PARAMETER:
MONONOBE - OKABE
Kas = Cos²(Ø - θ) / (Cos²θ x (1+(SenØ x Sen(Ø - θ) / Cosθ )^½ )² = 0.62 ke = Ksª = Kas - Ka = 0.21
gb x Ksª = 0.44
kh = 0.25 Horizontal acceleration = 1/2 x asv /g
kv = 0.00 Vertical acceleration = 2/3 x ash /g
θ = 14.0° = ArcTg [kh / (1-kv)]
MONONOBE - RANKINE
Z = 0.40
Tp = 0.60 ; S = 1.20
C = 2.50
U = 1.50 C = 2.5 X Tp / T
R = 7.00 T = hn / CT T = 0.174
C = 8.621
as = 0.26
PROJECT N°: CAMPAMENTO PIONERO MICHIQUILLAY PAGE: 1 OF 4
F.G.A. F. CLIENT: TECNO FAST-ATCO SAC DESIGN BY: F.G.A.
Gallardo JOB N°: MURO DE CONTENCIÓN PRIMER TRAMO DATE: 18.05.2009 REVIEW BY:
RETAINING WALL DESIGN BASED ON ACI 318-05
ANALISIS
SERVICE LOADS
FACTORED LOADS
a2 Hb = 1.60 Hb = 0.00 T
a2 HS = 1.60 HS = 1.47 T
a3 He = 1.00 He = 0.54 T
a2 WS = 1.60 WS = 0.88 T
a1 Wb = 1.20 Wb = 0.00 T
a1 Wf = 1.20 Wf = 2.66 T
a1 Wk = 1.20 Wk = 0.00 T U = a1 DL + a2 LL + a3 E
a1 Ww,t = 1.20 Ww,t = 2.16 T
a1 Ww,b = 1.20 Ww,b = 0.36 T WHERE: a1 = 1.20 ; a2 = 1.60 ; a3 = 1.00
NORMAL CASE
EVENTUAL CASE
EVENTUAL CASE FS = (Hb + HS + He) = 2.5 T F.S. = 2.26 > 1.30 [Satisfactory]
FR = Hp + m SW = 5.8 T
EVENTUAL CASE MO = SHy = 1.1 T-m F.S. = 4.79 > 1.40 [Satisfactory]
MR = SWx = 5.4 T-m
NORMAL CASE e = L/2 - (SWx - SHy) / SW = 0.40 T-m > L/6 = 0.31 m L' = 1.58 m
Ac = 85 %
qmin = 4.12 T/m²
qmax = 10.35 T/m² < QN = 12.0 T/m² [Satisfactory]
EVENTUAL CASE e = L/2 - (SWx - SHy) / SW = 0.36 T-m > L/6 = 0.31 m L' = 1.69 m
Ac = 91.4 % > Acmin = 75.0 % [Satisfactory]
qmin = 0.00 T/m²
qmax = 9.01 T/m² < QE = 12.0 T/m² [Satisfactory]
d = 20 cm d = 20 cm f = 0.9
b = 100 cm b = 100 cm r = 5 cm Cover
EVENTUAL CASE U = a1 DL + a2 LL + a3 E
AT HALF OF STEM AT BASE OF STEM
MU = 2.26 T-m MU = 3.93 T-m a1 = 1.20
VU = 2.03 T VU = 3.26 T a2 = 1.60
PU = 2.16 T PU = 2.52 T a3 = 1.00
d = 20 cm d = 20 cm f = 0.9
b = 100 cm b = 100 cm r = 5 cm Cover
CHECK SHEAR CAPACITY FOR STEM (ACI 318-05 SEC. 15.4.2, 11.1.3.1 & 11.3)
f Vc = 0.85 x 0.53 f'c0.5 b d f Vc > VU
NORMAL CASE
AT HALF OF STEM AT BASE OF STEM
CHECK HEEL FLEXURE CAPACITY, AS3 , FOR FOOTING (ACI 318-05 SEC. 15.4.2, 10.5.4, 7.12.2, 12.2 & 12.5)
NORMAL CASE EVENTUAL CASE
MU = aMF M
M = -2 T-m M = 0.0 T-m
MU = -4 T-m MU = 0.0 T-m
aMF = 1.6 aMF = 1.4
d = 45 cm r = 5 cm Cover
b = 100 cm
CHECK SHEAR CAPACITY FOR STEM (ACI 318-05 SEC. 15.4.2, 11.1.3.1 & 11.3)
f Vc = 0.85 x 0.53 f'c0.5 b d f Vc > VU
f Vc = 26.82 T
VU = -7.5 T IN POINT 3 ; f Vc = 26.82 T > VU = -7.51 T [Satisfactory]
CHECK TOE FLEXURE CAPACITY, AS4 , FOR FOOTING (ACI 318-05 SEC. 15.4.2, 10.5.4, 7.12.2, 12.2 & 12.5)
d = 45 cm r = 5 cm Cover
b = 100 cm
ANALISIS
SERVICE LOADS
FACTORED LOADS
a2 Hb = 1.60 Hb = 0.00 T
a2 HS = 1.60 HS = 1.47 T
a3 He = 1.00 He = 0.54 T
a2 WS = 1.60 WS = 0.88 T
a1 Wb = 1.20 Wb = 0.00 T
a1 Wf = 1.20 Wf = 2.66 T
a1 Wk = 1.20 Wk = 0.00 T U = a1 DL + a2 LL + a3 E
a1 Ww,t = 1.20 Ww,t = 2.16 T
a1 Ww,b = 1.20 Ww,b = 0.36 T WHERE: a1 = 1.20 ; a2 = 1.60 ; a3 = 1.00
NORMAL CASE
EVENTUAL CASE
EVENTUAL CASE FS = (Hb + HS + He) = 2.5 T F.S. = 2.26 > 1.30 [Satisfactory]
FR = Hp + m SW = 5.8 T
EVENTUAL CASE MO = SHy = 1.1 T-m F.S. = 4.79 > 1.40 [Satisfactory]
MR = SWx = 5.4 T-m
NORMAL CASE e = L/2 - (SWx - SHy) / SW = 0.40 T-m > L/6 = 0.31 m L' = 1.58 m
Ac = 85 %
qmin = 4.12 T/m²
qmax = 10.35 T/m² < QN = 12.0 T/m² [Satisfactory]
EVENTUAL CASE e = L/2 - (SWx - SHy) / SW = 0.36 T-m > L/6 = 0.31 m L' = 1.69 m
Ac = 91.4 % > Acmin = 75.0 % [Satisfactory]
qmin = 0.00 T/m²
qmax = 9.01 T/m² < QE = 12.0 T/m² [Satisfactory]
d = 20 cm d = 20 cm f = 0.9
b = 100 cm b = 100 cm r = 5 cm Cover
EVENTUAL CASE U = a1 DL + a2 LL + a3 E
AT HALF OF STEM AT BASE OF STEM
MU = 2.26 T-m MU = 3.93 T-m a1 = 1.20
VU = 2.03 T VU = 3.26 T a2 = 1.60
PU = 2.16 T PU = 2.52 T a3 = 1.00
d = 20 cm d = 20 cm f = 0.9
b = 100 cm b = 100 cm r = 5 cm Cover
CHECK SHEAR CAPACITY FOR STEM (ACI 318-05 SEC. 15.4.2, 11.1.3.1 & 11.3)
f Vc = 0.85 x 0.53 f'c0.5 b d f Vc > VU
NORMAL CASE
AT HALF OF STEM AT BASE OF STEM
CHECK HEEL FLEXURE CAPACITY, AS3 , FOR FOOTING (ACI 318-05 SEC. 15.4.2, 10.5.4, 7.12.2, 12.2 & 12.5)
NORMAL CASE EVENTUAL CASE
MU = aMF M
M = -2 T-m M = 0.0 T-m
MU = -4 T-m MU = 0.0 T-m
aMF = 1.6 aMF = 1.4
d = 45 cm r = 5 cm Cover
b = 100 cm
CHECK SHEAR CAPACITY FOR STEM (ACI 318-05 SEC. 15.4.2, 11.1.3.1 & 11.3)
f Vc = 0.85 x 0.53 f'c0.5 b d f Vc > VU
f Vc = 26.82 T
VU = -7.5 T IN POINT 3 ; f Vc = 26.82 T > VU = -7.51 T [Satisfactory]
CHECK TOE FLEXURE CAPACITY, AS4 , FOR FOOTING (ACI 318-05 SEC. 15.4.2, 10.5.4, 7.12.2, 12.2 & 12.5)
d = 45 cm r = 5 cm Cover
b = 100 cm
4
F.G.A.
4
F.G.A.
4