ITEM NO.

DESCRIPTION QUANTITY

1.0 EARTHWORKS
1.1 EXCAVATION WORKS
COLUMN FOOTING
WALL FOOTING
1.2 BACKFILL WORKS
COLUMN FOOTING
WALL FOOTING

SUBTOTAL:
2.0 STRUCTUTAL WORKS
2.1 CONCRETE WORKS
CEMENT
SAND
GRAVEL
GRAVEL BEDDING
2.1.2 COLUMN
CEMENT
SAND
GRAVEL
2.1.3 WALL FOOTING
CEMENT
SAND
GRAVEL
GRAVEL BEDDING
2.2 REBAR WORKS
2.2.1 COLUMN FOOTING
DEF. BAR 16mm x 6.0m
GI TIEWIRE Ga. 16
2.2.2 COLUMN
DEF. BAR 16mm x 6.0m
DEF. BAR 16mm x 6.0m
GI TIEWIRE Ga. 16
2.2.3 WALL FOOTING
DEF. BAR 16mm x 6.0m
DEF. BAR 16mm x 6.0m
GI TIEWIRE Ga. 16
2.2.4 SLAB ON FILL
DEF. BAR 16mm x 6.0m
GI TIEWIRE Ga. 16
SUBTOTAL:
3.0 ELECTRICAL WORKS
5.1 SWITCH
2 GANG SWITCH, ROYU
UTILITY BOX, 2 x 4
5.2 LIGHTS
30 WATTS LED LIGHT BULB
5.3 RECEPTACLE
3" RECEPTACLE
5.4 CONVENIENCE OUTLET
2 GANG CONVENIENCE OUTLET
UTILITY BOX, 2 x 4
5.5 ELECTRIC WIRE
PANEL BOARD, 4 HOLES
THHN WIRE, #12
THHN WIRE, #14
FLEXIBLE HOSE, 1/2"
UTILITY BOX, 4 x 4
SAFETY BREAKER, 50 AMPS
SAFETY BREAKER, 3O AMPS
SAFETY BREAKER, 20 AMPS
SAFETY BREAKER, 15 AMPS
ELECTRICAL TAPE
SUBTOTAL:

TOTAL MATERIAL COST


LABOR COST ( 40% x MATERIAL COSTS):
PROJECT SUPERVISION, MISCELLANEOUS, OVERHEAD ( 10% x MATERI

GRAND TOTAL:
UNIT UNIT COST TOTAL COST

cu.m. 250
cu.m. 250

cu.m 150
cu.m 150

215
200
600
600

215
200
600

215
200
600
600

290
55

163
113
55

163
113
55

163
55

85
15

110
22

45
15

330
30
20
7.5
20
166
143
143
143
24

, OVERHEAD ( 10% x MATERIAL COSTS):