UOM TIME

05:30
03:30
01:30
23:30
21:30
19:30
17:30
15:30
13:30
11:30
09:30
07:30

SHIFT C
SHIFT B
SHIFT A:
ON/OFF STATUS

HCL DAY TANK

REMARKS
RAW WATER TANK

BIOCIDE DAY TANK


CAUSTIC DAY TANK
Bar PRESSURE

OPERATOR SHIFT "C"


OPERATOR SHIFT "B"
OPERATOR SHIFT "A"
TURBINE

ANTISCALANT DAY TANK

AMM. HYDROXIDE TANK


DM WATER TANK (150 m3)
A/B STATUS

INLET PUMP
Bar
PRESSURE
OULET PUMP

SHIFT A
MMF

Bar
PRESSURE

TANKS LEVEL
Bar TOTAL ΔP

INLET PUMP

SHIFT B
Bar
PRESSURE
OULET PUMP
Bar
PRESSURE
ACF

SHIFT C
Bar TOTAL ΔP

A/B STATUS

TOTAL
Bar CF IN PRESSURE

TODAY (m3)

TODAY (Hrs)
Bar CF OUT PRESSURE

THIS MONTH (m3)

THIS MONTH (Hrs)


Bar TOTAL CF ΔP

HP PUMP FEED

TURBINE
TURBINE
Bar
PREESURE
HP PUMP OUTLET
Bar
PRESSURE
1ST STAGE INLET

RO-1 (A)
RO-1 (A)
Bar
PRESSURE
2ND STAGE INLET
Bar
PRESSURE

RO-2 (A)
RO-2 (A)
Bar REJECT PRESSURE

Bar TOTAL ΔP
st

TOTAL FEED WATER

RO-1 (B)
RO-1 (B)
m3/hr
FLOW
RO-1 (1 PASS )

RUNNING HOURS
TOTAL PRODUCT
m3/hr
WATER FLOW
DM WATER GENERATION
TOTAL REJECT

RO-2 (B)
RO-2 (B)
m3/hr
WATER FLOW
PRODUCT
%
RECOVERY

EDI-1
EDI-1

pH RO FEED pH

RO FEED
us/cm
CONDUCTIVITY

EDI-2
EDI-2

RO PRODUCT
us/cm
CONDUCTIVITY
RO PRODUCT
ppm
WATER SILICA
RO REJECT WATER
TOTAL
TOTAL

ppm
SILICA

C-SHIFT IN-CHARGE
B-SHIFT IN-CHARGE
A-SHIFT IN-CHARGE

Page 1 of 1
A/B STATUS

HP PUMP FEED
Bar
PREESURE
TODAY
TODAY

THIS MONTH
THIS MONTH

HP PUMP OUTLET
Bar
PRESSURE
WATER TREATMENT PLANT (RO+EDI) LOG BOOK

1ST STAGE INLET


Bar
PRESSURE
2ND STAGE INLET
NIMIR INDUSTRIAL CHEMICALS

Bar
FLLOCULANT
FLLOCULANT

PRESSURE
Bar REJECT PRESSURE
BIOCIDE
BIOCIDE

Bar TOTAL ΔP

TOTAL FEED WATER


m3/hr
FLOW
nd

TOTAL PRODUCT
m3/hr
ANTISCALANT

WATER FLOW
ANTISCALANT

TOTAL REJECT
RO-2 (2 Pass)

m3/hr
WATER FLOW
PRODUCT
NH4OH
NH4OH

%
RECOVERY

pH RO FEED pH
HCL
HCL
CHEMICAL CONSUMPTION

RO FEED
us/cm
CHEMICAL AVAILABLE STOCK

CONDUCTIVITY
RO PRODUCT
us/cm
CONDUCTIVITY
RO PRODUCT
CAUSTIC
CAUSTIC

ppm
WATER SILICA
RO REJECT WATER
ppm
SILICA
Cleaning
Cleaning

Chemical
Chemical

A\B STATUS

FEED PUMP
Bar
PRESSURE
Filters
Filters

Cartridge
Cartridge

Bar CF OUT PRESSURE

EDI FEED
us/cm
CONDUCTIVITY
EDI PRODUCT
us/cm
CONDUCTIVITY
EDI PRODUCT
mΩcm
WATER RESISTIVTIY
SHIFT "C"
SHIFT "B"
SHIFT "A"
TOTAl R/H
CLEANING DATE

METER READING

m3/hr EDI FEED FLOW


Manager Quality Control

EDI PRODUCT
m3/hr
FLOW

EDI REJECT FLOW


DATED:

Bar REJECT PRESSURE


EDI (Electronic Deionization System)

Amp MODULE CURRENT


SINCE LAST CLEANING (Membranes)

MMF/ACF BACK WASH (TIME)

V MODULE VOLTAGE

ppm PRODUCT SILICA