Pro Rehabilitation Works
ESMP . for Saada Vaccines
Warehouse
Rehabilitation Works for Saadah Vaccines
Name of Project: Warehouse Name of Document: HSE Management Plan Document Version: 1 Date Issued: 18/04/2024 File Name: ISGM 1 Name of Company: Ultimate Transit Company Reference: VSC-RW-SDA-01. Location: Saada Governate, Saada city District, Yemen Coordinates: 16°56'7.51"N, 43°45'9.01"E period of the project 8 Months owner UNOPS Work Area 450 m2
HSE MANAGEMENT PLAN PREPARED BY
Name: Position: Signature Date:
HSE MANAGEMENT PLAN AUTHORISED BY
Name: Position: Signature Date:
WASTE MANAGEMENT PLAN
This Waste Management Plan (WMP) will deal with waste to be generated as a result of project activities during the construction period. The WMP specify provisions for disposal, re-use or recycling of solid and hazardous waste. It includes actions to be taken by Ultimate Transit Company (UTC) for the management and safe disposal of waste materials generated by construction activities. During the construction period, UTC will be responsible for collection, storage, treatment and transport of all types of waste generated during the course of project activities. Where UTC is conducting project activities in the field all waste generated will be collected and disposed in the official waste disposal site. Pro Rehabilitation Works ESMP . for Saada Vaccines Warehouse
5.3.1. Waste Minimization
UTC will promote waste minimization, by waste avoidance, reduction, reuse and recycling to the extent practical. Waste minimization is generally accomplished through the "7Rs": reduce, reuse, recycle, recover, react, reflect and respect..
5.3.2. Waste identification
Waste will be identified basing on its characteristics such as degradable, non- degradable, organic waste, chemical as well as hazardous and non-hazardous waste. After identification all waste will be stored.
5.3.3. Waste storing
Waste will be stored according to its composition. All waste containers will be labeled to facilitate staff where to store any kind of waste. Containers will keep waste temporally because after a certain period, all stored waste should be transported to an approved site.
5.3.4. Waste Identification, and Classification
Waste types to be generated during the construction period will include:
1) Non-hazardous Waste: Waste that is not hazardous, and may consist of
recyclable and non-recyclable components. Non-hazardous wastes can be a combination of putrescible and non-putrescible waste materials. Waste shall be segregated according the sub-classes of: A. Organic waste B. Plastic C. Wood D. Iron E. Chemical (paint, diesel, fuel) F. Old oil G. Concrete – bricks 2) Hazardous Waste: Are wastes which by virtue of their concentration nature (such as ignitibility, corrosiveness, reactivity, toxicity, radioactivity etc.) pose a hazard to human or environmental health if improperly managed e.g. waste oil and lubricants. Waste Storage and Segregation All waste will be segregated into clearly marked containers prior to transportation . Mixing hazardous and non-hazardous waste is prohibited. Each container/skip shall bear clear labeling. Non-hazardous Storage Requirements Reception areas will be designed to prevent fire and minimize airborne pollutants and odors. Storage areas will be sufficient to accommodate the volume of waste anticipated to be generated and the period of time between collection and disposal. Pro Rehabilitation Works ESMP . for Saada Vaccines Warehouse
Containers will be of sufficient capacity and equipped with lids.
Containers and storage area are to be cleaned on a regular basis. . After generation, waste will be transported to the disposal site at the earliest opportunity. 5.2. Hazardous Storage Requirements Hazardous waste storage areas will be designed to have spill containment systems. Spill response supplies and equipment will be available in close proximity to the storage areas. In case spill accident happened, the entire quantity of soil (environment) damaged will be collected and dispose in approved deposit place. Containment curbs will be maintained around the loading and unloading area. Containers will be designed to contain the hazardous waste and will have identification labels. Storage facilities will be inspected regularly for leaks. Selected personnel will be trained in the handling of hazardous waste and will be specifically tasked with the disposal and handling of wastes generated. The storage areas will be paved, fenced, marked and illuminated. Hazardous wastes will not be allowed to accumulate beyond the capacity of the storage area. It will be transported on a regular basis to an appropriate storage facility.