0% found this document useful (0 votes)
50 views14 pages

As-Built Drawing

detailed

Uploaded by

hok94645
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views14 pages

As-Built Drawing

detailed

Uploaded by

hok94645
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 14

Diversity in Action

Published by SBE certified


SBE/DBE/MBE

Vol 37, Edition 122 Daily Publication September 10, 2021

What Are As Built Drawings?


[ Article was originally posted on
Autodesk Construction Cloud Blog.
constructionblog.autodesk.com ]
By Grace Ellis,
If a picture can speak a thousand words, in a proj-
ect, as-built drawings can speak a thousand con-
struction processes. But in all seriousness, with the
hundreds and thousands of steps and documents
needed to complete just one project, as-builts
might be overlooked for their importance. None-
theless, as-built drawings remain an essential pro-
cess in a project, especially to maintain a project’s
lifecycle after construction has ended.
Despite this, as-builts are often not included, or are
only addressed right at the end when an accurate
product is far less achievable because of a failure
to record changes to the project along the way. Be-
low, we provide a thorough look at what as-built
drawings are, who creates them and why they’re
important. We’ll also offer a roundup of the most
critical items to include in each as-built drawing.
Image credit by https://constructionblog.autodesk.com
What Is an “As-Built?”
Also known as record drawings and red-line draw- Who Creates As-Built Drawings? sarily a must on every job, it’s a helpful compo-
ings, as-builts drawings are documents that allow a Typically, the architects or designers who origi- nent to any completed project, and if completed
compare and contrast between the designed versus nally designed the project will also create the correctly, reflects well on your company’s profes-
final specifications, and provide a detailed blueprint as-builts. They are familiar with the original sional image. As the Construction Management
of the building and the land around it as actually con- specifications and are therefore the most quali- Association of America explains:
structed in the end. According to Business Diction- fied to reflect recorded changes. According to “They are important for those who use the fin-
ary, as-builts are a “revised set of drawings submit- Cornell University Facilities Services, the people ished product, as they provide a legacy of what
ted by a contractor upon completion of a project or a in charge of as-built drawings differ depending was actually built. This legacy becomes more
particular job. They reflect all changes made in the on whether the design job is in-house or from an important, as we continue to build on top of
specifications and working drawings during the con- external party, like the contractor: old work, land ownership changes or for public
struction process, and show the exact dimensions, works, as employees familiar with what was-built
“For in-house design jobs … these could be put
geometry and location of all elements of the work are replaced over time by attrition.”
together by anyone on the design team or the
completed under the contract.”
shops,” whereas for “out of house design jobs … As-builts, in other words, ensure that as design-
The final as-built drawings include any and all of the drawings are put together by the contractor, ers, architects and contracts move on from the
the following, as well as every other change made typically with the assistance of sub-contractors project and, a resource still exists beyond the
during the construction phase of a project: for submittal to the architect for inclusion in the original blueprints.
• Modifications record drawings.”
Overall, as-builts are important for four main rea-
• Field changes As mentioned, as-builts on a whole are much sons:
easier to accomplish with detailed notes from
• Shop drawing changes • Improves onboarding: As subcontractors
every phase of construction. Because truly use-
are added to a project, delivering a set of as-
• Design changes ful as-builts require so many nitty gritty details,
builts helps teams get access to the right in-
it’s simpler to use technology to record changes
• Extra works formation quickly, which allows getting up
along the way than it is to try to recover the de-
to speed starting work sooner.
As-built drawings go hand-in-hand with as-built tails of those changes afterward. One helpful tool
surveys, also called as-built maps. These are used to detail changes is mobile technology powered • Assists the facilities team: With a full record
during the construction phase to continually track by construction software to enable you to track of change, facility teams can meet issues
how the land and building is changing as work adjustments immediately, avoiding loss of chang- faster and owners can save money down the
progresses. Dedicated as-built surveys make as- es and errors in recording them. road due to improved operations and speed
built drawings much easier to construct in the end,
Why Are As-Builts Important?
because of the greater level of detail recorded from
every stage of the project. While submitting as-built drawings is not neces- g Continued on page 10
2 SBE TODAY E-NEWSLETTER WWW.SBEINC.COM SEPTEMBER 10, 2021

California Sub-Bid Request Ads

An Equal Opportunity Employer is requesting quotations from all certified and qualified
Disadvantage Business Enterprise (DBE)
Professional services, sub-contractors, material suppliers and trucking for the following project:
Owner: City of Fresno
Veterans Boulevard Interchange
Bid File Number: 3809 ~ Project ID #: PW00927
RCS Inc.
DBE Participation Goal is 16% Kim Romero, President
The Veterans Boulevard/State Route 99 interchange; the northerly jug handle (“J2” as identified subsequently); Veterans Boulevard [email protected]
876overcrossing of Golden State Boulevard, and; completing Veterans Boulevard between Wathen Avenue and the Veterans Boulevard/ 1-562-307-7734
Bryan Avenue/Barstow Avenue intersection. This phase also includes the extension of Sierra Avenue to Bullard Avenue
www.rcsinc.info
REVISED Bid Date: September 28, 2021 at 3:00 PM
**Bidding Electronically. Quotes need to be received by 11:00am on bid day** SBE/DBE/MBE Certified
CONTACT: DIR Certified
Debby Pannell
Brosamer & Wall Inc.
California Located
1777 Oakland Blvd, Suite 300, Walnut Creek, California 94596
PH: 925-932-7900 • FAX: 925-279-2269 Servicing the Contractor with
PROJECT SCOPE: Dedication and Professionalism
Brosamer & Wall Inc., is requesting quotes from all qualified and certified DBE subcontractors and suppliers Consulting Services
all items of work type listed below, including but not limited to:
Baseline Schedule, Monthly Schedule Up-
Class 2 AB, Structure Backfill, Decomposed Granite, Import Borrow, Rock Slope Protection, AC Paving, AC Dike/Curbs, Cold Plane AC, Road-
way Excavation, Slurry Seal, Geotextile Materials, Ready Mix, Minor Concrete, Concrete Barrier (Roadway & Bridge), Jointed Plain Concrete
dates, Earned Value, Resource/Cost Load-
Pavement, Prestressing Concrete, Concrete Structures, Concrete Bridge Deck Surface, Concrete Pumping Services, Reinforced Concrete ing, Cost Analysis, Change Order Review/
Pipe, Ductile Iron Pipes, Steel Pipe, Pipe Bollard, Pipe Culvert, PVC-Lined Reinforced Concrete Pipe, PVC Conduit, Basin Excavation, Earth- Negotiation, Claim Assessment, Schedule
work, Landscaping/Irrigation, Clearing & Grubbing, Erosion Control, Traffic Control, Crash Cushion, Electrical, Underground & Utilities, Signal
& Lighting, Intelligent Transportation Systems (City), Ramp Metering System, Fiber Optic Cable Systems, Fencing, Chain Link Railing, Rebar, Delay, Disruption, Impact and Acceleration
Misc Metals/Iron/Structural Steel, Welding, Biologist, Lead Compliance Plan, Survey, Storm Water Prevention Plan (SWPP), Street Sweeping, Analysis, Settlement Negotiation, Litigation
Fugitive Dust Control Plan (FDCP), Vibration Monitoring, Roadway Signs, Construction Area Signs, Overhead Signs, Trucking, HAZmat Ther- Support, Arbitration Support, Expert
moplastic Traffic Stripe & Pavement Marking Removal & Trucking, Striping/Markings, Fire Hydrant
Reporting and Testimony.
Please Contact Brosamer & Wall Inc. at the email listed below for the complete list of the Actual Available Project Bid Items.
Requirements: Brosamer & Wall, Inc. will work with interested subcontractors/suppliers to identify opportunities to break down items into economi-
cally feasible packages to facilitate DBE. Brosamer & Wall, Inc. is a union signatory contractor. Subcontractors must possess a current contractor’s

SBE OUTREACH SERVICES


license, insurance coverage, valid DBE certification, DIR (Department of Industrial Relations) registration number for public work projects, and
worker’s compensation for the entire length of the contract. All subcontractors will be required to sign our standard Subcontract Agreement. 100%
payment and performance bonds may be required. If you have any questions regarding this project or need assistance in obtaining/waiving insur-
ance, bonding, equipment, materials and/or supplies please call or email Debby Pannell contact information below.
Plans and specifications can viewed at our office located at 1777 Oakland Blvd Suite 300, Walnut Creek, Ca. 94596 or can be accessed online at the With 1.5 million businesses in our database, SBE is
City of Fresno Planet Bids website: https://pbsystem.planetbids.com/portal/14769/portal-home. You will need to register with Planet Bids and log in
to access the files for this project. B&W will also make plans & specs available electronically. Please email Debby Pannell at [email protected] California’s #1 source for diversity outreach.
for free online link. Brosamer & Wall Inc. intends to work cooperatively with all qualified firms seeking work on this project.
**Submit ALL Bid/Quotes via email to [email protected] or via fax at 925-279-2269 along with a copy of your CURRENT DBE
Advertisements
CERTIFICATION by 11am on bid day. Please Include your CSLB License Number & DIR Registration Number on all bid/quotes. Placed in the Small Business Exchange newspaper,
Subcontractors, Dealers/Suppliers and Brokers please provide your designation code to us on or before September 27, 2021.
B&W, INC., IS AN EQUAL OPPORTUNITY EMPLOYER.
SBE Today newsletter, and online at www.sbeinc.com
Faxed and Eblast Solicitations
Targeted mailings sent to businesses per your criteria.
WESTERN ROOFING SERVICE
Requests bids from all qualified DBE and/or SBE subcontractors and suppliers for
Telemarketing
the project listed below: Telephone follow-up calls that follow a script of
AC Transit D2 Maintenance
5 questions you create.
Roof Replacement Computer Generated Reports
1147 47th Street Will fit right into your proposal, along with a list of
Emeryville, CA 94608 interested firms to contact.
(AC Transit IFB #2022-1546)
BID DUE: September 20 @ 2pm Contact Info:
Trades Needed: Roofing demolition, scaffold/stair tower, caulk/sealant work 795 Folsom Street, 1st Flr, Room 1124
Plans & specs available at our office or via PDF upon request San Francisco, CA 94107
Email: [email protected]
WESTERN ROOFING SERVICE
Website: www.sbeinc.com
15002 Wicks Blvd
San Leandro, CA 94577
Phone: (415) 778-6250, (800) 800-8534
(510) 686-4951 • (510) 357-1160 Fax Fax: (415) 778-6255
Contacts: Rick Padfield or Oliver Wong
Publisher of
Please send proposals via email to: Small Business Exchange
[email protected] OR [email protected] OR
weekly newspaper
fax to 510-924-0969
SEPTEMBER 10, 2021 WWW.SBEINC.COM SBE TODAY E-NEWSLETTER 3

California Sub-Bid Request Ads

An Equal Opportunity Employer is requesting quotations from all qualified Professional services, sub-contractors, material suppliers and
trucking including certified Disadvantaged Business Enterprise (DBE) for the following project:
Caltrans ~ 03-1H18U4
Route 80 In and Near Truckee from 0.2 Mile West of Donner Park Overcrossing to Route 89/267 Separation – Nevada County Project Name: Mission Bay Block 9A
03-Nev-80-13.0/16.5 ~ Project ID 0321000106 Design-Build Piles
Roadway excavation, JPCP and furnish polyester concrete overlay.
Bid Date: October 5, 2021 at 2:00 PM
Location: San Francisco, California
**Bidding Electronically. Quotes need to be received by 11:00am on bid day** Bid Date: October 4, 2021 @2:00pm
CONTACT: Pre-Bid: September 20, 2021 10:30am
Debby Pannell (Web Ex Call)
Brosamer & Wall Inc.
1777 Oakland Blvd, Suite 300, Walnut Creek, California 94596 Labor Requirements: Prevailing Wage
PH: 925-932-7900 • FAX: 925-279-2269 Project Schedule: Est. Start February
PROJECT SCOPE: 2022
Brosamer & Wall Inc., is requesting quotes from all qualified subcontractors, suppliers, and truckers including certified DBEs
on all items of work type listed below, including but not limited to: Nibbi Brothers has been selected as the
·Lead Compliance Plan ·Develop Water Supply ·Construction Area Signs ·Traffic Control System ·Stationary Impact Attenuator Vehicle ·Type
General Contractor for the Mission Bay
III Barricade ·Temporary Traffic Stripe (Paint) ·Plastic Traffic Drums ·Portable Radar Speed Feedback Sign System ·Temporary Pedestrian Block 9A housing project in San Fran-
Access Route ·Portable Changeable Message Sign ·Temporary Railing (Type K) ·Temporary Crash Cushion ·Temporary Traffic Screen ·Pre- cisco. We are in receipt of the 75% CD
pare Storm Water Pollution Prevention Plan ·Rain Event Action Plan ·Storm Water Sampling and Analysis Day ·Storm Water Annual Report set and are currently requesting bid pro-
·Temporary Erosion Control Blanket ·Move-In/Move-Out (Temporary Erosion Control) ·Temporary Hydraulic Mulch (Bonded Fiber Matrix) posals from qualified subcontractors and
·Temporary Cover ·Temporary Check Dam ·Temporary Drainage Inlet Protection ·Temporary Fiber Roll ·Temporary Gravel Bag Berm ·Temporary
Silt Fence ·Temporary Construction Entrance ·Street Sweeping ·Temporary Concrete Washout ·Temporary Creek Diversion Systems ·Treated
suppliers including those certified with
Wood Waste ·Temporary High-Visibility Fence ·Clearing And Grubbing ·Roadway Excavation ·Shoulder Backing ·Sand Bedding ·Wood Mulch the Office of Community Investment and
·Check and Test Existing Irrigation Facilities ·Bonded Fiber Matrix ·Rolled Erosion Control Product (Netting) ·Compost ·Class 2 Aggregate Infrastructure (OCII)/Successor to SFRA
Base ·Base Bond Breaker ·Hot Mix Asphalt (Type A) ·Minor Hot Mix Asphalt ·Place Hot Mix Asphalt Dike (Type E & Type F) ·Tack Coat ·Remove for Design-Build Piles. The Office of
Asphalt Concrete Dike ·Cold Plane Asphalt Concrete Pavement ·Jointed Plain Concrete Pavement ·Drill And Bond (Dowel Bar) ·Drill And Bond Community Investment and Infrastructure
(Tie Bar) ·Individual Slab Replacement (RSC) ·Replace Joint Seal (Asphalt Rubber) ·Remove Concrete Pavement (CY) ·Grind Existing Concrete
Pavement ·60” Cast-In-Drilled-Hole Concrete Pile (Sign Foundation) ·Structural Concrete ·Drainage Inlet ·Minor Concrete ·Furnish And Install
(OCII) has established a 50% SBE partici-
Sign Structure ·Polyester Concrete Overlay ·Plastic Pipe ·Reinforced Concrete Pipe ·Corrugated Steel Pipe ·Slotted Plastic Pipe ·Corrugated pation goal for this project, with first con-
Steel Pipe Downdrain ·Anchor Assembly ·Alternative Flared End Section ·Abandon Culvert ·Abandon Inlet ·Cleaning, Inspecting, and Prepar- sideration to San Francisco-based LBEs
ing Culvert ·Sand Backfill ·Cured-In-Place Pipeliner ·Concrete (Ditch Lining) ·Rock Slope Protection ·Detectable Warning Surface ·Pre/Post located in zip code areas 94124, 94134
Construction Surveys ·Miscellaneous Iron and Steel ·Manhole Frame and Cover ·Concrete Barrier Delinetor ·Delineator (Class 2) ·Signage and 94107, followed by all other San Fran-
·Midwest Guardrail System (Steel Post) ·Vegetation Control ·Transition Railing (Type WB-31) ·End Anchor Assembly ·Two-Component Paint
Pavement Marking and Stripe ·Rumble Strip (Asphalt Concrete Pavement and Concrete Pavement) ·Traffic Stripe ·Maintaining Existing Traffic
cisco-based LBEs. Non-San Francisco
Management System Elements During Construction ·Locating and Mapping Underground Facilities ·Fiber Optic Cable Systems ·Modifying based SBEs should only be used to satisfy
Lighting Systems ·Modifying Sign Illumination Systems ·Modifying Traffic Monitoring Stations ·Mobilization ·Etc. participation goals where San Francisco-
Please Contact Brosamer & Wall Inc. at the email listed below for the complete list of the Actual Available Project Bid Items. based firms are not available, qualified, or
Requirements: Brosamer & Wall, Inc. will work with interested subcontractors/suppliers to identify opportunities to break down items into
if their bids or fees are significantly higher
economically feasible packages to facilitate DBE. Brosamer & Wall, Inc. is a union signatory contractor. Subcontractors must possess a current than those of non-San Francisco-based
contractor’s license, insurance coverage, valid DBE certification, DIR (Department of Industrial Relations) registration number for public work firms. We strongly encourage LBE/MBE/
projects, and worker’s compensation for the entire length of the contract. All subcontractors will be required to sign our standard Subcontract WBE to participate. Please contact Maria
Agreement. 100% payment and performance bonds may be required. If you have any questions regarding this project or need assistance in Pecot, OCII Contract Compliance Spe-
obtaining/waiving insurance, bonding, equipment, materials and/or supplies please call or email Debby Pannell contact information below.
cialist for additional information at maria.
Plans and specifications can be viewed at our office located at 1777 Oakland Blvd Suite 300, Walnut Creek, Ca. 94596 or can be
[email protected]. The 350 China Basin
accessed for free at the Caltrans website: www.dot.ca.gov/hq/esc/oe. B&W will also make plans & specs available electronically. Please email
Debby Pannell at [email protected] for free online link. Brosamer & Wall Inc. intends to work cooperatively with all qualified firms Street project consists of approximately
seeking work on this project. **Submit ALL Bid/Quotes via email to [email protected] or via fax at 925-279-2269 along with a copy 179,937 GSF sprinklered Type I-B (con-
of your CURRENT DBE CERTIFICATION by 11am on bid day. Please Include your CSLB License Number & DIR Registration Number on all bid/quotes. crete superstructure + misc steel posts
Subcontractors, Dealers/Suppliers and Brokers please provide your designation code to us on or before October 5, 2021. and beams at rooftop structures & misc.
B&W, INC., IS AN EQUAL OPPORTUNITY EMPLOYER. other locations), eight-story mid-rise res-
idential building, 148 affordable for sale
condo units including 1, 2, and 3-bedroom
REQUEST FOR CERTIFIED DBE SUBCONTRACTORS, SUPPLIERS & TRUCKERS FOR: configurations. The project will be ap-
proximately 89’-4” to the roof structure,
Widening of US 101 to SR 87 SB & US 101 SB On-Ramp from Story Rd C19240F
as measured from the lowest entry point
Santa Clara Valley Transportation Authority
on the site (along China Basin Street). The
EE: $4.2M-$4.7M
proposed project would include new side-
Various Locations in Santa Clara County, CA
walks & street trees, utility infrastructure
Bid Date: September 17, 2021 @ 2:00 PM
and landscaping as well as common, land-
DBE – 14.31%
scaped open space for residents at levels
Work types requested, but are not limited to, the following: 02 and 09 Roof. The building design will
Bar Reinforcing Steel, Cold Plane AC Pavement, Concrete Barrier, Construction Area Signs, Construction incorporate sustainable building strate-
Materials, Electrical Work, Erosion Control, Midwest Guardrail System Work, Portable Changeable Mes- gies to achieve LEED Silver or Green Point
sage Sign, Prepare WPCP, Sign Work, Striping Work, Temporary Erosion Control, Traffic Control System,
and Trucking.
Rated.
Plans and Specifications are available for review at our office, or can be downloaded online at: https://secure. For any questions on accessing the bid-
procurenow.com/portal/vta/projects/11331 ding
Call Serina Sirna for assistance in obtaining bonds, line of credit, insurance, scheduling accommodations, documents, please contact Jacqueline
equipment, supplies, materials and related assistance or services. Leiva, Precon & Estimating Coordinator
Gordon N. Ball, Inc. via email, [email protected]
Attn: Serina Sirna For project specific questions
333 Camille Ave., Alamo, CA 94507 please contact
Phone: (925) 838-5675 • Fax: (925) 838-0814 Anastasia Scorsone, Assistant Project
[email protected] Manager via email,
An Equal Opportunity Employer [email protected].
4 SBE TODAY E-NEWSLETTER WWW.SBEINC.COM SEPTEMBER 10, 2021

California Sub-Bid Request Ads

11555 Dublin Boulevard • P.O. Box 2909 11555 Dublin Boulevard • P.O. Box 2909
Dublin, CA 94568-2909 Dublin, CA 94568-2909
(925) 829-9220 / FAX (925) 803-4263 (925) 829-9220 / FAX (925) 803-4263
Website: www.desilvagates.com Website: www.desilvagates.com
ESTIMATOR: DAVID CZECH ESTIMATOR: DAVID CZECH 5225 Hellyer Avenue, Suite #220
An Equal Opportunity/ Affirmative Action Employer San Jose, CA 95138
An Equal Opportunity/ Affirmative Action Employer
DeSilva Gates Construction (DGC) is preparing a bid as a
Phone (408) 574-1400
DeSilva Gates Construction (DGC) is preparing a bid as a Prime Contractor for the project listed below: Fax (408) 365-9548
Prime Contractor for the project listed below:
WIDENING OF US 101 SB TO SR-87 SB CONNECTOR Contact: Randy Bonino
ROCKLIN ROAD AT PACIFIC STREET ROUNDABOUT
City Project Mo. 50131
RAMP AND US 101 SB ON-RAMP Email: [email protected]
FROM STORY ROAD, Contract No. C19240F
Federal Aid Project No. CML-5095(023) Disadvantaged Business Enterprise Goal Assigned
Disadvantaged Business Enterprise Goal Assigned
is 21%
is 14.31%
REQUESTING SUB-QUOTES FROM
OWNER: CITY OF ROCKLIN
OWNER: SANTA CLARA VALLEY QUALIFIED DBE, MBE, WBE
TRANSPORTATION AUTHORITY
DEPARTMENT OF PUBLIC SERVICES 3331 North First Street, Building B,
SUBCONTRACTORS/SUPPLIERS/
4081 Alvis Court, Rocklin, CA 95677 San Jose, CA 95134 TRUCKERS FOR:
BID DATE: SEPTEMBER 22nd, 2021 @ 1:00PM. BID DATE: SEPTEMBER 17, 2021 @ 2:00 P.M.
Widening of US 101 to SR 87 SB and US 101 SB
DGC is soliciting quotations from certified Disadvantaged DGC is soliciting quotations from certified Disadvantaged
Business Enterprises, for the following types of work and Business Enterprises, for the following types of work and On-Ramp from Story Road
supplies/materials including but not limited to: supplies/materials including but not limited to:
Contract C19240F
ADJUST IRON, CLEARING AND GRUBBING/DEMOLI- AC DIKE, COLD PLANE, CONCRETE BARRIER, CON-
STRUCTION AREA SIGNS, ELECTRICAL, EMULSION Owner: Santa Clara VTA
TION, COLD PLANE, CONSTRUCTION AREA SIGNS,
ELECTRICAL, EMULSION SUPPLIER, IRRIGATION, SUPPLIER, EROSION CONTROL, HAZARDOUS MA- Engineers’ Estimate: $4,700,000
LANDSCAPING, MINOR CONCRETE, ROADSIDE TERIAL, IRRIGATION, METAL BEAM GUARDRAIL, MI-
NOR CONCRETE, BOX CULVERT, ROADSIDE SIGNS, BID DATE: Sept. 17, 2021 @ 2:00 PM
SIGNS, SAWCUTTING, STRIPING, SURVEY/STAKING,
SAWCUTTING, STRIPING, SURVEY/STAKING, SWPPP/ Items of work include but are not limited
SWPPP PREP/WATER POLLUTION CONTROL PLAN
WATER POLLUTION CONTROL PLAN PREPARATION,
PREPARE, TEMPORARY EROSION CONTROL, TEST-
TEMPORARY EROSION CONTROL, TESTING, TREE RE- to: Lead Compliance Plan, Construction
ING, TRAFFIC CONTROL SYSTEM, TRAFFIC CON- Area Signs, Traffic Control, PCMS, Prepare
MOVAL/TRIMMING, VEGETATION CONTROL, TRUCK-
TROL/ENGINEER, TREE REMOVAL/TRIMMING, UN- ING, WATER TRUCKS, STREET SWEEPING, HOT MIX Water Pollution Control Program, Asbestos
DERGROUND, TRUCKING, WATER TRUCKS, STREET
SWEEPING, HOT MIX ASPHALT (TYPE A) MATERIAL.
ASPHALT (TYPE A) MATERIAL, RUBBERIZED HMA Plan, Edge Drain, Street Sweeping, Clearing
(OPEN GRADE) MATERIAL, RUBBERIZED HMA (GAP
& Grubbing, Erosion Control, Hydroseed-
Plans and specifications may be reviewed at our of- GRADE) MATERIAL.
fices located at 11555 Dublin Boulevard, Dublin, CA ing, AC Dike, Tack Coat, Minor Concrete,
Plans and specifications may be reviewed at our of-
or 3855 N. Freeway Blvd., Sacramento, CA, or at fices located at 11555 Dublin Boulevard, Dublin, CA and Rebar, Adjust Utilities, Rock Slope Protec-
your local Builders Exchange, or reviewed and down- 3855 North Freeway Boulevard, Suite 100, Sacramento, tion, Pavement & Object Markers, Roadside
loaded from our dropbox located at: https://www. CA or at your local Builders Exchange, or reviewed and Signs, Midwest Guardrail System, Concrete
dropbox.com/sh/5rvdc1bwfbasgl9/A ABbrd0ba51_ downloaded from the dropbox site at https://www. Barrier, Striping, Electrical and Trucking.
kN3GtAESfBUoa?dl=0 or from the Owner’s site at http:// dropbox.com/sh/5r vdc1bw fbasgl9/A ABbrd0ba51 _
ciplist.com/ kN3GtAESfBUoa?dl=0 or from the Owner’s site at https:// Granite Rock Company ‘Graniterock’ is signa-
secure.procurenow.com/portal/vta tory to Operating Engineers, Laborers, Team-
Fax your bid to (925) 803-4263 to the attention of Esti-
mator David Czech. If you have questions for the Estima- Fax your bid to (925) 803-4263 to the attention of Esti- sters, Carpenters and Cement Masons unions.
tor, call at (925) 829-9220. When submitting any public mator David Czech. If you have questions for the Estima- 100% performance and payment bonds will be
works bid please include your DUNS number and DIR tor, call at (925) 829-9220. When submitting any public required from a qualified surety company for
number. For questions regarding registration for DIR use works bid please include your DUNS number and DIR the full amount of the subcontract price. Bond-
the link at www.dir.ca.gov/Public-Works/PublicWorks.html number. For questions regarding registration for DIR use ing assistance is available. Graniterock will pay
the link at www.dir.ca.gov/Public-Works/PublicWorks.html bond premium up to 1.5%. In addition to bond-
If you need DBE support services and assistance in ob-
taining bonding, lines of credit, insurance, necessary If you need DBE support services and assistance in ob- ing assistance, subcontractors are encouraged
taining bonding, lines of credit, insurance, necessary to contact Graniterock Estimating with ques-
equipment, materials and/or supplies or related assis-
equipment, materials and/or supplies or related assis-
tance or services, for this project call the Estimator at tions regarding obtaining lines of credit, insur-
tance or services, for this project call the Estimator at
(925) 829-9220, or contact your local Small Business
(925) 829-9220, or contact your local Small Business ance, equipment, materials and/or supplies,
Development Center Network (http://californiasbdc.org) Development Center Network (http://californiasbdc.org) or with any questions you may have. Subcon-
or contact the California Southwest Transportation Re- or contact the California Southwest Transportation Re- tractors must possess a current contractor’s
source Center (www.transportation.gov/osdbu/SBTRCs). source Center (www.transportation.gov/osdbu/SBTRCs). license, DIR number, insurance and worker’s
DGC is willing to breakout portions of work to increase the DGC is willing to breakout portions of work to increase the compensation coverage. Subcontractors will
expectation of meeting the DBE goal. expectation of meeting the DBE goal. be required to enter into our standard contract.
At our discretion, 100% Payment and 100% Performance At our discretion, 100% Payment and 100% Performance Graniterock intends to work cooperatively with
bonds may be required as a subcontract condition. bonds may be required as a subcontract condition. all qualified firms seeking work on this project.
This will be a PREVAILING WAGE JOB. DGC is an Equal This will be a PREVAILING WAGE JOB. DGC is an Equal
Opportunity/Affirmative Action Employer. Opportunity/Affirmative Action Employer. We are an Equal Opportunity Employer

KJ Woods Construction, Inc.


is requesting quotes from certified DBE businesses for
Oro Loma Sanitary District (OLSD) •Sewer Collection System Pipeline
Rehabilitation and Replacement Project – Phase 2 • Project #45-146.02
Due 9/22/21 @ 2 PM
We are seeking subs/suppliers of Traffic Control, Paving, Grinding, Install Concrete Flatwork, Manholes, Excavation, Shoring, Trucking, Saw Cutting,
Sewer Bypass, TV Inspection, and Pipe Bursting.
Payment & performance bonds may be required. Subs are encouraged to contact Cristina Bernal [email protected] / 415.759.0506 for info/assist
with insurance reqs, bonding, lines of credit, equipment or instructions to obtain plans/specs at no cost
SEPTEMBER 10, 2021 WWW.SBEINC.COM SBE TODAY E-NEWSLETTER 5

California Sub-Bid Request Ads

INVITATION TO BID FOR


All People’s Community Center – ADA Upgrades
APPLICABLE TRADES
PROJECT NAME:
Selective Demolitions, Structural & Site Concrete, Structural Steel , Metals, Rough Carpentry, Architec-
Dublin Transit Center Parking Garage
tural Woodwork, Roofing, Doors, Frames, & Hardware, Drywall & Framing, Tile, Stone, & Countertops,
Flooring, Painting, Acoustical Ceilings, Specialties, Signage, Elevators, Fire Suppression, Plumbing &
Campus Drive and Martinelli Way, Dublin, CA 94568
Fixtures, HVAC, Electrical, Fire Alarm, Low Voltage, Asphalt & Striping
BID DATE: October 06, 2021 at 12:00 PM.
CERTIFICATION DESIRES
Swinerton is requesting quotations from certified
SBE, MBE, WBE, Alameda County SLEB/LBE. MBE/WBE/OBE/DBE or Similar Certifications
Trades For Bid: Design/Build MEPF (Partnerships APPLICANTS
with Alameda County SLEB design firms strongly en- If interested in prequalifying and bidding, please contact [email protected] (213) 896-3439 for
couraged) Precast / GRFC Panels, Metal Stairs, Metal the prequalification and Bid Forms. Do NOT contact CPMG , Architect or any of the project Consultants.
Panels, Elevators, Parking Management System. All queries direct to Swinerton.
Trades For Budget: Misc. Metals, Flashing & Sheet PREQUALIFICATION SUBMITTALS
Metal, Coiling Doors, Plaster, Acoustical Ceilings, 1. Submit all documents required for Swinerton Prequalification.
Glazing, Solar Panels, Earthwork, Paving, Site Con- a. Visit: http://www.swinerton.com/subcontractors/subcontractor-prequal.
crete, Striping, Landscape, Utilities. 2. Complete Review of and Sign Swinerton Master Service Agreement.
RFIs Due: September 29, 2021. PROJECT INFORMATION AND DESCRIPTION:
Project Description: PROJECT DESCRIPTION
County of Alameda is developing a 5-level above grade This project involves the modification of multiple public accommodation areas in and around the approxi-
parking structure on a 2.4-acre County owned prop- mate 20,000 sf center. The scope includes, but is not limited to, on-site parking, facility entry/exit points,
erty (Parcel D-1) located at the Dublin Transit Center. interior/exterior public use areas, routes of travel including stairways and installation of new elevator,
This parcel is currently undeveloped, with a three-story restrooms, and signage.
residential building to the North, a five-story mixed-use The work performed must meet Federal ADA and UFAS regulations (see https://www.access-board.gov/
building to the West, and the existing Dublin/Pleasanton aba/ufas.html).
BART Parking Garage to the South. The proposed park-
• This is an operational facility that provides critical services to the community and must remain open
ing structure will provide 525 parking spaces. This proj-
and operational during construction.
ect shall achieve Parksmart Silver Certification.
• All interior demo and loud work to occur during OFF HOURS (6pm-9pm)
PROJECT SCHEDULE: Construction is estimated to
start on Q1 2022 with a total duration of 578 CD. • Labor and Material Breakouts required on all bids (% Okay)
PLANS & SPECIFICATIONS:
https://swinerton.com/subcontractors/current-bid- Project Requirements: Buy American Act (BAA); Prevailing Wage/Davis-Bacon; EMR less than 1.0; Swin-
opportunities/
erton PLP wrap policy; Textura; CCIP/PLP Enrollment. For more information, please refer to the bid docu-
Contact: Zulma Figueroa
ments.
Tel: (415)527.6569 BID START DATE
EMAIL TO: [email protected] Tuesday, August 30th 2021
DUE DATE FOR TRADE CONTRACTOR BIDS
• This is a Public Works project. Subcontractor
must be registered with the CA Department of In-
Friday, September 17th, 2021 at 2:00PM PST
dustrial Relations before submitting a bid. Submit Bids to Swinerton at:
[email protected]
• This is a Prevailing Wage project.
• Project Stabilization Agreement / Community Swinerton is an Equal Employment Opportunity, Minority, Women, Disability, and Veteran Employer
Workforce Agreement.
• Alameda County LBE 60% - Alameda County S/
LBE 20% - MBE 15% - WBE 5% - SBE 5% Sub-Bids Requested from DBE, MBE/WBE Subcontractors and Suppliers
• Alameda County Contractor Technical Assistance Oro Loma Sanitary District
Program (CTAP) to support businesses with bond-
ing and insurance assistance included in bid docu- Sewer Collection System Pipeline
ments. Rehabilitation & Replacement Project Phase 2
We reserve the right to require all subcontractors to fur- Bid Date 9/22/21 @ 2:00 P.M.
nish 100% performance and payment bonds from a U.S.
Treasury-listed surety. Premium cost to be included as a For Subcontractors & Suppliers in the
separate item. At our discretion, a bid bond and/or letter area of Trucking, Supply of Pipe & Fittings, Striping
of bondability from a U.S. Treasury-listed surety may be
required within 48 hours of demand. Precision Engineering, Inc.
“Swinerton is an Equal Employment Opportunity, 1939 Newcomb Ave
Minority, Women, Disability, and Veteran Employer” San Francisco, CA 94124
Ph: (415) 621-4882 x 100
Fx: (415) 621-4812
Contact: Finbar Brody
For assistance with bonding, lines of credit, insurance,or anything else
regarding bidding on this project, contact Precision Engineering, Inc. via phone
EXCHANGE
An Equal Opportunity Employer
6 SBE TODAY E-NEWSLETTER WWW.SBEINC.COM SEPTEMBER 10, 2021

California Sub-Bid Request Ads

300 S. Grand Avenue, 8th Floor


Request for Qualification (RFQ)
RFQ Period: September 8, 2021 – September 23, 2021
Los Angeles, CA 90071 • T 1-213-593-8100

Turner Construction Company (Turner) is seeking qualified Subcontractors for the following project:
REQUEST FOR CBE SUBCONSULTANT INTEREST
Gateway – University of California, Berkeley
Project No. 12785A AECOM is bidding on the following project
as Prime Contractor
Turner has been awarded the UCB Gateway project designed by Weiss Manfredi, Executive Architect Gensler and MEP by
Interface, located at the former Tolman Hall site, bounded by Hearst Avenue to the north, Koshland Hall to the west, and Owner: Los Angeles County Public Works
Morgan Hall and Wellman Courtyard to the east. The project gateway will span over Morgan Bikeway with new paving and On-call Environmental Assessment,
planting to invite visitors into campus. This is a new 5-story, 380,000 square feet building hosting Berkeley’s data science
classrooms, seminar and core spaces on the lower level, while the upper five levels are dedicated to a mix of research Remediation,
labs, faculty and staff offices, workstations and collaborative meeting spaces. This project is seeking either LEED Gold or and Compliance Services, BRC 0000247
Platinum certification.
Proposal due date:
Up to (4) Mechanical, (5) Electrical & Fire Alarm, (5) Plumbing, (4) Exterior Glazing, highest scoring Subcontrac- Wednesday, September 22, 2021
tors who meet pre-qualification criteria to perform work on their respective trades will be invited to submit a best
value design-build proposal. Trade Subcontractors who do not submit the pre-qualification information and are not pre- AECOM is seeking qualifications from Community
qualified will not be allowed to propose on the project. Business Enterprise (CBE) companies for the fol-
Turner is currently seeking RFQs for the following Trade Packages: lowing supporting services:
All subcontractor staff must have gradu-
ated from an accredited university with a
major in civil or environmental engineer-
ing, geology, environmental health and safety,
industrial hygiene or other related major and
have a minimum of 10 years’ experience in a field
described below:
• performing Phase I and II Environmen-
tal Site Assessments and environmental
remediation and closure activities;
• performing waste characterization, air moni-
toring, and waste disposal activities;
• preparing environmental compliance reports,
risk assessments, and health and safety plans;
Turner has a 20% UBE [MBE/WBE/DVBE/LGBTQ+] goal for this project. • performing underground storage tank (UST)
University Project Reference: https://capitalstrategies.berkeley.edu/gateway removals, UST and aboveground storage tank
replacements, compliance, upgrades, and
For information on how to Pre-Qualify with Turner, please contact Tim Galvin – Subject: UCB Gateway at the
following email address: [email protected] tank maintenance and testing;
• performing environmental permit pro-
cessing; performing hazardous building
material property condition surveys and abate-
Bids Requested from qualified DBE (including MBE, WBE) Subcontractors and Suppliers For: ment activities; performing hydrogeologic
DESIGN-BUILD FOR GROUNDWATER TREATMENT PLANTS investigations, geophysical and downhole sur-
veys, and agronomic and biological studies;
(PHASE B)
Owner: City of Anaheim • designing, permitting, and perform-
ing aquifer testing and dewatering system
Location: Anaheim, CA
installations; performing oil and gas field as-
Bid Date: September 29, 2021 @ 2:00 P.M. sessments and closures for community rede-
velopment;
• and providing consultation and project man-
agement services and augmenting County
forces.
667 Brea Canyon Road, Suite 30 • Walnut, CA 91789
Phone: (909) 595-4397, Fax: (909) 444-4268 The requested services are often performed as
a component of larger County projects, and often
Contact: Lori Olivas, [email protected] involve performing professional practices, such as
J.F. Shea Construction, Inc. is soliciting your participation in the preparation of this bid. We are the Practices of Geology and Civil Engineering.
particularly interested in bids from subcontractors/suppliers for the following work items: Experience providing similar services on On-call
Surveyor, Corrosion Engineer, Hydrogeologist, Well Rehabilitation, Geotechnical Environmental Assessment, Remediation and Com-
Engineer, Soil & Concrete Testing, Security Systems, Laboratory Testing, Architect, pliance Services for the County of Los Angeles is
preferred. This Proposal is in alignment with the
Utility Location Services, AC Paving, Ready-Mix Concrete, Reinforcing Steel, Structural County of Los Angeles CBE Program requirements
Steel, Miscellaneous Metals, Painting & Coatings, Roofing, and HVAC. and certified CBEs are encouraged to respond.
Plans and Specifications: Email your requests to [email protected]. Interested businesses should email a brief
Plans may also be viewed at the Dodge Plan Rooms or at our Walnut Office. overview of County of Los Angeles or
similar experience, along with CBE documen-
J.F. Shea Construction, Inc. is an equal opportunity employer and intends to negotiate in tation by Monday, September 13, 2021 to
Katherine Martin at [email protected].
good faith with interested DBE (including MBE, WBE) firms and intends to utilize the lowest
responsive bidder. J.F. Shea expects potential subcontractors to be bondable. J.F. Shea will pay Assistance is available in obtaining any necessary
bonding; lines of credit or insurance; information
for up to 1% for subcontractor bond costs. Subcontractors and Suppliers are expected to bid per related to the requirements for the work; and nec-
plans and specifications, including requirements for warranties. Standard manufacturer’s essary equipment, supplies materials, or related
warranties, if not in conformance with owner’s specifications, will not be accepted. services.
SEPTEMBER 10, 2021 WWW.SBEINC.COM SBE TODAY E-NEWSLETTER 7

California’s Labor Day lament:


A shortage of workers
[ Article was originally posted on Oddly, although California has the nation’s Ironically, California’s high housing costs drive
www.calmatters.org ] highest poverty rate and one of its highest un- away the very people we need to build more hous-
By Dan Walters, employment rates, employers have hundreds of ing. The situation implies that California must do
thousands of jobs going unfilled – from teachers, better in generating skilled workers within it-
An acquaintance had some good news to impart carpenters and auto mechanics to farm workers self, rather than relying on migration, and there
last week: Her son, who operates construction and even hamburger flippers. It’s not uncommon are some hopeful indications of that attitudinal
machinery, just got a raise from $43 an hour to for fast food chains to offer $15 per hour, but still change.
$57. not get enough applicants. A recent announcement by Chaffey College, a
That sounded outlandishly high — the equiva- The worker shortages indicate that the pandem- community college in Fontana, is one such indi-
lent of well over $100,000 a year — but the most ic may have wrought at least a semi-permanent cation. It has received a $2.9 million state grant
recent “prevailing wage” schedule for Northern change in California’s employment scene, and if to build a new welding training facility that will
California public works projects confirms that it persists, it will have a negative impact on the double the number of trainees. Welders are much
$50-plus per hour is commonplace. And that state’s economy. in demand and earn premium wages.
doesn’t include more than $30 per hour in fringe
benefits. In decades past, when California has experienced Last week, the Legislature passed a bill to pro-
labor shortages, we could count on an inflow of mote blue-collar trades among high school stu-
It explains why government construction is costly workers from other states and nations to fill the dents.
in California, but also undermines the popular be- gaps. But foreign migration has slowed to a trick-
lief that one must have a college degree to get a “We must ensure that trade apprenticeships are
le and California loses more people to other states
well-paying job. presented as an option,” the author of the bill,
than it gains. Assemblymember James Ramos, a Highland
As well as marking the unofficial end of summer The Public Policy Institute of California has stud- Democrat, said. “These programs expand work-
and the beginning of autumn, Labor Day honors ied those trends and found that those lacking col- force opportunities for young people and create a
the men and women who do the real physical lege educations are most likely to leave the state pipeline of skilled employees receiving competi-
work that society needs to function. They oper- while those with higher education degrees are tive wages.”
ate machinery, fix our cars and appliances, build more likely to come here from other states.
our houses, cultivate and deliver our food and do The Chaffey grant and Assembly Bill 643 are re-
hundreds of other vital tasks. The exchange may help industries demanding freshing signs that the college-for-all mentality is
higher education levels and paying high salaries, finally giving way to the reality that we need to
As I’m writing this column, I’m waiting for a plumb- such as Silicon Valley, but it bodes ill for filling train more Californians to do our vital work.
er to clear a plugged-up drainage pipe, the kindred blue collar jobs and even professional positions
soul of the electrician who repaired a faulty circuit SOURCE:
that are not especially lucrative, such as teaching.
a couple of weeks ago. It’s what happens when you https://calmatters.org/commentary/2021/09/
live in a nearly 70-year-old home. california-worker-shortage/

Mayor Garcetti announces free financial counseling


for small business owners in Los Angeles
[ Article was originally posted on small business owners to help them stabilize cash $47,000 on average. Closing that structural gap
www.lamayor.org ] flow, decrease debt, improve credit standing, and in available financial relief is one of the new pro-
Mayor Eric Garcetti today announced a program reach their financial goals. gram’s primary goals.
that will provide small business owners with “Our counselors understand the unique financial “Small businesses endured extraordinary finan-
counseling, education, and debt repayment assis- challenges faced by small business owners and cial hardships during the pandemic, including
tance to help with their economic recovery from can help show them how to balance their house- negative impacts to their credit and increasing
the pandemic. hold budget, improve their credit profile, and con- their debt. The Office of Mayor Garcetti and the
“Small businesses account for nearly half the jobs nect to vetted resources,” Jim Triggs, President City of LA’s Economic and Workforce Develop-
in our City and their recovery is essential to our and CEO of MMI. “Nonprofit financial counsel- ment Department’s collaboration with Money
economy,” said Mayor Eric Garcetti. “We recog- ing has been proven to increase financial wellness Management International, supports local mom-
nize that small businesses are the foundation of and reduce debt, so we hope local small business and-pop shops by offering small businesses the
our communities and are committed to helping owners will take full advantage of this new rela- tools to establish credit and debt management
them get back on their feet.” tionship and engage with our experts.” best practices. Learning these skills helps small
businesses strengthen their finances and broaden
Free counseling will be provided to small busi- The city’s small businesses have been among the
their access to capital, ultimately boosting the
nesses 24/7 through a collaboration between the hardest hit during the pandemic, with women-
City’s economic recovery efforts and the restora-
City of Los Angeles’ Economic and Workforce and minority-owned businesses suffering the big-
tion of LA’s vibrant small business community,”
Development Department (EWDD) and Money gest losses. At the same time, Black small busi-
said EWDD General Manager Carolyn Hull.
Management International (MMI). The program ness owners received significantly less federal
will offer guidance, resources, and assistance to financial support, about $19,000 in PPP loans as
compared to White business owners who received g Continued on page 8
8 SBE TODAY E-NEWSLETTER WWW.SBEINC.COM SEPTEMBER 10, 2021

California Sub-Bid Request Ads


REQUESTING BIDS FROM CERTIFIED DBE, DVBE,
MBE, WBE, SBE, OBE
Subcontractors and Vendors
Project: San Pablo Reservoir Hypolimnetic
Request for Qualified/Certified DBE Participation from Oxygenation System, Contra Costa, CA
Subcontractors/Suppliers/Service Providers Reference: 2152
Veterans Blvd Interchange Project Bid Date: 09/15/2021 @ 01:30 pm
City of Fresno, CA Project Location: El Sobrante, CA -
Bid File No. 3809 Located in Contra Costa, CA
Engineers Estimate $54.3M
Owner: East Bay Municipal Utility District
DBE Goal 16%, Participation Encouraged (EBMUD) CA
REVISED Bid Date: September 28th, 2021 3:00 PM We are requesting bids for the following trades and/
or material suppliers:
*This is an Electronic Bid Submittal*
Communications Work, Electronic Safety & Se-
*Quotes not received by 11:00 AM on bid day may not be reviewed/evaluated* curity Work, Demo/Construction Debris Trucking
and Disposal, Concrete Work (Supply, Pumping,
Flatiron West Inc is requesting DBE Subcontractor/Supplier/Service Provider participation for the following Items Placement and/or Finishing), Concrete Reinforcing,
of work, but not limited to: CAS/Roadway Signs, Clear & Grub, Erosion Control (Temp & Perm), Landscaping/Irriga- Fencing,Civil/Earthwork, Building Work, SWPPP,
tion, AC Paving, AC Dike/Curbs, Cold Plane AC, Post Tensioning, Rebar, Overhead Signs, Painting/Staining Concrete, Erosion Control, Site Sanitation Services, Mechani-
Underground & Utilities, Fencing & Metal Railing, MBGR, Bridge Concrete Barrier, Roadway Concrete Barrier, Striping/ cal & Electrical Supply/Work, Pipe Supply/Work,
Markings, Electrical, Minor Concrete, Pavement Fabric, Jack & Bore 24” & 30”, PCC Paving, Clean & Treat Deck, Slurry Misc. Metals/ Fabrications, Sawcutting, Paving, and
Seal, Welding, Grading, Polyester Concrete Overlay, Trucking, HAZMat Trucking, Aggregates: including Import Borrow, Material/Equipment Trucking and Aggregate Sup-
Class 2AB, Structure BF &CL2 Rip Rap, Ready Mix, Concrete Pumping Services, 77” Steel Pipe Casings, Underground ply.
Pipe Products: including ACP, RCP, 16” Ductile Iron, 54” RCP PVC lined, Misc. Metals/Iron/Structural Steel, SWPP Plan & Bid documents can be viewed at or obtained
Materials, Lead Compliance Plan, Geotextile Materials, Formliner, Underground Precast, Street Sweeping, Traffic Con- from:
trol, Vibration Monitoring, Survey, and Biologist.
Download from EBMUD’s website at
Non-DBE Subs & Suppliers: You will be expected to carry a proportionate percentage of 2nd-tier participation https://construction-bids.ebmud.com
with your quote. 2nd-tier participation will be evaluated with your price. or by contacting DMZ to make an
appointment for viewing or assistance
100% performance/payment bonds will be required for the full amount of the subcontract price. Please contact Flatiron at our Concord CA office.
for any assistance to this solicitation, including obtaining bonding, insurance, equipment, materials and/or supplies. Pro- Email: [email protected]
vide all scopes/quotes as early as possible to enable estimators to perform a thorough evaluation of all quotes received.
Request for Quotes from All Qualified Busi-
Quotes will be broken down into comparable packages as reasonably necessary to facilitate participation. Quotes must
ness Enterprises identified in EMBUD’s Con-
be valid for the same duration as specified by the Owner for Contract Award. We are signatory to Operating Engineers, tract Equity Program availability groups: White
Laborers, Cement Masons, Carpenters and Pile Drivers Unions. Non-signatory subs will be required to sign an agreement Men, White Women and Ethnic Minority (both
for trades covered under our union agreements. Flatiron intends to work cooperatively with all firms for all bid items you menand women). Please submit Bids no later than
are licensed and qualified to perform. Bid items can be split to facilitate participation from all certified firms. Flatiron 10 am on 9/15/21. Please submit completed EB-
will reimburse for bond premium up to 2%. Firms must possess & provide current contractor’s license number & MUDSpec 2152 “Employment Data and Certification
DIR Registration number on the quote. Firms must possess insurance and workers compensation coverage meeting Instructions” Form (P-025) and Declaration of Eligi-
project requirements. Waiver of Subrogation is required. Please contact Flatiron for any assistance required by your firm. bility to work on Public Works Projects Statement
Subcontractors/Suppliers will be required to execute our standard agreements and agree to our standard and general (Form E-102). Send quotes, completedForms P-025
terms & conditions. Copies are available for review on our Box.com ftp site or upon email request. and E-102 Eligibility Statement via email to: esti-
[email protected] or fax to 925-826-5766.
Project documents can be found on the City of Fresno Planet Bids project page at PlanetBids Vendor Portal You will
All Quotations must be valid for same du-
need to register with Planet Bids and log in to access the project files for the City of Fresno Veterans Blvd Interchange
ration as specified by Owner for con-
project. tract award. All Quotations must be in
To access FREE project documents from our Flatiron BOX ftp site, please send an email request to accordance with the Contract Docu-
[email protected] ments/Requirements. Subcontractors
You will be provided with a BOX link to view & download plans and specs for FREE from our BOX.com ftp site. Due to Co- must provide their active CSLB license
vid-19 & some social distancing requirements still in place in some areas, we are not currently scheduling appointments number and DIR registration number with their
to review project docs or meet with estimators in our office. When all pandemic restrictions are lifted, we will offer these quote. DMZ Builders is a union contractor. Subcon-
services again in our office by appointment only. Thank you for your understanding.
tractors will be required to execute DMZBuilders
standard subcontract terms and conditions or pur-
Please send all quotes by email to [email protected] or to our BID FAX at 707-746-1603. chase order agreement (for suppliers), both avail-
able for review upon request, and meet insurance
Flatiron West, Inc.
requirements, including waiver of subrogation. Sub-
2100 Goodyear Rd Benicia, CA 94510
contractors, at DMZ’s discretion, may be required to
Phone 707-742-6000 Bid Fax 707-746-1603 provide payment and performance bonds for 100%
An Equal Opportunity Employer of the subcontract value. DMZ will reimburse bond
Contractor License 772589 premium at actual cost, not to exceed 2.0%. Project
requires paying prevailing wages and submitting
certified payrolls. For assistance in obtaining bond-
ing, lines of credit, insurance, equipment, supplies
and materials, technical assistance, or any other co-
ordination required for the project, please contact
Mayor Garcetti announces free financial counseling for Adam Sheldon by phone at (925) 826-
small business owners in Los Angeles 5387, by fax at (925) 826-5766, or by e-
mail at [email protected].
g Continued from page 7 back Checks and Rental Assistance to further DMZ will work with interested subcontractors and
aid in the economic recovery of L.A.’s small suppliers toidentify opportunities to divide the work
This is the latest in the Mayor’s efforts to lift into economically feasible packages and intends to
businesses. cooperate with all qualified firms seeking work on
small businesses up during the pandemic. In the project.
the past year, the City of Los Angeles launched For more information, please visit EWDD or call
DMZ BUILDERS
the Small Business Microloan Program, the LA 888-645-2227. 4070 Nelson Avenue, Ste A,
Recovery Fund, and small business grants, dis- Concord, CA 94520
SOURCE: Phone 925-826-5387 • Fax: 925-826-5766
tributing over $56 million in grants and loans to Email: [email protected]
https://www.lamayor.org/mayor-garcetti- Adam Sheldon
businesses and microentrepreneurs. This Fall,
announces-free-financial-counseling-small- An Equal Opportunity Employer
the City will provide $37 million in Come-
business-owners-los-angeles
SEPTEMBER 10, 2021 WWW.SBEINC.COM SBE TODAY E-NEWSLETTER 9

California Sub-Bid Request Ads


GRANITE CONSTRUCTION COMPANY
Is requesting DBE quotes for the following Project:
Route 133 to South of Route 91
Project Owner: CALTRANS
O.C. Jones & Sons, Inc. O.C. Jones & Sons, Inc. Estimate # 1476
1520 Fourth Street • Berkeley, CA 94710 Estimators: Aaron Ochoa.
1520 Fourth Street • Berkeley, CA 94710
Phone: 510-526-3424 • FAX: 510-526-0990 Phone: 760-444-1985
Phone: 510-526-3424 • FAX: 510-526-0990
Contact: Jason Martin Bid Date: 10/06/2021 at 2:00 PM
Contact: Jean Sicard Please Fax Quotes to: (760) 444-1988
REQUEST FOR DBE General work description:
SUBCONTRACTORS AND SUPPLIERS FOR: REQUEST FOR DBE Contract No. 12-0H0474 – CONSTRUCTION ON
Farm to Market Phase 3 and
SUBCONTRACTORS AND SUPPLIERS FOR: STATE HIGHWAY IN ORANGE COUNTY AT VARIOUS
Solano County Roadway Preservation Widening of US101 SB to LOCATIONS FROM 0.1 MILE NORTH OF ROUTE 133
County of Solano TO 0.5 MILE SOUTH OF ROUTE 91.
SR-87 SB Connector Ramp
Federal Aid No. STPL -5923(123) and US101 SB On-Ramp from Story Road Granite Construction Company (Granite) is requesting
BID DATE: September 15, 2021 @ 2:00 PM quotes from qualified Subcontractors and Suppliers
Santa Clara Valley Transit Authority including Certified DBE firms for the following items
We are soliciting quotes for (including but not Contract C19240F of work, including but not limited to: AC Dike, Aggre-
limited to): Trucking, QC/QA Testing, Flagging, gate Supply, Asphalt Paving, Clearing & Grubbing,
BID DATE: September 17, 2021 @ 2:00 PM
Traffic Control System, Construction Area Signs, Cold Plane AC, Concrete Barrier, Construction Area
SWPPP, Clearing & Grubbing, Crack Sealing, Sweep- We are soliciting quotes for (including but not Signs, Electrical, Guardrail, Minor Concrete, Misc. Iron
ing, Chip Seal, Polymer Modified Rejuvenating Emul- limited to): Trucking, Temporary and Permanent & Steel, Overhead Signs, Pipe Supply, Roadside Sign,
sion (PMRE) Binder, Date Cores, Nuclear Gauge Hydroseed and Erosion Control Measures, QC/QA Street Sweeping, Striping, SWPPP/Lead Plans, Traffic
Testing, Cold Planing, Monument Wells, Delineators, Testing, Construction Staking, Lead Compliance Control Systems, Trucking.
Roadside Signs, Culvert Marker, Striping & Marking, Plan, Construction Area Signs, Portable Changeable Granite is an Equal Opportunity Employer and will work
Loop Detectors, Geosynthetic Pavement Interlayer, Message Sign, Water Pollution Control Program, with any interested subcontractor to identify oppor-
Import Borrow, Shoulder Backing, Potholing, Adjust Sweeping, Asbestos Compliance Plan, Treated Wood tunities to break items into any economically feasible
Utilities, Misc. Concrete, and Construction Materials Waste, Temp. High Visibility Fence, Clearing & Grub- packages. We welcome quotes from qualified Minor-
Jason Martin (510-809-3432 [email protected]) bing, Develop Water Supply, Roadway Excavation ity Business Enterprise (MBE), Women Business Enter-
is the estimator on this project and he is available prises (WBE), Small Business Enterprises (SBE), Disad-
(Type Z-2 Aerially Deposited Lead), Welded Steel
to provide assistance or answer questions regard- vantaged Business Enterprise (DBE) and other entities
Pipe Conduit, Hydroseed, Compost, Asphalt Treated defined as socially and/or economically disadvantaged.
ing the project scope of work including bid require- Permeable Base, AC Dike, Tack Coat, Structural
ments, break out of bid items, plan or spec inter- Assistance in obtaining bonding, insurance, equip-
Concrete, Minor Concrete, Bar Reinforcing Steel, Im-
pretation, bonding or insurance requirements, and ment, materials and/or supplies is available upon re-
ported Biofiltration, Adjust Utilities, Concrete, Rock quest. Additionally, please contact us if you require
other bid assistance. Plans and specs are available
Slope Protection, Guard Railing Delineator, Pave- any technical assistance. Quotations must be valid
to review at our Berkeley office or can be sent out
via Building Connected. PDF format quotes should
ment Marker, Object Marker, Roadside Signs, Mid- for same duration as specified by Owner for contract
be emailed to the estimator or faxed to 510-526- west Guardrail System, Vegetation Control (Minor award. Granite intends to work cooperatively with all
0990 prior to 12:00 PM on the date of the bid. Concrete), Transition Railing, End Anchor Assembly, qualified firms seeking work on this project.
Quotes from DBE Subcontractors, Suppliers and End Cap, Alternative In-Line Terminal System, Con- Plans and specifications can be accessed at no cost:
Truckers are highly encouraged. OCJ is willing to crete Barrier, Striping & Marking, Modify Existing On the Caltrans Website at http://ppmoe.dot.ca.gov/
breakout any portion of work to encourage DBE Lighting System, Modify Traffic Monitoring Systems, des/oe/weekly-ads/specs-ntb.php?c=12-0H0474. Ad-
participation. Subcontractors must possess a cur- Maintain Existing Traffic System Elements During ditionally, plans and specifications can be viewed at
rent DIR, Contractors License, and insurance and Construction, Ramp Metering System, Cold Planing, our office located at: 5860 El Camino Real, Suite 200,
workers compensation coverage including waiver Overhead Sign Panels, and Construction Materials. Carlsbad, CA 92008. Please call to make an appoint-
of subrogation. OCJ may require Performance ment.
Jean Sicard (510-809-3411 [email protected]) is the esti-
and Payment bonds on subcontracts. OCJ will pay mator on this project and he is available to provide assistance This project has a 20% DBE goal. In addition to request
the bond premium up to 2% of the contract value. or answer questions regarding the project scope of work for participation from Certified DBE subcontractors
Please contact OCJ for any assistance required by including bid requirements, break out of bid items, plan or and suppliers, Granite request Non-DBE subcontrac-
your firm in obtaining bonding or insurance. The US spec interpretation, bonding or insurance requirements, and tors to provide lower-tier DBE subcontractor and/or
Small Business Administration may also assist you in other bid assistance. Plans and specs are available to review supplier participation. Bidders are encouraged to indi-
obtaining bonding - please see the following site for at our Berkeley office or can be sent out via Building Con- cate lower-tier DBE participation, as it will be evaluated
information: http://www.sba.gov/content/contrac- nected. PDF format quotes should be emailed to the estima- as part of their quote.
tors. Visit the California Access to Capital Program tor or faxed to 510-526-0990 prior to 10:00 AM on the date Please include your Contractor License Number and
of the bid. Quotes from DBE Subcontractors, Suppliers and DIR Registration Number on your quote
Financing Solutions website for additional resources
Truckers are highly encouraged. OCJ is willing to breakout
for your small business - http://www.calbizfinance. any portion of work to encourage DBE participation. Subcon- Granite Construction Company is signatory to Operat-
org/cal_cert_biz_program.html. OCJ is available to tractors must possess a current DIR, Contractors License, ing Engineers, Laborers, Cement Masons and Carpen-
help obtain necessary equipment, material and/or and insurance and workers compensation coverage includ- ters unions. Granite may require 100% performance
supplies. All subcontractors are required to execute ing waiver of subrogation. OCJ may require Performance and payment bonds for the full amount of subcontract
OC Jones’ standard subcontract agreement, comply and Payment bonds on subcontracts. OCJ will pay the bond price. Granite Construction will assist with bonding
with all insurance requirements, and name OCJ as premium up to 2% of the contract value. Please contact OCJ costs for subcontractors. Additionally, The US Small
additional insured. Copies of our agreement and for any assistance required by your firm in obtaining bonding Business Administration may also assist you in obtain-
insurance requirements are available upon request. or insurance. The US Small Business Administration may also ing bonding, for more information please visit them at
OCJ is a Union contractor, and we are signatory to assist you in obtaining bonding - please see the following site http://www.sba.gov/content/contractors#. Subcon-
the Operating Engineers, Laborers, Teamsters, and for information: http://www.sba.gov/content/contractors. tractors must possess a current contractor’s license,
Visit the California Access to Capital Program Financing So- insurance and worker’s compensation coverage meet-
Carpenters. OCJ is an Equal Opportunity Employer.
lutions website for additional resources for your small busi- ing Granite’s requirements and will be required to sign
ness - http://www.calbizfinance.org/cal_cert_biz_program. the standard Granite Subcontract Agreement. A copy
html. OCJ is available to help obtain necessary equipment, of the insurance requirements and subcontract agree-
material and/or supplies. All subcontractors are required to ment are available upon request. The full agreement
execute OC Jones’ standard subcontract agreement, comply can be obtained by contacting Granite. Subcontractors
with all insurance requirements, and name OCJ as additional must also be registered with a current DIR number.
insured. Copies of our agreement and insurance require-
ments are available upon request. OCJ is a Union contractor, Granite Construction Company
and we are signatory to the Operating Engineers, Laborers, 5860 El Camino Real, Suite 200
Teamsters, and Carpenters. Carlsbad, CA 92008
Phone (760) 444-1032 • Fax (760) 444-1988
EXCHANGE OCJ is an Equal Opportunity Employer. Veronica Garcia • Email: [email protected]
10 SBE TODAY E-NEWSLETTER WWW.SBEINC.COM SEPTEMBER 10, 2021

Indianapolis, IN Sub-Bid Request Ads


What Are As Built Drawings? Shea-Kiewit Joint Venture
g Continued from page 1 (J.F. Shea Construction, Inc., and Kiewit Infrastructure Co.)
667 Brea Canyon Road, Suite 22, Walnut, CA 91789
• Streamlines permitting process: Oftentimes,
909-594-0990 • 909-869-0827 (Fax)
government agencies request sets of as-builts
in order to issue building permits. Pleasant Run CCS Phase 1, Phase 2, Regulator Modifications. Project No.
• Improves the renovation process: With a full 92TU00534
Owner: Citizens Energy Group
history of project changes, owners can see 2020 North Meridian St. Indianapolis, IN 46202
exactly what has been built and do not have BID DATE: September 30, 2021 at 1:00 PM
to invest heavily in learning about existing
conditions Opportunities to participate exist in the following specific areas of soil and rock excavation,
hauling, excavation support systems, engineering, survey, instrumentation and monitoring ser-
Why Should Contractors Care? vices, materials testing, dewatering, pipe installation, site preparation, restoration, environ-
If you’re a general contractor, you might be think- mental investigation, utility relocation, paving, fencing and gates, geotechnical and structural
ing, “why should I prioritize as-builts at the end of instrumentation, precast and cast-in-place concrete structures, reinforcing steel, ground sta-
bilization, steel dowels, concrete finishing, waterproofing, service utilities, grouting, mechani-
a project?” The truth is, you shouldn’t just focus
cal equipment – hydraulic, sluice & weir gates, electrical services, pest control, IT services,
on creating as-builts; you should strive to elevate security, waste disposal, cleaning services, and security services.
the quality of the packages you provide, too.
Good as-builts drawings can do wonders to improve The Work under this contract is located in Indianapolis, Indiana.
The Work consists of the Pleasant Run CCS Phase 1, Phase 2, Regulator Modifications.
your reputation as a company and increase your busi- Project No. 92TU00534
ness in the long-term. If you’re a subcontractor, as-
builts can be especially important as you might be Shea-Kiewit Joint Venture (An Equal Opportunity Employer) located at 667 Brea Canyon Road,
hired for system maintenance and renovations. At Suite 22, Walnut, CA 91789 is bidding on the above referenced project. We are actively solicit-
this point, the information and data found in pack- ing sub-bids – all trades and material supply quotes from MBE, WBE and VBE firms certified by:
ages won’t just benefit owners, it will benefit your Citizens Energy Group (CEG)
ability to successfully complete a job. Indiana Minority Supplier Development Council (IMSDC)
Indiana Department of Administration (IDOA)
Looking to learn more about how to create quality
The City of Indianapolis Department of Minority & Women Business Development (DMWBD)
as-built drawings? Read on. Women Business Enterprise National Council (WBENC)
What Should Be Included in As-Builts? National Women Business Owners Corporation (NWBOC)
United States Department of Veterans Affairs (with certification from DMWBD)
In order to make your as-builts as clear and use-
ful as possible, you must include a wide variety of Shea Kiewit Joint Venture intends to negotiate in good faith with MBE, WBE and VBE firms for
details and documents. This information includes, participation on this project. Any business seeking to participate as an MBE/WBE/VBE can ap-
but is not limited to: ply for certification as required from any of the agencies listed to obtain certification.

• Recording changes in scale, or ideally using Plans and specifications should be reviewed, and competitive proposals must be submitted.
the same scale as the original drawings We have an FTP site where you can view all plans, addendums and specifications for your
convenience. Please contact Aimee Remo at (909) 594-0990, Aimee.Remo@ jfshea.com to
• Using clear labels and descriptions rather than receive instructions on accessing the FTP Site.
vague phrases such as “similar” or “equal to”
Send your proposal to Aimee Remo via Email: [email protected] by mail, via
• Including changes in sizing, materials, di-
Fax: 909-869-0827, or by email.
mensions, location, installation, fabrication
and so on
• Noting unexpected obstructions encountered,
and the solutions decided upon bile technology can assist in putting this record • Often lack the right kind of documentation
process in practically auto-drive.
• Noting dates when changes were made • Fail to back up statements with photograph-
Where As-Builts Fall Short Today ic evidence or drawings
• Recording any changes made as a result of
final inspection If the goal is to improve as-builts, then we must • Don’t capture data at a deep enough level
pinpoint where they’re falling short today. Oth-
• Attaching all related shop drawings and ap- • Don’t effectively provide for later updates
erwise, it’s impossible to address the real prob-
pendices and additional documentation
lem where it lies. So what’s the issue? In the long
Obviously, this is a significant amount of informa- run, it comes down to inadequate documenta- • Frequently are disorganized, making it
tion to include and needs a great deal of detail to tion. As we saw in the case of Burlington mall, nearly impossible to sort through the infor-
be recorded along the way. Although this can seem missing information is a common reason why mation
like a daunting and time-consuming prospect, it’s projects get delayed or halted. Visit the link below for the full article:
presumably less intimidating than telling a client Too many as-builts exhibit missing information
no as-builts are available, or turning in shoddy https://constructionblog.autodesk.com/as-
and errors, at least partially due to a lack of com- built-drawings/
work that does not serve them (or your chances of mitment on the construction team’s part. Today’s
getting rehired) in the long run. Nonetheless, mo- as-builts:
SEPTEMBER 10, 2021 WWW.SBEINC.COM SBE TODAY E-NEWSLETTER 11

Public Legal Notices


tion” is required for the performance of all work. &type=meetupjoin&deeplinkId=7f34a3c0-0dc4-
413f-8471-2a5600c3cf74&directDl=true&msLa
This Contract is subject to the requirements of
unch=true&enableMobilePage=true&suppressPr
Administrative Code Chapter 12X, which prohib-
ompt=true
its contracting in states with laws that allow dis-
CITY & COUNTY OF SAN FRANCISCO crimination. The City is prohibited from entering For information on the City’s Contractor Devel-
DEPARTMENT OF PUBLIC WORKS
into any Contract with a Contractor that has its opment Program, call (415) 986-3999 or email
Sourcing Event ID No.: 0000003157 United States headquarters in a state on the Cov- [email protected].
GOLDEN GATE AVENUE AND ered State List or where any or all of the work A corporate surety bond or certified check for ten
LAGUNA STREET on the contract will be performed in any of those percent (10%) of the amount bid must accompany
PAVEMENT RENOVATION AND states on the Covered State List. Administrative each bid. Administrative Code Section 6.22(a) re-
SEWER REPLACEMENT Code Chapter 12X and a list of states on the Cov- quires all construction greater than $25,000 to in-
(PW GG AVE & LAGUNA ST PR & SWR) ered State List can be found at: http://sfgsa.org/ clude performance and payment bonds for 100%
chapter-12x-anti-lgbt-state-ban-list.
Bids shall be submitted online via ShareFile un- of the contract award.
til 2:30:00 p.m. on September 29, 2021, after The Specifications include liquidated damages. Class “A” license is required to bid.
which the bid opening will be conducted live Contract will be on a Unit Price basis. Progres-
online via Microsoft Teams. Contract Adminis- sive payments will be made. In accordance with Administrative Code Chapter
tration will email the Microsoft Teams meeting 6, no bid is accepted and no contract in excess
The Contract will be awarded to the lowest re-
information to all Plan Holders approximately 24 of Threshold is awarded by the City and County
sponsible responsive bidder.
hours prior to Bid opening. Digital files of Bid of San Francisco until such time as the Mayor or
Documents, Plan Holders Lists, and Addenda A bid may be rejected if the City determines that the Mayor’s designee approves the contract for
may be downloaded at no cost from the Public any of the bid item prices are materially unbal- award, and the Director of Public Works then is-
Works Electronic Bid Documents Download site anced to the potential detriment of the City. sues an order of award. Pursuant to Charter Sec-
at https://bsm.sfdpw.org/ContractAdmin/Login. tion 3.105, all contract awards are subject to cer-
Bid discounts may be applied as per Adminis-
aspx. Please visit the Contracts, Bids and Pay- tification by the Controller as to the availability
trative Code Chapter 14B. LBE Subcontracting
ments webpage at https://bidopportunities.apps. of funds.
Participation Requirement is 20%. Contact Ivan
sfdpw.org for more information. Notices regard- Oldenkamp at [email protected] or Minimum wage rates for this project must com-
ing Addenda and other bid changes will be dis- (415) 581-2310 for details. In accordance with ply with the current General Prevailing Wage as
tributed by email to Plan Holders. Administrative Code Chapter 14B requirements, determined by the State Department of Industrial
Scope of Work: located along Golden Gate Av- all bidders shall submit documented good faith Relations. Minimum wage rates other than appli-
enue from Divisadero to Van Ness Avenue, and efforts with their bids, except those who exceed cable to General Prevailing Wage must comply
Laguna Street from Pine Street to Haight Street the above stated LBE Subcontracting Participa- with Administrative Code Chapter 12P, Minimum
in San Francisco, California and consists of pave- tion Requirement by 35%. Bidders must achieve Compensation Ordinance.
ment renovation, curb ramp construction, sewer 80 out of 100 points to be deemed responsive. This Project is subject to the requirements of the
work, traffic control, and all related work. Bidders will receive 15 points for attending the San Francisco Local Hiring Policy for Construc-
pre-bid conference, if scheduled. Refer to CMD
The time allowed for completion is 260 consecu- tion (‘’Policy’’) as set forth in Administrative
Form 2B.
tive calendar days. The estimated construction Code Section 6.22(g). Bidders are hereby advised
cost is approximately $9,000,000. For more in- A pre-bid meeting will be held by conference that the requirements of the Policy will be incor-
formation, contact the Project Manager Ramon call on Thursday, September 9, 2021 starting at porated as a material term of any contract award-
Kong by phone: (628) 271-2581 or email: Ra- 10:00 am. ed for the Project. Refer to Section 00 73 30 of the
[email protected]. Project Manual for more information.
Microsoft Teams Meeting
On July 1, 2014, the registration program under Bidders are hereby advised that the Contractor to
Call in (audio only)
section 1725.5 of the California Labor Code went whom the Contract is awarded must be certified
into effect. The program requires that all contrac- +1 415-906-4659,,878941242# United States, by the Contract Monitoring Division as being in
tors and subcontractors who bid or work on a pub- San Francisco compliance with the Equal Benefits Provisions of
lic works project register and pay an annual fee to Phone Conference ID: 878 941 242# Chapter 12B of the Administrative Code within
the California Department of Industrial Relations two weeks after notification of award.
OR
(“DIR”). If a bidder objects on any ground to any bid speci-
Join on your computer or mobile app fication or legal requirement imposed by this Ad-
No contractor or subcontractor may be listed in a
Click here to join the meeting vertisement for Bids, the bidder shall, no later
bid or awarded a contract for a public works proj-
ect unless registered with the DIR as required by https://teams.microsoft.com/dl/launcher/launch- than the 10th working day prior to the date of Bid
Labor Code section 1725.5 [with limited excep- er.html?url=%2F_%23%2Fl%2Fmeetupjoin%2F opening, provide written notice to the Contract
tions from this requirement for bid purposes only 19%3Ameeting_NTBkZjc5MTMtMDRiZC00O Administration Division, San Francisco Public
under Labor Code section 1771.1(a)]. TIyLWFiYTctMzdmYjIwODQyNzdl%40thread. Works, setting forth with specificity the grounds
v2%2F0%3Fcontext%3D%257b%2522Tid%252 for the objection.
This Project shall incorporate the required part-
2%253a%252222d5c2cf-ce3e-443d-9a7fdfcc023 Right reserved to reject any or all bids and waive
nering elements for Partnering Level 2. Refer to
1f73f%2522%252c%2522Oid%2522%253a%25 any minor irregularities.
Section 01 31 33 for more details.
225447db3f-523f-40d9-91bfced78c86efcb%252
Pursuant to San Francisco Administrative Code 2%257d%26CT%3D1629782237640%26OR%3 9/9/21
(“Administrative Code”) Section 6.25 and Chap- DOutlook-Body%26CID%3DF02B4619-434B- CNS-3507666#
ter 25 of the Environment Code, “Clean Construc- 4810-AB40-439140297B9A%26anon%3Dtrue SMALL BUSINESS EXCHANGE
12 SBE TODAY E-NEWSLETTER WWW.SBEINC.COM SEPTEMBER 10, 2021

Public Legal Notices


This Contract is subject to the requirements of Ad- 6579d30d&directDl=true&msLaunch=true&ena
ministrative Code Chapter 12X, which prohibits bleMobilePage=true&suppressPrompt=true
contracting in states with laws that allow discrim- For information on the City’s Contractor Devel-
CITY & COUNTY OF SAN FRANCISCO
ination. The City is prohibited from entering into opment Program, call (415) 986-3999 or email
DEPARTMENT OF PUBLIC WORKS any Contract with a Contractor that has its Unit- [email protected].
ed States headquarters in a state on the Covered
Sourcing Event ID No.: 0000002807 A corporate surety bond or certified check for ten
State List or where any or all of the work on the
Contract No.: 1000015859 percent (10%) of the amount bid must accompany
contract will be performed in any of those states
PW VARIOUS LOCATIONS PAVEMENT each bid. Administrative Code Section 6.22(a) re-
on the Covered State List. Administrative Code
RENOVATION NO. 45 & SEWER RE- quires all construction greater than $25,000 to in-
Chapter 12X and a list of states on the Covered
PLACEMENT clude performance and payment bonds for 100%
State List can be found at:
(PW VL PAVE RENOV NO.45 & SWR) of the contract award.
http://sfgsa.org/chapter-12x-anti-lgbt-state-ban-list.
Bids shall be submitted online via ShareFile un- Class “A” license is required to bid.
til 2:30:00 p.m. on October 6, 2021, after which The Specifications include liquidated damages. Con- In accordance with Administrative Code Chapter
the bid opening will be conducted live online via tract will be on a Lump Sum Bid Items With Unit Pric- 6, no bid is accepted and no contract in excess
Microsoft Teams. Contract Administration will es basis. Progressive payments will be made. of Threshold is awarded by the City and County
email the Microsoft Teams meeting information The Contract will be awarded to the lowest re- of San Francisco until such time as the Mayor or
to all Plan Holders approximately 24 hours prior sponsible responsive bidder. the Mayor’s designee approves the contract for
to Bid opening. Digital files of Bid Documents, award, and the Director of Public Works then is-
Plan Holders Lists, and Addenda may be down- A bid may be rejected if the City determines that
sues an order of award. Pursuant to Charter Sec-
loaded at no cost from the Public Works Electron- any of the bid item prices are materially unbal-
tion 3.105, all contract awards are subject to cer-
ic Bid Documents Download site at https://bsm. anced to the potential detriment of the City.
tification by the Controller as to the availability
sfdpw.org/ContractAdmin/Login.aspx. Please Bid discounts may be applied as per Adminis- of funds.
visit the Contracts, Bids and Payments webpage trative Code Chapter 14B. LBE Subcontracting
at https://bidopportunities.apps.sfdpw.org for Minimum wage rates for this project must com-
Participation Requirement is 20%. Call Finbarr
more information. Notices regarding Addenda ply with the current General Prevailing Wage as
Jewell at [email protected] for details.
and other bid changes will be distributed by email determined by the State Department of Industrial
In accordance with Administrative Code Chap-
to Plan Holders. Relations. Minimum wage rates other than appli-
ter 14B requirements, all bidders shall submit
cable to General Prevailing Wage must comply
Scope of Work: at various locations throughout documented good faith efforts with their bids,
with Administrative Code Chapter 12P, Minimum
San Francisco, California and consists of pave- except those who exceed the above stated LBE
Compensation Ordinance.
ment renovation, sewer replacement, environ- Subcontracting Participation Requirement by
mental work, traffic control, and all related work. 35%. Bidders must achieve 80 out of 100 points This Project is subject to the requirements of
to be deemed responsive. Bidders will receive the San Francisco Local Hiring Policy for Con-
The time allowed for completion is 500 consecu- 15 points for attending the pre-bid conference, if struction (‘’Policy’’) as set forth in Administra-
tive calendar days. The estimated construction scheduled. Refer to CMD Form 2B. tive Code Section 6.22(g). Bidders are hereby
cost is approximately $6,300,000. For more in- advised that the requirements of the Policy will
formation, contact the Project Manager Ramon A pre-bid meeting will be held on Thursday, Sep-
be incorporated as a material term of any contract
Kong by phone: (628) 271-2581 or email: Ra- tember 16, 2021 starting at 10:00 a.m.
awarded for the Project. Refer to Section 00 73
[email protected]. Refer to Section 00 21 13 Appendix B for a guide 30 of the Project Manual for more information.
On July 1, 2014, the registration program under sec- to joining a Microsoft Teams meeting. Bidders are hereby advised that the Contractor to
tion 1725.5 of the California Labor Code went into Microsoft Teams Meeting whom the Contract is awarded must be certified
effect. The program requires that all contractors and by the Contract Monitoring Division as being in
Call in (audio only) compliance with the Equal Benefits Provisions of
subcontractors who bid or work on a public works
+1 415-906-4659,,717624773# Chapter 12B of the Administrative Code within
project register and pay an annual fee to the Cali-
United States, San Francisco two weeks after notification of award.
fornia Department of Industrial Relations (“DIR”).
Phone Conference ID: 717 624 773# If a bidder objects on any ground to any bid speci-
No contractor or subcontractor may be listed in a
bid or awarded a contract for a public works proj- OR Join on your computer or mobile app fication or legal requirement imposed by this Ad-
ect unless registered with the DIR as required by vertisement for Bids, the bidder shall, no later
Click here to join the meeting
Labor Code section 1725.5 [with limited excep- than the 10th working day prior to the date of Bid
tions from this requirement for bid purposes only https://teams.microsoft.com/dl/launcher/launch- opening, provide written notice to the Contract
under Labor Code section 1771.1(a)]. er.html?url=%2F_%23%2Fl2Fmeetupjoin%2F Administration Division, San Francisco Public
193Ameeting_ZmE3ZjJlNzUtODJhMy00ODY Works, setting forth with specificity the grounds
This Project shall incorporate the required part- wLWJmMTctOTVhMzNjNmM4YzMx%40thre for the objection.
nering elements for Partnering Level 2. Refer to ad.v2%2F0%3Fcontext%3D%257b%2522Tid%
Section 01 31 33 for more details. Right reserved to reject any or all bids and waive
2522%253a%252222d5c2cf-ce3e-443d-9a7fdfc
any minor irregularities.
Pursuant to San Francisco Administrative Code c0231f73f%2522%252c%2522Oid%2522%253
(“Administrative Code”) Section 6.25 and Chap- a%252244cffaad-ba0a-4bd9-b6c2-68ea0ffca317 9/9/21
ter 25 of the Environment Code, “Clean Construc- %2522%257d%26anon%3Dtrue&type=meetup- CNS-3508446#
tion” is required for the performance of all work. join&deeplinkId=ebc98fab-4844-4c91-b10ed7ea SMALL BUSINESS EXCHANGE
SEPTEMBER 10, 2021 WWW.SBEINC.COM SBE TODAY E-NEWSLETTER 13

California Sub-Bid Request Ads


ANDREW M JORDAN INC
dba A & B CONSTRUCTION
1350 Fourth Street, Berkeley, CA 94710
Subcontractor/Supplier Bids/Proposals Requested For Phone: 510-999-6000 Fax: 510-982-3636
ROSECRANS/MARQUARDT GRADE SEPARATION PROJECT Requests proposals/quotes from all qualified DBE
Los Angeles, California certified subcontractors, suppliers, and truckers
RFP #C77307C1210 for the following project:
Owner: Los Angeles County Metropolitan Transportation Authority (METRO
Proposal Due Date: September 22, 2021 – 2:00 PM Caltrans Project 04-0A7724
DBE Goal – 12% ON GILMAN AVE UNDERCROSSING
80 Gilman Ave., Berkeley, CA
This advertisement is in response to Metro’s DBE Program. Skanska USA Civil West California District Inc. Bids are due by: 10/6/2021 2:00 PM
intends to conduct itself in “Good Faith” with DBE firms regarding participation on this project. Requested
scopes include, but are not limited to the following and should be based on the project IFB, Contract, and all LCP, DEVELOP WATER SUPPLY, CONST. AREA SIGNS, TRAFFIC
amendments: CNTRL SYST., STRIPPING, K-RAIL, SWPPP, EROSION CNTRL, ST.
SWEEPING, TEMP. CONC. WASHOUT, WASTE DISPOSAL, NOISE
Aggregates, Ready Mix Concrete, Bridge Bearing Pads, Erosion Control materials, precast girders, Precast MONITOR, FENCING, CLEAR & GRUBB, ROADWY EX., LIGHTWEIGHT
Deck Panels, Formliner, Join Seal Assembly, Pipe Supply, Rip Rap, MSE Panels, Erosion Control, Asbestos CELL CONC. BF, LANDSCAPING, PALM TREE SPECIALIST & PATHOL-
Mitigation/Removal, Furnish and Erect Precast Concrete Girders, Signs, Bar Reinforcing Steel, Minor Concrete OGIST W/ A WORK PLAN, IRRIG. FACILITY, UNDERGROUND WORK,
HDPE PIPE, ALT. PIPE CULVERT (APC), CLASS,TYPE 2 3 4 ASB &
Flatwork, Midwest Guardrail System, Fence & Railing, Electrical, CIDH Concrete Piling, Asphalt Paving, Con-
AB, HMA RUBBERIZED & TEXTURED (WITH COLOR COATING),
crete Pavers, Striping, Landscape, Irrigation, Wet Utilities, Storm Drain, Clear & Grub, Survey, Quality Control, AC DIKE, COLD PLANE AC PAVEMENT, C-I-D-H, STEEL SOLDIER
Photographic Documentation, Pre-Post Construction Survey, Trucking, Sweeping. PILE, STRUCTURAL CONC. (BRIDGE, FOOTING, CURTAIN WALL),
CONC. TEXTURE (MURAL), FRACTURED GRANITE TEXTURE, RE-
Plans & Specs can be viewed at our main office in Riverside (call or email for appointment) and Building Con- BAR (WALL, BRIDGE, CURTAIN WALL), SIGN STRUCTURE (TRUSS),
nected at bit.ly/Skanskaplanroom TIMBER LAGGING, CLEAN & PAINT STEEL SOLDIER PILING CONC.
& ANTI-GRAFFITI COATING, 18” SLOTTED CSP, 16” WSP, MODIFY
Assistance: Skanska intends to conduct itself in good faith with all interested subcontractors as well as
MH, RSP, MINOR CONC. (CURB, GUTTER, CURB RAMP), MISC. IRON
certified DBE firms looking for subcontract opportunities on this project. Subcontractors may be re- & STEEL, REMOVE SECURITY HOUSE, SIGNAL & LIGHTING (CITY
quested to furnish a bond. Please call if we can assist you in obtaining bonding, lines of credit, insurance, ST., GOLDEN GATE FIELDS), ELECTRIC SERVICE FOR IRRIGATION
necessary equipment, materials and/or supplies. Assistance to DBE subcontractors and suppliers in obtaining (GOLDEN GATE FIELDS), SSMH, CITY PRECAST MH ECCENTRIC
bonding, lines of credit, or other capital financing is available through the DOT Bond Assistance Program at CONE, EBMUD (12” ML&PCS PIPE), CITY OF BERKELEY MONUMENT,
(800) 532-1169. You may also contact Merriwether and Williams Insurance Services at (213) 258-3000 or ADJ. UTILITY BOX, PAINT CURB, WROUGHT IRON FENCE, EBRPD
online at http://.imwis.com for Metro’s Bonding Assistance Pilot Program that assists DBEs by providing tech- TWO-RAIL WOOD FENCE, CL FENCE & GATES, GUARDRAIL, HAND-
nical and administrative assistance as well as providing the opportunity to expand their bonding capacity. RAILING, CABLE RAILING, CONC. BARRIER, TRAFFIC CONTROL,
ELECTRIC SERVICE FOR IRRIGATION, LIGHTING SYSTEMS, CAMERA
Under the Program, Metro will provide a bond guarantee to qualified prospective contractors and subcontrac- SYSTEMS, ACTIVE TRAFFIC MANAGEMENT SYSTEMS, TRAFFIC
tors looking to increase their bonding capacity. MONITORING STATIONS, RAMP METERING SYSTEMS, MODIFYING
LIGHTING SYSTEMS, TRAFFIC MONITORING STATIONS, CAMERA
Subcontracting Requirements: Skanska’s insurance requirements are Commercial General Liability (GL):
SYSTEMS, MOBILIZATION.
$1M ea. occ., $1M personal injury, $2M products & completed operations agg. & general agg.; $1M Auto Li-
ability; $5M Excess/Umbrella and $1M Workers Comp. Endorsements and waivers required are the Additional Bonding, insurance, lines of credit and any technical assistance or in-
Insured End., Primary Wording End., & a Waiver of Subrogation (GL & WC). Other insurance requirements may formation related to the plans & specifications & requirements for the
be necessary per scope or RFP requirement. Subcontractors may be required to furnish performance & pay- work will be made available to interested suppliers & subcontractors.
ment bonds in the full amount of their subcontract by an admitted surety & subject to approval by Skanska Assistance with obtaining necessary equipment, supplies, materials,
will pay bond premium up to 1%. Quotations must be valid for the same duration as specified by the Owner for or related assistance or services for this project will also be offered
to interested DBE certified suppliers, subcontractors, truckers. A &
contract award. Conditions or exceptions in Subcontractor’s quote are expressly rejected unless accepted in
B is signatory to the Operating Engineers and Laborers Collective
writing. Skanska and Stacy and Witbeck D20, JV is signatory to the Operating Engineers, Laborers, Cement Bargaining Agreements.
Masons, & Carpenters Unions. Subcontractors must provide weekly, one original and one copy of all certified
payrolls, including non-performance and fringe benefit statements if required by law or by the Prime Contract. 100% Payment & Performance bonds will be required from a
single, Treasury-listed surety company subject to A & B’s ap-
Please note that all Contractors and Subcontractors must register with The DIR (Department of Industrial Re-
proval. A & B will pay bond premium up to 1.5%. Subcontractors
lations) in order to bid on public works projects. Include CSLB License Number and DIR Number on All Quotes awarded on any project will be on A & B’s standard form for sub-
Submitted. contract without any modifications. For questions or assistance
required on the above, please call Abel Canlas at 510-210-2832 or at
Skanska USA Civil West California District is an Equal Opportunity/ [email protected]
Affirmative Action Employer and EEO/AA/Vet/Disability Employer
Estimating Department: 1995 Agua Mansa Rd, Riverside, CA 92509 Project Link:
http://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=04-
Phone: (951) 684-5360, Fax: (951) 788-2449 0A7724
Lead Estimator: Jeanine Soriano - Email: [email protected]

Arcadis U.S., Inc.


100 Montgomery Street, Suite 300
San Francisco California, 94104
Contact: Megan Hemmerle
[email protected] | 513.323.6595

REQUEST FOR DBE, MBE, WBE and OBE who meet the criteria outlined in the Contract Equity Program for East Bay
Municipal Utility District (EBMUD): RFP for Construction Management (CM) and Inspection Services for the Orinda Water
Treatment Plant Disinfection and Chemical Systems Safety Improvements Project, due Thursday, September 23, 2021,
by 4:00 PM. PLEASE REPOND ASAP and no later than Thursday, September 16, 2021.
We are seeking qualifications for Environmental Compliance, Estimating, Special Inspections, Coating Inspector, Deep Excava-
tion/Trenchless Inspector, I&C Inspector. Please email a Letter of Interest, brief qualifications, and no more than two resumes
per service demonstrating that you meet all of the required qualifications specified in the RFP for the service(s) referenced
above, and a copy of your DBE/MBE/WBE certification, if applicable.
RFP available upon request or download at the EBMUD website at
https://www.ebmud.com/business-center/requests-proposal-rfps/cm-ci-orinda-wtp-dcssip/.
Arcadis intends to work cooperatively with all qualified firms seeking work on this project. Please contact Megan Hemmerle
if you need assistance obtaining bonds, lines of credit, or any insurance that may be required by this RFP.
14 SBE TODAY E-NEWSLETTER WWW.SBEINC.COM SEPTEMBER 10, 2021

California Sub-Bid Request Ads

Kiewit Infrastructure West Co.


10704 Shoemaker Ave., Santa Fe Springs, CA 90670
Tel: (562) 946-1816 • Fax: (562) 946-3823
Contact: Cesar Gutierrez
BAY CITIES PAVING & GRADING, INC. Email: [email protected]
1450 Civic Court | Concord, CA 94520
Office: (925) 687-6666 | Fax: (925) 687-2122
Owner: Crestline Sanitation District
INVITATION TO BID Project Name: Huston Creek WWTP Primary Clarifier and
Bay Cities Paving & Grading, Inc. invites all certified DBE’s to submit bids on the following project: Dewatering Building Improvements
SANTA CLARA VALLEY TRANSPORTATION AUTHORITY Location: 24516 Lake Drive, Crestline, CA 92325
WIDENING OF US 101 TO SR87 SB AND US101 SB ON-RAMP FROM STORY ROAD Bid Date: October 21, 2021 at 2:00p.m.
Contract C19240F Request for DBE sub-quotes
Bid Date: September 17, 2021
Kiewit Infrastructure West Co. (“Kiewit”) is seeking quotes
Sub-trades/suppliers/truckers needed for following work (but not limited to): CONSTRUCTION STAKING; LEAD
from qualified Disadvantaged Business Enterprises (DBE),
COMPLIANCE PLAN; PROGRESS SCHEDULE (CRITICAL PATH METHOD); CONSTRUCTION AREA SIGNS; TRAFFIC
including Minority Business Enterprises (MBE), Woman Busi-
CONTROL SYSTEM; PORTABLE CHANGEABLE MESSAGE SIGN (EA); TEMPORARY TRAFFIC STRIPE (PAINT);
ness Enterprises (WBE), Small Business Enterprises (SBE),
CHANNELIZER (SURFACE MOUNTED); TEMPORARY PAVEMENT MARKER; TEMPORARY RAILING (TYPE K);
TEMPORARY CRASH CUSHION; TEMPORARY ALTERNATIVE CRASH CUSHION; JOB SITE MANAGEMENT; Small Business in Rural Area (SBRA), Labor Surplus Area Firms
PREPARE WATER POLLUTION CONTROL PROGRAM; TEMPORARY FIBER ROLL; TEMPORARY CONSTRUCTION (LSAF), Historically Underutilized Business (HUB) Zone Small
ENTRANCE; TEMPORARY DRAINAGE INLET PROTECTION; TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX); Businesses and all other business enterprises to perform as
STREET SWEEPING; TEMPORARY CONCRETE WASHOUT; ASBESTOS COMPLIANCE PLAN; REMOVE YELLOW THER- subcontractors, material contractors, and suppliers. DBEs must
MOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE); TREATED WOOD WASTE; REMOVE CONCRETE; REMOVE CON- provide evidence of certification by the U.S. Environmental Pro-
CRETE (MISCELLANEOUS) (CY); TEMPORARY HIGH VISIBILITY FENCE; CLEARING AND GRUBBING (LS); REMOVE TREE; tection Agency (USEPA), the Small Business Administration (SBA),
DEVELOP WATER SUPPLY; ROADWAY EXCAVATION; DITCH EXCAVATION; 8” WELDED STEEL PIPE CONDUIT; FIBER the Department of Transportation’s State-Implemented DBE
ROLLS; HYDROMULCH; HYDROSEED; COMPOST; CLASS 2 AGGREGATE BASE; ASPHALT TREATED PERMEABLE BASE; Certification Program (with U.S. citizenship) (CUCP), Tribal, State,
HOT MIX ASPHALT; RUBBERIZED HOT MIX ASPHALT; RUBBERIZED HOT MIX ASPHALT-OPEN GRADED; PLACE HOT and Local Governments, or Independent Private Organization
MIX ASPHALT; TACK COAT; COLD PLANE ASPHALT CONCRETE PAVEMENT; STRUCTURAL CONCRETE, BOX CULVERT; Certifications.
STRUCTURAL CONCRETE, WINGWALL; MINOR CONCRETE; BAR REINFORCING STEEL; BAR REINFORCING STEEL; IM- Kiewit will be requesting quotes for various areas of work listed
PORTED BIOFILTRATION SOIL; 3” PLASTIC PIPE; REMOVE HEADWALL; ADJUST INLET; ADJUST VALVE BOX FRAME AND in, but not limited to, the scopes of work below.
COVER TO GRADE; CONCRETE; ROCK SLOPE PROTECTION; ROCK SLOPE PROTECTION FABRIC; REMOVE CONCRETE;
REMOVE PAVEMENT MARKER; DELINEATOR; GUARD RAILING DELINEATOR; PAVEMENT MARKER; OBJECT MARKER; Demolition, asphalt paving and supplies, concrete reinforc-
REMOVE ROADSIDE SIGN; REMOVE ROADSIDE SIGN PANEL; FURNISH FORMED PANEL SIGN; FURNISH SINGLE SHEET ing installation, masonry, metals, metal deck, damp proof-
ALUMINUM SIGN; ROADSIDE SIGN; INSTALL SIGN; FURNISH LAMINATED WOOD BOX POST; MIDWEST GUARDRAIL SYS- ing and waterproofing, overhead doors, plaster and gypsum
TEM; VEGETATION CONTROL; TRANSITION RAILING; END ANCHOR ASSEMBLY; END CAP; ALTERNATIVE IN-LINE TER- board, painting and coating, plumbing fixtures and equip-
MINAL SYSTEM; CONCRETE BARRIER; REMOVE GUARDRAIL; THERMOPLASTIC PAVEMENT MARKING; THERMOPLAS- ment, HVAC and electrical work
TIC TRAFFIC STRIPE; REMOVE THERMOPLASTIC TRAFFIC STRIPE; REMOVE THERMOPLASTIC PAVEMENT MARKING;
Firms interested in receiving a bid package for this project must
MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION; MODIFYING LIGHTING
contact us at the e-mail address noted. Responding firms will be
SYSTEM; MODIFYING TRAFFIC MONITORING STATIONS; RAMP METERING SYSTEM; MOBILIZATION
issued an “Invitation to Bid” through Kiewit’s electronic use of
Plans and specifications for the Project are available for review at our office at 1450 Civic Court, Concord, CA 94520 or can be download-
SmartBid system (at no cost to bidder) with project information
ed, please contact BCPG estimating department for assistance. 100% Performance, Payment Bonds by an admitted surety naming prime
contractor as oblige, in the full amount of the subcontractors bid shall be required. Retention will be withheld if subcontractor fails to provide and bid instructions. Plans and specifications will also be avail-
bonds. Bonding assistance is available, Bay Cities Paving & Grading, Inc., will pay bond premium up to 2%. Call Russ Olney or Robert Rosas able for review at the address listed below if requested.
at (925) 687-6666 for assistance with credit line, bonding, insurance, equipment, supplies and materials. Subcontractors will be required to
This is a public works project and is subject to prevailing wage
enter into our standard contract. Items of work can be broken down to facilitate DBE and SBE participation. BCPG will make every effort to work
cooperatively with all qualified firms seeking work on this project. rates. Project is also financed in part by the California Clean
Water State Revolving Fund and is subject to federal funding re-
Please be advised, Contractors and Subcontractors must register with the D.I.R (Department of Industrial Relations) in order to bid on
quirements including, but not limited to the AIS Provisions, DBE
public works projects. Registration with the D.I.R. costs $300 and covers the fiscal year (July 1 to June 30th). To verify the status of your
D.I.R. number, please visit: http://www,dir.ca.gov/Public-Works/Contractors.html. Program requirements, California Labor Code and the Davis-
Bacon Act.

Responsive bidders must possess a valid California Contrac-

Looking for
tor’s license (as appropriate) and provide acceptable insurance.
Responsible subcontractors and material contractors will be

Subcontractors, Vendors, and Suppliers? required to provide bonding for 100% of their contract value.
Kiewit will reimburse bond premiums. Firms performing any on-
site work is signatory to collective bargaining agreements with
Advertise your Sub-Bid Requests in the the carpenters, laborers, cement masons, ironworkers, operat-
ing engineers and teamsters. Kiewit will consider quotes from
Small Business Exchange. any, and all bidders who demonstrate an ability to foster and
maintain labor harmony on the Project.

With a monthly readership of 26,000, Kiewit intends to conduct itself in good faith with all DBEs and
all other business enterprises regarding participation on this
SBE reaches a diverse audience, project. For further information regarding this project, licensing,
insurance or bonding, equipment, supplies, materials, or related
cutting across ethnic and gender lines assistance or services or project schedule, please contact the

as well as tradional industry segments. Lead Estimator listed below.

“Kiewit Infrastructure West Co. is an Equal Opportunity Em-


ployer. Employment decisions are made without regard to race,
Call 1-800-800-8534 or visit us at color, religion, national or ethnic origin, sex, sexual orientation,
gender identity or expression, age, disability, protected veteran
www.sbeinc.com status or other characteristics protected by law.”

You might also like