SAMPLE Workplan

Uploaded by

fjanebatec
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 222

ENERGY AND BUILDING APPLICATIONS TECHNOLOGIES CORPORATION

WORK PLAN & ACCOMPLISHMENT


18 1
DESIGN, SUPPLY, RETROFIT, MANUFACTURE, INSTALL, TEST AND DESIGN, SUPPLY, CONSTRUCT, INSTALL, TEST AND COMMISSION OF THE REHABILITATION OF ELECTRICAL SYSTEM FOR SAN MIGUEL
PROJECT NAME WORKPLAN LEGEND:
CORPORATION HEAD OFFICE
SMC HEAD OFFICE COMPLEX Planned
PROJECT LOCATION 40 SAN MIGUEL MANDALUYONG CITY Actual
16 17
GENERAL DESCRIPTION Start Date 1/2/2024 (Tuesday) Display Week 1
End Date 7/23/2024 (Tuesday) Supervisor JOHN CHRISTIAN LANGCAMON Project Management Department Workplan
OVERALL ACTIVITIES/WORKPLAN Total Days 203 days
16 0
ACTIVITIES 31 Dec 2023 7 Jan 2024 14 Jan 2024 21 Jan 2024 28 Jan 2024 4 Feb 2024
ITEM TASK QTY UOM PLANNED ACTUAL % 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
START END DAYS START END DAYS DONE S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S
A CIVIL WORKS 1 lot -
1 CONSTRUCTION OF BOARD UP
1.1 Staking/Layout Tue 1/02/24 Wed 1/03/24 2 0%
1.3 Installation of G.I Pipes and Frames Wed 1/03/24 Fri 1/05/24 3 0%
1.4 Installation of Pre Painted roof Sheet Fri 1/05/24 Sun 1/07/24 3 0%
2 CONSTRUCTION OF POWER CENTER
Power Center Foundation -
1.6 Site Preparation/Staking/Layout/Clearing works Mon 1/08/24 Mon 1/08/24 1 - 0%
1.7 Excavation for Power Center Foundation Tue 1/09/24 Fri 1/12/24 4 - 0%
1.8 Fabrication of Rebars (Bulacan Area) Sat 1/13/24 Fri 2/02/24 21 - 0%
1.9 Installation of Rebars Tue 1/16/24 Wed 1/17/24 2 - 0%
1.10 Formworks Sat 1/20/24 Sun 1/21/24 2 - 0%
Conrete Pouring for concrete pedestal Tue 1/23/24 Tue 1/23/24 1 - 0%
Dismatling of Forms Wed 1/24/24 Wed 1/24/24 1 - 0%
2 Power Center Slab/Flooring including Transformer Pad -
2.2 Installation of Rebars and Forms (Slab) Sun 1/21/24 Sat 2/03/24 14 - 0%
Concrete pouring for Flooring Sat 2/03/24 Sat 2/03/24 1 - 0%
Dismantling of Forms Sat 2/17/24 Sat 2/17/24 1 - 0%
Installation of Rebars, Anchor bolts & Forms (Transformer Pad) Fri 2/23/24 Wed 2/28/24 6 - 0%
Concrete Pouring for Transformer Pad Thu 2/29/24 Thu 2/29/24 1 - 0%
Dismantling of Forms Fri 3/22/24 Fri 3/22/24 1 - 0%
3 Power Center Columns - 0%
3.2 Installation of Stirrups Thu 2/29/24 Fri 3/01/24 2 - 0%
Installation of Forms Sat 3/02/24 Sun 3/03/24 2 - 0%
Concrete Pouring Mon 3/04/24 Mon 3/04/24 1 - 0%
Dismantling of Forms Mon 3/11/24 Mon 3/11/24 1 - 0%
Power Center Walls - 0%
CHB Laying Tue 3/12/24 Sun 3/31/24 20 - 0%
Plastering/Finishing Mon 4/01/24 Wed 4/10/24 10 - 0%
Power Center Steel Works, Cladding and Roofing - 0%
Installation of structural steel members; Framings, Bracing, Purlins,
Rafter, Strut, Connector Plates, Bolts, Steel Pipe, Base Plate, Sag Rod, Square Mon 4/01/24 Sun 4/21/24 21 - 0%
Bar, Steel Canopy, Trusses, Built Up, Stiffener Plates

Roofing Works includes installation of Luxalon Roofing for Canopy and


other portion of the building as reflected on the drawing plans. the work is
Mon 4/22/24 Sun 4/28/24 7 - 0%
deemed to include flashings, ridge roll, canopy, end trim, anchors,
connectors, sealers

Installation of Fence Transformer Area Sat 6/08/24 Mon 6/10/24 3 - 0%


ARCHITECTURAL WORKS - 0%
Floor finish - Plain Cement Sun 4/28/24 Sat 5/04/24 7 - 0%
Water proofing for Roof Slab Thu 4/25/24 Wed 5/01/24 7 - 0%
Wall Finish Sun 4/21/24 Sat 5/04/24 14 - 0%
Ceiling Finish Sun 4/28/24 Sat 5/04/24 7 - 0%
Painting works Sun 5/05/24 Sat 5/25/24 21 - 0%
Installation of Door and Window Tue 4/30/24 Thu 5/02/24 3 - 0%
CABLE BRIDGE FOUNDATION CONSTRUCTION -
Excavation for Cable Bridge Pedestal Tue 1/09/24 Mon 1/15/24 7 - 0%
Fabrication of Rebars Tue 1/16/24 Thu 1/18/24 3 - 0%
Installation Rebars and Anchor bolts Thu 1/18/24 Sat 1/20/24 3 - 0%
Formworks Sat 1/20/24 Sat 1/20/24 1 - 0%
Concrete Pouring Tue 1/23/24 Tue 1/23/24 1 - 0%
Removal of Forms Wed 1/24/24 Wed 1/24/24 1 - 0%
Backfilling Thu 1/25/24 Thu 1/25/24 1 - 0%
Installation of I Beam Fri 2/02/24 Fri 2/02/24 1 - 0%
B ELECTRICAL WORKS 1 lot
4 CABLE BRIDGE CONSTRUCTION/CABLE TRAY ROUTE
MVSG TO DISTRIBUTION TRANSFORMER - 0%
4.1 Installation of Cable Trays Support and Cable Trays Fri 3/22/24 Tue 3/26/24 5 - 0%
POWER CENTER TO LVSG SIDE - 0%
Installation of Cable Trays Support and Cable Trays Wed 3/27/24 Wed 4/10/24 15 - 0%
POWER CENTER TO MERALCO LINE - 0%
4.3 Installation of Cable Trays Support and Cable Trays Thu 4/11/24 Wed 4/17/24 7 - 0%
5 MEDIUM VOLTAGE POWER DISTRIBUTION -
Mounting/assymbly of Power Transformer, 3,000kVA, 34.5kV/ 460V, 3-
5.1 Sun 6/02/24 Fri 6/07/24 6 - 0%
Phase, 60Hz, 5 - Steps OFF Load Tap Changer, Mineral Oil Filled
5.2 Mounting of Medium Voltage Switchgears and Accessories Sun 7/14/24 Tue 7/16/24 3 - 0%
5.3 Cable Pulling for Controls Mon 7/15/24 Wed 7/17/24 3 - 0%
5.4 Termination Works Wed 7/17/24 Fri 7/19/24 3 - 0%
5.5 Testing and Commissioning Sat 7/20/24 Sun 7/21/24 2 - 0%
6 LOW VOLTAGE POWER DISTRIBUTION
Installation of ECB for MV Transformer, IP 54, 5000A/5000AF, 100KAIC,
6.1 Mon 4/08/24 Tue 4/09/24 2 - 0%
3P, 460V, 3Ø, 60Hz, ACB, complete with accessories
6.2 Mounting of Low Voltage Switchgears Tue 4/09/24 Wed 4/10/24 2 - 0%
6.3 Installation of Tie Breakers Wed 4/10/24 Wed 4/10/24 1 - 0%
6.4 Termination Works Thu 4/11/24 Sun 4/14/24 4 - 0%
6.5 Testing and Commissioning Thu 4/04/24 Thu 4/04/24 1 - 0%
7 GROUNDING SYSTEM
7.1 Laying of Grounding Cables and CADWELD Connection Fri 1/12/24 Sat 1/13/24 2 - 0%
7.2 Installation of Grounidng Rod Fri 1/12/24 Fri 1/12/24 1 - 0%
7.3 Construction of Grounding pit Sat 1/13/24 Sat 1/13/24 1 - 0%
7.5 Testing and Commissioning Fri 6/07/24 Fri 6/07/24 1 - 0%
8 CABLE PULLING WORKS
8.1 Cable Pulling of 1Cx250mm2 Cable; MVSG to Distribution Transformer Tue 4/02/24 Sat 4/06/24 5 - 0%
8.2 Cable Pulling of 125mm2 Grounding cable Sat 4/06/24 Sat 4/06/24 1 - 0%
8.3 Cable Pulling of 1Cx250mm2 Cable; Power Center to LVSG Fri 4/05/24 Thu 4/18/24 14 - 0%
8.4 Cable Pulling of 125mm2 Grounding cable Thu 4/18/24 Thu 4/18/24 1 - 0%
Cable Pulling of 3Cx250mm2 Cable; Power Center to LVSG Thu 4/18/24 Mon 4/22/24 5 - 0%
Cable Pulling of 125mm2 Grounding cable Mon 4/22/24 Mon 4/22/24 1 - 0%
8.5 Testing and Commisioning Mon 4/22/24 Mon 4/22/24 1 - 0%
9 34.5KV DISTRIBUTION LINE (TO MERALCO)
FM-TNC-10-Rev00-05202023 Page 1 of 222
9.1 Erection of 60ft Concrete Pole Thu 2/08/24 Fri 2/09/24 2 - 0%
9.2 Installation of Cross Arm & I beam Fri 2/09/24 Fri 2/09/24 1 - 0%
9.3 Mounting of Post Insulator and Suspension Insulator Sat 2/10/24 Sat 2/10/24 1 - 0%
9.4 Mounting of Disconnect Switch, Manual Sat 2/10/24 Sat 2/10/24 - 0%
Mounting of Surge Arrester Sat 2/10/24 Sat 2/10/24 - 0%
9.5 Termination Works Sun 2/11/24 Sun 2/11/24 1 - 0%
9.6 Testing and Commissioning Mon 2/12/24 Mon 2/12/24 1 - 0%
10 AC/DC & STATION SERVICE SUPPLY -
10.1 Installation of AC & DC Panel Thu 4/04/24 Thu 4/04/24 1 - 0%
10.2 Installation of Station Battery 12Vdc Fri 4/05/24 Sat 4/06/24 2 - 0%
10.3 Installation of Battery Charger 220V, 1 phase Sat 4/06/24 Sat 4/06/24 - 0%
Termination Works Fri 4/07/24 Fri 4/07/24 1 - 0%
10.4 Testing and Commissioning Sun 4/07/24 Sun 4/07/24 1 - 0%
11 POWER CENTER BUILDING WIRING -
11.1 Roughing installation Thu 4/11/24 Wed 4/24/24 14 - 0%
11.2 Testing of Cables Wed 4/24/24 Wed 4/24/24 1 - 0%
11.3 Installation of Devices Wed 4/24/24 Wed 4/24/24 1 - 0%
Installation of Ligthing Fixtures Thu 4/25/24 Thu 4/25/24 1 - 0%
Termination Works Fri 4/26/24 Fri 4/26/24 1 - 0%
MECHANICAL WORKS
Dismantling of 2 Old Transformer Tue 7/23/24 Tue 7/23/24 1 - 0%
Installation of Building Exhaust Fan Fri 4/26/24 Fri 4/26/24 1 - 0%
Installation of Split type Air Conditioner Sat 4/27/24 Sun 4/28/24 2 - 0%
Fabrication for Cable Tray's and Cable Bridge Support Wed 1/31/24 Sat 2/03/24 4 0%
12 TRAININGS/ORIENTATION
12.1 Trainings/Orientation and Manuals Sat 11/04/23 Sat 11/04/23 1 - 0%

MANPOWER LOADING
31 Dec 2023 7 Jan 2024 14 Jan 2024 21 Jan 2024 28 Jan 2024 4 Feb 2024
ITEM DESIGNATION NO. OF PERSONNEL REMARKS 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S
ADMIN
Project Admin 1 1 1 1 1 1 1 1 1
Timekeeper 1 1 1 1 1 1 1 1 1
Service Driver 1 1 1 1 1 1 1 1 1
Safety Officer 1 1 1 1 1 1 1 1 1
Warehouseman 2 2 2 2 2 2 2 2 2
First Aider 1 1 1 1 1 1 1 1 1
Secruity Head 1 1 1 1 1 1 1 1 1
CONSTRUCTION MANAGEMENT
Project Manager 1 1 1 1 1 1 1 1 1
Electrical Engineer 2 2 2 2 2 2 2 2 2
Electrical Supervisor 2 2 2 2 2 2 2 2 2
Civil Supervisor 1 1 1 1 1 1 1 1 1
Mechanical Supervisor 0 0 0 0 0 0 0 0 0
ELECTRICAL
Linemen 5 5 5 6 6 6 6 6 6
Electrician 12 12 12 12 12 12 12 12 12
Welder 1 1 1 1 1 1 1 1 1
Labor/Helper 1 1 1 2 2 2 2 2 2
Terminator (Power Cables) 1 1 1 1 1 1 1 1 1
Terminator (Control Cables) 5 5 5 5 5 5 5 5 5
CIVIL
1 Skilled 0 0 0 7 7 7 7 7 7
Unskilled 0 0 0 0 0 0 0 0 0
MECHANICAL / RIGGING/CIVIL
Boom Truck and Crane Operator 1 1 1 2 2 2 2 2 1
Rigging Team (1 Team) 0 0 0 0 0 0 0 0 0
Welder 0 0 0 0 0 0 0 0 0
TESTING AND COMMISIONING
TNC MANAGER 0 0 0 0 0 0 0 0 0
TESTING ENGINEER 0 0 0 0 0 0 0 0 0
TECHNICIAN 0 0 0 0 0 0 0 0 0
EBAX TEAM (Retrofitting and SCADA)
Supervisor 0 0 0 0 0 0 0 1 1
Technician 0 0 0 0 0 0 0 2 2
Labor/Helper 0 0 0 0 0 0 0 0 0
1 TOTAL MANPOWER 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 40 40 40 50 50 50 50 53 52

Accomplishment date as of - to date


Projejct Accomplishment 0.00%

Prepared by: Reviewed by:

JOHN CHRISTIAN LANGCAMON DIEGO AMBIONG


Electrical Engineer Porject Manager

Noted by: Approved by:

LESTER LOUISE DAYDAY VIRGILIO FRANCISCO


PMD Manager General Manager

FM-TNC-10-Rev00-05202023 Page 2 of 222


PROJECT NAME

PROJECT LOCATION

GENERAL DESCRIPTION
OVERALL ACTIVITIES/WORKPLAN

Phase

A.

B.
A.1

C.
D.

E.

MANPOWER LOADING

ITEM
1

ITEM
ITEM

1
1

Accomplishment date as of - to date


Projejct Accomplishment

Prepared by:

JOHN CHRISTIAN LANGCAMON


Electrical Engineer

Noted by:

LESTER LOUISE DAYDAY


PMD Manager
PROJECT NAME

PROJECT LOCATION

GENERAL DESCRIPTION Start Date


End Date
OVERALL ACTIVITIES/WORKPLAN
Total Days

TASK QTY

TEMPORARY FACILITIES 1
Construction of Temporary Facility
CONSTRUCTION OF CONCRETE POLES FOR OVERHEAD LINES 1
CONSTRUCTION OF CONCRETE POLE (POLE 1 - POLE 16)
Staking and Lay out
Excavation works
Erection of Pole 1 to Pole 16
Backfilling Works
Assymbly of Cross Arms and Accessories
Installation of Insulators
Stringing Works
Final Tensioning
CIVIL WORKS 1
CONSTRUCTION OF CABLE PEDESTAL
Excavation
Lean Concreting
Fabrication of Rebars
Installation of Rebars
Formworks
Concrete Pouring
CONSTRUCTION OF MANHOLES AND DUCT BANK
Excavation
Lean Concreting
Installation of Rebars
Formworks
Concrete Pouring
Backfilling
CONSTRUCTION OF CABLE TRENCH
Excavation
Lean Conreting
Installation of rebars
Installation of Forms
Concrete Pouring
ELECTRICAL WORKS 1
MOUNTING OF EQUIPMENTS
Mounting of LVSG
Termination for LVSG
Mounting of MVSG
Termination for MVSG
Mounting/Assymbly of Transformer
Termination for Transformer
CABLE PULLING WORKS
Cable Pulling of 3 - 150mm2 Cable; Distribution line to MVSG
Cable Pulling of 1 - 100mm2 Cable; MVSG to Transformer
BUSDUCTS
Installation of Busducts TX to LVSG
Installation of Busducts LVSG to GENSET
TESTING AND COMMISSIONING
Testing of ACSR Cable
Testing of XLPE Cables
Testing of Busduct
Testing of LVSG
Testing of MVSG
Testing of Transformer
Functionality Test
TRAININGS/ORIENTATION 1
Trainings/Orientation and Manuals

MANPOWER LOADING

DESIGNATION NO. OF PER

ADMIN as to d
Project Admin 1
Timekeeper
Service Driver 1
Safety Officer 1
Warehouseman 0
Warehouse Assistant 0
First Aider 1
Secruity Head
CONSTRUCTION MANAGEMENT
Project Manager 1
Project In Charge 1
Electrical Engineer 1
QA/QC/Document Controller
Draftsman
Electrical Supervisor 1
Civil Supervisor 1
Mechanical Supervisor
ELECTRICAL
Linemen 6
Electrician 2
Welder 1
Labor/Helper 4
Terminator (Power Cables)
Terminator (Control Cables)
CIVIL
Skilled 1
Unskilled
MECHANICAL / RIGGING/CIVIL
Boom Truck and Crane Operator
Rigging Team (1 Team)
Welder
TESTING AND COMMISIONING
TNC MANAGER
TESTING ENGINEER
TECHNICIAN
TOTAL MANPOWER 23

OT FORECAST

DESIGNATION NO. OF PER


DESIGNATION NO. OF PER

ADMIN
Project Admin 1
Timekeeper

Service Driver 1
Safety Officer 1
Warehouseman & Assistant 1
First Aider 1
Secruity Head
CONSTRUCTION MANAGEMENT
Project Manager 1
Electrical Engineer 1
QA/QC/Document Controller
Draftsman
Electrical Supervisor 1

1
Civil Supervisor
Mechanical Supervisor
ELECTRICAL
Linemen 6
Electrician 2
Welder 1
Labor/Helper 2
Terminator (Power Cables)
Terminator (Control Cables)
CIVIL
Skilled 1
Unskilled 2
MECHANICAL / RIGGING/CIVIL
Boom Truck and Crane Operator
Rigging Team (1 Team)
Welder
TESTING AND COMMISIONING
TNC MANAGER
TESTING ENGINEER
TECHNICIAN
TOTAL MANPOWER 23

Accomplishment date as of - to date


Projejct Accomplishment 1.73%

Prepared by: Reviewed by:

JOHN CHRISTIAN LANGCAMON DIEGO AMBION


Electrical Engineer Porject Manage

Noted by: Approved by:

LESTER LOUISE DAYDAY VIRGILIO FRAN


PMD Manager General Manage
ENERGY AND BUILDI
WORK
23

Design, supply, construct, install, test and commission of the r

Central Nautical Highway, S


21
Start Date 6/12/2024 (Wednesday) Display Week 1
End Date 6/12/2025 (Thursday) Supervisor JOHN CHRISTIAN LANGCAMON
Total Days 365 days
20
ACTIVITIES
UOM PLANNED ACTUAL
START END DAYS START END
lot
6/7/2024 Tue 6/11/24 5 5/28/2024 Tue 5/28/24
lot

Wed 6/12/24 Thu 6/13/24 2 -


Fri 6/14/24 Mon 7/01/24 18 -
Mon 7/01/24 Mon 7/15/24 15 -
Mon 7/01/24 Mon 7/15/24 15 -
Mon 7/15/24 Tue 7/16/24 2 -
Mon 7/15/24 Fri 7/19/24 5 -
Sat 7/20/24 Fri 8/02/24 14 -
Sat 8/03/24 Fri 8/09/24 7 -
lot

Mon 7/15/24 Wed 7/17/24 3 -


Thu 7/18/24 Thu 7/18/24 1 -
Sun 7/14/24 Sat 7/20/24 7
Sun 7/21/24 Sat 7/27/24 7 -
Sun 7/28/24 Sat 8/03/24 7 -
Sun 8/04/24 Tue 8/06/24 3 -

Wed 8/07/24 Fri 8/09/24 3 -


Sat 8/10/24 Sat 8/10/24 1 -
Sun 8/11/24 Fri 8/30/24 20 -
Sun 8/25/24 Sat 8/31/24 7 -
Sun 9/01/24 Thu 9/05/24 5 -
Fri 9/06/24 Mon 9/09/24 4 -

Tue 9/10/24 Thu 9/12/24 3 -


Fri 9/13/24 Fri 9/13/24 1 -
Sat 9/14/24 Fri 9/20/24 7 -
Sat 9/21/24 Fri 9/27/24 7 -
Sat 9/28/24 Sat 9/28/24 1 -
lot

Thu 12/26/24 Sat 12/28/24 3 -


Fri 1/03/25 Fri 1/03/25 -
Mon 3/10/25 Mon 3/10/25 1 -
Tue 3/11/25 Wed 3/12/25 2 -
Mon 3/10/25 Tue 3/11/25 2 -
Thu 3/13/25 Sat 3/15/25 3 -

Thu 10/03/24 Tue 10/08/24 6 -


Mon 10/07/24 Sat 10/12/24 6 -

Sun 10/13/24 Fri 11/01/24 20 -


Sat 11/02/24 Fri 11/08/24 7 -

Tue 10/01/24 Wed 10/02/24 2 -


Sun 11/10/24 Mon 11/11/24 2 -
Tue 11/12/24 Thu 11/14/24 3 -
Wed 1/15/25 Fri 1/17/25 3 -
Thu 3/13/25 Thu 3/13/25 1 -
Thu 3/13/25 Wed 3/19/25 7 -
Thu 3/20/25 Wed 3/26/25 7 -
lot
Tue 4/01/25 Tue 4/01/25 1 -

NO. OF PERSONNEL REMARKS

as to date
1
1
1
0
0
1

1
1
1

1
1

6
2
1
4

23

REMARKS
NO. OF PERSONNEL
For Deliveries 6 wheelers up - 10pm onwards
REMARKS
NO. OF PERSONNEL
For Deliveries 6 wheelers up - 10pm onwards

1
1
1
1

1
1

6
2
1
2

1
2
23

1.73%

Reviewed by:

DIEGO AMBIONG
Porject Manager

Approved by:

VIRGILIO FRANCISCO
General Manager
GY AND BUILDING APPLICATIONS TECHNOLOGIES CORPORATION
WORK PLAN & ACCOMPLISHMENT
2

mmission of the rehabilitation of electrical system for Zenith VisMin Manufactu

autical Highway, Sitio Tulay, Brgy. Guinsay, Danao, Cebu


21
1
RISTIAN LANGCAMON

0
9 Jun 2024 16 Jun 2024
% 9 10 11 12 13 14 15 16 17 18 19 20 21
DAYS DONE S M T W T F S S M T W T F

0 95%

0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%

0%
0%

0%
0%

0%
0%
0%
0%
0%
0%
0%

0%

9 Jun 2024 16 Jun 2024


9 10 11 12 13 14 15 16 17 18 19 20 21
S M T W T F S S M T W T F
0 0 0 0 0 0 0 0 0 0 0 0 0

9 Jun 2024 16 Jun 2024


9 10 11 12 13 14 15 16 17 18 19 20 21
- 10pm onwards
- 10pm onwards
S M T W T F S S M T W T F

14 14 14 14 14 14 20 14 14 14 10 10
5 5 5 5 5 5 8 5 5 5 3 3
10 10 10 10 10 10 16 10 10 10 10 10

5 5 5 5 5 5 8 5 5 5 3 3
5 5 5 5 5 5 8 5 5 5 3 3
5 5 5 5 5 5 8 5 5 5 3 3
5 5 5 5 5 5 8 5 5 5 3 3

5 5 5 5 5 5 8 5 5 5 3 3

5 5 5 5 5 5 8 5 5 5 3 3
15 15 15 15 15 15 24 15 15 15 9 9
10 10 10 10 10 10 16 10 10 10 6 6
20 20 20 20 20 20 32 20 20 20 12 12

40 40 40 40 40 40 64 40 40 40 24 24
10 10 10 10 10 10 16 10 10 10 6 6
0 154 154 154 154 154 154 244 154 154 154 98 98
ORATION

WORKPLAN
sMin Manufacturing Plant LEGEND:

Project Management Department Workplan

24 23 Jun 2024 30 Jun 2024 7


22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7
S S M T W T F S S M T W T F S S
24 23 Jun 2024 30 Jun 2024 7
22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7
S S M T W T F S S M T W T F S S
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

24 23 Jun 2024 30 Jun 2024 7


22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7
S S M T W T F S S M T W T F S S

20 10 10 10 10 10 10 10 10 10 10
8 3 3 3 3 3 3 3 3 3 3
16 10 10 10 10 10 10 10 10 10 10

8 3 3 3 3 3 3 3 3 3 3
8 3 3 3 3 3 3 3 3 3 3
8 3 3 3 3 3 3 3 3 3 3
8 3 3 3 3 3 3 3 3 3 3

8 3 3 3 3 3 3 3 3 3 3

8 3 3 3 3 3 3 3 3 3 3
24 9 9 9 9 9 9 9 9 9 9
16 6 6 6 6 6 6 6 6 6 6
32 12 12 12 12 12 12 12 12 12 12

64 24 24 24 24 24 24 24 24 24 24
16 6 6 6 6 6 6 6 6 6 6
0 244 98 98 98 98 98 0 0 98 98 98 98 98 0 0
LEGEND:
Planned
Actual

7 Jul 2024 14 Jul 2024 21 Jul 2024


8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
M T W T F S S M T W T F S S M T
7 Jul 2024 14 Jul 2024 21 Jul 2024
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
M T W T F S S M T W T F S S M T
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

7 Jul 2024 14 Jul 2024 21 Jul 2024


8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
M T W T F S S M T W T F S S M T

10 10
3 3
10 10

3 3
3 3
3 3
3 3

3 3

3 3
9 9
6 6
12 12

24 24
6 6
98 98 0 0 0 0 0 0 0 0 0 0 0 0 0 0
21 Jul 2024 28 Jul 2024 4 Aug 2024
24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8
W T F S S M T W T F S S M T W T
21 Jul 2024 28 Jul 2024
24 25 26 27 28 29 30 31 1 2 3
W T F S S M T W T F S
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

21 Jul 2024 28 Jul 2024


24 25 26 27 28 29 30 31 1 2 3
W T F S S M T W T F S
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
g 2024 11 Aug 2024 18 Aug 2024
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
F S S M T W T F S S M T W T F S
0 0 0 0 0 0 0
0 0 0 0 0 0 0
25 Aug 2024
25 26 27 28 29 30 31
S M T W T F S
PROJECT NAME
Design,

PROJECT LOCATION

GENERAL DESCRIPTION Start Date


End Date
OVERALL ACTIVITIES/WORKPLAN
Total Days

Phase TASK QTY UOM

A. TEMPORARY FACILITIES 1 lot


Construction of Temporary Facility Office

Egress Back Filling & Compaction

Construction of Warehouse
B. CONSTRUCTION OF CONCRETE POLES FOR OVERHEAD 1 lot
A.1 CONSTRUCTION OF CONCRETE POLE (POLE 1 - POLE 16)
Staking and Layout
Excavation works
Erection of Pole 1 to Pole 16
Backfilling Works
Assymbly of Cross Arms and Accessories
Installation of Insulators
Stringing Works
Final Tensioning
C. CIVIL WORKS 1 lot
CONSTRUCTION OF CABLE PEDESTAL
Staking and Layout
Excavation
Lean Concreting
Fabrication of Rebars
Installation of Rebars
Formworks
Concrete Pouring
CONSTRUCTION OF MANHOLES AND DUCT BANK
Readiness of Area, Staking and Layout
Excavation
Leveling and Compaction
Lean Concreting
Installation of Rebars
Formworks
Concreting, Concrete Pouring &Curing
Backfilling
CONSTRUCTION OF CABLE TRENCH
Excavation
Leveling and compaction
Lean Conreting
Installation of rebars
Installation of Forms
Concrete Pouring
D. ELECTRICAL WORKS 1 lot
MOUNTING OF EQUIPMENTS
Mounting of LVSG
Mounting/Assymbly of Transformer
Mounting of MVSG
CABLE PULLING WORKS
Cable Pulling of 3 - 150mm2 Cable; Distribution line to MVSG
Cable Pulling of 1 - 100mm2 Cable; MVSG to Transformer
TERMINATION
Termination for LVSG
Termination for Transformer
Termination for MVSG
BUSDUCTS
Installation of Busducts TX to LVSG
Install & route Busduct - ATS1 to Sync Panel
Install & route Busduct - Sync Panel to GENSET
Bus Connection from TB1 to LVSG
Bus Connection from TB2 to LVSG
CABLE PULLING WORKS
Cable Pulling of MVSG FDR2 to PTX 2
Cable Pulling of MVSG FDR3 to PTX 3
TERMINATION
Bus Duct End / Bus Connection / Busbar termination
POWER DISTRIBUTION WORKS
MVSG
Control Cables
Power Cables
TRANSFORMER
Control Cables
Power Cables
LVSG
Control Cables
TESTING AND COMMISSIONING
Testing of ACSR Cable
Testing of XLPE Cables
Testing of Busduct
Testing of Recloser
Testing of Power Fuses
Testing of Lightning Arrester
Testing of LVSG (3 units)
Testing of MVSG
Testing of Power Transformer (3 units)
Commisioning / Functionality Test
READY FOR ENERGIZATION
Readiness for Energization
E. TRAININGS/ORIENTATION 1 lot
Readiness for Energization
Joint Study

MANPOWER LOADING

ITEM DESIGNATION NO. OF PERSONNEL

ADMIN as to date
Project Admin 1
Timekeeper
Service Driver 1
Safety Officer 1
Warehouseman 0
Warehouse Assistant 0
First Aider 1
Secruity Head
CONSTRUCTION MANAGEMENT
Project Manager 1
Project In Charge 1
Electrical Engineer 1
QA/QC/Document Controller
Draftsman
Electrical Supervisor 1
Civil Supervisor 1
Mechanical Supervisor
ELECTRICAL
Linemen 6
Electrician 2
Welder 1
Labor/Helper 4
Terminator (Power Cables)
Terminator (Control Cables)
CIVIL
1 Skilled 1
Unskilled
MECHANICAL / RIGGING/CIVIL
Boom Truck and Crane Operator
Rigging Team (1 Team)
Welder
TESTING AND COMMISIONING
TNC MANAGER
TESTING ENGINEER
TECHNICIAN
1 TOTAL MANPOWER 23

OT FORECAST

ITEM DESIGNATION NO. OF PERSONNEL

ADMIN
Project Admin 1
Timekeeper

Service Driver 1
Safety Officer 1
Warehouseman & Assistant 1
First Aider 1
Secruity Head
CONSTRUCTION MANAGEMENT
Project Manager 1
Electrical Engineer 1
QA/QC/Document Controller
Draftsman
Electrical Supervisor 1

1
Civil Supervisor
Mechanical Supervisor
ELECTRICAL
Linemen 6
Electrician 2
Welder 1
Labor/Helper 2
Terminator (Power Cables)
Terminator (Control Cables)
CIVIL
1 Skilled 1
Unskilled 2
MECHANICAL / RIGGING/CIVIL
Boom Truck and Crane Operator
Rigging Team (1 Team)
Welder
TESTING AND COMMISIONING
TNC MANAGER
TESTING ENGINEER
TECHNICIAN
1 TOTAL MANPOWER 23

Accomplishment date as of - to date


Projejct Accomplishment 5.18%
Prepared by: Reviewed by:

JOHN CHRISTIAN LANGCAMON FJAN SANTIAGO


Electrical Engineer Porject Manager

Noted by: Approved by:

JEFREY YAMIT VIRGILIO FRANCISCO


Technical Director General Manager
ENERGY AND BUIL
WOR
28 4

Design, supply, construct, install, test and commission of the reha

Central Nautical Highway, Sitio T


26
6/12/2024 (Wednesday) Display Week 1
6/12/2025 (Thursday) Supervisor JOHN CHRISTIAN LANGCAMON
365 days
23 0
ACTIVITIES
PLANNED ACTUAL
START END DAYS START END DAYS

Wed 6/12/24 Tue 6/25/24 14 5/28/2024 Tue 5/28/24 0

Thu 6/20/24 Thu 6/27/24 8 5/28/2024 Tue 5/28/24 0

Tue 6/25/24 Mon 7/08/24 14 5/28/2024 Tue 5/28/24 0

Sat 7/06/24 Sun 7/07/24 2 -


Wed 7/24/24 Wed 8/07/24 15 -
Fri 8/16/24 Wed 9/04/24 20 -
Wed 9/04/24 Wed 9/18/24 15 -
Wed 9/04/24 Thu 9/05/24 2 -
Thu 9/05/24 Thu 9/12/24 8 -
Fri 9/13/24 Thu 9/26/24 14 -
Mon 9/30/24 Wed 10/02/24 3 -

Mon 8/19/24 Mon 8/19/24 1 -


Thu 8/15/24 Sat 8/17/24 3 -
Thu 8/22/24 Fri 8/23/24 2 -
Tue 8/20/24 Mon 8/26/24 7
Wed 8/28/24 Tue 9/10/24 14 -
Fri 8/30/24 Thu 9/12/24 14 -
Tue 9/03/24 Fri 9/13/24 11 -

Wed 8/21/24 Thu 8/22/24 2 -


Fri 8/23/24 Tue 8/27/24 5 -
Thu 8/29/24 Sun 9/01/24 4 -
Tue 9/03/24 Wed 9/04/24 2 -
Fri 9/06/24 Mon 10/07/24 32 -
Sat 9/14/24 Mon 10/14/24 31 -
Sat 9/21/24 Tue 10/29/24 39 -
Tue 10/29/24 Fri 11/01/24 4 -

Tue 9/10/24 Sat 9/14/24 5 -


Sun 9/15/24 Tue 9/17/24 3 -
Wed 9/18/24 Fri 9/20/24 3 -
Sat 9/21/24 Mon 10/07/24 17 -
Tue 9/24/24 Tue 10/08/24 15 -
Wed 10/09/24 Fri 10/11/24 3 -

Mon 12/30/24 Fri 1/03/25 5 -


Thu 2/20/25 Mon 2/24/25 5 -
Fri 2/28/25 Tue 3/04/25 5 -

Fri 12/20/24 Wed 12/25/24 6 -


Fri 12/20/24 Thu 12/26/24 7 -

Fri 1/03/25 Sun 1/05/25 3 -


Tue 2/25/25 Thu 2/27/25 3 -
Wed 3/05/25 Fri 3/07/25 3 -

Mon 12/30/24 Sat 1/18/25 20 -


Sun 1/19/25 Fri 2/07/25 20 -
Sat 2/08/25 Wed 3/05/25 26 -
Thu 3/06/25 Thu 3/06/25 1 -
Fri 3/07/25 Fri 3/07/25 1 -

Sat 3/08/25 Thu 3/13/25 6 -


Fri 3/14/25 Thu 3/20/25 7 -

Fri 3/21/25 Fri 4/11/25 22 -


Fri 3/21/25 Wed 3/26/25 6 -
Fri 3/21/25 Wed 3/26/25 6 -

Fri 3/21/25 Wed 3/26/25 6 -


Fri 3/21/25 Wed 3/26/25 6 -

Thu 3/27/25 Tue 4/01/25 6 -

Wed 4/02/25 Thu 4/03/25 2 -


Fri 4/04/25 Sat 4/05/25 2 -
Sat 4/05/25 Tue 4/08/25 4 -
Tue 4/08/25 Wed 4/09/25 2 -
Wed 4/09/25 Thu 4/10/25 2 -
Thu 4/10/25 Fri 4/11/25 2 -
Fri 4/11/25 Mon 4/14/25 4 -
Mon 4/14/25 Thu 4/17/25 4 -
Thu 4/17/25 Sun 4/27/25 11 -
Sun 4/27/25 Mon 4/28/25 2 -

Tue 4/29/25 Wed 4/30/25 2 -

Wed 4/30/25 Fri 5/02/25 3 -


Fri 5/02/25 Sun 5/11/25 10 -

NO. OF PERSONNEL REMARKS

as to date
1

1
1
0
0
1

1
1
1

1
1

6
2
1
4

23

REMARKS
NO. OF PERSONNEL
For Deliveries 6 wheelers up - 10pm onwards

1
1
1
1

1
1

6
2
1
2

1
2

23
viewed by:

AN SANTIAGO
rject Manager

proved by:

RGILIO FRANCISCO
neral Manager
ERGY AND BUILDING APPLICATIONS TECHNOLOGIES CORPORATION
WORK PLAN & ACCOMPLISHMENT
sion of the rehabilitation of electrical system for Zenith VisMin Manufacturing

al Highway, Sitio Tulay, Brgy. Guinsay, Danao, Cebu


26
1
N LANGCAMON P

9 Jun 2024 16 Jun 2024


% 9 10 11 12 13 14 15 16 17 18 19 20 21 22
DONE S M T W T F S S M T W T F S

100%
Actual
95%
Actual
90%

0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%

0%
0%
0%

0%
0%

0%
0%
0%

0%
0%
0%
0%
0%

0%
0%

0%
0%
0%

0%
0%

0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%

0%
0%

9 Jun 2024 16 Jun 2024


9 10 11 12 13 14 15 16 17 18 19 20 21 22
S M T W T F S S M T W T F S
0 0 0 0 0 0 0 0 0 0 0 0 0 0

9 Jun 2024 16 Jun 2024


9 10 11 12 13 14 15 16 17 18 19 20 21 22
pm onwards
S M T W T F S S M T W T F S
0 0 0 0 0 0 0 0 0 0 0 0 0 0
RPORATION

WORKPLAN
n Manufacturing Plant LEGEND:
Planned
Actual

Project Management Department Workplan

23 Jun 2024 30 Jun 2024 7 Jul 20


23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8
S M T W T F S S M T W T F S S M
23 Jun 2024 30 Jun 2024 7 Jul 20
23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8
S M T W T F S S M T W T F S S M
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

23 Jun 2024 30 Jun 2024 7 Jul 20


23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8
S M T W T F S S M T W T F S S M
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Planned
Actual

7 Jul 2024 14 Jul 2024 21 Jul 2024


9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
T W T F S S M T W T F S S M T W
7 Jul 2024 14 Jul 2024 21 Jul 2024
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
T W T F S S M T W T F S S M T W
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

7 Jul 2024 14 Jul 2024 21 Jul 2024


9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
T W T F S S M T W T F S S M T W
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
21 Jul 2024 28 Jul 2024 4 Aug 2024
25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9
T F S S M T W T F S S M T W T F
21 Jul 2024 28 Jul 2024 4 Aug 2024
25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9
T F S S M T W T F S S M T W T F
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

21 Jul 2024 28 Jul 2024 4 Aug 2024


25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9
T F S S M T W T F S S M T W T F

10 10
3 3
10 10
3 3
3 3
3 3
3 3

3 3

3 3
9 9
6 6
12 12

24 24
6 6

0 0 0 0 0 0 0 0 0 0 0 98 98 0 0 0
24 11 Aug 2024 18 Aug 2024 25
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
S S M T W T F S S M T W T F S S
24 11 Aug 2024 18 Aug 2024 25
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
S S M T W T F S S M T W T F S S
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

24 11 Aug 2024 18 Aug 2024 25


10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
S S M T W T F S S M T W T F S S
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
25 Aug 2024 1 Sep 2024 8 Sep 2024
26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
M T W T F S S M T W T F S S M T
25 Aug 2024 1 Sep 2024 8 Sep 2024
26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
M T W T F S S M T W T F S S M T
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

25 Aug 2024 1 Sep 2024 8 Sep 2024


26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
M T W T F S S M T W T F S S M T

10 10
3 3
10 10
3 3
3 3
3 3
3 3

3 3

3 3
9 9
6 6
12 12

24 24
6 6

0 0 0 0 0 0 0 98 98 0 0 0 0 0 0 0
8 Sep 2024 15 Sep 2024 22 Sep 2024
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
W T F S S M T W T F S S M T W T
8 Sep 2024 15 Sep 2024 22 Sep 2024
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
W T F S S M T W T F S S M T W T
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

8 Sep 2024 15 Sep 2024 22 Sep 2024


11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
W T F S S M T W T F S S M T W T
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
p 2024 29 Sep 2024 6 Oct 2024
27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12
F S S M T W T F S S M T W T F S
p 2024 29 Sep 2024 6 Oct 2024
27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12
F S S M T W T F S S M T W T F S
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

p 2024 29 Sep 2024 6 Oct 2024


27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12
F S S M T W T F S S M T W T F S

10 10
3 3
10 10
3 3
3 3
3 3
3 3

3 3

3 3
9 9
6 6
12 12

24 24
6 6

0 0 0 98 98 0 0 0 0 0 0 0 0 0 0 0
13 Oct 2024 20 Oct 2024
13 14 15 16 17 18 19 20 21 22
S M T W T F S S M T
13 Oct 2024 20 Oct 2024
13 14 15 16 17 18 19 20 21 22
S M T W T F S S M T
0 0 0 0 0 0 0 0 0 0

13 Oct 2024 20 Oct 2024


13 14 15 16 17 18 19 20 21 22
S M T W T F S S M T
0 0 0 0 0 0 0 0 0 0
20 Oct 2024 27 Oct 2024
23 24 25 26 27 28 29 30 31 1
W T F S S M T W T F
20 Oct 2024 27 Oct 2024
23 24 25 26 27 28 29 30 31 1
W T F S S M T W T F
0 0 0 0 0 0 0 0 0 0

20 Oct 2024 27 Oct 2024


23 24 25 26 27 28 29 30 31 1
W T F S S M T W T F
0 0 0 0 0 0 0 0 0 0
3 Nov 2024 10
2 3 4 5 6 7 8 9 10 11
S S M T W T F S S M
3 Nov 2024 10
2 3 4 5 6 7 8 9 10 11
S S M T W T F S S M
0 0 0 0 0 0 0 0 0 0

3 Nov 2024 10
2 3 4 5 6 7 8 9 10 11
S S M T W T F S S M
0 0 0 0 0 0 0 0 0 0
10 Nov 2024 17 Nov 2024
12 13 14 15 16 17 18 19 20 21
T W T F S S M T W T
10 Nov 2024 17 Nov 2024
12 13 14 15 16 17 18 19 20 21
T W T F S S M T W T
0 0 0 0 0 0 0 0 0 0

10 Nov 2024 17 Nov 2024


12 13 14 15 16 17 18 19 20 21
T W T F S S M T W T
0 0 0 0 0 0 0 0 0 0
24 24 Nov 2024
22 23 24 25 26 27 28 29 30 1
F S S M T W T F S S
24 24 Nov 2024
22 23 24 25 26 27 28 29 30 1
F S S M T W T F S S
0 0 0 0 0 0 0 0 0 0

24 24 Nov 2024
22 23 24 25 26 27 28 29 30 1
F S S M T W T F S S
0 0 0 0 0 0 0 0 0 0
1 Dec 2024 8 Dec 2024
2 3 4 5 6 7 8 9 10 11
M T W T F S S M T W
1 Dec 2024 8 Dec 2024
2 3 4 5 6 7 8 9 10 11
M T W T F S S M T W
0 0 0 0 0 0 0 0 0 0

1 Dec 2024 8 Dec 2024


2 3 4 5 6 7 8 9 10 11
M T W T F S S M T W
0 0 0 0 0 0 0 0 0 0
Dec 2024 15 Dec 2024
12 13 14 15 16 17 18 19 20 21
T F S S M T W T F S
Dec 2024 15 Dec 2024
12 13 14 15 16 17 18 19 20 21
T F S S M T W T F S
0 0 0 0 0 0 0 0 0 0

Dec 2024 15 Dec 2024


12 13 14 15 16 17 18 19 20 21
T F S S M T W T F S
0 0 0 0 0 0 0 0 0 0
22 Dec 2024 29 Dec 2024
22 23 24 25 26 27 28 29 30 31
S M T W T F S S M T
22 Dec 2024 29 Dec 2024
22 23 24 25 26 27 28 29 30 31
S M T W T F S S M T
0 0 0 0 0 0 0 0 0 0

22 Dec 2024 29 Dec 2024


22 23 24 25 26 27 28 29 30 31
S M T W T F S S M T
0 0 0 0 0 0 0 0 0 0
29 Dec 2024 5 Jan 2025
1 2 3 4 5 6 7 8 9 10
W T F S S M T W T F
29 Dec 2024 5 Jan 2025
1 2 3 4 5 6 7 8 9 10
W T F S S M T W T F
0 0 0 0 0 0 0 0 0 0

29 Dec 2024 5 Jan 2025


1 2 3 4 5 6 7 8 9 10
W T F S S M T W T F
0 0 0 0 0 0 0 0 0 0
12 Jan 2025 19
11 12 13 14 15 16 17 18 19 20
S S M T W T F S S M
12 Jan 2025 19
11 12 13 14 15 16 17 18 19 20
S S M T W T F S S M
0 0 0 0 0 0 0 0 0 0

12 Jan 2025 19
11 12 13 14 15 16 17 18 19 20
S S M T W T F S S M
0 0 0 0 0 0 0 0 0 0
19 Jan 2025 26 Jan 2025
21 22 23 24 25 26 27 28 29 30
T W T F S S M T W T
19 Jan 2025 26 Jan 2025
21 22 23 24 25 26 27 28 29 30
T W T F S S M T W T
0 0 0 0 0 0 0 0 0 0

19 Jan 2025 26 Jan 2025


21 22 23 24 25 26 27 28 29 30
T W T F S S M T W T
0 0 0 0 0 0 0 0 0 0
25 2 Feb 2025
31 1 2 3 4 5 6 7 8 9
F S S M T W T F S S
25 2 Feb 2025
31 1 2 3 4 5 6 7 8 9
F S S M T W T F S S
0 0 0 0 0 0 0 0 0 0

25 2 Feb 2025
31 1 2 3 4 5 6 7 8 9
F S S M T W T F S S
0 0 0 0 0 0 0 0 0 0
9 Feb 2025
10 11 12 13 14 15 16 17 18 19
M T W T F S S M T W
9 Feb 2025
10 11 12 13 14 15 16 17 18 19
M T W T F S S M T W
0 0 0 0 0 0 0 0 0 0

9 Feb 2025
10 11 12 13 14 15 16 17 18 19
M T W T F S S M T W
0 0 0 0 0 0 0 0 0 0
20 Feb 2025 27 Feb 2025
20 21 22 23 24 25 26 27 28 1
T F S S M T W T F S
20 Feb 2025 27 Feb 2025
20 21 22 23 24 25 26 27 28 1
T F S S M T W T F S
0 0 0 0 0 0 0 0 0 0

20 Feb 2025 27 Feb 2025


20 21 22 23 24 25 26 27 28 1
T F S S M T W T F S
0 0 0 0 0 0 0 0 0 0
27 Feb 2025 10
2 3 4 5 6 7 8 9 10 11
S M T W T F S S M T
27 Feb 2025 10
2 3 4 5 6 7 8 9 10 11
S M T W T F S S M T
0 0 0 0 0 0 0 0 0 0

27 Feb 2025 10
2 3 4 5 6 7 8 9 10 11
S M T W T F S S M T
0 0 0 0 0 0 0 0 0 0
10 Mar 2025 17 Mar 2025
12 13 14 15 16 17 18 19 20 21
W T F S S M T W T F
10 Mar 2025 17 Mar 2025
12 13 14 15 16 17 18 19 20 21
W T F S S M T W T F
0 0 0 0 0 0 0 0 0 0

10 Mar 2025 17 Mar 2025


12 13 14 15 16 17 18 19 20 21
W T F S S M T W T F
0 0 0 0 0 0 0 0 0 0
25 28 Mar 2025
22 23 24 25 26 27 28 29 30 31
S S M T W T F S S M
25 28 Mar 2025
22 23 24 25 26 27 28 29 30 31
S S M T W T F S S M
0 0 0 0 0 0 0 0 0 0

25 28 Mar 2025
22 23 24 25 26 27 28 29 30 31
S S M T W T F S S M
0 0 0 0 0 0 0 0 0 0
8 Mar 2025 4 Apr 2025
1 2 3 4 5 6 7 8 9 10
T W T F S S M T W T
8 Mar 2025 4 Apr 2025
1 2 3 4 5 6 7 8 9 10
T W T F S S M T W T
0 0 0 0 0 0 0 0 0 0

8 Mar 2025 4 Apr 2025


1 2 3 4 5 6 7 8 9 10
T W T F S S M T W T
0 0 0 0 0 0 0 0 0 0
15 Apr 2025
11 12 13 14 15 16 17 18 19 20
F S S M T W T F S S
15 Apr 2025
11 12 13 14 15 16 17 18 19 20
F S S M T W T F S S
0 0 0 0 0 0 0 0 0 0

15 Apr 2025
11 12 13 14 15 16 17 18 19 20
F S S M T W T F S S
0 0 0 0 0 0 0 0 0 0
22 Apr 2025
21 22 23 24 25 26 27 28 29 30
M T W T F S S M T W
22 Apr 2025
21 22 23 24 25 26 27 28 29 30
M T W T F S S M T W
0 0 0 0 0 0 0 0 0 0

22 Apr 2025
21 22 23 24 25 26 27 28 29 30
M T W T F S S M T W
0 0 0 0 0 0 0 0 0 0
4 May 2025
1 2 3 4 5 6 7 8 9 10
T F S S M T W T F S
4 May 2025
1 2 3 4 5 6 7 8 9 10
T F S S M T W T F S
0 0 0 0 0 0 0 0 0 0

4 May 2025
1 2 3 4 5 6 7 8 9 10
T F S S M T W T F S
0 0 0 0 0 0 0 0 0 0
11 12 13 14 15 16
S M T W T F
11 12 13 14 15 16
S M T W T F
0 0 0 0 0 0

11 12 13 14 15 16
S M T W T F
0 0 0 0 0 0