramps m3 4.00

Formwork
Sawn formwork; to:
iii) Sides of apron concrete m2 4

CONCRETE WORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


D BRICKWORK AND MASONRY
Blockwork in concrete blocks not less than 10N/mm2 in crushing strength
cement mortar (1:3); and filled with C15 concrete in:

For Substructure works:


i) 200 mm Kiosk blockwork m2 6
ii) 200 mm Kiosk Soak Pit honeycomb m2 10

Two strand 3.25 mm diameter high tensile steel wire wall reinforcement; 100
mm laps (measured net: no allowance made for laps); every course; in

Kiosk blockwork:
iii) 200 mm block wall. m 20
iv) 200 mm Kiosk Soak Pit honeycomb m2 38
BRICKWORK AND MASONRY - TOTAL CARRIED TO SUMMARY

E PLASTERING AND FLOORING


Cement mortar (1:4) plastering 10mm thick over concrete and blockwork
surface and concrete apron to be finished even and smooth with steel float
trowel; all complete as directed by the Resident Engineer.

i) Apron Flooring m2 23

ii) Kiosk Blockwork m2 9

iii) Kiosk Soak Pit honeycomb m2 45


PLASTERING AND FLOORING - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


1.1 PLUMBING INSTALLATION

Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 19 mm Diameter pipe to walls and slab underside m 2
ii) 25 mm Diameter pipe to walls and slab underside m 15
iii) Allow for Extra for all fittings in diameter 19 mm No. 12
iv) Allow for Extra for all fittings in pipe diameter 25 mm No. 5

Equipment
v) Include for making chases and holes in walls, existing slab and breaking Item 1
existing slab where necessary and making good walls, slab and finishings.

PLUMBING INSTALLATION - TOTAL CARRIED TO SUMMARY

SUMMARY

Sl.No. ITEM
A FOUNDATION AND EARTHWORKS
B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
D BRICKWORK AND MASONRY
E PLASTERING AND FLOORING
F PLUMBING INSTALLATION
TO COLLECTIONS

WATER KIOSKS- TOTAL CARRIED TO MAIN SUMMARY

4.0 CONSTRUCTION OF WATER TROUGHS

No. ITEM UNIT QTY


A FOUNDATION AND EARTHWORKS

Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 384
cutting down trees not exceeding 600mm girth and grub
up roots
Unless otherwise stated excavations shall be in 'pickable' material.
Excavations and Earthworks

Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Cattle Water Trough apron and pipe trenches m3 40

Refilling of foundation hardcore base with approved laterite in layers of


150mm thick including compaction and consolidation etc., all complete
as directed by the Engineer-in-Charge.

3 i) Below Cattle Water Trough apron m3 40.0

FOUNDATION AND EARTHWORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


B STEEL REINFORCEMENT FOR CONCRETE

Supplying, bending and fixing in position as per approved design; steel


reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.
i) 3.2mm dia , 150 BRC heavy duty conforce wire in apron slab m2 120

ii) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.

3 i) 10mm dia. As Y10 in trough stem concrete Kg 586

STEEL REINFORCEMENT FOR CONCRETE- TOTAL CARRIED TO


SUMMARY

Sl.No. ITEM UNIT QTY


C CONCRETE WORKS

All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer
i) Below Cattle Water Trough apron m3 7.00
All structral concrete shall vibrated reinforced concrete (reinforcement
measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control. Formwork rates to include all supports and jointing to required to
assemble sound formwork necessary to achieve and form described concrete
geometry
For Substructure works:
ii) in Cattle Water Trough Apron m3 23.00

Formwork
Sawn formwork; to:
iii) Sides of trough stem concrete m2 64

CONCRETE WORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


E TROUGH GROUTING AND SEALING

10mm thick Cement grouting mortar (1:2) to be rendered to the interior of the
water trough over concrete surface; smooth with steel float trowel; all complete
as directed by the Resident Engineer.

i) Grout to interior surfaces of water troughs m2 116

TROUGH GROUTING AND SEALING- TOTAL CARRIED TO SUMMARY

F PLUMBING INSTALLATIONS

Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 25 mm Diameter pipe to walls and slab underside m 20
ii) Allow for Extra for all fittings in pipe diameter 25 mm No. 5

Supply and installation of ball-floater automated water opening and closing


iii) mechanism, including all associated fixture to render installation functional L.S.
(Provisional Sum only) 1

Equipment
Include for making chases and holes in walls, existing slab and breaking slab
iv) Item
where necessary and making good walls, slab and finishings.
1
Supply and install, 50mm dia. uPVC pipes including all fittings to render the
v) installation functional as described; in accordance with ASMD - 1785 or equal m 180
and approved standard

PLUMBING INSTALLATIONS - TOTAL CARRIED TO SUMMARY

SUMMARY

A FOUNDATION AND EARTHWORKS


B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
E TROUGH GROUTING AND SEALING
F PLUMBING INSTALLATIONS
To collections
F

MWEEMBA CHIRUNDU DISTRICT


No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS

Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 384
cutting down trees not exceeding 600mm girth and grub
up roots

Unless otherwise stated excavations shall be in 'pickable' material.


Excavations and Earthworks

Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Cattle Water Trough apron and pipe trenches m3 40

Refilling of foundation hardcore base with approved laterite in layers of


150mm thick including compaction and consolidation etc., all complete
as directed by the Engineer-in-Charge.

3 i) Below Cattle Water Trough apron m3 40.0

FOUNDATION AND EARTHWORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


B STEEL REINFORCEMENT FOR CONCRETE

Supplying, bending and fixing in position as per approved design; steel


reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.
i) 3.2mm dia , 150 BRC heavy duty conforce wire in apron slab m2 120

ii) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.

3 i) 10mm dia. As Y10 in trough stem concrete Kg 586

STEEL REINFORCEMENT FOR CONCRETE- TOTAL CARRIED TO


SUMMARY

Sl.No. ITEM UNIT QTY


C CONCRETE WORKS

All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer
i) Below Cattle Water Trough apron m3 7.00

All structral concrete shall vibrated reinforced concrete (reinforcement


measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control. Formwork rates to include all supports and jointing to required to
assemble sound formwork necessary to achieve and form described concrete
geometry
For Substructure works:
ii) in Cattle Water Trough Apron m3 23.00

Formwork
Sawn formwork; to:
iii) Sides of trough stem concrete m2 64

CONCRETE WORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


E TROUGH GROUTING AND SEALING

10mm thick Cement grouting mortar (1:2) to be rendered to the interior of the
water trough over concrete surface; smooth with steel float trowel; all complete
as directed by the Resident Engineer.

i) Grout to interior surfaces of water troughs m2 116


TROUGH GROUTING AND SEALING- TOTAL CARRIED TO SUMMARY

F PLUMBING INSTALLATIONS

Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 25 mm Diameter pipe to walls and slab underside m 20
ii) Allow for Extra for all fittings in pipe diameter 25 mm No. 5

Supply and installation of ball-floater automated water opening and closing


iii) mechanism, including all associated fixture to render installation functional L.S.
(Provisional Sum only) 1

Equipment
Include for making chases and holes in walls, existing slab and breaking slab
iv) Item
where necessary and making good walls, slab and finishings.
1

Supply and install, 50mm dia. uPVC pipes including all fittings to render the
v) installation functional as described; in accordance with ASMD - 1785 or equal m 180
and approved standard

PLUMBING INSTALLATIONS - TOTAL CARRIED TO SUMMARY

SUMMARY

A FOUNDATION AND EARTHWORKS


B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
E TROUGH GROUTING AND SEALING
F PLUMBING INSTALLATIONS
To collections
F

CHINKANZAYA CHIRUNDU DISTRICT


No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS
Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 384
cutting down trees not exceeding 600mm girth and grub
up roots

Unless otherwise stated excavations shall be in 'pickable' material.


Excavations and Earthworks

Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Cattle Water Trough apron and pipe trenches m3 40

Refilling of foundation hardcore base with approved laterite in layers of


150mm thick including compaction and consolidation etc., all complete
as directed by the Engineer-in-Charge.

3 i) Below Cattle Water Trough apron m3 40.0

FOUNDATION AND EARTHWORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


B STEEL REINFORCEMENT FOR CONCRETE

Supplying, bending and fixing in position as per approved design; steel


reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.
i) 3.2mm dia , 150 BRC heavy duty conforce wire in apron slab m2 120

ii) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.

3 i) 10mm dia. As Y10 in trough stem concrete Kg 586

STEEL REINFORCEMENT FOR CONCRETE- TOTAL CARRIED TO


SUMMARY

Sl.No. ITEM UNIT QTY


C CONCRETE WORKS

All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer
i) Below Cattle Water Trough apron m3 7.00
All structral concrete shall vibrated reinforced concrete (reinforcement
measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control. Formwork rates to include all supports and jointing to required to
assemble sound formwork necessary to achieve and form described concrete
geometry
For Substructure works:
ii) in Cattle Water Trough Apron m3 23.00

Formwork
Sawn formwork; to:
iii) Sides of trough stem concrete m2 64

CONCRETE WORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


E TROUGH GROUTING AND SEALING

10mm thick Cement grouting mortar (1:2) to be rendered to the interior of the
water trough over concrete surface; smooth with steel float trowel; all complete
as directed by the Resident Engineer.

i) Grout to interior surfaces of water troughs m2 116

TROUGH GROUTING AND SEALING- TOTAL CARRIED TO SUMMARY

F PLUMBING INSTALLATIONS

Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 25 mm Diameter pipe to walls and slab underside m 20
ii) Allow for Extra for all fittings in pipe diameter 25 mm No. 5

Supply and installation of ball-floater automated water opening and closing


iii) mechanism, including all associated fixture to render installation functional L.S.
(Provisional Sum only) 1

Equipment
Include for making chases and holes in walls, existing slab and breaking slab
iv) Item
where necessary and making good walls, slab and finishings.
1
Supply and install, 50mm dia. uPVC pipes including all fittings to render the
v) installation functional as described; in accordance with ASMD - 1785 or equal m 180
and approved standard

PLUMBING INSTALLATIONS - TOTAL CARRIED TO SUMMARY

SUMMARY

A FOUNDATION AND EARTHWORKS


B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
E TROUGH GROUTING AND SEALING
F PLUMBING INSTALLATIONS
To collections

JAMBA
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS

Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 384
cutting down trees not exceeding 600mm girth and grub
up roots

Unless otherwise stated excavations shall be in 'pickable' material.


Excavations and Earthworks

Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Cattle Water Trough apron and pipe trenches m3 40

Refilling of foundation hardcore base with approved laterite in layers of


150mm thick including compaction and consolidation etc., all complete
as directed by the Engineer-in-Charge.

3 i) Below Cattle Water Trough apron m3 40.0

FOUNDATION AND EARTHWORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


B STEEL REINFORCEMENT FOR CONCRETE

Supplying, bending and fixing in position as per approved design; steel


reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.
i) 3.2mm dia , 150 BRC heavy duty conforce wire in apron slab m2 120

ii) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.

3 i) 10mm dia. As Y10 in trough stem concrete Kg 586

STEEL REINFORCEMENT FOR CONCRETE- TOTAL CARRIED TO


SUMMARY

Sl.No. ITEM UNIT QTY


C CONCRETE WORKS

All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer
i) Below Cattle Water Trough apron m3 7.00

All structral concrete shall vibrated reinforced concrete (reinforcement


measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control. Formwork rates to include all supports and jointing to required to
assemble sound formwork necessary to achieve and form described concrete
geometry
For Substructure works:
ii) in Cattle Water Trough Apron m3 23.00

Formwork
Sawn formwork; to:
iii) Sides of trough stem concrete m2 64

CONCRETE WORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


E TROUGH GROUTING AND SEALING

10mm thick Cement grouting mortar (1:2) to be rendered to the interior of the
water trough over concrete surface; smooth with steel float trowel; all complete
as directed by the Resident Engineer.

i) Grout to interior surfaces of water troughs m2 116


TROUGH GROUTING AND SEALING- TOTAL CARRIED TO SUMMARY

F PLUMBING INSTALLATIONS

Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 25 mm Diameter pipe to walls and slab underside m 20
ii) Allow for Extra for all fittings in pipe diameter 25 mm No. 5

Supply and installation of ball-floater automated water opening and closing


iii) mechanism, including all associated fixture to render installation functional L.S.
(Provisional Sum only) 1

Equipment
Include for making chases and holes in walls, existing slab and breaking slab
iv) Item
where necessary and making good walls, slab and finishings.
1

Supply and install, 50mm dia. uPVC pipes including all fittings to render the
v) installation functional as described; in accordance with ASMD - 1785 or equal m 180
and approved standard

PLUMBING INSTALLATIONS - TOTAL CARRIED TO SUMMARY

SUMMARY

A FOUNDATION AND EARTHWORKS


B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
E TROUGH GROUTING AND SEALING
F PLUMBING INSTALLATIONS
To collections
F

CHIWENA
No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS
Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 384
cutting down trees not exceeding 600mm girth and grub
up roots

Unless otherwise stated excavations shall be in 'pickable' material.


Excavations and Earthworks

Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Cattle Water Trough apron and pipe trenches m3 40

Refilling of foundation hardcore base with approved laterite in layers of


150mm thick including compaction and consolidation etc., all complete
as directed by the Engineer-in-Charge.

3 i) Below Cattle Water Trough apron m3 40.0

FOUNDATION AND EARTHWORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


B STEEL REINFORCEMENT FOR CONCRETE

Supplying, bending and fixing in position as per approved design; steel


reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.
i) 3.2mm dia , 150 BRC heavy duty conforce wire in apron slab m2 120

ii) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.

3 i) 10mm dia. As Y10 in trough stem concrete Kg 586

STEEL REINFORCEMENT FOR CONCRETE- TOTAL CARRIED TO


SUMMARY

Sl.No. ITEM UNIT QTY


C CONCRETE WORKS

All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer
i) Below Cattle Water Trough apron m3 7.00
All structral concrete shall vibrated reinforced concrete (reinforcement
measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control. Formwork rates to include all supports and jointing to required to
assemble sound formwork necessary to achieve and form described concrete
geometry
For Substructure works:
ii) in Cattle Water Trough Apron m3 23.00

Formwork
Sawn formwork; to:
iii) Sides of trough stem concrete m2 64

CONCRETE WORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


E TROUGH GROUTING AND SEALING

10mm thick Cement grouting mortar (1:2) to be rendered to the interior of the
water trough over concrete surface; smooth with steel float trowel; all complete
as directed by the Resident Engineer.

i) Grout to interior surfaces of water troughs m2 116

TROUGH GROUTING AND SEALING- TOTAL CARRIED TO SUMMARY

F PLUMBING INSTALLATIONS

Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 25 mm Diameter pipe to walls and slab underside m 20
ii) Allow for Extra for all fittings in pipe diameter 25 mm No. 5

Supply and installation of ball-floater automated water opening and closing


iii) mechanism, including all associated fixture to render installation functional L.S.
(Provisional Sum only) 1

Equipment
Include for making chases and holes in walls, existing slab and breaking slab
iv) Item
where necessary and making good walls, slab and finishings.
1
Supply and install, 50mm dia. uPVC pipes including all fittings to render the
v) installation functional as described; in accordance with ASMD - 1785 or equal m 180
and approved standard

PLUMBING INSTALLATIONS - TOTAL CARRIED TO SUMMARY

SUMMARY

A FOUNDATION AND EARTHWORKS


B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
E TROUGH GROUTING AND SEALING
F PLUMBING INSTALLATIONS
To collections
F

SITE: CHULAULA CHIRUNDU DISTRICT


No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS

Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 384
cutting down trees not exceeding 600mm girth and grub
up roots

Unless otherwise stated excavations shall be in 'pickable' material.


Excavations and Earthworks

Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Cattle Water Trough apron and pipe trenches m3 40

Refilling of foundation hardcore base with approved laterite in layers of


150mm thick including compaction and consolidation etc., all complete
as directed by the Engineer-in-Charge.

3 i) Below Cattle Water Trough apron m3 40.0

FOUNDATION AND EARTHWORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


B STEEL REINFORCEMENT FOR CONCRETE

Supplying, bending and fixing in position as per approved design; steel


reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.
i) 3.2mm dia , 150 BRC heavy duty conforce wire in apron slab m2 120

ii) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.

3 i) 10mm dia. As Y10 in trough stem concrete Kg 586

STEEL REINFORCEMENT FOR CONCRETE- TOTAL CARRIED TO


SUMMARY

Sl.No. ITEM UNIT QTY


C CONCRETE WORKS

All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer
i) Below Cattle Water Trough apron m3 7.00

All structral concrete shall vibrated reinforced concrete (reinforcement


measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control. Formwork rates to include all supports and jointing to required to
assemble sound formwork necessary to achieve and form described concrete
geometry
For Substructure works:
ii) in Cattle Water Trough Apron m3 23.00

Formwork
Sawn formwork; to:
iii) Sides of trough stem concrete m2 64

CONCRETE WORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


E TROUGH GROUTING AND SEALING

10mm thick Cement grouting mortar (1:2) to be rendered to the interior of the
water trough over concrete surface; smooth with steel float trowel; all complete
as directed by the Resident Engineer.

i) Grout to interior surfaces of water troughs m2 116


TROUGH GROUTING AND SEALING- TOTAL CARRIED TO SUMMARY

F PLUMBING INSTALLATIONS

Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 25 mm Diameter pipe to walls and slab underside m 20
ii) Allow for Extra for all fittings in pipe diameter 25 mm No. 5

Supply and installation of ball-floater automated water opening and closing


iii) mechanism, including all associated fixture to render installation functional L.S.
(Provisional Sum only) 1

Equipment
Include for making chases and holes in walls, existing slab and breaking slab
iv) Item
where necessary and making good walls, slab and finishings.
1

Supply and install, 50mm dia. uPVC pipes including all fittings to render the
v) installation functional as described; in accordance with ASMD - 1785 or equal m 180
and approved standard

PLUMBING INSTALLATIONS - TOTAL CARRIED TO SUMMARY

SUMMARY

A FOUNDATION AND EARTHWORKS


B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
E TROUGH GROUTING AND SEALING
F PLUMBING INSTALLATIONS
To collections
F

IBBWEMUNYAMA CHIRUNDU DISTRICT


No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS
Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 384
cutting down trees not exceeding 600mm girth and grub
up roots

Unless otherwise stated excavations shall be in 'pickable' material.


Excavations and Earthworks

Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Cattle Water Trough apron and pipe trenches m3 40

Refilling of foundation hardcore base with approved laterite in layers of


150mm thick including compaction and consolidation etc., all complete
as directed by the Engineer-in-Charge.

3 i) Below Cattle Water Trough apron m3 40.0

FOUNDATION AND EARTHWORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


B STEEL REINFORCEMENT FOR CONCRETE

Supplying, bending and fixing in position as per approved design; steel


reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.
i) 3.2mm dia , 150 BRC heavy duty conforce wire in apron slab m2 120

ii) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.

3 i) 10mm dia. As Y10 in trough stem concrete Kg 586

STEEL REINFORCEMENT FOR CONCRETE- TOTAL CARRIED TO


SUMMARY

Sl.No. ITEM UNIT QTY


C CONCRETE WORKS

All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer
i) Below Cattle Water Trough apron m3 7.00
All structral concrete shall vibrated reinforced concrete (reinforcement
measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control. Formwork rates to include all supports and jointing to required to
assemble sound formwork necessary to achieve and form described concrete
geometry
For Substructure works:
ii) in Cattle Water Trough Apron m3 23.00

Formwork
Sawn formwork; to:
iii) Sides of trough stem concrete m2 64

CONCRETE WORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


E TROUGH GROUTING AND SEALING

10mm thick Cement grouting mortar (1:2) to be rendered to the interior of the
water trough over concrete surface; smooth with steel float trowel; all complete
as directed by the Resident Engineer.

i) Grout to interior surfaces of water troughs m2 116

TROUGH GROUTING AND SEALING- TOTAL CARRIED TO SUMMARY

F PLUMBING INSTALLATIONS

Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 25 mm Diameter pipe to walls and slab underside m 20
ii) Allow for Extra for all fittings in pipe diameter 25 mm No. 5

Supply and installation of ball-floater automated water opening and closing


iii) mechanism, including all associated fixture to render installation functional L.S.
(Provisional Sum only) 1

Equipment
Include for making chases and holes in walls, existing slab and breaking slab
iv) Item
where necessary and making good walls, slab and finishings.
1
Supply and install, 50mm dia. uPVC pipes including all fittings to render the
v) installation functional as described; in accordance with ASMD - 1785 or equal m 180
and approved standard

PLUMBING INSTALLATIONS - TOTAL CARRIED TO SUMMARY

SUMMARY

A FOUNDATION AND EARTHWORKS


B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
E TROUGH GROUTING AND SEALING
F PLUMBING INSTALLATIONS
To collections

NABBANDA CHIRUNDU DISTRICT


No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS

Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 384
cutting down trees not exceeding 600mm girth and grub
up roots

Unless otherwise stated excavations shall be in 'pickable' material.


Excavations and Earthworks

Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Cattle Water Trough apron and pipe trenches m3 40

Refilling of foundation hardcore base with approved laterite in layers of


150mm thick including compaction and consolidation etc., all complete
as directed by the Engineer-in-Charge.

3 i) Below Cattle Water Trough apron m3 40.0

FOUNDATION AND EARTHWORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


B STEEL REINFORCEMENT FOR CONCRETE
Supplying, bending and fixing in position as per approved design; steel
reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.
i) 3.2mm dia , 150 BRC heavy duty conforce wire in apron slab m2 120

ii) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.

3 i) 10mm dia. As Y10 in trough stem concrete Kg 586

STEEL REINFORCEMENT FOR CONCRETE- TOTAL CARRIED TO


SUMMARY

Sl.No. ITEM UNIT QTY


C CONCRETE WORKS

All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer
i) Below Cattle Water Trough apron m3 7.00

All structral concrete shall vibrated reinforced concrete (reinforcement


measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control. Formwork rates to include all supports and jointing to required to
assemble sound formwork necessary to achieve and form described concrete
geometry
For Substructure works:
ii) in Cattle Water Trough Apron m3 23.00

Formwork
Sawn formwork; to:
iii) Sides of trough stem concrete m2 64

CONCRETE WORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


E TROUGH GROUTING AND SEALING

10mm thick Cement grouting mortar (1:2) to be rendered to the interior of the
water trough over concrete surface; smooth with steel float trowel; all complete
as directed by the Resident Engineer.

i) Grout to interior surfaces of water troughs m2 116


TROUGH GROUTING AND SEALING- TOTAL CARRIED TO SUMMARY

F PLUMBING INSTALLATIONS

Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 25 mm Diameter pipe to walls and slab underside m 20
ii) Allow for Extra for all fittings in pipe diameter 25 mm No. 5

Supply and installation of ball-floater automated water opening and closing


iii) mechanism, including all associated fixture to render installation functional L.S.
(Provisional Sum only) 1

Equipment
Include for making chases and holes in walls, existing slab and breaking slab
iv) Item
where necessary and making good walls, slab and finishings.
1

Supply and install, 50mm dia. uPVC pipes including all fittings to render the
v) installation functional as described; in accordance with ASMD - 1785 or equal m 180
and approved standard

PLUMBING INSTALLATIONS - TOTAL CARRIED TO SUMMARY

SUMMARY

A FOUNDATION AND EARTHWORKS


B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
E TROUGH GROUTING AND SEALING
F PLUMBING INSTALLATIONS
To collections

HACHIPILKA CHIRUNDU SITE


No. ITEM UNIT QTY
A FOUNDATION AND EARTHWORKS
Site Preparation
1 Clear site of bushes, shrubs undergrowth and the like including m2 384
cutting down trees not exceeding 600mm girth and grub
up roots

Unless otherwise stated excavations shall be in 'pickable' material.


Excavations and Earthworks

Excavate not exceeding 1500 mm deep starting from stripped level for;
2 Below Cattle Water Trough apron and pipe trenches m3 40

Refilling of foundation hardcore base with approved laterite in layers of


150mm thick including compaction and consolidation etc., all complete
as directed by the Engineer-in-Charge.

3 i) Below Cattle Water Trough apron m3 40.0

FOUNDATION AND EARTHWORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


B STEEL REINFORCEMENT FOR CONCRETE

Supplying, bending and fixing in position as per approved design; steel


reinforcement cut to length, bent to shape required, cranking, hooking ends
etc., including binding with 0.90mm dia (soft drawn) MS black binding wire etc.,
all complete as directed by Engineer-in-Charge.
i) 3.2mm dia , 150 BRC heavy duty conforce wire in apron slab m2 120

ii) High tensile steel bar reinforcement; gr. 460N/mm2 including tying wire and
space blocks and fixing.

3 i) 10mm dia. As Y10 in trough stem concrete Kg 586

STEEL REINFORCEMENT FOR CONCRETE- TOTAL CARRIED TO


SUMMARY

Sl.No. ITEM UNIT QTY


C CONCRETE WORKS

All lean and blinding concrete shall be mixed on site as C15 concrete using
42.5R cement, 20mm graded granite aggregated and quarry dust; thickness
as required including compacting, curing, formwork etc., complete as directed
by the Resident Engineer
i) Below Cattle Water Trough apron m3 7.00
All structral concrete shall vibrated reinforced concrete (reinforcement
measured separately); to specified classes for different member categories;
30MPa for foundation members, (30MPa for stub columns; 20 mm maximum
aggregate). Slump and cube samples shall be taken for each batch for quality
control. Formwork rates to include all supports and jointing to required to
assemble sound formwork necessary to achieve and form described concrete
geometry
For Substructure works:
ii) in Cattle Water Trough Apron m3 23.00

Formwork
Sawn formwork; to:
iii) Sides of trough stem concrete m2 64

CONCRETE WORKS - TOTAL CARRIED TO SUMMARY

Sl.No. ITEM UNIT QTY


E TROUGH GROUTING AND SEALING

10mm thick Cement grouting mortar (1:2) to be rendered to the interior of the
water trough over concrete surface; smooth with steel float trowel; all complete
as directed by the Resident Engineer.

i) Grout to interior surfaces of water troughs m2 116

TROUGH GROUTING AND SEALING- TOTAL CARRIED TO SUMMARY

F PLUMBING INSTALLATIONS

Galvanized mild steel pipes and fittings to B.S 1387 Table 2 and 1256
(Medium gauge)
Note: The rates for pipes not exceeding 63 mm diameter shall include all
jointing fittings.
Galvanised mild steel pipework, medium weight, imbeded in blockwork at
construction
i) 25 mm Diameter pipe to walls and slab underside m 20
ii) Allow for Extra for all fittings in pipe diameter 25 mm No. 5

Supply and installation of ball-floater automated water opening and closing


iii) mechanism, including all associated fixture to render installation functional L.S.
(Provisional Sum only) 1

Equipment
Include for making chases and holes in walls, existing slab and breaking slab
iv) Item
where necessary and making good walls, slab and finishings.
1
Supply and install, 50mm dia. uPVC pipes including all fittings to render the
v) installation functional as described; in accordance with ASMD - 1785 or equal m 180
and approved standard

PLUMBING INSTALLATIONS - TOTAL CARRIED TO SUMMARY

SUMMARY

A FOUNDATION AND EARTHWORKS


B STEEL REINFORCEMENT FOR CONCRETE
C CONCRETE WORKS
E TROUGH GROUTING AND SEALING
F PLUMBING INSTALLATIONS
To collections

SUMMARY COLLECTION FOR THE WATER TROUGH

5.0 CONSTRUCTION OF FENCING

FENCING
Site: SIKONGO CHIRUNDU DISTRICT
Sl.No. ITEM UNIT QTY
G FENCING INSTALLATION

Game wire fencing shall be 1.88m x 300mm 14W Wire VELDSPAN brand or
equal and approved, with all posts, steys and Y sections well anchored in to
the ground by concreting with C20 concrete to resident Engineer's approval, all
complete with fence posts round 3.0m x 76mm MD, Fence Stey Round 3.0 x
38mm MD, all bolts, washers and nuts to render installation functional, fence
standards Y sections 3.05m at not more than 4.5m centres, Double 1.8 x 4.2m
Fence Gate all complete with required Wire plains to Engineers satisfaction
Supply and install 'game wire fencing' as described around the water tank and
i) water kiosk facility around 1/4 hactare plot m 250

Supply and install double gate as described to allow for controlled access
ii) around the water tank and water kiosk facility around 1/4 hactare plot No. 1

FENCING INSTALLATION - TOTAL CARRIED TO SUMMARY

Site: NABBANDA CHIRUNDU DISTRICT


Sl.No. ITEM UNIT QTY
G FENCING INSTALLATION
Game wire fencing shall be 1.88m x 300mm 14W Wire VELDSPAN brand or
equal and approved, with all posts, steys and Y sections well anchored in to
the ground by concreting with C20 concrete to resident Engineer's approval, all
complete with fence posts round 3.0m x 76mm MD, Fence Stey Round 3.0 x
38mm MD, all bolts, washers and nuts to render installation functional, fence
standards Y sections 3.05m at not more than 4.5m centres, Double 1.8 x 4.2m
Fence Gate all complete with required Wire plains to Engineers satisfaction
Supply and install 'game wire fencing' as described around the water tank and
i) water kiosk facility around 1/4 hactare plot m 250

Supply and install double gate as described to allow for controlled access
ii) around the water tank and water kiosk facility around 1/4 hactare plot No. 1

FENCING INSTALLATION - TOTAL CARRIED TO SUMMARY

SITE: JAMBA
CHIRUNDU
Sl.No. ITEM UNIT QTY
DISTRICT
G FENCING INSTALLATION

Game wire fencing shall be 1.88m x 300mm 14W Wire VELDSPAN brand or
equal and approved, with all posts, steys and Y sections well anchored in to
the ground by concreting with C20 concrete to resident Engineer's approval, all
complete with fence posts round 3.0m x 76mm MD, Fence Stey Round 3.0 x
38mm MD, all bolts, washers and nuts to render installation functional, fence
standards Y sections 3.05m at not more than 4.5m centres, Double 1.8 x 4.2m
Fence Gate all complete with required Wire plains to Engineers satisfaction
Supply and install 'game wire fencing' as described around the water tank and
i) water kiosk facility around 1/4 hactare plot m 250

Supply and install double gate as described to allow for controlled access
ii) around the water tank and water kiosk facility around 1/4 hactare plot No. 1

FENCING INSTALLATION - TOTAL CARRIED TO SUMMARY

Site: MWEEMBA CHIRUNDU DISTRICT


Sl.No. ITEM UNIT QTY
G FENCING INSTALLATION

Game wire fencing shall be 1.88m x 300mm 14W Wire VELDSPAN brand or
equal and approved, with all posts, steys and Y sections well anchored in to
the ground by concreting with C20 concrete to resident Engineer's approval, all
complete with fence posts round 3.0m x 76mm MD, Fence Stey Round 3.0 x
38mm MD, all bolts, washers and nuts to render installation functional, fence
standards Y sections 3.05m at not more than 4.5m centres, Double 1.8 x 4.2m
Fence Gate all complete with required Wire plains to Engineers satisfaction
Supply and install 'game wire fencing' as described around the water tank and
i) water kiosk facility around 1/4 hactare plot m 250

Supply and install double gate as described to allow for controlled access
ii) around the water tank and water kiosk facility around 1/4 hactare plot No. 1

FENCING INSTALLATION - TOTAL CARRIED TO SUMMARY

Site: CHIKANZAYA CHIRUNDU DISTRICT


Sl.No. ITEM UNIT QTY
G FENCING INSTALLATION

Game wire fencing shall be 1.88m x 300mm 14W Wire VELDSPAN brand or
equal and approved, with all posts, steys and Y sections well anchored in to
the ground by concreting with C20 concrete to resident Engineer's approval, all
complete with fence posts round 3.0m x 76mm MD, Fence Stey Round 3.0 x
38mm MD, all bolts, washers and nuts to render installation functional, fence
standards Y sections 3.05m at not more than 4.5m centres, Double 1.8 x 4.2m
Fence Gate all complete with required Wire plains to Engineers satisfaction
Supply and install 'game wire fencing' as described around the water tank and
i) water kiosk facility around 1/4 hactare plot m 250

Supply and install double gate as described to allow for controlled access
ii) around the water tank and water kiosk facility around 1/4 hactare plot No. 1

FENCING INSTALLATION - TOTAL CARRIED TO SUMMARY

SITE:
HACHIPILIKA
Sl.No. ITEM UNIT QTY
CHIRUNDU
DISTRICT
G FENCING INSTALLATION

Game wire fencing shall be 2.11m x 300mm 14W Wire VELDSPAN brand or
equal and approved, with all posts, steys and Y sections well anchored in to
the ground by concreting with C20 concrete to resident Engineer's approval, all
complete with fence posts round 3.0m x 76mm MD, Fence Stey Round 3.0 x
38mm MD, all bolts, washers and nuts to render installation functional, fence
standards Y sections 3.05m at not more than 4.5m centres, Double 1.8 x 4.2m
Fence Gate all complete with required Wire plains to Engineers satisfaction
Supply and install 'game wire fencing' as described around the water tank and
i) water kiosk facility around 1 hactare plot m 500

Supply and install double gate as described to allow for controlled access
ii) around the water tank and water kiosk facility around 1 hactare plot No. 1

FENCING INSTALLATION - TOTAL CARRIED TO SUMMARY


Site: IBBWEMUNYAMA CHIRUNDU DISTRICT
Sl.No. ITEM UNIT QTY
G FENCING INSTALLATION

Game wire fencing shall be 1.88m x 300mm 14W Wire VELDSPAN brand or
equal and approved, with all posts, steys and Y sections well anchored in to
the ground by concreting with C20 concrete to resident Engineer's approval, all
complete with fence posts round 3.0m x 76mm MD, Fence Stey Round 3.0 x
38mm MD, all bolts, washers and nuts to render installation functional, fence
standards Y sections 3.05m at not more than 4.5m centres, Double 1.8 x 4.2m
Fence Gate all complete with required Wire plains to Engineers satisfaction
Supply and install 'game wire fencing' as described around the water tank and
i) water kiosk facility around 1/4 hactare plot m 250

Supply and install double gate as described to allow for controlled access
ii) around the water tank and water kiosk facility around 1/4 hactare plot No. 1

FENCING INSTALLATION - TOTAL CARRIED TO SUMMARY

Site: CHULAULA CHIRUNDU DISTRICT


Sl.No. ITEM UNIT QTY
G FENCING INSTALLATION

Game wire fencing shall be 1.88m x 300mm 14W Wire VELDSPAN brand or
equal and approved, with all posts, steys and Y sections well anchored in to
the ground by concreting with C20 concrete to resident Engineer's approval, all
complete with fence posts round 3.0m x 76mm MD, Fence Stey Round 3.0 x
38mm MD, all bolts, washers and nuts to render installation functional, fence
standards Y sections 3.05m at not more than 4.5m centres, Double 1.8 x 4.2m
Fence Gate all complete with required Wire plains to Engineers satisfaction
Supply and install 'game wire fencing' as described around the water tank and
i) water kiosk facility around 1/4 hactare plot m 250

Supply and install double gate as described to allow for controlled access
ii) around the water tank and water kiosk facility around 1/4 hactare plot No. 1

FENCING INSTALLATION - TOTAL CARRIED TO SUMMARY

Site: CHIWENA CHIRUNDU DISTRICT


Sl.No. ITEM UNIT QTY
G FENCING INSTALLATION
Game wire fencing shall be 1.88m x 300mm 14W Wire VELDSPAN brand or
equal and approved, with all posts, steys and Y sections well anchored in to
the ground by concreting with C20 concrete to resident Engineer's approval, all
complete with fence posts round 3.0m x 76mm MD, Fence Stey Round 3.0 x
38mm MD, all bolts, washers and nuts to render installation functional, fence
standards Y sections 3.05m at not more than 4.5m centres, Double 1.8 x 4.2m
Fence Gate all complete with required Wire plains to Engineers satisfaction
Supply and install 'game wire fencing' as described around the water tank and
i) water kiosk facility around 1 hactare plot m 500

Supply and install double gate as described to allow for controlled access
ii) around the water tank and water kiosk facility around 1 hactare plot No. 1

FENCING INSTALLATION - TOTAL CARRIED TO SUMMARY

FENCING INSTALLATION - TOTAL CARRIED TO MAIN SUMMARY

6.0 CONSTRUCTION OF DRIP IRRIGATION SYSTEM

Site: CHIWENA CHIRUNDU DISTRICT

ITEM DESCRIPTION UNIT QTY

1 DRIP IRRIGATION SYSTEM 1ha


The contractor is expected to supply, construct, commission the
1ha drip irrigation system

A Excavating trenches not exceeding 0.80m deep and


average depth 600mm starting from existing ground level
to receive service pipes, including grading bottoms,
earthwork supports, backfilling with excavated material,
disposing of surplus excavated material off site m 400

B Extra over excavating in hard rock m³ 100

Polyvinyl Chloride class 6, PVC pipes, fittings


and jointing as described

FILTER
1 DISC FILTER 130 MICRONS, 3" EA 1
2 ACCESSORIES incl valves, fittings, risers etc EA 1
3

MAINLINE & SUBMAIN FITTINGS


1 PIPE PVC 63 W/SEAL CLASS 6 MTR 204
2 GALVANISED UNION WITH O-RING, HD 50MM EA 10
3 PVC VALVE PLAIN 50 EA 10
4 PVC 90 DEG TEE GLUE 63 EA 4
5 PVC ADAPTOR GLUE 50*63*2", PN16 EA 10
6 PVC END CAP PN16 EA 10
7 PVC 63MM SOCKET PN16 EA 8
8 NAVC 10 2" COMBINATION AV PN10 BSP EA 2
9 GALVANISED RISER 2" X 75MM, HD EA 30
10 GALVANISED EQUAL TEE, HD, 50MM EA 10
11 GALVANISED ELBOW, HD, 50MM EA 40
12 GALVANISED NIPPLE, HD, 50MM EA 60
13 PVC ADAPTOR-GLUE 63*75*2, PN16 EA 3
14 PVC ADAPTOR TEE-GLUE 63* 2", PN16 EA 3
15 ACCESSORIES EA 2
16

SUBMAIN PVC PIPES


1 PIPE UPVC 50 CLASS 6 MTR 240
2 ACCESSORIES fittings LS 1
3

DRIP SYSTEM
DRIP PIPE 1.0L/H @ 0.3CM SP, 0.60MM MIN WALL THICKNESS, VIRGIN
1 MATERIAL, 4 YR WARRANTY MTR 10000
2 PE IRRIGATION PIPE 16/4 100M MTR 200
3 START CONN-PVC BARB 16 W/SEAL- MT EA 200
4 END LINE (DOUBLE O) 16/17 EA 200
5 BARB 16 COUPLING CONN. 1UNIT EA 200
6 BARB 16 W/FLARE COUPLING EA 200

DRIP IRRIGATION CONSTRUCTION SUMMARY

SITE: HACHIPILIKA CHIRUNDU DISTRICT

ITEM DESCRIPTION UNIT QTY

1 DRIP IRRIGATION SYSTEM 1ha


The contractor is expected to supply, construct, commission the
1ha drip irrigation system

A Excavating trenches not exceeding 0.80m deep and


average depth 600mm starting from existing ground level
to receive service pipes, including grading bottoms,
earthwork supports, backfilling with excavated material,
disposing of surplus excavated material off site m 400

B Extra over excavating in hard rock m³ 100


Polyvinyl Chloride class 6, PVC pipes, fittings
and jointing as described

FILTER
1 DISC FILTER 130 MICRONS, 3" EA 1
2 ACCESSORIES incl valves, fittings, risers etc EA 1
3

MAINLINE & SUBMAIN FITTINGS


1 PIPE PVC 63 W/SEAL CLASS 6 MTR 204
2 GALVANISED UNION WITH O-RING, HD 50MM EA 10
3 PVC VALVE PLAIN 50 EA 10
4 PVC 90 DEG TEE GLUE 63 EA 4
5 PVC ADAPTOR GLUE 50*63*2", PN16 EA 10
6 PVC END CAP PN16 EA 10
7 PVC 63MM SOCKET PN16 EA 8
8 NAVC 10 2" COMBINATION AV PN10 BSP EA 2
9 GALVANISED RISER 2" X 75MM, HD EA 30
10 GALVANISED EQUAL TEE, HD, 50MM EA 10
11 GALVANISED ELBOW, HD, 50MM EA 40
12 GALVANISED NIPPLE, HD, 50MM EA 60
13 PVC ADAPTOR-GLUE 63*75*2, PN16 EA 3
14 PVC ADAPTOR TEE-GLUE 63* 2", PN16 EA 3
15 ACCESSORIES EA 2
16

SUBMAIN PVC PIPES


1 PIPE UPVC 50 CLASS 6 MTR 240
2 ACCESSORIES fittings LS 1
3

DRIP SYSTEM
DRIP PIPE 1.0L/H @ 0.3CM SP, 0.60MM MIN WALL THICKNESS, VIRGIN
1 MATERIAL, 4 YR WARRANTY MTR 10000
2 PE IRRIGATION PIPE 16/4 100M MTR 200
3 START CONN-PVC BARB 16 W/SEAL- MT EA 200
4 END LINE (DOUBLE O) 16/17 EA 200
5 BARB 16 COUPLING CONN. 1UNIT EA 200
6 BARB 16 W/FLARE COUPLING EA 200

DRIP IRRIGATION CONSTRUCTION SUMMARY

COLLECTION
DRIP IRRIGATION TO MAIN SUMMARY

7.0 CONSTRUCTION OF SOLAR SYSTEMS


Site: SIKONGO CHIRUNDU DISTRICT
1 BOREHOLES
No. ITEM UNIT QTY

SOLAR PUMP STRUCTURE


Excavation(Provisional)

A SOLAR PUMP AND STRUCTURE

Excavation(Provisional)

Excavation including maintaining and supporting sides and keeping free from
water, mud and fallen materials by bailing, pumping or otherwise

A1 Prepare site by stripping top 200 mm of soil to remove all debris including sand
(if any) from site and carting away spoil m2 50

A2 Pit excavation commencing at reduced levels depth not exceeding 1.50m deep
m3 2

A3 Remove surplus excavated material from site m3 0.50

A4 Backfill around foundation m3 2

Concrete work

Reinforced Concrete class 25

A5 Concrete pad with surface steel trowelled smooth m3 0.13

Reinforcement

A6 Reinforcement bars (all sizes) kg 35

Sawn formwork

A7 Formwork to sides m 2

Structural steelwork

A8 Supply, fabricate and erect the following framed structural steelwork; complete 1
with and including all welded and bolted connections; and including one shop
coat red oxide, zinc chromate or similar and approved primer and 2 finishing
coats of gloss oil paint after erection: refer to DWG #1 attached
A9 Solar panels support structure constructed according to design including anti
theft U-channels 50mm x 50mm, including Aluminium U 3mm channel, 7mm sum 1
angle lines,

Warranty (months): 12

6 Supply and Installation of Solar Powered Pump

A 1HP DC Solar Submersible Pump CW Control Panel ea 1

B 4.0mm submersible cable 3-core m 100

C Joint kit ea 1

D 550W solar modules, Monocrystalline, 49.9 VoC DC OR alternative module ea 4


combination

E 32mm HDPE poly pipe class 9 x 100m ea 1

F 32mm HDPE poly pipe class 6 x 100m ea 2

G 32mm x 1 1/4" poly adapter ea 1

H 1 1/4" well seal complete (union, tee and Elbow etc) ea 1

I Cable ties packets ea 1

J 6mm earth wire m 15

K 32mm compression couplers ea 4

L Miscelleaneous ( i.e sundries, bolts, thread tape etc) items 1

M Installation ea 1

N Borehole flushing ea 1

O Borehole pump test ea 1

Sub-Total

Site: NABBANDA CHIRUNDU DISTRICT


1 BOREHOLES
No. ITEM UNIT QTY

SOLAR PUMP STRUCTURE


Excavation(Provisional)
A SOLAR PUMP AND STRUCTURE

Excavation(Provisional)

Excavation including maintaining and supporting sides and keeping free from
water, mud and fallen materials by bailing, pumping or otherwise

A1 Prepare site by stripping top 200 mm of soil to remove all debris including sand
(if any) from site and carting away spoil m2 100

A2 Pit excavation commencing at reduced levels depth not exceeding 1.50m deep
m3 2

A3 Remove surplus excavated material from site m3 0.50

A4 Backfill around foundation m3 2

Concrete work

Reinforced Concrete class 25

A5 Concrete pad with surface steel trowelled smooth m3 0.13

Reinforcement

A6 Reinforcement bars (all sizes) kg 35

Sawn formwork

A7 Formwork to sides m 2

Structural steelwork

A8 Supply, fabricate and erect the following framed structural steelwork; complete 1
with and including all welded and bolted connections; and including one shop
coat red oxide, zinc chromate or similar and approved primer and 2 finishing
coats of gloss oil paint after erection: refer to DWG #1 attached

A9 Solar panels support structure constructed according to design including anti


theft U-channels 50mm x 50mm, including Aluminium U 3mm channel, 7mm sum 1
angle lines,

Warranty (months): 12
6 Supply and Installation of Solar Powered Pump

A 1HP DC Solar Submersible Pump CW Control Panel ea 1

B 4.0mm submersible cable 3-core m 100

C Joint kit ea 1

D 550W solar modules, Monocrystalline, 49.9 VoC DC OR alternative module ea 4


combination

E 32mm HDPE poly pipe class 9 x 100m ea 1

F 32mm HDPE poly pipe class 6 x 100m ea 2

G 32mm x 1 1/4" poly adapter ea 1

H 1 1/4" well seal complete (union, tee and Elbow etc) ea 1

I Cable ties packets ea 1

J 6mm earth wire m 15

K 32mm compression couplers ea 4

L Miscelleaneous ( i.e sundries, bolts, thread tape etc) items 1

M Installation ea 1

N Borehole flushing ea 1

O Borehole pump test ea 1

Sub-Total

SITE: JAMBA CHIRUNDU DISTRICT


1 BOREHOLES
No. ITEM UNIT QTY

SOLAR PUMP STRUCTURE


Excavation(Provisional)

A SOLAR PUMP AND STRUCTURE

Excavation(Provisional)
Excavation including maintaining and supporting sides and keeping free from
water, mud and fallen materials by bailing, pumping or otherwise

A1 Prepare site by stripping top 200 mm of soil to remove all debris including sand
(if any) from site and carting away spoil m2 100

A2 Pit excavation commencing at reduced levels depth not exceeding 1.50m deep
m3 2

A3 Remove surplus excavated material from site m3 0.50

A4 Backfill around foundation m3 2

Concrete work

Reinforced Concrete class 25

A5 Concrete pad with surface steel trowelled smooth m3 0.13

Reinforcement

A6 Reinforcement bars (all sizes) kg 35

Sawn formwork

A7 Formwork to sides m 2

Structural steelwork

A8 Supply, fabricate and erect the following framed structural steelwork; complete 1
with and including all welded and bolted connections; and including one shop
coat red oxide, zinc chromate or similar and approved primer and 2 finishing
coats of gloss oil paint after erection: refer to DWG #1 attached

A9 Solar panels support structure constructed according to design including anti


theft U-channels 50mm x 50mm, including Aluminium U 3mm channel, 7mm sum 1
angle lines,

Warranty (months): 12

6 Supply and Installation of Solar Powered Pump

A 1HP DC Solar Submersible Pump CW Control Panel ea 1

B 4.0mm submersible cable 3-core m 100


C Joint kit ea 1

D 550W solar modules, Monocrystalline, 49.9 VoC DC OR alternative module ea 4


combination

E 32mm HDPE poly pipe class 9 x 100m ea 1

F 32mm HDPE poly pipe class 6 x 100m ea 2

G 32mm x 1 1/4" poly adapter ea 1

H 1 1/4" well seal complete (union, tee and Elbow etc) ea 1

I Cable ties packets ea 1

J 6mm earth wire m 15

K 32mm compression couplers ea 4

L Miscelleaneous ( i.e sundries, bolts, thread tape etc) items 1

M Installation ea 1

N Borehole flushing ea 1

O Borehole pump test ea 1

Sub-Total

Site: MWEEMBA CHIRUNDU DISTRICT


1 BOREHOLES
No. ITEM UNIT QTY

SOLAR PUMP STRUCTURE


Excavation(Provisional)

A SOLAR PUMP AND STRUCTURE

Excavation(Provisional)

Excavation including maintaining and supporting sides and keeping free from
water, mud and fallen materials by bailing, pumping or otherwise

A1 Prepare site by stripping top 200 mm of soil to remove all debris including sand
(if any) from site and carting away spoil m2 100
A2 Pit excavation commencing at reduced levels depth not exceeding 1.50m deep
m3 2

A3 Remove surplus excavated material from site m3 0.50

A4 Backfill around foundation m3 2

Concrete work

Reinforced Concrete class 25

A5 Concrete pad with surface steel trowelled smooth m3 0.13

Reinforcement

A6 Reinforcement bars (all sizes) kg 35

Sawn formwork

A7 Formwork to sides m 2

Structural steelwork

A8 Supply, fabricate and erect the following framed structural steelwork; complete 1
with and including all welded and bolted connections; and including one shop
coat red oxide, zinc chromate or similar and approved primer and 2 finishing
coats of gloss oil paint after erection: refer to DWG #1 attached

A9 Solar panels support structure constructed according to design including anti


theft U-channels 50mm x 50mm, including Aluminium U 3mm channel, 7mm sum 1
angle lines,

Warranty (months): 12

6 Supply and Installation of Solar Powered Pump

A 1HP DC Solar Submersible Pump CW Control Panel ea 1

B 4.0mm submersible cable 3-core m 100

C Joint kit ea 1

D 550W solar modules, Monocrystalline, 49.9 VoC DC OR alternative module ea 4


combination

E 32mm HDPE poly pipe class 9 x 100m ea 1


F 32mm HDPE poly pipe class 6 x 100m ea 2

G 32mm x 1 1/4" poly adapter ea 1

H 1 1/4" well seal complete (union, tee and Elbow etc) ea 1

I Cable ties packets ea 1

J 6mm earth wire m 15

K 32mm compression couplers ea 4

L Miscelleaneous ( i.e sundries, bolts, thread tape etc) items 1

M Installation ea 1

N Borehole flushing ea 1

O Borehole pump test ea 1

Sub-Total

Site: CHIKANZAYA CHIRUNDU DISTRICT


1 BOREHOLES
No. ITEM UNIT QTY

SOLAR PUMP STRUCTURE


Excavation(Provisional)

A SOLAR PUMP AND STRUCTURE

Excavation(Provisional)

Excavation including maintaining and supporting sides and keeping free from
water, mud and fallen materials by bailing, pumping or otherwise

A1 Prepare site by stripping top 200 mm of soil to remove all debris including sand
(if any) from site and carting away spoil m2 100

A2 Pit excavation commencing at reduced levels depth not exceeding 1.50m deep
m3 2

A3 Remove surplus excavated material from site m3 0.50

A4 Backfill around foundation m3 2


Concrete work

Reinforced Concrete class 25

A5 Concrete pad with surface steel trowelled smooth m3 0.13

Reinforcement

A6 Reinforcement bars (all sizes) kg 35

Sawn formwork

A7 Formwork to sides m 2

Structural steelwork

A8 Supply, fabricate and erect the following framed structural steelwork; complete 1
with and including all welded and bolted connections; and including one shop
coat red oxide, zinc chromate or similar and approved primer and 2 finishing
coats of gloss oil paint after erection: refer to DWG #1 attached

A9 Solar panels support structure constructed according to design including anti


theft U-channels 50mm x 50mm, including Aluminium U 3mm channel, 7mm sum 1
angle lines,

Warranty (months): 12

6 Supply and Installation of Solar Powered Pump

A 1HP DC Solar Submersible Pump CW Control Panel ea 1

B 4.0mm submersible cable 3-core m 100

C Joint kit ea 1

D 550W solar modules, Monocrystalline, 49.9 VoC DC OR alternative module ea 4


combination

E 32mm HDPE poly pipe class 9 x 100m ea 1

F 32mm HDPE poly pipe class 6 x 100m ea 2

G 32mm x 1 1/4" poly adapter ea 1

H 1 1/4" well seal complete (union, tee and Elbow etc) ea 1

I Cable ties packets ea 1


J 6mm earth wire m 15

K 32mm compression couplers ea 4

L Miscelleaneous ( i.e sundries, bolts, thread tape etc) items 1

M Installation ea 1

N Borehole flushing ea 1

O Borehole pump test ea 1

Sub-Total

SITE:
HACHIPILIKA 1 BOREHOLES
CHIRUNDU
No.
DISTRICT ITEM UNIT QTY

SOLAR PUMP STRUCTURE


Excavation(Provisional)

A SOLAR PUMP AND STRUCTURE

Excavation(Provisional)

Excavation including maintaining and supporting sides and keeping free from
water, mud and fallen materials by bailing, pumping or otherwise

A1 Prepare site by stripping top 200 mm of soil to remove all debris including sand
(if any) from site and carting away spoil m2 100

A2 Pit excavation commencing at reduced levels depth not exceeding 1.50m deep
m3 2

A3 Remove surplus excavated material from site m3 0.50

A4 Backfill around foundation m3 2

Concrete work

Reinforced Concrete class 25

A5 Concrete pad with surface steel trowelled smooth m3 0.13


Reinforcement

A6 Reinforcement bars (all sizes) kg 35

Sawn formwork

A7 Formwork to sides m 2

Structural steelwork

A8 Supply, fabricate and erect the following framed structural steelwork; complete 1
with and including all welded and bolted connections; and including one shop
coat red oxide, zinc chromate or similar and approved primer and 2 finishing
coats of gloss oil paint after erection: refer to DWG #1 attached

A9 Solar panels support structure constructed according to design including anti


theft U-channels 50mm x 50mm, including Aluminium U 3mm channel, 7mm sum 1
angle lines,

Warranty (months): 12

6 Supply and Installation of Solar Powered Pump

A10 2.2Kw Submersible, average yield 4l/s ea 1

A11 4.0 mm submersible cable 3-core m 100

A12 Joint kit ea 1

A13 INVT prewired DC/AC controller w/protection ea 1

A14 345W solar modules, voc 46.4v +/-3% OR alternative module combination
ea 16

A15 50mm HDPE poly pipe class 9 x 100m ea 1

A16 50mm HDPE poly pipe class 6 x 100m ea 2

A17 50mm x 2" poly adapter ea 1

A18 2" well seal complete (union, tee and Elbow etc) ea 1

A19 Cable ties packets ea 1

A20 6mm earth wire m 40


A21 50mm compression couplers ea 4

A22 Miscelleaneous ( bolts, thread tape etc) items 1

A23 Installation of solar kit and pipework from borehole to tanks ea 1

A25 Borehole flushing and testing ea 1

Sub-Total

Site: IBBWEMUNYAMA CHIRUNDU DISTRICT


1 BOREHOLES
No. ITEM UNIT QTY

SOLAR PUMP STRUCTURE


Excavation(Provisional)

A SOLAR PUMP AND STRUCTURE

Excavation(Provisional)

Excavation including maintaining and supporting sides and keeping free from
water, mud and fallen materials by bailing, pumping or otherwise

A1 Prepare site by stripping top 200 mm of soil to remove all debris including sand
(if any) from site and carting away spoil m2 100

A2 Pit excavation commencing at reduced levels depth not exceeding 1.50m deep
m3 2

A3 Remove surplus excavated material from site m3 0.50

A4 Backfill around foundation m3 2

Concrete work

Reinforced Concrete class 25

A5 Concrete pad with surface steel trowelled smooth m3 0.13

Reinforcement

A6 Reinforcement bars (all sizes) kg 35

Sawn formwork
A7 Formwork to sides m 2

Structural steelwork

A8 Supply, fabricate and erect the following framed structural steelwork; complete 1
with and including all welded and bolted connections; and including one shop
coat red oxide, zinc chromate or similar and approved primer and 2 finishing
coats of gloss oil paint after erection: refer to DWG #1 attached

A9 Solar panels support structure constructed according to design including anti


theft U-channels 50mm x 50mm, including Aluminium U 3mm channel, 7mm sum 1
angle lines,

Warranty (months): 12

6 Supply and Installation of Solar Powered Pump

A 1HP DC Solar Submersible Pump CW Control Panel ea 1

B 4.0mm submersible cable 3-core m 100

C Joint kit ea 1

D 550W solar modules, Monocrystalline, 49.9 VoC DC OR alternative module ea 4


combination

E 32mm HDPE poly pipe class 9 x 100m ea 1

F 32mm HDPE poly pipe class 6 x 100m ea 2

G 32mm x 1 1/4" poly adapter ea 1

H 1 1/4" well seal complete (union, tee and Elbow etc) ea 1

I Cable ties packets ea 1

J 6mm earth wire m 15

K 32mm compression couplers ea 4

L Miscelleaneous ( i.e sundries, bolts, thread tape etc) items 1

M Installation ea 1

N Borehole flushing ea 1

O Borehole pump test ea 1


Sub-Total

Site: CHULAULA CHIRUNDU DISTRICT


1 BOREHOLES
No. ITEM UNIT QTY

SOLAR PUMP STRUCTURE


Excavation(Provisional)

A SOLAR PUMP AND STRUCTURE

Excavation(Provisional)

Excavation including maintaining and supporting sides and keeping free from
water, mud and fallen materials by bailing, pumping or otherwise

A1 Prepare site by stripping top 200 mm of soil to remove all debris including sand
(if any) from site and carting away spoil m2 100

A2 Pit excavation commencing at reduced levels depth not exceeding 1.50m deep
m3 2

A3 Remove surplus excavated material from site m3 0.50

A4 Backfill around foundation m3 2

Concrete work

Reinforced Concrete class 25

A5 Concrete pad with surface steel trowelled smooth m3 0.13

Reinforcement

A6 Reinforcement bars (all sizes) kg 35

Sawn formwork

A7 Formwork to sides m 2

Structural steelwork
A8 Supply, fabricate and erect the following framed structural steelwork; complete 1
with and including all welded and bolted connections; and including one shop
coat red oxide, zinc chromate or similar and approved primer and 2 finishing
coats of gloss oil paint after erection: refer to DWG #1 attached

A9 Solar panels support structure constructed according to design including anti


theft U-channels 50mm x 50mm, including Aluminium U 3mm channel, 7mm sum 1
angle lines,

Warranty (months): 12

6 Supply and Installation of Solar Powered Pump

A 1HP DC Solar Submersible Pump CW Control Panel ea 1

B 4.0mm submersible cable 3-core m 100

C Joint kit ea 1

D 550W solar modules, Monocrystalline, 49.9 VoC DC OR alternative module ea 4


combination

E 32mm HDPE poly pipe class 9 x 100m ea 1

F 32mm HDPE poly pipe class 6 x 100m ea 2

G 32mm x 1 1/4" poly adapter ea 1

H 1 1/4" well seal complete (union, tee and Elbow etc) ea 1

I Cable ties packets ea 1

J 6mm earth wire m 15

K 32mm compression couplers ea 4

L Miscelleaneous ( i.e sundries, bolts, thread tape etc) items 1

M Installation ea 1

N Borehole flushing ea 1

O Borehole pump test ea 1

Sub-Total

Site: CHIWENA CHIRUNDU DISTRICT


1 BOREHOLES
No. ITEM UNIT QTY

SOLAR PUMP STRUCTURE


Excavation(Provisional)

A SOLAR PUMP AND STRUCTURE

Excavation(Provisional)

Excavation including maintaining and supporting sides and keeping free from
water, mud and fallen materials by bailing, pumping or otherwise

A1 Prepare site by stripping top 200 mm of soil to remove all debris including sand
(if any) from site and carting away spoil m2 100

A2 Pit excavation commencing at reduced levels depth not exceeding 1.50m deep
m3 2

A3 Remove surplus excavated material from site m3 0.50

A4 Backfill around foundation m3 2

Concrete work

Reinforced Concrete class 25

A5 Concrete pad with surface steel trowelled smooth m3 0.13

Reinforcement

A6 Reinforcement bars (all sizes) kg 35

Sawn formwork

A7 Formwork to sides m 2

Structural steelwork

A8 Supply, fabricate and erect the following framed structural steelwork; complete 1
with and including all welded and bolted connections; and including one shop
coat red oxide, zinc chromate or similar and approved primer and 2 finishing
coats of gloss oil paint after erection: refer to DWG #1 attached
A9 Solar panels support structure constructed according to design including anti
theft U-channels 50mm x 50mm, including Aluminium U 3mm channel, 7mm sum 1
angle lines,

Warranty (months): 12

6 Supply and Installation of Solar Powered Pump

A10 2.2Kw Submersible, average yield 4l/s ea 1

A11 4.0 mm submersible cable 3-core m 100

A12 Joint kit ea 1

A13 INVT prewired DC/AC controller w/protection ea 1

A14 345W solar modules, voc 46.4v +/-3% OR alternative module combination
ea 16

A15 50mm HDPE poly pipe class 9 x 100m ea 1

A16 50mm HDPE poly pipe class 6 x 100m ea 2

A17 50mm x 2" poly adapter ea 1

A18 2" well seal complete (union, tee and Elbow etc) ea 1

A19 Cable ties packets ea 1

A20 6mm earth wire m 40

A21 50mm compression couplers ea 1

A22 Miscelleaneous ( bolts, thread tape etc) items 1

A23 Installation of solar kit and pipework from borehole to tanks ea 1

A25 Borehole flushing and testing ea 1

Sub-Total

SOLAR SYSTEM- TOTAL CARRIED TO MAIN SUMMARY

PRIME COSTS

DESCRIPTION UNIT QTY


Include the following NET Provisional Sums
to be expended by Ministry of Agriculture
or omitted if not expended without any claim for loss
of profit

1 ALLOW the provisional sum at K300,000 to cover incidentals,


complete ea 1
cost of incorporating materials into the
works including delivery of materials to site,
off-loading, storing, checking replacing defective
items, establishment charges all transport and
for installation of materials on site and all
contractor's overheads and profit

2 Add Contigency sum at 10% of total ea 1

PROVISIONAL AND PRIME COST SUMS


TOTAL CARRIED TO SUMMARY

SUMMARY
Sl.No. ITEM

1 PRELIMINARIES AND GENERAL ITEMS

CONSTRUCTION OF A STEEL WATER TANK TO HOIST LITRE POLY


2
WATER TANK

3 4 POINT WATER KIOSK

4 WATER TROUGHS

5 FENCING

6 DRIP IRRIGATION

7 SOLAR SYSTEM & STRUCTURE

8 PRIME COSTS

9 TOTAL
UNIT PRICE TOTAL PRICE

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0
0

0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

0
0
0
0

0
0
0
0
0
0
0
0

0
0

0
0

0
0
0

0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0
0

0
0
0

0
0
0
0

0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

0
0

0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0

0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0
0
0
0

0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

0
0

0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0

0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0

0
0

0
0

0
0

0
0

0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0

0
0
0
0
0

0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0

0
0
0
0
0

0
-

0
0

-
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

0
0

RATE AMOUNT
-