DESCRIPTION QUANTITY
1.0 EARTHWORKS
1.1 EXCAVATION WORKS
COLUMN FOOTING
WALL FOOTING
1.2 BACKFILL WORKS
COLUMN FOOTING
WALL FOOTING
SUBTOTAL:
2.0 STRUCTUTAL WORKS
2.1 CONCRETE WORKS
CEMENT
SAND
GRAVEL
GRAVEL BEDDING
2.1.2 COLUMN
CEMENT
SAND
GRAVEL
2.1.3 WALL FOOTING
CEMENT
SAND
GRAVEL
GRAVEL BEDDING
2.2 REBAR WORKS
2.2.1 COLUMN FOOTING
DEF. BAR 16mm x 6.0m
GI TIEWIRE Ga. 16
2.2.2 COLUMN
DEF. BAR 16mm x 6.0m
DEF. BAR 16mm x 6.0m
GI TIEWIRE Ga. 16
2.2.3 WALL FOOTING
DEF. BAR 16mm x 6.0m
DEF. BAR 16mm x 6.0m
GI TIEWIRE Ga. 16
2.2.4 SLAB ON FILL
DEF. BAR 16mm x 6.0m
GI TIEWIRE Ga. 16
SUBTOTAL:
3.0 ELECTRICAL WORKS
5.1 SWITCH
2 GANG SWITCH, ROYU
UTILITY BOX, 2 x 4
5.2 LIGHTS
30 WATTS LED LIGHT BULB
5.3 RECEPTACLE
3" RECEPTACLE
5.4 CONVENIENCE OUTLET
2 GANG CONVENIENCE OUTLET
UTILITY BOX, 2 x 4
5.5 ELECTRIC WIRE
PANEL BOARD, 4 HOLES
THHN WIRE, #12
THHN WIRE, #14
FLEXIBLE HOSE, 1/2"
UTILITY BOX, 4 x 4
SAFETY BREAKER, 50 AMPS
SAFETY BREAKER, 3O AMPS
SAFETY BREAKER, 20 AMPS
SAFETY BREAKER, 15 AMPS
ELECTRICAL TAPE
SUBTOTAL:
GRAND TOTAL:
UNIT UNIT COST TOTAL COST
cu.m. 250
cu.m. 250
cu.m 150
cu.m 150
215
200
600
600
215
200
600
215
200
600
600
290
55
163
113
55
163
113
55
163
55
85
15
110
22
45
15
330
30
20
7.5
20
166
143
143
143
24