0% found this document useful (0 votes)
10 views

Task

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views

Task

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

Date: 2024-10-19

Abhishek's' Task List


Employee Id : 3
Name : Abhishek Srivastav
Email : [email protected]

Date & Time Tasks Task Status Manager's Feedback


2024-10-01 09:54:50 Yesterday, I worked on the back- DONE
end of the new Invest Mango
website, focusing on updates and
improvements. I also tested the
latest developments for Project X,
specifically tracking progress on
the Business Management
Application (BMA). Additionally, I
provided the team with several key
back-end updates.

I reviewed the automated processes


on the HR Console to ensure they
were functioning as expected.
Furthermore, I spent over three
hours presenting the technical
projects, development workflows,
environments, and technology stack
to a new consultant, giving them a
comprehensive overview of our
work.
2024-10-01 18:00:07 Today, I conducted research on DONE
CDN management for the S3
bucket and mapped our domains to
the respective buckets for cloud
storage for the HR Console. I tested
and deployed this successfully.
Now, I am working on the same for
Project X, which contains a lot of
live data. I will find a way to
resolve the CDN name domain
mapping with the bucket, which
will be useful for CRM automation.
2024-10-02 01:02:05 Today I'm analysing the current DONE
development of all projects and
finding bugs and missing elements
as well.

Powered By: Abhishek Srivastav


1
Date: 2024-10-19

2024-10-03 22:17:19 Today, I audited the tasks and work DONE


of all team members up to this
point. I checked, assigned their
tasks, identified lapses, and
instructed them to make the
necessary improvements to ensure
task punctuality and performance. I
submitted the team's performance
report on the HR Console, resolved
a bug in the HR Console's manager-
side leave method, tested it, and
deployed it successfully.
2024-10-03 22:27:56 Resolve the conflict in the DONE
"Performance & Reviews" section
between the web and app, in
coordination with Yogesh, Deepali,
and Khushi.
Ask Prachi for the complete class
test method, including all aspects
and exceptions of the User class,
where 3 to 4 methods are still
pending for Project X.
Handle the DLT subscription and
OTP API integration testing, AWS
CDN configuration, and data
population for Project X. This is
assigned to me.
Collaborate with Aamir to test the
"Save Project" form in Project X,
integrating AWS bucket
management on the form.
Track the development of new and
old changes in the Console with
Deepali and ensure progress is on
track.
Follow up with Sachin regarding
the assigned tasks related to the
back-end management of the
Business Management Application
(BMA).
Ask Yogesh about the new Project
X home screen and the Review
page for the Console.
2024-10-08 10:11:14 Yesterday, I worked on updating DONE
the Project X data and also worked
on the back-end of the new Invest
Mango website. I reviewed the
progress report for the new
development of the BMA (Business
Management Application) and
made corrections to the BMA back-
end.

Powered By: Abhishek Srivastav


2
Date: 2024-10-19

2024-10-09 10:07:56 Yesteray, I worked on the LMS DONE


back-end and web application,
fixing the attendance component,
adding filters to the data
component, and resolving the issue
with the "Not Called" filter on
CRM leads reports. I also fixed
approximately 5 to 6 APIs as per
the requirements, created a few new
APIs for integrations, tested all the
features and changes, and
successfully deployed everything
after testing.
2024-10-09 23:48:02 Today was highly productive. I DONE
designed two new classes and
developed over 16 APIs for them. I
also implemented the entire
meeting module within the CRM
module of the LMS system. After
thorough testing, I successfully
deployed the back-end.

Once deployment was complete, I


started testing on the HR Console
to ensure all updates were
functioning smoothly. I also had a
meeting regarding the new Invest
Mango website development,
where we discussed the design and
project plans.

Additionally, I enhanced the


Facebook Leads Generation
automation by adding two new
forms, further optimizing our lead
collection process.
2024-10-10 18:16:14 Today, I made some value changes DONE
in the development database and
updated a few API logics in the
leaves and manager services as per
the team's requirements. I also
populated JSONs on the newly
written APIs and classes. I am still
facing issues with setting up a
domain proxy on the Project X
AWS bucket and have been in
continuous contact with AWS
support to reactivate the account.
Additionally, I requested the team
to implement the changes I received
from the Pune team.

Powered By: Abhishek Srivastav


3
Date: 2024-10-19

2024-10-14 11:08:42 On October 11, 2024, I worked on DONE


the HR Console bug report and
resolved the API issues according
to the team's requirements. I also
wrote two new classes, designed
their APIs for the new IM website,
and populated the data.
Additionally, I attended a meeting
with the team and Varun Sir to
discuss the project, and I verified
two screens for Project X with him
as well.
2024-10-15 00:36:29 Yesterday, I worked dedicatedly on DONE
Project X with the team. I
rechecked all the designs, fixed the
AWS server issue, and created
CloudFront to serve as a proxy for
the domain name linked to the S3
bucket. Additionally, I successfully
tested newly made APIs for
property and project uploads.
2024-10-15 17:56:49 Today I have worked on the DONE
GoPropify cloud url changes and
changed more than 200 files.
2024-10-15 17:59:27 Checking the relevant time in task DONE
in console
2024-10-16 18:17:48 Yesterday's Tasks: DONE

I worked on testing the HR Console


and successfully fixed an API
serialization issue. Additionally, I
connected with the DLT team,
collaborating with Shubham to
obtain the necessary DLT for
Project X. I also configured several
changes in the Project X API
according to team requirements.
This involved updating data across
multiple tables, including
properties, projects, and amenities.
Furthermore, I implemented a
reverse proxy specifically for our
domain and set up the AWS server
accordingly.

Powered By: Abhishek Srivastav


4
Date: 2024-10-19

2024-10-16 18:18:16 Today's Tasks: DONE

Today, I focused on the integration


of leads from Project X to the LMS.
I wrote automation codes and
successfully integrated the cross-
APIs, ensuring they functioned
properly with or without user leads
properties. After thorough testing, I
deployed the changes successfully.
I also addressed a WhatsApp
campaign delivery issue reported
by the DM team. I informed them
about the reasons behind the
campaign interruptions on Meta,
providing them with the
explanation code and potential
causes. Lastly, I fixed an API
method that had been reported by
the tester and deployed that fix as
well.

2024-10-17 21:01:25 Today, I worked on the AWS DONE


server for Project X, searching for
the missing .env file. After a
thorough search across the entire
server, I was able to locate the
necessary credentials. However,
despite my efforts, I couldn't
resolve the issue, so I decided to
remove the existing repository. I
then cloned a new branch of the
repository, initialized Docker, and
successfully deployed the new
build.

Following the deployment, I tested


the "Post a Project" form and
identified a few necessary changes,
which I communicated to the team
for fixes. Additionally, I researched
an issue encountered during the
Invest Mango WhatsApp campaign
and provided the marketing team
with the necessary information to
address it.

Powered By: Abhishek Srivastav


5
Date: 2024-10-19

2024-10-18 23:16:10 Today, I focused on several critical DONE


tasks across Project X, the Learning
Management System (LMS), and
infrastructure setup.

Project X Debugging: I started the


day by addressing some debugging
tasks in Project X. The team
provided a few changes related to
the Post a Project API. After
reviewing and implementing the
changes, I successfully modified
the API to meet the team's
requirements, ensuring it works as
expected.

LMS Back-end and Front-end:


Following the work on Project X, I
shifted my attention to the Learning
Management System (LMS). The
team provided changes for both the
back-end and front-end, requiring
updates to several functions. I
worked on fixing these functions on
both ends. Once the changes were
made, I conducted thorough testing
to ensure everything was
functioning correctly and that the
back-end and front-end components
were aligned.

AWS RDS Setup: Additionally, I


set up a new Amazon RDS
(Relational Database Service)
instance on the VI AWS server.
After successfully configuring the
RDS, I imported all the live
databases into the new instance,
ensuring the data was securely
migrated and accessible for
production needs.

SSL Issue Fix on imconsole.in:


Lastly, I fixed an SSL issue on the
website imconsole.in and its back-
end. This involved troubleshooting
SSL certificate configurations,
ensuring that both the website and
its back-end were properly secured
with SSL, and verifying that the site
was functioning securely via
HTTPS.