False and Formwork
False and Formwork
Contract Identification No :
BH No :
Nature of the work :
Name of Road :
Collection rate of 'Aggregate 13.2 mm' is taken as default for all types of AGGREGATE
Collection rate of 'Collection, quarrying and sieving sand in local river' is taken as default for all types of SAND
For Loading and Unloading:
Manual Loading is taken as default for AGGREGATES, SANDS, RUBBLES and WOODS
Abstract of Cost Page 1 of 33
Government of Nepal
0
0
0
0
Abstract Of Cost
0
0
0
0
Rate Amount
S.N. Description of Works Unit Quantity Remarks
(NRs) (NRs)
1 General
Providing , Preparing and Installing form work including necessary supports and
1.1 removing
Providing after completion
, Preparing for foundation
and Installing and footings.,
form work including(Class F1 Finish),
necessary supports Using
and sqm 0 0 0
1.2 timber
removing
Providing (soft wood
after ) and Installing
completion
, Preparing for foundation and footings.,
form work including(Class F1 Finish),
necessary supports Using
and sqm 0 0 0
1.3 steel
removing after completion for walls., (Class F2 Finish), vertical
Providing , Preparing and Installing form work including necessary supports and plain surface, sqm 0 0 0
1.4 Using
removing timber (soft
after wood
completion ), Height
for upto
walls., 3 m
(Class F2 Finish), vertical
Providing , Preparing and Installing form work including necessary supports and plain surface, sqm 0 0 0
1.5 Using
removing
Providing timber (soft
after
, Preparingwood and),Installing
completion Height above
for walls., 3work
(Class
form mF2toincluding
6m
Finish), vertical plain
necessary surface,and
supports sqm 0 0 0
1.6 Using
removing
Providing timber (soft
after wood and),Installing
completion
, Preparing Height above
for walls., 6work
(Class
form mF2toincluding
9m
Finish), vertical plain
necessary surface,and
supports sqm 0 0 0
1.7 Using
Providing timber
removing after (soft
, Preparingwood
completion ), Height
and Installing above
for walls.,form 9
(Class m
workF2 including
Finish), vertical plain
necessary surface,and
supports sqm 0 0 0
1.8 Using
Providing steel,
removing after Height
, Preparing upto
completion for walls.,form
and Installing (Class
workF2 including
Finish), vertical plain
necessary surface,and
supports sqm 0 0 0
1.9 Using steel,
removing
Providing Height
after
, Preparing above
completion 3for
m walls.,
to 6 mform
and Installing (Class
workF2 including
Finish), vertical plain
necessary surface,and
supports sqm 0 0 0
1.10 Using steel,
removing
Providing Height
after
, Preparing above
completion 6for
m walls.,
to 9 mform
and Installing (Class
workF2 including
Finish), vertical plain
necessary surface,and
supports sqm 0 0 0
1.11 Using steel,
removing
Providing Height
after
, Preparing above
completion 9for
m walls.,form
and Installing (Class
workF2 including
Finish), Vertical
necessarycurve surface,
supports and sqm 0 0 0
1.12 using timber,
removing
Providing Height
after
, Preparing upto
and 3Installing
completion m walls.,form
for (Class
workF2 including
Finish), Vertical
necessarycurve surface,
supports and sqm 0 0 0
1.13 using timber,
removing
Providing Height
after
, Preparing above
completion 3mwalls.,
for to 6 m
and Installing (Class
form workF2 including
Finish), Vertical
necessarycurve surface,
supports and sqm 0 0 0
1.14 using timber,
removing
Providing Height
after
, Preparing above
completion 6 mwalls.,
for
and Installingto 9 form
m(Class
workF2 including
Finish), Vertical
necessarycurve surface,
supports and sqm 0 0 0
1.15 using timber,
removing
Providing Height
after
, Preparing above
completion 9 mwalls.,form
for
and Installing (Class
workF2 including
Finish), Vertical curve
necessary surface,
supports and sqm 0 0 0
1.16 using steel,after
removing
Providing Height
, Preparing upto
completion 3m
and for walls.,form
Installing (Class
workF2 including
Finish), Vertical curve
necessary surface,
supports and sqm 0 0 0
1.17 using steel,after
removing
Providing Height
, Preparing above
and 3Installing
completion m to
for 6 mform
walls., (Class
workF2 including
Finish), Vertical curve
necessary surface,
supports and sqm 0 0 0
1.18 using
removing
Providingsteel,after
Height
, Preparing above
and 6Installing
completion m to
for 9 mform
walls., (Class
workF2 including
Finish), Vertical curve
necessary surface,
supports and sqm 0 0 0
1.19 using
removing
Providingsteel,after
Height moreandthan
completion
, Preparing forabove 9 m (Class
columns,
Installing form work F3 Finish),necessary
including Square / Rectangular
supports and sqm 0 0 0
1.20 surface,
removing Using
after timber,
completionHeightfor upto 3
columns,m (Class F3 Finish), Square
Providing , Preparing and Installing form work including necessary supports and / Rectangular sqm 0 0 0
1.21 surface,
removingUsing
Providing after timber,
completion
, Preparing Height
and for upto 3form
columns,
Installing m to(Class
6m F3
work Finish),necessary
including Square / Rectangular
supports and sqm 0 0 0
1.22 surface,
removingUsing
Providing after timber,
completion
, Preparing Height
and for upto
Installing 6form
columns,m to(Class
9m F3
work Finish),necessary
including Square / Rectangular
supports and sqm 0 0 0
1.23 surface, Using
removing after
Providing timber,
completion
, Preparing Above 9 m
for columns,
and Installing form(Class
work F3 Finish),necessary
including Square / Rectangular
supports and sqm 0 0 0
1.24 surface,
Providing Using
removing after steel,
, Preparing Height
completion upto
and Installing 3 m
for columns,form(Class
work F3 Finish),necessary
including Square / Rectangular
supports and sqm 0 0 0
1.25 surface, Using
removing
Providing after steel, Height
completion
, Preparing upto
for 3 mform
columns,
and Installing to 6m
(Class
work F3 Finish),necessary
including Square / Rectangular
supports and sqm 0 0 0
1.26 surface, Using
removing
Providing after steel,
, Preparing Height
completion upto
for
and Installing 6 mform
columns, to 9m
(Class
work F3 Finish),necessary
including Square / Rectangular
supports and sqm 0 0 0
1.27 surface, Using
removing
Providing after steel,
, Preparing Above
completion 9 mcolumns,
for
and Installing form(Class
work F3 Finish),necessary
including Circular surface,
supports and sqm 0 0 0
1.28 Using timber,
removing
Providing afterHeight
, Preparing upto
completion 3for
m columns,
and Installing form(Class
work F3 Finish),necessary
including Circular surface,
supports and sqm 0 0 0
1.29 Using timber,
removing
Providing afterHeight
, Preparing upto
completion 3for
m columns,
to 6mform(Class
and Installing work F3 Finish),necessary
including Circular surface,
supports and sqm 0 0 0
1.30 Using timber,
removing
Providing afterHeight
, Preparing upto
completion 6for
m columns,
to 9mform(Class
and Installing work F3 Finish),necessary
including Circular surface,
supports and sqm 0 0 0
1.31 Using timber,
removing
Providing afterAbove
, Preparing 9and
completionm Installing
for columns,form(Class
work F3 Finish),necessary
including Circular surface,
supports and sqm 0 0 0
1.32 Using steel,
removing
Providing Height
after
, Preparing upto
and3 Installing
completion mfor columns,form(Class
work F3 Finish),necessary
including Circular surface,
supports and sqm 0 0 0
1.33 Using steel,
removing
Providing Height
after
, Preparing upto
and3 Installing
completion mfortocolumns,
6m form(Class
work F3 Finish),necessary
including Circular surface,
supports and sqm 0 0 0
1.34 Using
removing
Providing steel, Height
after upto
and6 Installing
completion
, Preparing mfortocolumns,
9m form(Class
work F3 Finish),necessary
including Circular surface,
supports and sqm 0 0 0
1.35 Using
removing
Providing steel, Above
after
, Preparing 9m
completion for slab structure.,
and Installing form workClass F2 Finish,
including Falsesupports
necessary work notand sqm 0 0 0
1.36 included,
removing Using
after timber
completion for slab structure., Class F2
Providing , Preparing and Installing form work including necessary supportsFinish, False work notand sqm 0 0 0
1.37 included,
ProvidingUsing
removing after steel and Installing
completion
, Preparing for slab structure.,
form workClass F2 Finish,
including Falsesupports
necessary work notand sqm 0 0 0
1.38 included,
removing Using
Providing after shuttering
completion
, Preparing Ply
for slab &form
and Installing beam structure.,
work includingClass F2 Finish,
necessary False and
supports sqm 0 0 0
1.39 work
removingnot included,
Providing after
, Preparing Using
and timber
completion for slab &form
Installing beam structure.,
work includingClass F2 Finish,
necessary False and
supports sqm 0 0 0
1.40 work not
removing after
Providing included,
, Preparing Using
completion steel
for slab &form
and Installing beam structure.,
work includingClass F2 Finish,
necessary False and
supports sqm 0 0 0
1.41 work not included,
removing
Providing after
, Preparing Using
and shuttering
completion Installing Ply workClass
for arch structure.,
form F2 Finish,
including Falsesupports
necessary work notand sqm 0 0 0
1.42 included, Using
removing
Providing after timberand Installing
completion
, Preparing for arch structure.,
form workClass F2 Finish,
including Falsesupports
necessary work notand sqm 0 0 0
1.43 included, Using
removing
Providing after steel and Installing
completion
, Preparing for precast element.,
form Class F3 Finish,
work including Square
necessary /
supports and sqm 0 0 0
1.44 Rectangular
removing
Providing section,
after
, Preparing Using
completion timber
for precast
and Installing element.,
form Class F3 Finish,
work including Square
necessary /
supports and sqm 0 0 0
1.45 Rectangular
removing
Providing section,
after
, Preparing Using
completion steel
for precast
and Installing element.,
form Class F3 Finish,
work including Circular
necessary supports and sqm 0 0 0
1.46 section, Using
removing
Providing after timber
completionin
and assembling forposition
precastfalsework
element., Class
for theF3 Finish, Circular
construction of RCC sqm 0 0 0
1.47 section, Using and
superstructure steelremoving after completion including design & drawings as sqm 0 0 0
superstructure
per specification For Slab and Box culverts, Using timber, Height upto 2 m as
and removing after completion including design & drawings
1.48 sqm 0 0 0
per specification
superstructure andFor Slab andafter
removing Boxcompletion
culverts, Using timber,
including Height
design above 2 masto 4
& drawings
1.49 Providing and assembling in position falsework fortimber,
the construction of RCC sqm 0 0 0
per specification For Slab and Box culverts, Using Height above 4 m to 6
1.50 superstructure
Providing and assembling in position falsework for the construction of RCCas
and removing after completion including design & drawings 0 0 0
1.51 per specification
superstructure andFor Slab andafter
removing Boxcompletion
culverts, Using timber,
including For Height
design & drawingsaboveas6 m sqm 0 0 0
superstructure
per specification andForremoving
Slab and after
Boxcompletion
culverts, including
Using design
Height&upto
drawings m as
1.52 Providing
per and assembling
specification For Slab andin position falsework
Box culverts, Usingforsteel,
the construction
steel, Height above of2 2RCC
m to 4
sqm 0 0 0
1.53 superstructure and removing after completion including design & drawings as sqm 0 0 0
superstructure
per specification andForremoving
Slab and after
Box completion
culverts, including
Using steel, design
Height&above
drawings6 m as
1.54 Providing and assembling in position falsework forsteel,
the construction of 4RCC sqm 0 0 0
per specification For Slab and Box culverts, Using Height above m to 6
1.55 superstructure
Providing and removing
and assembling after completion
in position falsework including design & drawings
for the construction of RCCas sqm 0 0 0
1.56 per specification,
superstructure
Providing for
and assembling RCC
and removing Beam Bridge, Using
after completion
in position falsework timber,
including Height upto 3
design & drawings
for the construction m
of RCCas sqm 0 0 0
1.57 per specification,
superstructure andfor RCC Beam
removing afterBridge, Usingincluding
completion timber, Height
design above 3 m toas6 m
& drawings sqm 0 0 0
,per
Height above
specification, 9 m Increase
for RCC in the
Beam rate by
Bridge, 10% for every
Using timber, additional meter
Height aboveof6RCC height
m to 9 tom
1.58 Providing and assembling position falsework for the construction 0 0 0
the rate for the previous height or Design as a special case and derive Norms
1.59 superstructure
Providing and removing
and assembling after completion
in position falsework including design & drawings
for the construction of RCCas sqm 0 0 0
1.60 per specification,
superstructure
Providing andfor
and assembling RCC in
removing BeamafterBridge,
position Usingincluding
completion
falsework steel,
for theHeight upto
design 3m
& drawings
construction of RCCas sqm 0 0 0
1.61 per specification,
superstructure andfor RCC Beam
removing afterBridge, Usingincluding
completion steel, Height above
design 3 m to 6m
& drawings as sqm 0 0 0
,per
Height above
specification, 9 m Increase
for RCC in the
Beam rate by
Bridge, 10% for every
Using steel, additional
Height meter
above 3 mRCC height
to 6m to
1.62 Providing 0 0 0
the rate forandthe assembling
previous height position falsework
or Design for thecase
as a special construction
and deriveofNorms
1.63 superstructure
Providing and removing
and assembling after completion
in position falsework including design & drawings
for the construction of RCCas sqm 0 0 0
1.64 per specification,
superstructure
Providing andfor
and assembling RCC in
removing ArchafterBridge, Usingincluding
completion
position falsework timber,
for the Height
designupto 3ofmRCCas
& drawings
construction sqm 0 0 0
1.65 per specification,
superstructure
Providing andfor
and assembling RCC in
removing ArchafterBridge, Usingincluding
completion
position falsework timber,
for the Height
designabove 3mRCC
& drawings
construction of to 6asm sqm 0 0 0
1.66 per specification,
superstructure
Providing andfor RCC in
removing
and assembling ArchafterBridge, Usingincluding
completion
position falsework timber,
for the Height
designabove 6m
& drawings
construction of RCC to as
9m 0 0 0
1.67 per specification,
superstructure
Providing andfor
and assembling RCC in
removing ArchafterBridge, Usingincluding
completion
position falsework timber,
for the Height
designabove 9m
& drawings
construction of RCCas sqm 0 0 0
1.68 per specification,
superstructure
Providing andfor RCC in
removing
and assembling ArchafterBridge, Usingincluding
completion
position falsework steel, Height
for the upto
design & 3drawings
construction mof RCCas sqm 0 0 0
1.69 per specification,
superstructure
Providing andfor RCC in
removing
and assembling ArchafterBridge, Usingincluding
completion
position falsework steel, Height
for the above
design 3 of
m RCC
& drawings
construction to 6 asm sqm 0 0 0
1.70 per specification,
superstructure andfor RCC Arch
removing afterBridge, Usingincluding
completion steel, Height above
design 6 m to 9 as
& drawings m 0 0 0
per specification, for RCC Arch Bridge, Using steel, Height above 9 m
Total (Excl. VAT & Contin.) 0
Provisional Sum 0
VAT (13%) 0
Contingency (5%) 0
Provision for Price Escalation (10%) 0
Physical Contingency (10%) 0
GRAND TOTAL 0
Quantity Sheet
0
0
0
0
Length Breadth Height
S.N. Description of Works Unit No. Quantity Remarks
(m) (m) (m)
1 General
1.1 0 sqm
1.2 0 sqm
1.3 0 sqm
1.4 0 sqm
1.5 0 sqm
1.6 0 sqm
1.7 0 sqm
1.8 0 sqm
1.9 0 sqm
1.10 0 sqm
1.11 0 sqm
1.12 0 sqm
1.13 0 sqm
1.14 0 sqm
1.15 0 sqm
1.16 0 sqm
1.17 0 sqm
1.18 0 sqm
1.19 0 sqm
1.20 0 sqm
1.21 0 sqm
1.22 0 sqm
1.23 0 sqm
1.24 0 sqm
1.25 0 sqm
1.26 0 sqm
1.27 0 sqm
1.28 0 sqm
1.29 0 sqm
1.30 0 sqm
1.31 0 sqm
1.32 0 sqm
1.33 0 sqm
1.34 0 sqm
1.35 0 sqm
1.36 0 sqm
1.37 0 sqm
1.38 0 sqm
1.39 0 sqm
1.40 0 sqm
1.41 0 sqm
1.42 0 sqm
1.43 0 sqm
1.44 0 sqm
1.45 0 sqm
1.46 0 sqm
1.47 0 sqm
1.48 0 sqm
1.49 0 sqm
1.50 0
1.51 0 sqm
1.52 0 sqm
1.53 0 sqm
1.54 0 sqm
1.55 0 sqm
1.56 0 sqm
1.57 0 sqm
1.58 0
1.59 0 sqm
1.60 0 sqm
1.61 0 sqm
1.62 0
1.63 0 sqm
1.64 0 sqm
1.65 0 sqm
1.66 0
1.67 0 sqm
1.68 0 sqm
1.69 0 sqm
1.70 0
Total : 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for foundation and footings., (Class F1 Finish), Using timber (soft wood ) 1 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.1.a Skilled day 1.5 0 0.0 Planks 38 mm thick. cum 0.000 0 0
Unskilled day 2 0 0.0 Struts, Ballies, etc. cum 0.000 0 0
Nails, spikes, etc. kg 1 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for foundation and footings., (Class F1 Finish), Using steel 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.1.b Skilled day 1.5 0 0.0 MS Sheet 14 gauge & Angle Stiffners kg 0.000 0 0
Unskilled day 2.5 0 0.0 MS Pipes 40 mm dia. m 0.000 0 0
Clamps nos. 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 0.000 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), vertical plain surface, Using timber (soft wood ), Height upto 3 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.2.A.i Skilled day 2.2 0 0.0 Ply Wood 9 mm thick. sqm 0.000 0 0
Unskilled day 2.2 0 0.0 Struts, Ballies, etc. cum 0.4 0 0
Nails, spikes, etc. kg 2.5 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), vertical plain surface, Using timber (soft wood ), Height above 3 m to 6 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.2.A.ii Skilled day 2.6 0 0.0 Ply Wood 9 mm thick. sqm 0.000 0 0
Unskilled day 2.8 0 0.0 Struts, Ballies, etc. cum 0.5 0 0
Nails, spikes, etc. kg 3.5 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), vertical plain surface, Using timber (soft wood ), Height above 6 m to 9 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.2.A.iii Skilled day 3.2 0 0.0 Ply Wood 9 mm thick. sqm 0.000 0 0
Unskilled day 4 0 0.0 Struts, Ballies, etc. cum 0.6 0 0
Nails, spikes, etc. kg 4.5 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), vertical plain surface, Using timber (soft wood ), Height above 9 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Increase the rate by 10 % for every additional meter height to
18.2.A.iv
the rate for previous height
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), vertical plain surface, Using steel, Height upto 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.2.B.i Skilled day 1.6 0 0.0 MS Sheet 14 gauge & Angle Stiffners kg 0.000 0 0
Unskilled day 2.2 0 0.0 MS Pipes 40 mm dia. m 0.000 0 0
Clamps nos. 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 0.000 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), vertical plain surface, Using steel, Height above 3 m to 6 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.2.B.ii Skilled day 1.9 0 0.0 MS Sheet 14 gauge & Angle Stiffners kg 0.000 0 0
Unskilled day 2.8 0 0.0 MS Pipes 40 mm dia. m 0.000 0 0
Clamps nos 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 0.000 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), vertical plain surface, Using steel, Height above 6 m to 9 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.2.B.iii Skilled day 2.3 0 0.0 MS Sheet 14 gauge & Angle Stiffners kg 0.000 0 0
Unskilled day 4 0 0.0 MS Pipes 40 mm dia. m 0.000 0 0
Clamps nos. 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 0.000 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), vertical plain surface, Using steel, Height above 9 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Increase the rate by 10 % for every additional meter height to
18.2.B.iv
the rate for previous height
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), Vertical curve surface, using timber, Height upto 3 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.3.A.i Skilled day 3 0 0.0 Ply Wood 9 mm thick. sqm 0.000 0 0
Unskilled day 3 0 0.0 Timber cum 0.6 0 0
Nails, spikes, etc. kg 4 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), Vertical curve surface, using timber, Height above 3m to 6 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.3.A.ii Skilled day 3.5 0 0.0 Ply Wood 9 mm thick. sqm 0.000 0 0
Unskilled day 3.8 0 0.0 Timber cum 0.72 0 0
Nails, spikes, etc. kg 5 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), Vertical curve surface, using timber, Height above 6 m to 9 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.3.A.iii Skilled day 4.3 0 0.0 Ply Wood 9 mm thick. sqm 0.000 0 0
Unskilled day 5.4 0 0.0 Timber cum 0.9 0 0
Nails, spikes, etc. kg 6 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), Vertical curve surface, using timber, Height above 9 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Increase the rate by 10 % for every additional meter height to
18.3.A.iv
the rate for previous height
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), Vertical curve surface, using steel, Height upto 3 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.3.B.i Skilled day 2 0 0.0 MS Sheet 14 gauge & Angle Stiffners kg 0.000 0 0
Unskilled day 3 0 0.0 MS Pipes 40 mm dia. m 0.000 0 0
Clamps nos 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 0.000 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), Vertical curve surface, using steel, Height above 3 m to 6 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.3.B.ii Skilled day 2.4 0 0.0 MS Sheet 14 gauge & Angle Stiffners kg 0.000 0 0
Unskilled day 3.8 0 0.0 MS Pipes 40 mm dia. m 0.000 0 0
Clamps nos 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 0.000 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), Vertical curve surface, using steel, Height above 6 m to 9 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.3.B.iii Skilled day 3 0 0.0 MS Sheet 14 gauge & Angle Stiffners kg 0.000 0 0
Unskilled day 5.4 0 0.0 MS Pipes 40 mm dia. m 0.000 0 0
Clamps nos 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 0.000 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for walls., (Class F2 Finish), Vertical curve surface, using steel, Height more than above 9 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Increase the rate by 10 % for every additional meter height to
18.3.B.iv
the rate for previous height
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Square / Rectangular surface, Using timber, Height upto 3 m 10 sqm
Prepared By:________________ Checked By:________________ Recommended By:________________ Approved By:________________
District: Fiscal (Class
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, Year: 2074/75
F3 Finish), Square / Rectangular surface, Using timber, Height upto 3 m 10 sqm Page 4 of 33
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.4.A.i Skilled day 2.75 0 0.0 Ply Wood 9 mm thick. sqm 0.000 0 0
Unskilled day 2.4 0 0.0 Timber cum 0.5 0 0
Nails, spikes, etc. kg 3 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Square / Rectangular surface, Using timber, Height upto 3 m to 6m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.4.A.ii Skilled day 3.2 0 0.0 Ply Wood 9 mm thick. sqm 0.000 0 0
Unskilled day 3.2 0 0.0 Timber cum 0.6 0 0
Nails, spikes, etc. kg 4 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Square / Rectangular surface, Using timber, Height upto 6 m to 9m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.4.A.iii Skilled day 4 0 0.0 Ply Wood 9 mm thick. sqm 0.000 0 0
Unskilled day 4.4 0 0.0 Timber cum 0.75 0 0
Nails, spikes, etc. kg 5 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Square / Rectangular surface, Using timber, Above 9 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Increase the rate by 10 % for every additional meter height to
18.4.A.iv
the rate for previous height
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Square / Rectangular surface, Using steel, Height upto 3 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.4.B.i Skilled day 2 0 0.0 MS Sheet 14 gauge & Angle Stiffners kg 0.000 0 0
Unskilled day 2.4 0 0.0 MS Pipes 40 mm dia. m 0.000 0 0
Clamps nos 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 0.000 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Square / Rectangular surface, Using steel, Height upto 3 m to 6m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.4.B.ii Skilled day 2.3 0 0.0 MS Sheet 14 gauge & Angle Stiffners kg 0.000 0 0
Unskilled day 3.1 0 0.0 MS Pipes 40 mm dia. m 0.000 0 0
Clamps nos 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 0.000 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Square / Rectangular surface, Using steel, Height upto 6 m to 9m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.4.B.iii Skilled day 2.9 0 0.0 MS Sheet 14 gauge & Angle Stiffners kg 0.000 0 0
Unskilled day 4.4 0 0.0 MS Pipes 40 mm dia. m 0.000 0 0
Clamps nos 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 0.000 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Square / Rectangular surface, Using steel, Above 9 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Increase the rate by 10 % for every additional meter height to
18.4.B.iv
the rate for previous height
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Circular surface, Using timber, Height upto 3 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.5.A.i Skilled day 3.6 0 0.0 Ply Wood 9 mm thick. sqm 0.000 0 0
Unskilled day 3.3 0 0.0 Timber cum 0.75 0 0
Nails, spikes, etc. kg 5 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Circular surface, Using timber, Height upto 3 m to 6m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.5.A.ii Skilled day 4.2 0 0.0 Ply Wood 9 mm thick. sqm 0.000 0 0
Unskilled day 4.2 0 0.0 Timber cum 1 0 0
Nails, spikes, etc. kg 6.5 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Circular surface, Using timber, Height upto 6 m to 9m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.5.A.iii Skilled day 5.2 0 0.0 Ply Wood 9 mm thick. sqm 0.000 0 0
Unskilled day 5.9 0 0.0 Timber cum 1.2 0 0
Nails, spikes, etc. kg 8 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Circular surface, Using timber, Above 9 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Increase the rate by 10 % for every additional meter height to
18.5.A.iv
the rate for previous height
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Circular surface, Using steel, Height upto 3 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.5.B.i Skilled day 2.4 0 0.0 MS Sheet 14 gauge & Angle Stiffners kg 0.000 0 0
Unskilled day 3.3 0 0.0 MS Pipes 40 mm dia. m 0.000 0 0
Clamps nos 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 0.000 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Circular surface, Using steel, Height upto 3 m to 6m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No.
Prepared By:________________ Checked By:________________ Recommended By:________________ Approved By:________________
District:
Norms Fiscal Year: 2074/75 Page 7 of 33
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.5.B.ii Skilled day 2.9 0 0.0 MS Sheet 14 gauge & Angle Stiffners kg 0.000 0 0
Unskilled day 4.2 0 0.0 MS Pipes 40 mm dia. m 0.000 0 0
Clamps nos 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 0.000 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Circular surface, Using steel, Height upto 6 m to 9m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.5.B.iii Skilled day 3.6 0 0.0 MS Sheet 14 gauge & Angle Stiffners kg 0.000 0 0
Unskilled day 2.9 0 0.0 MS Pipes 40 mm dia. m 0.000 0 0
Clamps nos 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 0.000 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for columns, (Class F3 Finish), Circular surface, Using steel, Above 9 m 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
Increase the rate by 10 % for every additional meter height to
18.5.B.iv
the rate for previous height
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for slab structure., Class F2 Finish, False work not included, Using timber 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.6.A Skilled day 1.8 0 0.0 Planks 38 mm thick. & rafters, beam, battens etc. cum 0.000 0 0
Unskilled day 2.5 0 0.0 Nails, spikes, etc. kg 2.5 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for slab structure., Class F2 Finish, False work not included, Using steel 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.6.B Skilled day 1.25 0 0.0 Unit =sqm (For 10 sqm)
Unskilled day 2.5 0 0.0 MS Sheet 14 gauge & Angle Stiffners kg 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 0.000 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for slab structure., Class F2 Finish, False work not included, Using shuttering Ply 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.6.C Skilled day 1.5 0 0.0 Unit =sqm (For 10 sqm)
Unskilled day 2.5 0 0.0 Ply Wood 12 mm thick. sqm 0.000 0 0
Rafter, Stuts, Beam, Battens etc. cum 0.1 0 0
Nails, spikes, etc. kg 2 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for slab & beam structure., Class F2 Finish, False work not included, Using timber 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.7.A Skilled day 3 0 0.0 Planks 38 mm thick. & rafters, beam, battens etc. cum 0.000 0 0
Unskilled day 3 0 0.0 Nails, spikes, etc. kg 4 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for slab & beam structure., Class F2 Finish, False work not included, Using steel 10 sqm
Spec. cl. No: 1804, 1805
Prepared By:________________ Checked By:________________ Recommended By:________________ Approved By:________________
District: Fiscal Year: 2074/75 Page 9 of 33
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.7.B Skilled day 2 0 0.0 MS Sheet 14 gauge & Angle Stiffners kg 0.000 0 0
Unskilled day 3 0 0.0 MS Pipes 40 mm dia. m 0.000 0 0
Clamps nos 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 0.000 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for slab & beam structure., Class F2 Finish, False work not included, Using shuttering Ply 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.7.C Skilled day 2.5 0 0.0 Ply Wood 12 mm thick. sqm 0.000 0 0
Unskilled day 3 0 0.0 Rafter, Stuts, Beam, Battens etc. cum 0.32 0 0
Nails, spikes, etc. kg 3 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for arch structure., Class F2 Finish, False work not included, Using timber 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.8.A Skilled day 3.5 0 0.0 Ply Wood 12 mm thick. sqm 0.000 0 0
Unskilled day 3 0 0.0 Rafter, Stuts, Beam, Battens etc. cum 0.3 0 0
Nails, spikes, etc. kg 4 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for arch structure., Class F2 Finish, False work not included, Using steel 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.8.B Skilled day 2.5 0 0.0 MS Sheet 14 gauge & Angle Stiffners kg 0.000 0 0
Unskilled day 3 0 0.0 MS Pipes 40 mm dia. m 0.000 0 0
Clamps nos 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 0.000 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for precast element., Class F3 Finish, Square / Rectangular section, Using timber 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.9.I.a Skilled day 2.5 0 0.0 Ply Wood 9 mm thick. sqm 0.000 0 0
Unskilled day 2 0 0.0 Timber cum 0.2 0 0
Nails, spikes, etc. kg 2 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for precast element., Class F3 Finish, Square / Rectangular section, Using steel 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.9.I.b Skilled day 2 0 0.0 MS Sheet 14 gauge & Angle Stiffners kg 0.000 0 0
Unskilled day 2 0 0.0 MS Pipes 40 mm dia. m 0.000 0 0
Clamps nos 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 0.000 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for precast element., Class F3 Finish, Circular section, Using timber 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.9.II.a Skilled day 3 0 0.0 Ply Wood 9 mm thick. sqm 0.000 0 0
Unskilled day 2.5 0 0.0 Timber cum 0.2 0 0
Nails, spikes, etc. kg 3 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Prepared By:________________ Checked By:________________ Recommended By:________________ Approved By:________________
District: Fiscal Year: 2074/75 Page 11 of 33
Description of Work:
Providing , Preparing and Installing form work including necessary supports and removing after completion for precast element., Class F3 Finish, Circular section, Using steel 10 sqm
Spec. cl. No: 1804, 1805
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.9.II.b Skilled day 2.5 0 0.0 MS Sheet 14 gauge & Angle Stiffners kg 0.000 0 0
Unskilled day 2 0 0.0 MS Pipes 40 mm dia. m 0.000 0 0
Clamps nos 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 0.000 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification For Slab and Box culverts, Using timber, Height upto 2 m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.10.A.i Skilled day 8 0 0.0 Timber cum 0.000 0 0
Unskilled day 8 0 0.0 Nails, spikes, etc. kg 2.5 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification For Slab and Box culverts, Using timber, Height above 2 m to 4 m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.10.A.i
Skilled day 16 0 0.0 Timber cum 0.000 0 0
i
Unskilled day 18 0 0.0 Nails, spikes, etc. kg 4 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification For Slab and Box culverts, Using timber, Height above 4 m to 6 m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.10.A.i
Skilled day 24 0 0.0 Timber cum 0.000 0 0
ii
Unskilled day 28 0 0.0 Nails, spikes, etc. kg 5.5 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification For Slab and Box culverts, Using steel, Height upto 2 m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.10.B.i Skilled day 4 0 0.0 MS Pipes 40-50 mm dia. m 0.000 0 0
Unskilled day 6 0 0.0 Clamps nos 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 3.56 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification For Slab and Box culverts, Using steel, Height above 2 m to 4 m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.10.B.i
Skilled day 8 0 0.0 MS Pipes 40 mm dia. m 0.000 0 0
i
Unskilled day 14 0 0.0 Clamps nos 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 3.56 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification For Slab and Box culverts, Using steel, Height above 6 m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Increase
Type the rate by 10% for every additional meter height to Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.10.B.i
the rate for the previous height or Design as a special case and
v
Sub total of A = 0.0 derive Norms Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification For Slab and Box culverts, Using steel, Height above 4 m to 6 m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.10.B.i
Skilled day 12 0 0.0 MS Pipes 40 mm dia. m 0.000 0 0
ii
Unskilled day 20 0 0.0 Clamps nos 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 3.56 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Beam Bridge, Using timber, Height upto 3 m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.11.a.i Skilled day 14 0 0.0 Timber cum 0.000 0 0
Unskilled day 14 0 0.0 Nails, spikes, etc. kg 6 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Beam Bridge, Using timber, Height above 3 m to 6 m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.11.a.ii Skilled day 28 0 0.0 Timber cum 0.000 0 0
Unskilled day 32 0 0.0 Nails, spikes, etc. kg 12 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Beam Bridge, Using timber, Height above 6 m to 9 m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.11.a.ii
Skilled day 40 0 0.0 Timber cum 0.000 0 0
i
Unskilled day 50 0 0.0 Nails, spikes, etc. kg 21 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Beam Bridge, Using steel, Height upto 3 m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.11.b.i Skilled day 7 0 0.0 MS Pipes 40-50 mm dia. m 0.000 0 0
Unskilled day 11 0 0.0 Clamps nos 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 3.56 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Beam Bridge, Using steel, Height above 3 m to 6m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.11.b.i
Skilled day 14 0 0.0 MS Pipes 40 mm dia. m 0.000 0 0
i
Prepared By:________________ Checked By:________________ Recommended By:________________ Approved By:________________
District: Fiscal Year: 2074/75 Page 14 of 33
Unskilled day 25 0 0.0 Clamps nos 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 3.56 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Beam Bridge, Using steel, Height above 3 m to 6m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.11.b.i
Skilled day 20 0 0.0 MS Pipes 40 mm dia. m 0.000 0 0
ii
Unskilled day 40 0 0.0 Clamps nos 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 3.56 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Arch Bridge, Using timber, Height upto 3 m 10 sqm
Spec. cl. No: 1803
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.12.A.i Skilled day 18 0 0.0 Timber cum 0.000 0 0
Unskilled day 16 0 0.0 Nails, spikes, etc. kg 3.5 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Arch Bridge, Using timber, Height above 3m to 6 m 10 sqm
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.12.A.i
Skilled day 36 0 0.0 Timber cum 0.000 0 0
i
Unskilled day 36 0 0.0 Nails, spikes, etc. kg 7 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Arch Bridge, Using timber, Height above 6 m to 9 m 10 sqm
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.12.A.i
Skilled day 50 0 0.0 Timber cum 0.000 0 0
ii
Unskilled day 57 0 0.0 Nails, spikes, etc. kg 12 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Arch Bridge, Using steel, Height upto 3 m 10 sqm
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.12.B.i Skilled day 8 0 0.0 MS Pipes 40-50 mm dia. m 0.000 0 0
Unskilled day 12 0 0.0 Clamps nos 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 3.56 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Arch Bridge, Using steel, Height above 3 m to 6 m 10 sqm
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.12.B.i
Skilled day 16 0 0.0 MS Pipes 40 mm dia. m 0.000 0 0
i
Unskilled day 25 0 0.0 Clamps nos 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 3.56 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work:
Providing and assembling in position falsework for the construction of RCC superstructure and removing after completion including design & drawings as per specification, for RCC Arch Bridge, Using steel, Height above 6 m to 9 m 10 sqm
Spec. cl. No:
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No.
Prepared By:________________ Checked By:________________ Recommended By:________________ Approved By:________________
District:
Norms Fiscal Year: 2074/75 Page 16 of 33
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
18.12.B.i
Skilled day 25 0 0.0 MS Pipes 40 mm dia. m 0.000 0 0
ii
Unskilled day 46 0 0.0 Clamps nos 0.000 0 0
Nuts & bolts 6 mm dia. (@approx. 2 kg per 100 nos) kg 3.56 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Loading/Unloading Mechanical
S.N. Description Unit Loader Tipper Total
1 Gravel cum 0.060 0.060 0.0
2 Sand cum 0.060 0.060 0.0
3 Rubble cum 0.140 0.140 0.0
4 Aggregate cum 0.140 0.140 0.0
Loading/Unloading Manual
Unskille
S.N. Description Unit Skilled Truck Tipper Total
d
1 Cement tonne 0.200 0.000 0.200 0.000 0.0
1000
2 Bricks 0.000 0.000 0.000 0.000 0.0
Nos.
3 Bitumen Drums tonne 0.150 0.000 0.150 0.000 0.0
4 Timber tonne 0.270 0.003 0.200 0.000 0.0
5 C.C. Blocks, Kerb, etc. cum 0.400 0.050 0.300 0.000 0.0
6 Steel tonne 0.200 0.000 0.200 0.000 0.0
7 Gravel cum 0.136 0.000 0.000 0.136 0.0
8 Sand cum 0.136 0.000 0.000 0.136 0.0
9 Rubble cum 0.136 0.000 0.000 0.136 0.0
10 Aggregate cum 0.136 0.000 0.000 0.136 0.0
Collection
Unskille
S.N. Description Unit Rate Amount
d
Gravel
a 5 mm - 70 mm cum 2.060 0 0.0
b 40 mm cum 3.090 0 0.0
c 20 mm cum 4.120 0 0.0
d 8 mm cum 6.180 0 0.0
e 40 mm - 70 mm cum 4.120 0 0.0
f 70 mm - 100 mm cum 3.090 0 0.0
Sand
a Quarry output less than 33% cum 4.120 0 0.0
b Quarry output 33 - 66% cum 3.090 0 0.0
c Quarry output more than 66% cum 1.545 0 0.0
Collection, quarrying and sieving
d cum 1.545 0 0.0
sand in local river
3 Rubble cum 1.442 0 0.0
4 Aggregate cum 1.442 0 0.0
Washing
Unskille
S.N. Description Unit Rate Amount
d
1 Gravel cum 0.515 0 0.000
2 Sand cum 0.515 0 0.000
3 Rubble cum 0.206 0 0.000
4 Aggregate cum 0.210 0 0.000
Tipper
ER GR BT ER GR BT 0
rate:
Coefficient/Distance(km) 0.09 0.06 0.045 0.18 0.12 0.09
Conversio Total Total
S.N. Description Unit Terai Hilly Remarks
n to tonne time Amount
Materials ER GR BT ER GR BT
1 Clamps nos. 0 0 From District HQ
2 Diesel litre 0 0 From District HQ
3 Electric Detonator nos. 0 0 From District HQ
4 Electricity unit 0 0 From District HQ
5 Fuse Wire meter 0 0 From District HQ
6 Gelatin kg 0.001 0 0 From District HQ
7 Kerosene Lit 0 0 From District HQ
8 LPG litre 0 0 From District HQ
9 MS Pipes 40 mm dia. m 0 0 From District HQ
10 MS Sheet 14 gauge & Angle Stiffners kg 0.001 0 0 From District HQ
11 Nails, spikes, etc. kg 0.001 0 0 From District HQ
Nuts & bolts 6 mm dia. (@approx. 2 kg
12 kg 0.001 0 0 From District HQ
per 100 nos)
13 Petrol litre 0 0 From District HQ
14 Planks 38 mm thick. cum 0 0 From District HQ
15 Ply Wood 12 mm thick. sqm 0 0 From District HQ
16 Ply Wood 9 mm thick. sqm 0 0 From District HQ
17 Rafter, Stuts, Beam, Battens etc. cum 0 0 From District HQ
18 Struts, Ballies, etc. cum 0 0 From District HQ
19 Timber cum 0 0 From District HQ
Sub-Total :
VAT 13% :
Grand Total with VAT: