(PC) Quality Checksheet Report For Powder-Coating
(PC) Quality Checksheet Report For Powder-Coating
(PC) Quality Checksheet Report For Powder-Coating
QAP/PCG/00 QAP/PCG/00
CUSTOMER NAME:- QAP NO.
1 2
QAP/PCG/003
POWDER
Quantity Verification Transfe QC CLEAR IN
SR. COATING SHADE
MATERIAL DESCRIPTION ITEM CODE WO No. JRC No. r Slip OFFER QTY INSP. QTY OK QTY RW QTY REJ QTY P.C. ERP NO. ERP
NO. No. Y/N
Required Observed COLOR RAL NO
OBSERVATIONS
INSPECTION PARAMETERS REQUIRED
1 2 3 4 5
As per Drawing (Ok/Not
I. DIMENSIONAL CHECK. Ok)
NO ADHESION FAIL.
Cross Hatch Test (<160Micron) Note:- Shall be checked on two side at Top,
III. CHEMICAL / PROCESS TEST CHECK.
Middle & Bottom of first and then every 21st
Adhesion Test(>160Micron) post .
1) No cluster of Pinholes.
2) Not visible from 1meter distance. (Except
Pin Holes Accessories)
3) Not visible from 300 mm distance. (For
Accessories)
V. OTHERS
Pass
Code: DD-MM-YY (shift) (powder make)
Presence of Traceability Mark (Recoated if)
(for coated AKAT panels) Fail
VI. TRACEABILITY Where powder make is,
1 if coating is of Plascoat (first layer) + Jotun (top
Each coated AKAT Panels shall be marked with the code. layer) make
2 if Only Plascoat make NA
3 if Only Purlon make
REMARKS :-