Step 1 Verify that the grid voltage matches the microinverter rating
Step 2 Y3 AC bus cable distribution
a. One end of the AC bus cable is used to access the junction box connected to the power grid.
b. Wire the conductors of the AC bus as follows:
European Standard: L - BROWN; N - BLUE; PE - YELLOW GREEN;
American Standard: L1 - BLACK; L2 - RED; PE - GREEN.
NOTE: Wiring color codes may vary according to local regulations. Before connecting to the AC bus, ensure that all wires of the installation match. Incorrect
cabling can irreparably damage the microinverters, and such damage is not covered by the warranty.
ATTENTION: Do NOT carry the microinverter by the AC cable. This could lead to partial or complete disconnection of the AC
cable from the unit, resulting in no operation or poor operation.
NOTE: Install the microinverters (including DC and AC connectors) beneath the PV modules to protect them from direct exposure to rain, UV, or other adverse
weather conditions.
Leave a minimum of 1.5 cm (3/4 inch) space below and above the microinverter casing to allow proper airflow. The racking must be grounded in accordance
with local electrical codes.
Tip: When flush-mounting photovoltaic modules on the rooftop, ensure that the DC
connectors, antenna, and LED indicator of the microinverter are facing outwards. This
arrangement facilitates monitoring of indicator status and ensures optimal communication
quality.
Thoroughfare
Insert the microinverter AC connector into the trunk cable connector. click
Ensure you hear the “click” sound as evidence of a secure connection.
Step 6 Installing a bus cable end cap at the end of the AC bus cable
25mm-30mm
a. Strip cable jacket.
b. Insert the cable end into the seal.
c. Rotate the nut with 4-5N·m until the latching mechanism meets
the base.
METER
a. Please install bi-polar circuit breakers with the appropriate rated
current or according to local regulations. These circuit breakers are
mandatory for grid connection.
b. Installation of leakage current breakers or AFCI/GFCI breakers is not
recommended. L/L1 N/L2 PE
NOTE:
①. The arrangement of the microinverters' serial numbers in the
installation map is designed for standard installations.
②. The Installation Map can be found in the appendix on the last page
of this manual.
③. When configuring the ECU, use the ECU_APP (accessible through the
EMA Manager) to scan the serial numbers on the map (refer to the ECU
instruction manual for further details).
Please scan this QR code to have access to our APPs and Products information.