B.plan Real Estate Class Presentation
B.plan Real Estate Class Presentation
B.plan Real Estate Class Presentation
IN URBAN DEVELOPMENT
Sub CBD
8
Efficiencies and Urban Form
BARCELONA ATLANTA
Population (in 2.8 2.5
million)
Built Up Land 162 4280
Area (sq. km)
Average density 171 6
(in pph)
Average land 58 1712
A 10 minute walking
Consumption
distance at 4.5 km/hour
(sq.m. per
speed
person)
corresponds to a maximum
accessibility radius of about Public Transit 99 km 74 km
800 m to a metro station. Network
Passengers 60% within 600 4 % lives within
catered by Public m from Transit 800 m from
Transit station transit station
For the City of Atlanta to build a Transit similar to that of
Barcelona i.e catering to 60% of population, it would have to build
3400 km of tracks and 2400 new stops! 9
Would it be financially Viable?
Efficiencies and Urban Form: Increasing Densities
ATLANTA
Population 2.5 million
Built Up Area 4280 sq.km.
Average density 6 pph
Scenario 1 ( Land density based: 30 pph on 12.84 million (25.6% annual growth
total land) rate)
Scenario 2 (Population Growth based) 4.77 million (2.7% annual growth rate)
Land required at 30 pph 1412 sq.m.
To encourage ‘re-densification’: To achieve an average density of 30
pph over a 20 year period, at the growth rate of 2.7 %, 67% of existing
building stock would have to be pulled down and the population and
jobs moved to33% of the land , the rest returned back to nature!
11
Urban Structure and Regulations: Case of Mumbai
Balancing FSI and Infrastructure Provision is a tight rope walk for city
planners!
Informal Housing will consume highest FSI in the Best Location if not
otherwise handled ! 12
Real Estate Development
• The process
• The outcome
• Techniques of Market Analysis
The First step …
Project Conceptualization
SIT
E
What?
Why?
How?
Broad Study Methodology
Project Scoping
and Definition
Township as Economy
Driver evolving as Self Township as Reservoir
Sustainable Integrated for residential demand
Project feeding into the region
Greenfield Planned developments – driver based development
Name of Area
Developer Status
development (acres)
Development started in 1970s. 10%
population increase in 1991 census. Final
Navi Mumbai CIDCO 47,060
target population of 2 million.14 nodal towns
of approx. 3500 acres each.
Development started in 1991. With 1.2 million
Greater target population, the development is under
GNIDA 49,400.0
NOIDA construction with 19% Industrial, 25%
residential.
With around 1.0 million target population,
New Town -
HIDCO 9,334.1 being developed as satellite township of
Kolkata
Kolkata with IT as main driver.
Bangalore-
Knowledge
Mysore
City - IT & Bio- 9,000.0 Planning stage
corridor
tech
BMRDA
An integrated township in Gurgaon, with
DLF City, significant Retail, Residential and
DLF 3,000.0
Gurgaon Commercial uses. Progressing since – 1981
to 2005
Identification of Demand
Driver
Edu-City
Medi-City
Knowledge
City
Media City
Other
Industrial
State as Facilitator
Location of Rajarhat w.r.t Kolkata
SITE
Rajarhat
Saltlake
Achievable Pricing
HOME
Demand Assessment: Identification of Target User
Micro
Catchment Who is the
Extended User?
Catchment •Socio-economic
• East & North--east India
group
•From where will
• Pan-India
they come?
• Neighbouring countries
•What
• Overseas preferences do
NH 6 they have?
Kolkata
Supply Mapping: Mapping of Competition
-Location
-Accessibility
-Natural
Resources
-Surrounding
Land Use
-Physical
Infrastructure-
Off site
facilities
On site
facilities