JMF ACwC REKON WOLO KOLAKA
JMF ACwC REKON WOLO KOLAKA
JMF ACwC REKON WOLO KOLAKA
KALIMANTAN TIMUR
FASILITAS SISI UDARA BANDAR UDARA JUWATA TARAKAN
SECTION PACKAGE :
Medium Aggregate ( Stock Pile 3/8 " ) 8.85 2.1 34% FA : 24.90 %
Pb = Kadar Aspal
CA = Agregat Kasar
FA = Agregat Halus
FF = Filler
Nilai Konstan untuk AC Binder = 1.0 - 2.0
JUDUL
1,400.0
1,200.0
1,000.0
800.0
600.0
4.00 4.50 5.00 5.50 6.00
KADAR ASPAL %
HUB.KADAR ASPAL DG VIM DAN VOID PRD HUB.KADAR ASPAL DENGAN VMA
8
7 17
VIM DAN PRD
6
16
VMA %
5
%
4
15
3
2
14
1
4.5 5 5.5 6 6.5
4.5 5.0 5.5 6.0 6.5
KADAR ASPAL % KADAR ASPAL %
85 350
80 300
75
(kg/mm)
VFB %
70 250
65 200
60
55 150
50 100
4.5 5 5.5 6 6.5 4.5 5 5.5 6 6.5
KADAR ASPAL % KADAR ASPAL %
STABILITAS
FLOW
VFB
VIM
VOID PRD
VMA
MQ
5.2 5.5
KADAR ASPAL OPTIMUM 5.3
VOID IN MIX at REFUSAL DENSITY ( PRD )
Bitument Vol. Of Mix Gs. Bulk of Mix Gs. Max Teoritis VIM at PRD
Content Weight of Mix ( Gram ) Cm3 ( gr/cm3 ) ( gr/cm3 ) %
% in Air in Water Ssd
No. b c d e f g h I
by Wt of e-d c/f 100/((100-b) 100-(100*g/h)
Mix From Lab. From Lab. From Lab. /(Gse+b/Gb))
100/((100-Pb)/Gse+Pb/Gb)
2.425
KEGIATAN PENINGKATAN BANDAR UDARA JUWATA TARAKAN
KALIMANTAN TIMUR
FASILITAS SISI UDARA BANDAR UDARA JUWATA TARAKAN
SPEC Mix Properties Bitumen Bulk SG Eff SG Max SG Brickete Weight Volume Bulk SG Air Stability Agg. Absob.
NO. (% by of Total Mix Content of Total of Total Comb in in SSD Of Of Void Marshall Surface Bit.(by Eff. Bit Bit. Film
Agg. Agg. Mix Air Water Spicimen Comb Mix Reading Adjust Flow Quotient Area Wt. Of Content Thickness
% (gr) (gr) (gr) (cc) (gr/cc) (%) (Kg) (mm) (kn/mm) (m2/kg) Tot. Mix) (%) (u m)
a b c d A B C D E F G H I J K L M N Q R S S
100 T(100-A)
% Bit. By Refer Refer ----------- FROM FROM FROM E 100(D - I) FROM FROM FROM L Refer A + --------- A-R 1000 (S)
Wto of Note 1 Note 2 100-A A LAB LAB LAB G-F ------------ ------------ LAB LAB LAB ------------ from B --------------
Mix Below Below ------ + --- H D 102 x M Las/2 100 T
C T - ----------- QT (100-A)
D
I 1
2
3
AVERAGE
II 1
2
3
AVERAGE
III 1
2
3
AVERAGE
SPECIFICATION
(a + b +c + d)
2. C = --------------- /[a/(Tapp.a)+b(Tapp.b)+c(Tapp.c)+d(Tapp.d)]+B/2
2
Form Marshall2
KEGIATAN PENINGKATAN BANDAR UDARA JUWATA TARAKAN
KALIMANTAN TIMUR
FASILITAS SISI UDARA BANDAR UDARA JUWATA TARAKAN
SECTION : PACKAGE :
100
90
80
70
60
50
40
30
20
10
0
# 200 # 100 # 80 # 50 # 40 # 30 # 16 # 10 # 8 # 4 3/8" 1/2" 3/4" 1"
PAN 47.6
3/4" 76.7 76.6
1/2" 249.7 248.6
3/8" 412.0 410.1
# 4 877.1 872.7
# 8 960.0 955.2
w IND 1200 TIMBANG 1200 TIMBANG 1200 TIMBANG
5% 299.3 5.50% 299.3 6% 299.3
SIEVE 1,140.00 1,439.30 1,134.00 1,433.30 1,128.00 1,427.30
1" -
3/4" 4.58 52.26 351.56 51.98 351.28 51.71 351.01
1/2" 8.69 99.03 450.59 98.51 449.79 97.99 449.00
3/8" 6.29 71.74 522.33 71.36 521.15 70.98 519.98
# 4 30.72 350.15 872.48 348.31 869.46 346.47 866.45
# 8 20.16 229.84 1,102.32 228.63 1,098.09 227.42 1,093.87
# 10
# 16 10.63 121.20 1,223.52 120.56 1,218.66 119.92 1,213.79
# 30 5.31 60.50 1,284.02 60.18 1,278.83 59.86 1,273.65
# 40 - - -
# 50 3.31 37.70 1,321.72 37.50 1,316.34 37.30 1,310.96
# 80 - - -
#100 3.62 41.26 1,362.98 41.04 1,357.38 40.83 1,351.78
No. 200 2.03 23.18 1,386.16 23.06 1,380.44 22.94 1,374.72
PAN 4.66 53.14 1,439.30 52.86 1,433.30 52.58 1,427.30
51.43 350.73
97.47 448.20
70.61 518.81
344.62 863.43
226.21 1,089.64
119.29 1,208.93
59.54 1,268.47
-
37.11 1,305.58
-
40.61 1,346.19
22.81 1,369.00
52.30 1,421.30
78.00
1200
KEGIATAN PENINGKATAN BANDAR UDARA JUWATA TARAKAN
KALIMANTAN TIMUR
FASILITAS SISI UDARA BANDAR UDARA JUWATA TARAKAN
100 - A B*U (100-A)C A + 100-A LAB LAB LAB H-G I E (100-A)J L LAB LAB LAB P
Gmm x 100 X B U
1 4.0 2.646 0.577 3.446 2.489 1166.3 672.1 1182.9 510.8 2.283 120 1563 2.50
2 1149.9 657.1 1161.3 504.2 2.281 130 1694 2.00
3 1142 661.1 1166.5 505.4 2.260 79 1029 3.00
Average 506.8 2.275 8.634 16.244216 46.846 1429 2.50 571
1 4.5 2.646 0.577 3.949 2.471 1150.8 658.3 1160.7 502.4 2.291 120 1563 3.00
2 1150 658.4 1157.8 499.4 2.303 130 1694 3.00
3 1146.6 655.1 1156.7 501.6 2.286 140 1824 2.50
Average 501.1 2.293 7.208 15.999903 54.947 1694 2.83 598
1 5.0 2.646 0.577 4.452 2.453 1145.9 652.3 1152.4 500.1 2.291 120 1563 2.00
2 1137 646.4 1147.5 501.1 2.269 80 1042 3.00
3 1138.2 652.2 1146.6 494.4 2.302 100 1303 3.00
Average 498.5 2.288 6.756 16.642777 59.407 1303 2.67 489
1 5.5 2.646 0.577 4.955 2.436 1139.3 647.4 1147.1 499.7 2.280 109 1420 2.00
2 1144.6 653.5 1150.8 497.3 2.302 116 1511 2.50
3 1143.2 652.1 1148.8 496.7 2.302 80 1042 3.00
Average 497.9 2.294 5.795 16.831955 65.571 1324 2.50 530
1
3
Average
100 - A B*U (100-A)C A + 100-A LAB LAB LAB H-G I E (100-A)J L LAB LAB LAB P
Gmm x 100 X B U
1 4.0 2.646 0.577 3.446 2.489 1166.3 672.1 1182.9 510.8 2.283 120 1563 2.50
2 1149.9 657.1 1161.3 504.2 2.281 130 1694 2.00
3 1142 661.1 1166.5 505.4 2.260 79 1029 3.00
Average 506.8 2.275 8.634 16.244216 46.846 1542 2.50 617
1 4.5 2.646 0.577 3.949 2.471 1150.8 658.3 1160.7 502.4 2.291 120 1563 3.00
2 1150 658.4 1157.8 499.4 2.303 130 1694 3.00
3 1146.6 655.1 1156.7 501.6 2.286 140 1824 2.50
Average 501.1 2.293 7.208 15.999903 54.947 1281 2.83 452
1 5.0 2.646 0.577 4.452 2.453 1145.9 652.3 1152.4 500.1 2.291 120 1563 2.00
2 1137 646.4 1147.5 501.1 2.269 80 1042 3.00
3 1138.2 652.2 1146.6 494.4 2.302 100 1303 3.00
Average 498.5 2.288 6.756 16.642777 59.407 1343 2.67 504
1 5.5 2.646 0.577 4.955 2.436 1139.3 647.4 1147.1 499.7 2.280 109 1420 2.00
2 1144.6 653.5 1150.8 497.3 2.302 116 1511 2.50
3 1143.2 652.1 1148.8 496.7 2.302 80 1042 3.00
Average 497.9 2.294 5.795 16.831955 65.571 1295 2.50 518
1
3
Average
MARSHALL QUOTIEN
450
1,400.0
STABILITAS Kg
400
1,200.0 350
(kg/mm)
300
1,000.0 250
800.0 200
150
600.0 100
5.00 5.30 5.60 5.90 6.20 6.50 5.00 5.30 5.60 5.90 6.20 6.50
KADAR ASPAL % KADAR ASPAL %
18 90.00
17 80.00
70.00
VMA %
16
VFB %
60.00
15
50.00
14
40.00
5.00 5.30 5.60 5.90 6.20 6.50
5.00 5.30 5.60 5.90 6.20 6.50
KADAR ASPAL % KADAR ASPAL %
HUB.KADAR ASPAL DENGAN FLOW HUB.KADAR ASPAL DG VIM DAN VOID PRD
5.00 6
VIM DAN PRD
FLOW (mm)
4.00 5
%
3.00
3
2.00
1.00 2
5.00 5.30 5.60 5.90 6.20 6.50 5.0 5.3 5.6 5.9 6.2 6.5
KADAR ASPAL % KADAR ASPAL %
Stabilitas marshal
( 5.5 + 6.2 )/2 = 5.85 Marshal Qoution
VMA
Kadar Aspal Optimum = 5.85 % Flow
F IB
Void
5.0 5.7 6.0 6.5
5.85
Diketahui Oleh Diperiksa Oleh Dikerjakan Oleh
Pengawas Lapangan Konsultan supervisi Kontraktor Pelaksana
REPUBLIK INDONESIA
DEPARTEMEN PEKERJAAN UMUM
DIREKTORAT JENDRAL BINA MARGA
SATKER NVT PEMBANGUNAN JALAN DAN JEMBATAN MALUKU
PEJABAT PEMBUAT KOMITMEN PEMBANGUNAN JALAN KOBISONTA - BULA
PAKET PEMBANGUNAN JALAN BANGGOI - BULA (EIB-170)
KONTRAKTOR : KONSULTAN :
PT. ADHI KARYA (Persero) Tbk PT.YODYA KARYA (Persero)
PT. YALA PERSADA ANGKASA, JO
Medium Aggregate ( Stock Pile 3/8 " ) 4.90 1.4 50% FA : 26.37 %
Pb = Kadar Aspal
CA = Agregat Kasar
FA = Agregat Halus
FF = Filler
Nilai Konstan untuk AC -WC = 1.0 - 2.0
Medium Aggregate ( Stock Pile 3/8 " ) 4.90 1.4 50% FA : 26.37 %
Pb = Kadar Aspal
CA = Agregat Kasar
FA = Agregat Halus
FF = Filler
Nilai Konstan untuk AC Binder = 1.0 - 2.0
100
90
80
70
60
50
40
30
20
10
0
# 200 # 100 # 80 # 50 # 40 # 30 # 16 # 10 # 8 # 4 3/8" 1/2" 3/4" 1"
PAN 47.6
3/4" 76.7 76.6
1/2" 249.7 248.6
3/8" 412.0 410.1
# 4 877.1 872.7
# 8 960.0 955.2
# 10 989.4 984.4
# 16 1,018.8 1,013.7
# 30 1,058.9 1,053.6
# 40 1,071.8 1,066.3
# 50 1,084.6 1,079.1
# 80 1,093.8 1,088.3
# 100 1,103.0 1,097.4
# 200 1,114.6 1,109.0
PAN 1,181.6 1,175.6
AC WC ASB LAWELE normal asb 8 %
wmaterial+wajan
berat wajan 461.8 1,661.80
asb 8%
1200
takaran kum
CA 664.96 16.93 203.16 17.635416667
MA 947.08 23.51 282.12 24.489583333
FA 1,517.80 47.56 570.72 49.541666667
ASB 1,613.80 8.00 96.00 1,152.00 8.3333333333
ASPL 1,661.80 4.00 48.00 100
100.00 1,200.00
270.4 366.40
AC WC ASB LAWELE - FA 5 %
wmaterial+wajan
berat wajan 440 1,640.00
asb 10%
1200
takaran kum
CA 643.16 16.93 203.16 17.635416667
MA 962.12 26.58 318.96 27.6875
FA 1,478.00 42.99 515.88 44.78125 24.00
ASB 1,598.00 10.00 120.00 1,158.00 10.416666667
ASPL 1,640.00 3.50 42.00 100.52083333
100.00 1,200.00
-
wmaterial+wajan
berat wajan 458.5 1,658.50
1200
AC WC ASB LAWELE - FA 3 %
wmaterial+wajan
berat wajan 440 1,640.00
asb 10%
1200
takaran kum
CA 643.16 16.93 203.16 17.635416667
MA 961.28 26.51 318.12 27.614583333
FA 1,478.00 43.06 516.72 44.854166667 24.00
ASB 1,598.00 10.00 120.00 1,158.00 10.416666667
ASPL 1,640.00 3.50 42.00 100.52083333
100.00 1,200.00
-
wmaterial+wajan
berat wajan 458.5 1,658.50
asb 8%
1200 270.5
asb 8%
1200 270.5
Bitument Vol. Of Mix Gs. Bulk of Mix Gs. Max Teoritis VIM at PRD
Content Weight of Mix ( Gram ) Cm3 ( gr/cm3 ) ( gr/cm3 ) %
% in Air in Water Ssd
No. b c d e f g h I
by Wt of e-d c/f 100/((100-b) 100-(100*g/h)
Mix From Lab. From Lab. From Lab. /(Gse+b/Gb))
100/((100-Pb)/Gse+Pb/Gb)
2.425
KEGIATAN PENINGKATAN BANDAR UDARA JUWATA TARAKAN
KALIMANTAN TIMUR
FASILITAS SISI UDARA BANDAR UDARA JUWATA TARAKAN
SECTION : PACKAGE :
3/4" 19.000 144.8 144.8 12.59 87.41 192.9 260.7 19.02 80.98 84.19
1/2" 12.500 325.0 469.8 40.85 59.15 626.6 694.4 50.67 49.33 54.24
3/8" 9.500 233.0 702.8 61.11 38.89 859.7 927.5 67.68 32.32 35.60
# 4 4.750 323.4 1026.2 89.23 10.77 1172.2 1240.0 90.48 9.52 10.14
# 8 2.360 104.1 1130.3 98.29 1.71 1187.2 1255.0 91.58 8.42 5.07
# 10 2.065 - - - - - 3.08
#. 16 1.180 3.2 1133.5 98.57 1.43 1292.2 1360.0 99.24 0.76 1.10
#. 30 0.600 0.5 1134.0 98.61 1.39 1292.7 1360.5 99.28 0.72 1.06
#. 40 0.450 - - - - - 1.05
# 50 0.300 0.1 1134.1 98.62 1.38 1292.9 1360.7 99.29 0.71 1.05
# 80 0.210 - - - - - 0.98
# 100 0.150 0.2 1134.3 98.63 1.37 1296.1 1363.9 99.53 0.47 0.92
No. 200 0.075 0.4 1134.7 98.67 1.33 1297.7 1365.5 99.64 0.36 0.84
3/8" 9.500 21.0 21.0 1.33 98.67 43.1 43.1 3.24 96.76 97.72
# 4 4.750 974.0 995.0 63.03 36.97 742.1 785.2 58.99 41.01 38.99
# 8 2.360 446.8 1441.8 91.33 8.67 425.7 1210.9 90.98 9.02 8.85
#. 16 1.180 59.2 1501.0 95.08 4.92 49.8 1260.7 94.72 5.28 5.10
#. 30 0.600 17.1 1518.1 96.16 3.84 15.0 1275.7 95.85 4.15 4.00
# 50 0.300 7.4 1525.5 96.63 3.37 8.6 1284.3 96.49 3.51 3.44
# 100 0.150 8.6 1534.1 97.17 2.83 14.4 1298.7 97.57 2.43 2.63
No. 200 0.075 6.0 1540.1 97.55 2.45 9.3 1308.0 98.27 1.73 2.09
# 4 4.750 146.9 146.9 8.85 91.15 140.2 149.3 9.94 90.06 90.60
# 8 2.360 377.7 524.6 31.60 68.40 343.6 492.9 32.82 67.18 67.79
#. 16 1.180 354.5 879.1 52.95 47.05 345.5 838.4 55.83 44.17 45.61
#. 30 0.600 230.2 1109.3 66.81 33.19 191.1 1029.5 68.56 31.44 32.31
# 50 0.300 146.7 1256.0 75.65 24.35 120.1 1149.6 76.56 23.44 23.90
# 100 0.150 165.5 1421.5 85.62 14.38 118.7 1268.3 84.46 15.54 14.96
No. 200 0.075 74.5 1496.0 90.10 9.90 81.0 1349.3 89.86 10.14 10.02
SECTION : PACKAGE :
Location
KONSULTAN : SPECIFIC GRAFITY
Ref. No.
CV. MIKROS KONSULTAN.
AGGREGATE
Date 25 FEB 2008
CONTRACTOR : PT. CAHAYA BARU PRIMA FORM :
A B C D E=B/C F=B/D
100%
PENGAWAS
BINA MARGA
LAPANGAN CONSULTANT
KONSULTAN CONTRACTORS
KONTRAKTOR
KEGIATAN PENINGKATAN BANDAR UDARA JUWATA TARAKAN
KALIMANTAN TIMUR
FASILITAS SISI UDARA BANDAR UDARA JUWATA TARAKAN
PENGAWAS
BINA MARGA
LAPANGAN CONSULTANT
KONSULTAN CONTRACTORS
KONTRAKTOR
KEGIATAN PENINGKATAN BANDAR UDARA JUWATA TARAKAN
KALIMANTAN TIMUR
FASILITAS SISI UDARA BANDAR UDARA JUWATA TARAKAN
Saringan mm 19 12.7 9.5 4.75 2.4 1.18 0.6 0.3 0.15 0.075
inchi 3/4" 1/2" 3/8" #4 #8 # 16 # 30 # 50 # 100 # 200
Titik Kontrol
Tengah
Zone Terbatas
Gradasi Asli
CA
MA
DUST
Gradasi hit.
CA
MA
DUST
Agr gabungan
Nilai Tengah
Ttik kontrol pada saringan # 8
dimana P=
A=
B=
Hitungan
Proporsi a
a= (P-B)/(A-B) = %
Nilai Tengah
Titik control Saringan # 200
dimana P=
B=
C=
Propdrsi c
c = ( B * a - P )/( B - C )= %
Diperoleh
c= 0
1 =a + b + c
b = 1 - (a + c) %
PERHITUNGAN PENGGABUNGAN GRADASI
Saringan mm 19 12.7 9.5 4.75 2.4 1.18 0.6 0.3 0.15 0.075
inchi 3/4" 1/2" 3/8" #4 #8 # 16 # 30 # 50 # 100 # 200
Titik Kontrol 100 100 90 58 10
28 4
Tengah 43 28.3 20.7 13.7 6
Zone Terbatas 34.6 22.3 16.7
Gradasi Asli
CA 100 90 80 50 10 5.6 1.1 0 0 0
MA 100 100 100 96 82 66.5 51 36 21 9.2
DUST 100 100 100 100 100 100 100 98 93 82
Gradasi hit.
CA 54.17 48.75 43.33 27.08 5.42 3.03 0.60 - - -
MA 44.44 44.44 44.44 42.66 36.44 29.55 22.66 16.00 9.33 4.09
DUST 1.40 1.40 1.40 1.40 1.40 1.40 1.40 1.37 1.30 1.15
Agr gabungan 100.00 94.58 89.17 71.14 43.25 33.98 24.66 17.37 10.63 5.23
Nilai Tengah
Ttik kontrol pada saringan # 8
dimana P= 43
A= 10
B= 82
Hitungan
Proporsi a
a= (P-B)/(A-B) = 54.2 %
Nilai Tengah
Saringan # 200
dimana P= 6
B= 9.2
C= 82
Propdrsi c
c = ( B * a - P )/( B - C )= 1.40 %
Diperoleh
c= 1.3965201
1= a+b+c
b= 1 - (a + c) 44.4 %
KEGIATAN PENINGKATAN BANDAR UDARA JUWATA TARAKAN
KALIMANTAN TIMUR
FASILITAS SISI UDARA ( STAGE LOT A ) BANDAR UDARA JUWATA TARAKAN
SIEVE CA MA FA Pasir
TOTAL SPEC
NO 18% 50% 20% 12.0%
3/4" 100.0 18.0 100.0 50.0 100.0 20.0 100.0 12.0 100.0 100
1/2" 42.4 7.6 98.9 49.5 100.0 20.0 100.0 12.0 89.1 90-100
3/8" 7.8 1.4 98.1 49.1 100.0 20.0 100.0 12.0 82.5 maks90
#4 0.7 0.1 44.1 22.1 99.1 19.8 100.0 12.0 54.0
#8 0.0 0.0 4.9 2.5 74.6 14.9 100.0 12.0 29.4 28-58
#16 0.0 3.9 2.0 52.1 10.4 99.7 12.0 24.3
#30 0.0 3.3 1.7 42.3 8.5 96.1 11.5 21.6
#50 0.0 3.1 1.6 38.4 7.7 78.6 9.4 18.7
# 200 0.0 1.4 0.7 20.4 4.1 0.3 0.0 4.8 4-10
90
TOTAL PERCENT RENTAINED
80
70
60
50
40
30
20
10
0
0
#200 #10
50 #20
30 #3016 #408 # 50
4 60
3/8" 70
1/2" 80
3/4"
SIEVE CA MA FA
TOTAL SPEC
NO 20% 45% 35%
3/4" 100.0 20.0 100.0 45.0 100.0 35.0 100.0 100
1/2" 56.9 11.4 100.0 45.0 100.0 35.0 91.4 90-100
3/8" 34.7 6.9 99.8 44.9 100.0 35.0 86.9 maks90
#4 1.1 0.2 35.6 16.0 90.2 31.6 47.8
#8 1.0 0.2 7.5 3.4 85.6 30.0 33.5 28-58
#16 0.0 0.9 0.4 65.0 22.8 23.2
#30 0.0 0.4 0.2 52.0 18.2 18.4
#50 0.0 0.2 0.1 35.6 12.5 12.5
# 200 0.0 0 0.0 15.6 5.5 5.5 4-10
90
TOTAL PERCENT RENTAINED
80
70
60
50
40
30
20
10
0
0
#200 #10
50 #20
30 #3016 #408 # 50
4 60
3/8" 70
1/2" 80
3/4"
EXTRACTION TEST
Date Of Test
WT OF SAMPLE WT OF SAMPLE WT OF FILTER WT OF FILTER WT OF FILTER WEIGHT % ASPHALT % ASPHALT
TYPE OF BEFORE AFTER BEFORE AFTER ON WT. OF DRY OF BY WEIGHT OF BY WEIGHT OF
SAMPLE AGREGATE
EXTRACTION EXTRACTION EXTRACTION EXTRACTION FILTER ASPHALT AGGREGATE MIX
A B C D E F=E-D G=C+F H=B-G I = H/G x 100 J=H/B x 100
AC-WC 1000 951 15.1 17.8 2.7 953.7 46.3 0.04854776135 4.63
0 0 0 #DIV/0! #DIV/0!
TOTAL WEIGHT DRY SAMPLE Grams
SIEVE SIZE 3/4" 1/2" 3/8" #4 #8 # 16 # 30 # 50 # 200
WEIGHT COMULATIVE RETAINED Grams 100 111.6 184.4 504.7 611 652.4 686.5 718.7 910.9
COMULATIVE RETAINED %
COMULATIVE PASSING %
JOB MIX FORMULA ( Passing ) % 100 91.3 83.4 68.3 53.4 36.4 24.7 19.7 12.5 8.9
90 -100 Max 90 - 28 -53 4-10
SPECIFICATION ( Passing ) % 100
39.1 25.6-31.519.1-23.1 15.5 -
EXTRACTION TEST