0% found this document useful (0 votes)
27 views3 pages

112 Quiz 1 Software

Uploaded by

cartanella98
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views3 pages

112 Quiz 1 Software

Uploaded by

cartanella98
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Chapter 1_Quiz Pr… Submission 2024.10.

01 11:19 Exam Score 90

1. Which question no longer concerns the modern software engineer?


Multiple-Choice (5 Points)

A. Why does computer hardware cost so much?

B. Why does software take a long time to finish?

C. Why does it cost so much to develop a piece of software?

D. Why can’t software errors be removed from products prior to delivery?

Right Answer: A

2. Software is a product and can be manufactured using the same technologies used for other engineering artifacts
True/False (10 Points)

A. True

B. False

Right Answer: B

3. Software deteriorates rather than wears out because


Multiple-Choice (5 Points)

A. Software suffers from exposure to hostile environments

B. Defects are more likely to arise after software has been used often

C. Multiple change requests introduce errors in component interactions

D. Software spare parts become harder to order

Right Answer: C

4. WebApps are a mixture of print publishing and software development, making their development outside the realm of software
engineering practice.

True/False (10 Points)

A. True

B. False

Right Answer: B

5. Which of the items listed below is not one of the software engineering layers?
Multiple-Choice (5 Points)

A. Process

B. Manufacturing
C. Methods

D. Tools

Right Answer: B

6. Software engineering umbrella activities are only applied during the initial phases of software development projects.
True/False (10 Points)

A. True

B. False

Right Answer: B

7. Which of these are the 5 generic software engineering framework activities?


Multiple-Choice (5 Points)

A. communication, planning, modeling, construction, deployment

B. communication, risk management, measurement, production, reviewing

C. analysis, designing, programming, debugging, maintenance

D. analysis, planning, designing, programming, testing

Right Answer: A

8. Planning ahead for software reuse reduces the cost and increases the value of the systems into which they are incorporated.

True/False (10 Points)

A. True

B. False

Right Answer: A

9. The essence of software engineering practice might be described as understand the problem, plan a solution, carry out the
plan, and examine the result for accuracy.

True/False (10 Points)

A. True

B. False

Right Answer: A

10. In agile process models the only deliverable work product is the working program.
True/False (10 Points)

A. True

B. False
Right Answer: B

11. A most software development projects are initiated to try to meet some business need.
True/False (10 Points)

A. True

B. False

Right Answer: A

12. In general software only succeeds if its behavior is consistent with the objectives of its designers. Wrong

True/False (10 Points)

A. True

B. False

Right Answer: B